Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

21810results about "Excavations" patented technology

An integrated coastal slope monitoring method based on multi-parameter collaborative recognition

To significantly improve the prediction accuracy, response speed and management efficiency of large river bank slope disasters, an integrated bank slope monitoring method based on multi-parameter collaborative recognition is proposed. The solution includes step S1 of synchronously collecting data on bank slope displacement, pore water pressure, inclination angle, vibration frequency and environmental temperature and humidity to form an original monitoring dataset and construct a multi-parameter collaborative recognition network; step S2 of using a multi-modal data fusion algorithm to generate a fusion data matrix including spatiotemporal correlation features and perform spatiotemporal data alignment and outlier cleansing; step S3 of combining a geomechanical parameter library and a past disaster case library to output a risk level map and perform dynamic risk assessment model analysis; and step S4 of triggering a multi-level early warning mechanism and generating linked control commands including treatment suggestions to perform multi-level early warning and linked control.
Owner:CHANGJIANG RIVER SCI RES INST CHANGJIANG WATER RESOURCES COMMISSION

Intelligent ecological restoration system, method and device for high and steep slope of strip mine in arid region

The invention provides an intelligent ecological restoration system, method and device for a high and steep slope of a strip mine in an arid region. Comprising a data acquisition layer which realizes real-time acquisition of multi-dimensional environmental data through InSAR satellite remote sensing, a ground sensor network and unmanned aerial vehicle multispectral imaging; the transmission layer adopts LoRa and 5G hybrid networking; the platform layer is used for constructing a slope stability prediction and restoration scheme optimization platform based on a digital twinborn model and a deep learning algorithm; and the application layer is used for remotely controlling the repairing device through a mobile terminal and a Web terminal and monitoring the repairing progress in real time. The problems that a traditional restoration technology is poor in adaptability, low in vegetation survival rate, high in ecological restoration cost, insufficient in monitoring technology application, insufficient in monitoring feedback mechanism, insufficient in intelligence, long in ecological restoration period and the like are solved.
Owner:CENT SOUTH UNIV +1

Foundation pit deformation real-time monitoring method, device and system based on BIM technology

The invention relates to the technical field of foundation pit detection, and discloses a foundation pit deformation real-time monitoring method, device and system based on a BIM technology. The method comprises the steps of sensor layout and data acquisition, data transmission and preprocessing, nonlinear dynamic model construction, data fusion and optimization, foundation pit deformation prediction, BIM visual presentation and data display, intelligent support optimization and construction scheme adjustment. The device comprises a sensor assembly, a data acquisition interface, a 5G communication module, a central processing unit, a fusion and prediction unit, a man-machine interaction interface and an execution mechanism interface. The system comprises a data acquisition module, a data transmission module, a data processing module, a deformation modeling module, a data fusion module, a deformation prediction module, a visualization module and an intelligent regulation and control module. By adopting the multi-type sensor fusion and data assimilation technology, the high-precision and low-error foundation pit deformation monitoring effect is achieved, the monitoring data is more stable, and the monitoring precision is ensured to meet the engineering safety management requirement.
Owner:CHIFENG BRANCH OF CHINA NATIONAL NUCLEAR LAND ECOLOGICAL TECHNOLOGY CO LTD

Foundation pit safety early-warning method based on multi-source monitoring data fusion

Disclosed in the present invention is a foundation pit safety early-warning method based on multi-source monitoring data fusion. The method comprises: first constructing a foundation pit safety evaluation indicator system, and acquiring cumulative values and change rates of multi-source time-series monitoring indicators; then determining a foundation pit safety grade identification framework, using multi-source time-series monitoring data as different evidence, and performing normalization processing; then, on the basis of the multi-source time-series monitoring data, determining basic probability assignment values in the identification framework; then, separately calculating weights of multi-source monitoring indicators, and credibility; and finally, fusing multi-source monitoring data of a foundation pit, in order to obtain a foundation pit safety evaluation grade. The present invention is characterized in that the importance of different monitoring indicators and the credibility of evidence are taken into consideration while making full use of actually measured monitoring data of a foundation pit, thereby ensuring that foundation pit safety state identification is objective, avoiding interference from subjective human factors, and effectively overcoming the defects of a traditional D-S evidence theory.
Owner:GUANGZHOU INSTITUTE OF BUILDING SCIENCE CO LTD +1

