Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

877 results about "Water table" patented technology

The water table is the upper surface of the zone of saturation. The zone of saturation is where the pores and fractures of the ground are saturated with water. The water table is the surface where the water pressure head is equal to the atmospheric pressure (where gauge pressure = 0). It may be visualized as the "surface" of the subsurface materials that are saturated with groundwater in a given vicinity.

Simulation regulation and control system and method of percolation performance of aeration zone of river or lake

InactiveCN102359084AAccurate control of percolation performanceImprove simulation accuracyHydraulic modelsPeristaltic pumpEngineering
The invention discloses a simulation regulation and control system and method of the percolation performance of an aeration zone of a river or a lake and relates to the technical field of research on water and soil resources and environmental engineering. The system comprises a seepage control device, an aeration zone simulation device, an underground water level regulation and control device anda data monitoring system, wherein the seepage control device comprises a seepage control column and a regulation column; the upper layer of the regulation column is connected with the seepage controlcolumn through a flange plate, and the lower layer of the regulation column is connected with the aeration zone simulation device through a water supply pipeline and a peristaltic pump; the aeration zone simulation device comprises a plurality of soil columns connected in series, and the underground water level regulation and control device comprises an underground water supply Markov bottle and an underground water balancing device which are connected through an underground water supplementing pipeline, and the underground water balancing device is connected with the aeration zone simulationdevice through the underground water supplementing pipeline. By adopting the system and the method, the hierarchical accurate simulation of a layered soil structure is realized, the accurate monitoring of the percolation performance of the aeration zone of the river or the lake is realized, and the simulation precision of the different types of layered soil is greatly improved.
Owner:CHINA AGRI UNIV

Model for causing ground setting due to engineering environment effect and test method thereof

The invention discloses a model for causing ground setting due to an engineering environment effect and a test method thereof. The model comprises a model casing, simulation materials, measuring equipment, data acquisition equipment and water pressure controlling equipment, wherein the simulation materials for simulating a research area are placed in the model casing; the measuring equipment is arranged in the model casing for measuring parameters; the data acquisition equipment is connected with the measuring equipment and is used for acquiring and processing the parameters measured by the measuring equipment; and the water pressure controlling equipment is connected with the model casing and provides water pressure for the model casing and is used for simulating a water table aquifer and an artesian aquifer on a practical soil layer. the test method comprises the following steps of: determining influence factors to be researched; considering the size and the distance of a simulationbuilding and the plane size of the model casing according to the consolidation principle; determining various similar constants by adopting a dimensional method; determining the simulation materials;simulating the early-stage preparations of the test; and carrying out a simulation test. According to the invention, the ground deformation due to the underground water level lifting and the ground setting due to the engineering environment effect can be researched.
Owner:TONGJI UNIV

Landslide forecasting method capable of utilizing underground water levels and displacement real-time monitoring

InactiveCN103150871AOvercome the inability to analyzeOvercome limitationsAlarmsHazard monitoringPredictive methods
The invention belongs to the slope stability estimation and landslide hazard monitoring and early warning technologies. A landslide forecasting method capable of utilizing underground water levels and displacement real-time monitoring includes the following steps: (1) landslide preliminary reconnaissance and monitoring point selection; (2) monitoring arrangement and installation of equipment; (3) monitoring the landslide displacement and the underground water levels in real time and processing real-time monitoring data; (4) statistical analysis period by unit and confirming mean-value underground water level HO and a displacement speed VO; (5) confirming underground water level loading and unloading parameters and loading and unloading quantities; (6) confirming displacement speed response parameters and displacement response quantities; (7) confirming the landslide displacement speed and underground water level loading and unloading response ratio parameters and numbers; (8) applying the underground water levels and displacement speed loading and unloading response ratio to carrying out evaluating slope stability and monitoring and early warning. According to the landslide forecasting method capable of utilizing the underground water levels and the displacement real-time monitoring, produced erroneous judgement or mistake judgement that landslide physics mechanical parameters, boundary conditions and the like can not be confirmed difficultly and accurately by the transitional ultimate equilibrium mechanics appraisal method can be overcome effectively.
Owner:QINGDAO TECHNOLOGICAL UNIVERSITY

