The invention discloses a
dewatering well air bag plugging construction method for a high-water-level gravel layer foundation pit, and belongs to the technical field of foundation pit construction. The method comprises the steps that waterproof construction is conducted, double-layer SBS waterproof coiled materials are laid on the surface of a foundation pit
cushion layer for bottom sealing, a steel
pipe sleeve with a
water stop ring is pre-buried in the
cushion layer, a wide
water stop ring is welded to the middle of the exterior of the steel
pipe sleeve, and a
flange is welded to the top of the steel
pipe sleeve; selecting
water pumping equipment according to the
water level condition of the foundation pit, starting
water pumping, regularly detecting the
water level, and stopping the pump after the
water level is reduced to the design requirement; a multi-layer structure air bag is installed in the steel pipe sleeve, a thick steel plate with the
diameter smaller than that of the pipe well is welded to the bottom of the steel pipe sleeve, a rubber
gasket is arranged between a
flange at the top of the steel pipe sleeve and the blind plate, the blind plate is fixed through embedded bolts, and high-strength grouting materials are backfilled through embedded steel bars; by means of the
dewatering well air bag plugging construction method for the high-water-level gravel
bed foundation pit, underground
water seepage can be effectively prevented, the risk of the foundation pit is reduced, meanwhile, the equipment investment is reduced, the plugging period is shortened, and the
engineering efficiency is remarkably improved.