Construction method suitable for vegetation restoration of bare rock slope

PCT designated stage expiredWO2025000167A1ExcavationsReceptacle cultivationRevegetationDrip irrigation
The present invention provides a construction method suitable for vegetation restoration of a bare rock slope, characterized by comprising the following steps: S1, preparation of a treatment area: before actual construction, preparing an area to be treated using a combination of mechanical and manual means; S2: providing a plant vine climbing net; S3: anchor rod construction: implementing on a rock slope surface with an inclination greater than 75°, wherein the slope surface should be drilled from top to bottom, the depth of the drilling is determined according to properties of the rock, a self-spinning resin anchor rod is fixed in a drilled hole on the slope surface with cement slurry, leaving a small part for hanging a galvanized gabion multidimensional mesh cage; S4: building a plant growth chamber, a gabion retaining wall and a construction system apparatus; S5: filling a matrix; S6: vegetation arrangement: selected dominant plant species must be drought-tolerant, barren-tolerant and fast-growing, and have strong sprouting ability and coverage capacity. The present invention integrates slope protection, intelligent water collection, water storage and drip irrigation apparatuses, matrix improvement, and vegetation arrangement, thereby ensuring the effectiveness of the restoration.
Owner:BEAUTIFUL CHINA ECOLOGICAL ENVIRONMENT TECHNOLOGY CO LTD

Cooperative monitoring device and method for large deep foundation pit complex supporting system

The invention discloses a cooperative monitoring device and method for a large deep foundation pit complex supporting system, and relates to the technical field of foundation pit supporting. The device comprises a multi-dimensional sensor network module, a BIM-GIS digital twin platform module, an intelligent analysis and early warning module, a construction collaborative decision module, a data backup and recovery module and a remote monitoring and management module. The method comprises the following steps: step 1, carrying out multi-source data space-time registration; step 2, dynamically constructing a digital twinborn model; step 3, coupling risk assessment; step 4, construction collaborative optimization; according to the technical scheme, the method comprises the following steps of data processing, data quality control and system performance evaluation, through three innovations of deep coupling of multi-source data, dynamic model correction and intelligent collaborative decision making, a'monitoring-analysis-decision-execution 'full closed loop is constructed, technical breakthroughs are achieved in complex working condition adaptability, early warning real-time performance and construction safety, and the method has remarkable engineering application value.
Owner:CHAOFENG STEEL STRUCTURE CO LTD

Novel large-angle steep rock slope ecological restoration method

The invention relates to the technical field of ecological restoration, in particular to a novel large-angle steep rock slope ecological restoration method, which comprises the following steps of: firstly, acquiring high temporal-spatial resolution monitoring data of a slope ecological system through multi-source data fusion such as unmanned aerial vehicle remote sensing, ground three-dimensional laser scanning and Internet of Things monitoring; then constructing an end-to-end deep learning model fused with spatial-temporal features, and realizing adaptive learning and multi-scene diagnosis of a slope ecological degradation mode; on the basis, technologies such as intelligent decision making, process optimization and visual management and control are further coupled, an ecological restoration whole process intelligent analysis platform and a business cooperation mechanism are constructed, and the intelligence and automation level of ecological restoration is remarkably improved.
Owner:SICHUAN SHIMIAN COUNTY HENGDA POWDER MATERIAL CO LTD

Deformation and stress intelligent monitoring system for deep foundation pit supporting structure