Method for biologically improving saline-alkali soil

The invention discloses a method for biologically improving saline-alkali soil. The method includes the steps of 1, deep ploughing and deep tilling the saline-alkali soil and making the saline-alkali soil exposed under the sun, 2, digging wells to lower the underground water level, 3, constructing tall ridges, 4, adding biological modifiers and turning over the soil after the biological modifiers are evenly broadcasted to effectively increase organic matter and nutrients in the soil, loosen the soil, enrich microbial flora in the soil, increase activity of the soil, and neutralize saline and alkaline through some activated adsorption base ions in the modifiers, and 5, planting oats to absorb part of the base ions in the soil, convert the base ions into substances needed by growth of the oats and reduce the content of saline and alkaline of the soil. The method can be suitable for saline-alkali soil formed due to different factors, and the saline-alkali soil is improved through physical measures, water conservation measures, utilization of the biological modifiers and plantation of the oats. The method has the advantages that improvement economic benefits can be achieved early, operation is easy to conduct, promotional reproductively is high, improvement is sustainable, effects can be accumulated, in situ saline-alkali soil improvement can be achieved, and improvement cost is reduced.
Owner:SHANGHAI CHUANGBO ECOLOGICAL ENG

Construction method for pulling-resistant and pressure-resistant slip casting pipe pile

InactiveCN101058979ASolve the problem of insufficient pullout resistance of pullout pilesImprove pull resistanceBulkheads/pilesCrushed stoneWater table
A construction method of casting pipe pile plucking with resistance to plucking and pressing, The invention relates to a construction method of pipe pile. The purpose of the invention is: solving the insufficient problems of resistance to plucking and pressing happened in the buildings which are built under complex geological conditions or under higher groundwater level geological strata and the problems are generated by bottom board percolating water due to buildings bottom board plucking resistance is insufficient, declination due to excessive eccentricity when design buildings and when design the resistance to plucking of new buildings. The invention drills hole downward on the buildings basic layer according the design height mark and bore diameter of pipe pile, lifts downward steel pipes or plastic pipes with slip casting hole after the drilled hole is completed, lifts downward reinforcement bar or reinforcement cage in the hole out the steel pipes or plastic pipes, lifts downward sands and broken stone between the outer wall of the steel pipes or plastic pipes and the hole wall. The invention has extremely distinctive action in buildings plucking-resistance and reinforcement, buildings declination correction and the foundation reinforcement project of house floors addition and reconstruction. The pile type in the invention is suitable for various geological strata, it can be used for the plucking-resistance, reinforcement and foundation reinforcement of prior buildings and the resistance-plucking pile construction of new buildings.
Owner:何新东

Multifunctional unsaturated soil permeameter and testing method thereof

The invention discloses a multifunctional unsaturated soil permeameter and a testing method thereof. The permeameter comprises a first bracket, a second bracket, a water supplementing device which is fixed on the first bracket and can perform up-and-down adjustment, and a soil sample permeation device which is fixed on the second bracket and can perform up-and-down adjustment, wherein the water supplementing device and the soil sample permeation device can be combined to form an underground water level rise simulation device, a flooding simulation device or a rainfall simulation device. The testing method comprises the following steps of: 1, performing underground water level rise, flooding and rainfall simulation tests, namely respectively performing the underground water level rise, flooding and rainfall simulation tests on the same tested soil sample by employing the underground water level rise simulation device, the flooding simulation device and the rainfall simulation device; 2, performing test data arrangement, and acquiring a permeation characteristic testing result of the tested soil sample. The multifunctional unsaturated soil permeameter is reasonable in design, low in investment cost, simple in operation, convenient in realization and good in using effect and can simply and rapidly finish the permeation characteristic testing process of unsaturated soil.
Owner:XIAN UNIV OF SCI & TECH

Device and method for improving saline land

The invention relates to a device and a method for improving a saline land, wherein, the device comprises an isolation layer arranged on the partial periphery of an afforestation-waiting area, and a main blind drain and an auxiliary blind drain used for draining salt and alkali and arranged above the critical water level in the afforestation-waiting area, and the water outlets of the main blind drain and the auxiliary blind drain lead to a water-collecting well, the level surface of which is lower than the blind drains. The method comprises the flowing steps: arranging the isolation layer, laying the blind drains, constructing the water-collecting well, and improving physical and chemical soil properties. The invention has the advantages that the invention can fully use various solid wastes as main materials available to improve the saline land and conduct the improvement on the saline land through the combination of physical, chemical, biological methods; the various solid wastes can be used for constructing the main blind drain, the auxiliary blind drain and the water collecting well, and controlling the water table; a tree microarea is planted, physical and chemical soil properties on a surface layer are improved, and the salt content of the soil is reduced; and indigenous plants and new plant species with the saline-alkali resistance are selected for being planted, and the forestry afforestation and the landscaping are achieved through the post-stage nursing, long-term salinity control and alkaline control measures.
Owner:北京首创大气环境科技股份有限公司

