The invention relates to a deep
coal resource mining method. When the buried depth of a
coal bed is 800 to 3,000 meters, the thickness is more than 3 meters, an inclination angle is less than 10 degrees, and pressure is more than 10 Mpa, the most advanced
well drilling and cementing, high-temperature resistant and high-pressure well completion technologies in oil industry, vertical shafts and vertical shafts and gas injection and gas production combined methods are adopted; the method is characterized by comprising the following steps of: drilling three vertical shafts first, wherein the distance between the wells is 500 meters; drilling a horizontal well which is more than 500 meters deep from a secondary well to a central well, combusting a long tunnel which is 1,000 meters long and 10 meters wide by a special
combustion method, wherein the tunnel is a gasification tunnel special for gas production, observation, monitoring and the like, and drilling a plurality of overlong
horizontal wells in the reverse direction according to the inclination gradient of the
coal bed. The deep coal
bed gas and the deep coal are gasified underground, and exploited in a combined way, so the problem of shortage in
energy resources in China can be greatly improved, the method is a new environment-friendly, low-carbon, innovative new-
energy development technology, and low in cost and has great economic value, and investment is reduced.