The invention discloses an intelligent monitoring system for deformation and stress of a deep foundation pit supporting structure, relates to the technical field of deep foundation pit supporting monitoring, and is used for solving the problem of poor early warning of the deformation risk of the supporting structure. According to the method, high-density acquisition of inclination angle, deformation and stress data of a key area of a deep foundation pit supporting structure is realized by constructing a sensitivity-driven measuring point layout mechanism; the method comprises the following steps: constructing an inversion model based on stress and strain rates, obtaining a structural equivalent modulus, extracting a change rate of the structural equivalent modulus, judging a rigidity evolution trend, further constructing a modulus change rate space field, setting a region threshold by combining a disturbance sensitivity factor, realizing abnormal region identification and spatial positioning, and extracting structural response behavior information on the basis. And driving a system to trigger a grading response strategy according to an analysis result of the structure response behavior information, thereby realizing intelligent early warning of local deformation and stress instability of the deep foundation pit supporting structure.
Owner:CHINA CONSTR 4TH ENG BUREAU 6TH +2

Ecological restoration method for mine slope

The invention relates to the technical field of mine side slope restoration, in particular to a mine side slope ecological restoration method which comprises the following steps: S1, performing field investigation and evaluation, and performing comprehensive surveying and mapping on the landform of a mine side slope by using a high-precision surveying and mapping instrument; the anti-seismic effect and the prevention and control of water and soil loss are prominent, the anti-seismic performance is enhanced through deep rock mass anchoring reinforcement, large-diameter and high-strength anchor cables are adopted, bed rock is deeply stabilized, prestress is applied, the integrity of the rock mass is enhanced, reinforced concrete anti-sliding piles are arranged near potential sliding surfaces, the anti-sliding capacity is improved, and the anti-seismic effect is achieved. When a damping ditch is dug between a slope top and a blasting area, loose gravel is filled to weaken vibration energy, the anti-seismic performance of the side slope is comprehensively improved, and water and soil loss is prevented, a drainage system is constructed to intercept surface water, vegetation is reasonably configured, planting grooves and fish-scale pits are arranged, an ecological restoration composite structure layer is built, and a grass spraying and planting and vine climbing system is combined. And water and soil loss is reduced through multiple measures.
Owner:YELLOW RIVER INST OF HYDRAULIC RES YELLOW RIVER CONSERVANCY COMMISSION

Deep and large foundation pit monitoring method and system, program product and storage medium

The invention provides a deep and large foundation pit monitoring method and system, a program product and a storage medium, and relates to the technical field of foundation pit detection. The GPS positioning device collects foundation pit slope crest displacement data, the monitoring sensor network collects deep horizontal displacement data, the two data types complement each other, comprehensive information of surface and internal deformation of the foundation pit is provided, and the generated deep horizontal displacement curve chart visually displays the displacement conditions of the supporting structure at all depths. A potential weak area can be identified, a foundation pit excavation response data acquisition device is arranged at the maximum stress part, response data of a key position is obtained, and the quantitative index of overall deformation is provided by measuring and monitoring the position change of a central point of a sensor network and calculating the deformation amount of the foundation pit. According to the multi-dimensional and multi-type data acquisition and integration method, the description comprehensiveness of the foundation pit environment is improved, potential risks can be judged more accurately, and limitation caused by a single data type is overcome.
Owner:ANENG CHONGQING CONSTR DEV CO LTD

Grouting method and system for enhancing stability of strip mine slope

The invention discloses a grouting method and system for enhancing strip mine slope stability, and belongs to the technical field of slope protection. The grouting method comprises the steps that early-stage data are pre-collected, and an analysis model is established; grouting is designed according to a model analysis result; a pressure-resistant grouting pipe is installed and connected with a grouting pump; grouting parameters are adjusted in real time according to feedback of the sensor; after grouting, all data in the grouting holes are analyzed; outputting a slurry permeation three-dimensional cloud picture, a stress change curve and a stability evaluation index; and storing all monitoring data and model parameters. A cyclic self-adaptive system is formed, it is ensured that the grouting process is efficient and accurate, the overall stability is improved for heterogeneous rock mass, dependence on a static geological report is reduced, and therefore the problem that grouting parameters depend on engineering experience or conservative of the static report is avoided.
Owner:CHINA MINMETALS CHANGSHA MINING RES INST

Soft soil deep foundation pit earth excavation construction scheme planning method and system