Method for supporting existing building underground added storey through original pile foundations

The invention discloses a method for supporting an existing building underground added storey through original pile foundations. The method comprises the steps that the pile foundations of the existing building underground added storey are end bearing piles; before soil around piles are excavated, foundation pit supporting and protection and underground water level reduction preparation work are carried out; the soil around the piles below an existing building is excavated; when the stability of the pile can not satisfy safety requirements, supports are installed between adjacent piles; a plurality of supports are arranged, and the soil around the piles is excavated until a designed elevation is reached; a newly added bottom plate of a basement is poured, and serves as a bearing platform of the pile foundations below the building; a support on the bottom storey is dismantled, and reinforcing steel bars are assembled around the piles from bottom to top; the piles are reinforced and reconstructed to form posts of the basement, and beams and plates of the basement are constructed at the same time; supports in all storeys are dismantled continuously, posts, beams and plates in the upper storey are constructed until the ground; soil is backfilled to the outer side of the basement. According to the method for supporting the existing building underground added storey through the original pile foundations, the existing building is provided with friction piles, new pile foundations are additionally arranged through press piles or bored piles arranged between the original pile foundations, the bearing platform is connected with the original piles through the bearing platform, and a new basement is additionally arranged according to an end bearing pile method.
Owner:山东水发市政建设有限公司

Grow method of pearl guava

InactiveCN101401535AGood sale priceThick fruit shapeFertilising methodsCultivating equipmentsYoung treeCataphyll
The invention belongs to the technical field of agricultural planting, and in particular discloses a method for planting pearl guavas, which comprises the following steps: (1) the planting garden for the pearl guavas is planned, gutters are dug to drain stagnant water and reduce underground water level, a gutter is dug every 6.5 to 7 meters in the garden, the row spacing of plants in each border is between 3.5 and 4 meters, the row spacing of plants on two sides of the gutters is three meters, the space of the plants is between 2.5 and 3 meters, the plants are all planted through supporting piers, the height of the piers is between 25 and 30 centimeters, the pearl guavas are grafted, bred and fixedly planted mainly in spring; (2) fertilizer is applied, wherein the pearl guavas are fertilized by taking earthworm excretion as the basic fertilizer and are sprayed by microelement foliage fertilizer such as zinc, boron and molybdenum after fertilizer; and (3) field management work is carried out, including 1. controlling the time of fruiting of young trees, 2. reasonably keeping fruits and controlling the flowering and fruiting, and 3. wrapping the fruits by bags. The pearl guavas planted by the method have incrassated and broad leaves, big and stout fruits, sweet taste without acid taste, good color and luster of the fruits, juicy and crisp pulp, good mouthfeel and high yield, are suitable for standardization planting on a large scale.
Owner:黄国伦

Method for dewatering large-area foundation pit on silt stratum

The invention discloses a method for dewatering a large-area foundation pit on a silt stratum, which belongs to modification of existing methods of dewatering light well points and includes the steps: firstly, setting well points, and determining spacing and depth of the well points according to dewatering depth and dewatering area; secondly, constructing the well points; thirdly, installing a dewatering system; fourthly, cleaning up wells; fifthly, operating the dewatering system to pump water; sixthly, regionally repeating the steps from one to five for dewatering a large-area foundation pit, lowering the water level to an expected depth, and maintaining the water level; seventhly, dismantling the dewater system within the foundation pit, maintaining the system to operate until the foundation pit is backfilled above the underground water level, and maintaining the underground water level to meet demands during construction; and eighthly, dismantling the foundation pit and maintaining the dewatering system. Mutual coupling among the well points is fully utilized, so that dewatering efficiency is improved. Compared with conventional light well point dewatering methods, the method is short in construction period, low in manufacturing cost and effective.
Owner:HEBEI CONSTR & INVESTIGATION RES INST