The invention relates to the technical field of design analysis, in particular to a soft soil deep foundation pit earth excavation construction scheme planning method and system.The soft soil deep foundation pit earth excavation construction scheme planning method comprises the following steps that a three-dimensional geological model is built based on geological exploration data, and rheological parameters, shear strength parameters and permeability coefficients of all soil layers are extracted to serve as layering parameters; according to the layering parameters and preset supporting structure rigidity parameters, a soil body rheological rate compensation coefficient is calculated, and an earthwork block excavation scheme with the grading thickness difference is generated; and in the excavation process, the displacement rate and pore water pressure data of the supporting structure are collected in real time, and when a monitoring value exceeds a preset threshold value, a dynamic adjustment instruction of the block excavation scheme is triggered. According to the method, the layering thickness and the blocking form are intelligently controlled according to different sensitivity levels, the matching coping capacity for soft soil instability inducements is improved, and the limitation that a single physical parameter dominates in traditional blocking design is broken through.
Owner:长大市政工程(广东)有限公司

Ecological slope protection structure and construction method thereof

The invention discloses an ecological slope protection structure and a construction method thereof.The ecological slope protection structure comprises an ecological vegetation layer formed by splicing a plurality of units, and a vegetation planting groove is formed in each unit; the regulation and control layer comprises a honeycomb-shaped coarse aggregate layer, a corrugated plate laminated middle aggregate layer and a fractal tree-root-shaped fine aggregate layer of which the porosity decreases progressively from top to bottom; the drainage mechanism comprises a drainage channel in the ecological vegetation layer, a porous drainage framework and a water collecting well arranged at the slope bottom; the anchoring mechanism comprises a plurality of umbrella-shaped expansion anchor rods, and the lower end of each anchor rod is perpendicular to the slope surface and is inserted into the slope surface soil layer; the lower end of each anchor rod is provided with four sets of extensible 120-degree arc-shaped anchor flukes, and the surfaces of the anchor flukes are provided with bionic ground gripping grooves consistent with the anti-sliding ribs in trend. By innovatively designing the ecological vegetation layer, the regulation and control layer, the drainage mechanism and the anchoring mechanism, stability of the slope protection structure in mechanical property and sustainable development of the ecological environment are achieved, and coordination and unification of vegetation growth and slope stability are promoted.
Owner:SINOHYDRO BUREAU 6 CO LTD

A construction device for foundation pit dewatering

A foundation pit dewatering device includes the support shell (1), which is fitted with a lifting ring (11) to connect the dragrope of the lifting mechanism. The outer side of the support shell (1) is provided with an auxiliary walking mechanism (2) to stabilize it downward during hole boring. A support rod (3) runs through the bottom of the support shell (1). The support rod (3) is connected at the bottom with a bracing mechanism (4) to support the lowered well pipe down to the bored hole. The support rod (3) is provided with a connection mechanism (5) to connect the lower well pipe to the upper one tightly. This foundation pit dewatering device can effectively save manpower and ensure the stability of the lowing well pipe, and at the same time, greatly improve the construction efficiency of deep well point dewatering.
Owner:OVERSEAS ENG CO OF CHINA RAILWAY NO 5 ENG GRP CO LTD

In-situ reconstruction and extension structure of embankment and construction method thereof

An in-situ reconstruction and extension structure of an embankment and a construction method thereof are provided. The structure includes a stepped slope excavated on an existing side slope. A gradient of the stepped slope is the same as that of an extension side slope, the stepped slope is individually intersected with top and bottom planes of existing side slope; a toe of existing side slope is taken as a toe of the extension side slope, and gradient of the extension side slope is determined according to positions of the toe and an expanded width. An outer side of stepped slope is filled with a geogrid reinforcement layer in a layered manner, a slope protection structure is arranged on an outer side of the geogrid reinforcement layer to form extension equivalent side slope; a drainage system is arranged at a bottom of the extension side slope.
Owner:CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY

Foundation pit slope protection pile concrete strength evaluation and intelligent reinforcement integrated method and system

The invention relates to the technical field of civil engineering, and discloses a foundation pit slope protection pile concrete strength evaluation and intelligent reinforcement integrated method which comprises the following steps: S1, data acquisition and transmission: acquiring a slope protection pile structure state and environmental parameters in real time through a multi-source sensor network, the sensor network comprises a mechanical sensor, an environment sensor and a hydrological sensor which are deployed in a spatial distribution manner; s2, data preprocessing and feature extraction: performing space-time fusion processing, including noise suppression, space-time reference unification and multi-dimensional feature extraction, on the acquired multi-source sensing data, and generating a structured feature matrix; according to the technical scheme, the multi-source sensor network and the deep learning model are combined, the strength of the foundation pit slope protection pile concrete is monitored and evaluated in real time, the accurate and lossless strength prediction effect is achieved, the problems of destructive testing and precision limitation are avoided, and the test efficiency is improved. The defects of low precision and poor real-time performance under complex geological conditions in the prior art are overcome.
Owner:BEIJING ZONGJIAN TECH CO LTD

Design method and system for water inrush risk prevention foundation pit support structure

The invention discloses a method and a system for designing a water inrush risk prevention foundation pit support structure, and relates to the technical field of foundation pit construction safety. The system can comprehensively obtain karst cave and crack information in a karst stratum and generate an initial geological data set through a multi-scale comprehensive investigation technology under complex geological conditions; compared with a traditional geophysical prospecting method, the method has the advantage that the accuracy of geological forecast is greatly improved. The system further accurately evaluates underground risks by analyzing the karst cave development degree, the crack filling condition, the soil layer bearing capacity and the underground water level fluctuation value, monitors the foundation pit deformation condition in real time, and discovers potential problems in time. In addition, the system classifies the water inrush risk to generate different reinforced support enclosure structures and densities, and drainage points are arranged, so that the serious water inrush risk can be effectively handled, and the foundation pit is prevented from being further damaged. In conclusion, the probability of occurrence of the problems of water burst and collapse is effectively reduced, and then the construction progress and safety are guaranteed.
Owner:SHENZHEN GEOTECHNICAL COMPREHENSIVE SURVEY & DESIGN CO LTD

Dynamic optimization construction method for tamping side ditch

The invention discloses a dynamic optimization construction method for side ditch tamping, and belongs to the technical field of side ditch tamping. The dynamic optimization construction method comprises the following steps that deformation possibly generated by a side slope and the lateral loss degree of backfill soil are evaluated, and a side ditch area is divided into a plurality of subareas and layers according to the deformation and the lateral loss degree; high-energy vibration tamping is conducted on the central bottom area to form a tamping base, then the tamping range is gradually expanded to the side slope areas on the two sides, and tamping energy and technological parameters are adjusted according to the characteristics of all the subareas; in the side slope areas on the two sides of the side ditch, tamping energy is effectively transmitted to the side slope areas by controlling the direction and strength of impact force, and the tamping quality of backfill soil in the side slope areas is ensured; slope stability and backfill lateral loss condition data are monitored in real time, tamping parameters of all the partitions are dynamically optimized and adjusted according to the monitored data, and self-adaptive partition and layering control is achieved; and after the vibration tamping operation of each subarea and layer is completed, the tamping quality of the side ditch backfill soil is comprehensively evaluated.
Owner:济南市莱芜区城乡道路基础设施建设服务中心

Construction method of layered solidified side slope anti-scouring greening base material

The invention relates to a construction method of a layered solidified side slope anti-scouring greening base material. The slope is reinforced from shallow to deep through surface mineralization, shallow mineralization, deep anchoring and greening base material spray-seeding and maintenance, the whole set of construction process is easy and efficient to operate, a multi-layer slope reinforcing structure is effectively formed, the cohesiveness of the greening base material and slope surface soil is enhanced, the base material layer can be prevented from being peeled off, and the service life of the slope is prolonged. Therefore, the stability and greening level of the side slope are improved. The microbial mineralization technology is introduced into preparation of the slope greening base material, so that the structure of the slope base material is optimized, the overall strength and rain wash resistance of the slope base material are improved, and erosion and loss of the base material are effectively reduced. The components of the greening base material are more beneficial to a soil environment for vegetation growth, a microenvironment in which vegetation and microorganisms are harmonious and symbiotic is constructed, rapid growth of vegetation can be promoted, and restoration of a regional ecological system is accelerated.
Owner:FUZHOU UNIV +1