Marine environment and dynamic load coupling test equipment system

InactiveCN103743587AReal actual serviceImplement loading testWeather/light/corrosion resistanceStructural/machines measurementEngineeringCompressed air
The invention discloses a marine environment and dynamic load coupling test equipment system, which comprises marine environment simulation environment box equipment (1) and an electro-hydraulic servo dynamic and static testing machine (2), wherein the electro-hydraulic servo dynamic and static testing machine comprises a testing machine loading head which applies power load to a test piece, a dynamic load control circuit and an electronic control cabinet; the electronic control cabinet is used for providing saline water and compressed air for a saline water spraying device; the electronic control cabinet is connected with the saline water spraying device via an air pipe and a water pipe; the test piece is fixedly arranged on a test piece support in the body of the marine environment simulation environment box; and the test piece is subjected to loading compression, stretching and bending deformation loading under different environments of saline water dipping, saline water fluctuation and saline water atomization. According to the marine environment and dynamic load coupling test equipment system disclosed by the invention, dynamic load as well as the environments of saline water dipping, saline water fluctuation and saline water atomization can be simultaneously provided for the experiment test piece, the characteristics of marine structure service under the marine environment conditions, such as marine underwater areas, water table fluctuation areas, splash areas and the like, can be simulated.
Owner:CCCC FOURTH HARBOR ENG INST +3

Side slope dynamic stability coefficient determination method based on underground water level and displacement monitoring

The invention discloses a side slope dynamic stability coefficient determination method and technology based on underground water level change and displacement monitoring data. The landslide formation motivation and mechanism are cross coupled with displacement response information change and an evaluation method thereof. A nonlinear unload and load response ratio parameter prediction model is established so that the side slope stability coefficient determination method based on underground water level and displacement change is established. According to the landslide displacement prediction method, the idea of a conventional displacement time sequence prediction method that only landslide displacement or displacement rate is selected to act as monitoring and evaluation parameters is changed, and simultaneous monitoring and integration of landslide underground water level and displacement or displacement rate are put forward so that the coupling integration power prediction parameter and evaluation method of landslide underground water level and displacement or displacement rate is confirmed. The limitation that a static limit mechanics evaluation method cannot analyze and evaluate the change rule of side slope stability along with time can be overcome by the method, and a defect that the conventional displacement time sequence prediction method cannot analyze and evaluate the landslide formation mechanism and motivation can also be overcome by the method.
Owner:QINGDAO TECHNOLOGICAL UNIVERSITY

Household type new air machine set

The invention discloses a household type new air machine set. The household type new air machine set solves the problem that PM 2.5 cannot be effectively filtered and outlet air temperature and moisture content are not adjustable in the prior art. The household type new air machine set comprises an outdoor air inlet, a new air outlet, an indoor air inlet, an air exhaust opening, a PM 2.5 filter, a heat recycling device, an air return filter, a water meter cooler, an evaporator of a compressor, a condenser of the compressor, an adjusting 3-way valve, a throttle valve, a forced draught blower, an air exhaust machine, a controller, and an electric bypass ventilation valve. According to the household type new air machine set, through a built-in compressor evaporation and refrigeration method, combined with a water table cooler and the condenser, depth moisture elimination and temperature adjustment are conducted to new humid air entering the machine set, through the linkage of a temperature and humidity detector and the electric bypass ventilation valve, frosting of a heat recycling module is prevented, and it is guaranteed that humidity and temperature of the new air machine outlet air are stable and adjustable. The household type new air machine set provides a reliable and energy saving processing method for a temperature and humidity independent control adjustable system, and can be applied in green buildings and meets the using standards of the green buildings.
Owner:中安瑞材(北京)科技有限公司

Saline-land salt-water drip-irrigation medlar cultivation method

The invention provides a method for cultivating Chinese wolfberry in a saline and alkaline land through drip irrigation with saline water, which comprises ridging, planting and irrigation management, and is characterized by comprising: A, a step of manual ridging; B, a step of planting, in which the row spacing is 3 meters and the plant spacing is 1 meter; C, a step of drip irrigation zone setting, in which a single drip irrigation zone is arranged in a single ridge; D, filming covering and irrigation, in which spring irrigation is performed after film covering with local underground saline water in a mount which is four times of that used for daily irrigation continuously for three days till the water accumulates to a fixed amount of 16 millimeters; E, a step of pruning the Chinese wolfberry in a growth season; and F, winter irrigation, in which winder irrigation is performed once after the growth season of the Chinese wolfberry with 16 millimeters of water. According to characteristics of a saline and alkaline land in the groundwater area, the method maintains the water potential in the soil of the root area of the Chinese wolfberry at a constant higher value through ridging, filming covering and saline water drip irrigation and other measures to ensure Chinese wolfberry absorbs water normally and grows, thereby providing a good growing environment for the Chinese wolfberry and increasing the output and quality of medlar. Meanwhile, irrigation with local underground saline water reduces the water level of underground water and reduces the risk of further raising the water level of ground water due to irrigation with extraneous water.
Owner:INST OF GEOGRAPHICAL SCI & NATURAL RESOURCE RES CAS +1

Soil column simulation experiment device aiming at reclaimed soil and coal ash matrix in mining area

The invention discloses a soil column simulation experiment device aiming at reclaimed soil and coal ash matrix in a mining area. The soil column simulation experiment device comprises a transparent column body, a plurality of flange disks, a movable plate, a stainless steel wire gauze, a base disk, a bracket and an underground water level simulation component, wherein the base disk is fixed at one end of the column body; the bracket is connected with the base disk; the column body has a multi-section structure and consists of a plurality of sub column bodies; two adjacent sub column bodies are fixedly connected by one of the flange disks; the movable plate and the stainless steel wire gauze are accommodated in a groove of the flange disk close to the bottom; and the underground water level simulation component is connected to the bottom of the base disk. The soil column simulation experiment device has the advantages that when capillary water rises, experiments such as soil water and salt movement under an atmosphere rainfall condition, soil water and salt movement under an evaporation condition and soil water and salt movement under an underground water level change control condition can be simulated; and the water and salt movement in the coal ash matrix of the reclaimed soil filled by the mining area coal ash can be dynamically observed through the device, so that a reclaiming mode suitable for crop growth can be found out.
Owner:ANHUI UNIV OF SCI & TECH

Low-lift high-flow reversible tubular pump with asymmetric SX type blades

The invention relates to a low-lift high-flow reversible tubular pump with asymmetric SX type blades. The low-lift high-flow reversible tubular pump comprises a forward water inlet runner, a rotating wheel, a guide blade, a gear box, a reversible motor, a bulb body, a sleeve pipe and a reverse water inlet runner. The low-lift high-flow reversible tubular pump is characterized in that the rotating wheel comprises the blades, a hub and a runner cone, wherein the blades are evenly arranged on the hub in the circumferential direction, and the runner cone is arranged on the reverse sluicing side of the hub; the blades are in a spatial warping SX shape, the axial midsection wing sections of the blades are in an asymmetric S shape, the guide blade is a movable guide blade oblique relative to the spatial curved surface, and the guide blade and the rotating paddle-type blades achieve the cooperation function. According to the low-lift high-flow reversible tubular pump, the demands that the water flow in a water pumping working condition and the water flow in a power generating working condition of the reversible tubular pump are opposite and the dual working conditions of water pumping and power generating can be met by one rotating wheel are met, and it is ensured that the efficiency in the two working conditions reaches the best. The reversible tubular pump is suitable for various reversible tubular pump stations with the water table drop ranging from 2 m to 5 m, and the efficient development and utilization of water resources can be achieved.
Owner:HOHAI UNIV

Simulation test model device for studying hyporheic exchange under drive of flood pulse and using method thereof

InactiveCN104697742ARealize the flood pulse driving effectConstant water levelHydrodynamic testingWater dischargeEngineering
The invention discloses a simulation test model device for studying hyporheic exchange under drive of flood pulse and a using method thereof. The simulation test model device comprise a trough body, an upstream ground surface water supplementing system, an underground water control box and a flood pulse driving device. A partition plate capable of dividing the trough body into a water level control chamber and a water discharging chamber, and a river nearby beach model is arranged in the water level control chamber. The underground water control box can perform hyporheic exchange with the river nearby beach model. The flood pulse driving device comprises a lifting piston capable of lifting in a partition plate and a periodic waveform driving device. The lifting piston can periodically lift under the drive of the periodic waveform driving device and enables a flood peak process line in the water level control chamber to change periodically. After the simulation test model device and the using method are adopted, the upstream ground surface water level periodically and proportionally changes along the flood peak process line under the drive of the periodic flood pulse, and the downstream underground water level is kept constant and is approximate to the hyporheic exchange situation of a natural flooding beach land.
Owner:HOHAI UNIV

Device and setting method for measuring underground water level of vacuum drainage prepressing sealing membrane