Optimized layout method of closed conduit-side slope system based on weak intercalated layer control

The invention discloses a weak intercalated layer control-based closed conduit-slope system optimization layout method, which comprises the following steps of S1, geological survey and parameter acquisition: accurately positioning a weak intercalated layer through a geological radar and drilling coring, and determining a rock-soil body strength parameter by combining a laboratory rock-soil mechanical test, geological radar data and rock-soil body strength parameters are analyzed through a random forest algorithm, and the interlayer space distribution rule is predicted. By combining geological survey, numerical simulation, intelligent optimization and dynamic monitoring technologies, scientific layout and adjustment of a closed conduit-side slope system are realized, a weak intercalated layer seepage path is accurately cut off, the safety coefficient of the side slope is effectively improved, meanwhile, expansion of a plastic zone is effectively inhibited, settlement of an overlying soil body or large-range deformation of the side slope is reduced, and the stability of the side slope is improved. The seepage stability and the stress slow release capacity of the system are enhanced, the safety of the water diversion project in a complex geological area is improved, and an operable technical path and basis can be provided for layout of similar projects in the future.
Owner:SHIHEZI UNIVERSITY

Assembly type reinforced concrete foundation pit supporting system convenient to disassemble and construction method

The invention relates to the field of constructional engineering, and discloses a fabricated reinforced concrete foundation pit supporting system convenient to disassemble and a construction method. According to the system, foundation pit supporting beam sections and foundation pit supporting splayed beams are adopted as fabricated components, a supporting structure in a foundation pit is arranged in an orthogonal diagonal bracing mode, the beam sections are spliced through joint bars, and a plurality of supporting steel latticed columns are arranged in the middle of the supporting system; a jack is arranged between the supporting beam and the top beam or the waist beam, and the top beam or the waist beam is provided with a rope penetrating hole for subsequent dismantling; the invention provides a construction method of an assembly type reinforced concrete foundation pit supporting system convenient to dismantle. The construction method comprises the detailed procedures of assembly construction from the uppermost layer to the lower layer step by step. Compared with a cast-in-place supporting beam, the method is high in construction speed, low in construction cost and convenient to dismantle, the foundation pit supporting beam section, the jack and other components can be recycled and reused, and the method is successful practice of the green building concept in the field of foundation pit supporting.
Owner:THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD +2

Assembly type reinforced concrete-steel structure foundation pit supporting system convenient to disassemble and construction technology

The invention relates to the field of constructional engineering, and discloses an assembly type reinforced concrete-steel structure foundation pit supporting system convenient to disassemble and a construction technology, and the assembly type reinforced concrete-steel structure foundation pit supporting system comprises a top beam, a waist beam, a supporting pile and an inner supporting system; the inner supporting system is formed by assembling a standard steel-concrete beam section main support and a steel member auxiliary support in cooperation with a jack adjusting system. The invention further provides a new system on-site assembly construction process, namely detailed steps of assembly construction from the uppermost layer to the lower layer step by step. The fabricated structure integrates the advantages of two fabricated structures, is suitable for foundation pit supporting with large stress and strict deformation control, and has the advantages of being high in construction speed, short in construction period, low in construction cost, convenient to dismantle and capable of completely recycling most of inner supporting components compared with a traditional cast-in-place steel-concrete foundation pit supporting system.
Owner:THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD +2

Deep foundation pit excavation deformation real-time monitoring system based on relative measurement

The invention discloses a deep foundation pit excavation deformation real-time monitoring system based on relative measurement. The deep foundation pit excavation deformation real-time monitoring system comprises a relative measurement sensor group, a data acquisition and preprocessing module, a wireless data transmission module, a cloud data processing and analysis module, an intelligent risk assessment module, a visual alarm module and a solar power supply and energy storage management module. The relative measurement sensor group collects deformation data of the deep foundation pit, the data acquisition and preprocessing module performs primary processing on the data, the wireless data transmission module stably transmits the data to the cloud, the cloud data processing and analysis module performs deformation prediction, and the intelligent risk assessment module performs risk grading. The visual alarm module gives an alarm in real time and carries out emergency notification according to different risk levels, and the solar power supply and energy storage management module guarantees continuous operation of the system. The system solves the problems of measurement precision, data transmission, risk assessment, power supply stability and the like of an existing monitoring system, provides powerful support for safe construction of the deep foundation pit, and has remarkable benefits.
Owner:CHINA RAILWAY 16TH BUREAU GRP ROAD & BRIDGE ENG CO LTD +2

Pre-disintegrated soft rock embankment structure based on spatial function zones and design method thereof

ActiveUS20250101701A1Geometric CADEmbankments
A pre-disintegrated soft rock embankment structure based on spatial function zones and a design method thereof are provided. The embankment structure includes an embankment shear control zone, an embankment settlement control zone, and an embankment shear-settlement control zone. The embankment shear control zone is a zone in which a shear failure ratio is greater than a predetermined value. The embankment settlement control zone is a filled zone right below a top surface of an embankment. The embankment shear-settlement control zone is an intersection of the embankment shear control zone and the embankment settlement control zone. The provided structure and method improve the shear strength, stability, and durability, reduce footprint, shorten a settlement duration after construction, and solve engineering problems such as low slope ratio and large deformation of an embankment due to a long period of subsequent disintegration in the prior art.
Owner:CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY

Slope early warning method and system based on optical fiber sensor

The invention discloses a side slope early warning method and system based on an optical fiber sensor, and relates to the technical field of side slope monitoring, and the method comprises the steps: collecting side slope deformation monitoring data and environment monitoring data, and carrying out the preprocessing of the collected deformation monitoring data; a causal association rule between the environment monitoring data and slope deformation is constructed, and the deformation space distribution range of the whole slope is predicted based on a BP neural network; and taking the slope deformation monitoring sequence as a sample, training an RNN neural network, predicting the development trend of slope deformation, carrying out early warning analysis on the overall stability of the slope, and generating an early warning result through an alarm device. According to the method, the causal association rule is constructed, the environmental monitoring data and the deformation data are combined, the space prediction precision is improved, the RNN neural network is used for training the time sequence data, and the development trend of slope deformation can be effectively predicted; and in combination with the spatial distribution data, a future deformation trend analysis and early warning result is generated, so that the timeliness and accuracy of early warning can be improved.
Owner:MINDONG HYDROPOWER DEV CO LTD +1

Foundation pit safety early warning method based on multi-source monitoring data fusion

The invention discloses a foundation pit safety early warning method based on multi-source monitoring data fusion, and the method comprises the steps: firstly constructing a foundation pit safety evaluation index system, and obtaining an accumulated value and a change rate of a multi-source time sequence monitoring index; secondly, determining a foundation pit safety level identification framework, taking the multi-source time sequence monitoring data as different evidences, and performing normalization processing; then, according to the multi-source time sequence monitoring data, determining a basic probability distribution value in the recognition framework; respectively calculating the weight and the credibility of the multi-source monitoring indexes; and finally, fusing the multi-source monitoring data of the foundation pit to obtain a safety evaluation grade of the foundation pit. The method is characterized in that the importance of different monitoring indexes and the credibility of evidence are considered at the same time on the basis of fully utilizing the actually measured monitoring data of the foundation pit, the objectivity of the identification of the safety state of the foundation pit is ensured, the interference of subjective human factors is avoided, and the defects of the traditional D-S evidence theory can be effectively overcome.
Owner:GUANGZHOU INSTITUTE OF BUILDING SCIENCE CO LTD

Foundation pit steel support axial force servo regulation and control method based on digital twinning