The invention discloses a device and setting method for measuring the underground water level of a vacuum drainage prepressing sealing membrane. The device is composed of water level sighting tubes embedded in drill holes. A stainless steel guide rod for displacement of a magnetic floating ball is arranged in an airtight water level pipe, a reed pipe-resistance sensing component is arranged in an inner cavity of the stainless steel guide rod, a data line is led out through a sealing screw structure on the top of the stainless steel guide rod, a fixing and limiting flange is arranged at the top end of the stainless steel guide rod, and a lower end limiter is arranged at the lower end of the stainless steel guide rod. A sealing top cover and a line outgoing device are arranged at the top end of the airtight water level pipe. The data line is connected with a liquidometer electrical signal receiving and reading instrument through the line outgoing device. A liquidometer is fixed in the manner that a steel wire rope passes through a suspension point and penetrates through the sealing top cover, and the liquidometer is connected with a steel wire rope concentrator. The lower portion of the airtight water level pipe is sleeved with a perforated pipe with pores, and the airtight water level pipe is covered with non-woven geotechnical cloth. A vacuum meter is communicated with the interior of the airtight water level pipe through a vacuum meter plastic guide pipe. The device is easy to install and measure and capable of carrying out automatic measuring and measuring the actual underground water level in soft soil under the vacuum effect, and basic data can be more reliable.
Owner:NANJING HYDRAULIC RES INST

High speed railway embankment structure in salty soil regions

The invention discloses a high speed railway embankment structure in salty soil regions. The high speed railway embankment structure comprises a ground stabilization body arranged in soft foundation, wherein a reinforced mattress layer is laid above the ground stabilization body; a salty soil isolation layer is laid above the reinforced mattress layer; a filling embankment is laid above the salty soil isolation layer. The high speed railway embankment structure is simple in structure and convenient to construct, the reinforced mattress layer on the base is fully utilized as a carrier, the isolation measures are taken through the salty soil isolation layer made by taking a composite geomembrane or a capillary drain board as a main body, the high speed railway embankment structure is small in layer thickness and relatively low in material price and has obvious advantages compared with the measures of excavating a great quantity of salty oil, reducing underground water level, permeating water and soil or isolating asphaltic sand, the project investment can be obviously reduced, the environmental pollution is alleviated, capillary water of the salty oil can be effectively prevented from eroding the embankment body, and high service performance and long-term stability of the embankment engineering are guaranteed.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP

Construction method by adopting dewatering and water recharging to control sedimentation surrounding deep foundation pit

The invention discloses a construction method by adopting dewatering and water recharging to control sedimentation surrounding a deep foundation pit, which comprises the following steps that: quantity and depth of dewatering wells are accurately determined by calculating water inflow of the deep foundation pit under the action of pressure water and the construction quality of finished wells is guaranteed; aquifers and pervious beds of the soil outside the foundation pit are determined through a geological exploration report, a target soil layer to be recharged is calculated, and a steel sleeve is sent to the target soil layer through a method for drilling a slope inside the foundation pit; a high-level water tank is arranged on the top part of the foundation pit, the water outlet of the high-level water tank is connected with a recharging well opening, water inside the foundation pit is pumped by a high-pressure pump to the high-level water tank and then to be pressed to the recharging well through the high-level pressure and to reach the recharged target soil layer. By utilizing the method, the underground water level inside the foundation pit can be maintained at a set water level, so a favorable condition can be created to the project construction. At the same time, the underground water level outside the foundation pit is adjusted to be stably maintained within a warning level, so powerful guarantee can be created for the safety of roads and buildings outside the foundation pit.
Owner:中铁二十二局集团第三工程有限公司

Comprehensive monitoring and early warning system and method for floor water inrush in coal working face

The invention relates to a monitoring and early warning system and method, belongs to the technical field of coal mine monitoring, and particularly relates to a comprehensive monitoring and early warning system and method for floor water inrush in a coal mining working face. The comprehensive monitoring and early warning system and method mainly focus on real-time monitoring and graded early warning of a goaf part during the recovery process and after the recovery process of a mine coal mining face, based on a "lower three zones" theory, and a numerical simulation method is combined to determine monitoring positions, a microseism monitoring subsystem is used for monitoring the damage depth of a floor in the coal mining working face, a multi-frequency continuous electrical monitoring subsystem is used for monitoring the height of water table of confined water in the floor of the coal mining working face, the distance between the lowest point of floor damage and the highest point of height of water table of the confined water is calculated; a floor water inrush coefficient method is used for dynamically calculating the water inrush coefficient of the floor of the entire working surface; and the level of floor water inrush early warning is determined through different water inrush coefficients, early warning indication of stress and strain, early warning indication of water temperature and water pressure, and early warning is performed.
Owner:XIAN RES INST OF CHINA COAL TECH& ENG GROUP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products