The invention relates to a foundation pit steel support axial force servo regulation and control method based on digital twinning, and the method comprises the following steps: S1, constructing a foundation pit deformation prediction agent model with key soil parameters and servo steel support axial force as input through a foundation pit engineering simulation module; s2, an internet-of-things monitoring module is used for collecting foundation pit deformation data and servo steel support axial force data through an internet-of-things monitoring system; s3, a soil mass parameter updating module which takes the foundation pit deformation prediction agent model in the S1 as a forward calculation model in probability back analysis, and updates a posterior sample of soil mass parameters through a data assimilation technology in combination with the Bayesian theorem; and S4, a deformation prediction and axial force regulation and control module is used for predicting the deformation of the foundation pit in the next stage and providing an axial force servo regulation and control scheme. The method is based on a digital twinning technology, a deep learning algorithm and a data assimilation technology, the influence of an axial force set value in a servo system on foundation pit deformation is analyzed, and a scientific and reasonable foundation pit steel support axial force servo regulation and control scheme is provided.
Owner:ZHEJIANG UNIV OF TECH

Basement roof lawn vegetation construction method under complex working conditions

A basement roof lawn vegetation construction method under complex working conditions comprises the steps of implementing complex basement roof modeling and implementing lawn vegetation above a basement roof. The complex basement top plate modeling method comprises the steps of a flat site large-area backfill construction method, a step-shaped basement top plate backfill construction method and a basement top plate large-gradient inclined plate earthwork backfill construction method. The step of implementing the lawn vegetation above the basement top plate comprises the steps of cross construction, backfilling and excavation, slope toe construction and solid soil area construction. According to the technology, the problem of construction of greening in a complex shape on the basement roof of a project is solved, particularly the problem that more slope roofs in a mountaintop shape or roofs in a stepped rice field shape exist is solved, the problem that backfill soil construction is difficult after the basement roof is complex in shape is solved, the stability of backfill soil after backfill soil is improved, and the construction period is shortened. And the concept of green building is practiced.
Owner:SHANGHAI BAOYE GRP CORP +1

Large deep foundation pit inner supporting system with safety system

The invention relates to the technical field of foundation pit supporting, and discloses a large deep foundation pit inner supporting system with a safety system.The large deep foundation pit inner supporting system comprises a telescopic rod, a supporting rod, a connecting plate and a soil retaining plate, one end of the telescopic rod is rotationally connected with a connecting block through a pin, the connecting block is movably provided with an elastic assembly, and the elastic assembly is connected with one side of the supporting rod; the elastic assembly reserves an elastic telescopic space between the supporting rod and the telescopic rod and is used for detecting displacement generated when the supporting rod and the soil retaining plate support the foundation pit, clamping grooves are formed in the two opposite sides of the soil retaining plate, and an assembling structure is arranged on one side of the supporting rod. According to the large-scale deep foundation pit inner supporting system with the safety system, prestress can be effectively applied to the side wall of the foundation pit, so that the periphery of the pit wall has certain supporting force, the deformation condition of the side wall of the foundation pit can be monitored, meanwhile, underground water seepage of a soil layer of the foundation pit can be eliminated in time, and the safety coefficient during foundation pit supporting is improved.
Owner:YANCHENG INST OF TECH

Full-recovery prestressed square pile and latticed column combined upright pile construction method

The invention discloses a fully-recycled prestressed square pile and latticed column combined stand column pile construction method, and belongs to the technical field of green foundation pit supporting. According to the construction method of the fully-recycled prestressed square pile and latticed column combined stand column pile, the prestressed square pile serves as the lower section of the stand column pile and is organically combined with the latticed column, the stand column pile can be pressed into the designed elevation through static pressure equipment, and the construction method has the advantages of being low in construction cost, high in construction efficiency, free of pollution and the like; the stand column piles are integrally pressed into a soil body, the foundation pit soil body is excavated layer by layer, concrete supports and surrounding purlins on the periphery of a foundation pit are supported layer by layer through self-servo hydraulic converters and supporting cross beams, foundation pit construction operation is easy and efficient, and construction is safer and more stable; moreover, after a bottom plate and structural floor slabs of all layers are built, the stand column piles can be recycled by 100%, zero emission is truly achieved, the low-carbon, environment-friendly and green construction effects are achieved, in addition, sensors can be arranged in the pile sections of the prestressed square piles, and foundation pit full-section monitoring and deformation control are achieved.
Owner:JIANGSU JIANYUAN CONSTR CO LTD +1