Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

66results about How to "Reduce shipping" patented technology

Forming method for square pile hole

The invention relates to the technical field of square pile holes, and discloses a forming method for a square pile hole. The forming method comprises the following construction methods that 1, trepanning is carried out, a square pile casing is put downwards, the lower end of the square pile casing penetrates a fill stratum and extends into a residual soil layer, and the upper end of the square pile casing extends out of the ground; 2, a round drill bit is utilized for carrying out hole guiding many times, a plurality of round holes are formed, the diameter of the round drill bit is consistent with the width of the square pile hole, the multiple round holes are sequentially connected in rows in the length direction of the square pile hole, and the extending length is consistent with the length of the square pile hole; and 3, a square drill bit is utilized for carrying out drilling from top to bottom, and the square pile hole is formed. The forming method for the square pile hole has the following beneficial effects that the forming speed of the square pile hole is high; the quality of the square pile hole is guaranteed; the construction cost is low, the construction speed is high, the single-machine comprehensive efficiency is high, and the mechanical construction cost is relatively low; and the construction site is clean, and field management is simplified.
Owner:SHENZHEN GONGKAN GEOTECHN GRP

Replaceable press-grouted cement soil composite pile, construction method of replaceable press-grouted cement soil composite pile and long twist drill employed in construction method

The invention discloses a replaceable press-grouted cement soil composite pile which comprises a replaceable cement soil layer and a core pile, wherein the core pile is vertically distributed in the center of the replaceable cement soil layer; the replaceable cement soil layer comprises cement, soil, building rubbish, coal cinder, slag and/or factory waste; and the raw materials of the replaceable cement soil layer stay in a superfluid state when injected into a pile hole initially. The invention further discloses a construction method of the replaceable press-grouted cement soil composite pile, which comprises the following steps: (1) enabling the drill rod of a long twist drill to drill to a design pile bottom level, and making superfluid cement soil slurry of soil which is taken out during drilling; (2) spirally lifting up the drill rod while performing press-grouting; and (3) placing the core pile in the cement soil slurry in the pile hole from the center of a steel sleeve. The invention further provides the long twist drill. The composite pile made according to the construction method has the beneficial effects of high bearing capacity, no waste slurry discharge and no soil compaction effect.
Owner:骆嘉成 +1

Coal mining roadway

The invention discloses a coal mining roadway. The coal mining roadway comprises a working surface, a ventilation roadway and a transportation roadway, wherein the ventilation roadway is arranged on a seam floor of a coal seam, and the transportation roadway is arranged between a coal seam roof and the seam floor. The working surface comprises a shelving working surface section, a transition circular-arc working surface section and an inclined working surface section, wherein the working surface is arranged in an inclined mode in the longitudinal direction, the shelving working surface section and the inclined working surface section are smoothly connected together through the transition circular-arc working surface section, the shelving working surface section is arranged on the lower oblique portion of the transition circular-arc working surface section, and is communicated with the transportation roadway, the inclined working surface section is arranged on the seam floor, is arranged on the upper oblique portion of the transition circular-arc working surface section, and is communicated with the ventilation roadway, a shelving included angle alpha is formed between the shelving working surface section and the horizontal plane, an inclined included angle beta is formed between the inclined working surface section and the horizontal plane, and the shelving included angle alpha is smaller than the inclined included angle beta. The coal mining roadway can improve the stress condition of an end support and the stress condition of a crab bearer of a large-dip-angle fully mechanized caving face, has control over downward sliding of the end support and the crab bearer of the large-dip-angle fully mechanized caving face, and is high in coal mining efficiency.
Owner:CHNA ENERGY INVESTMENT CORP LTD +1

Full-automatic whole blood collection and separation device and method

The invention discloses a full-automatic whole blood collection and separation device and method. The whole blood collection and separation process includes two stages, wherein one stage is before reaching the blood collection volume, and the other stage is after reaching the blood collection volume. The process before reaching the blood collection volume comprises the step 1 of collecting blood, the step 2 of separating the blood, the step 3 of collecting plasma, the step 4 of stopping blood collection, the step 5 of transfusing red blood cells, the step 6 of collecting the red blood cells, the step 7 of stopping transfusion and the step 8 of starting blood collection; the process after reaching the blood collection volume comprises the step 9 of stopping blood collection, the step 10 of supplementing red blood cells, the step 11 of separating and replacing the plasma, the step 12 of collecting the plasma, the step 13 of stopping supplementation, the step 14 of transfusing the red blood cells, the step 15 of collecting the red blood cells, the step 16 of supplementing plasma according to the calculated volume and the step 17 of stopping transfusion. Through the device and method, automation of whole blood collection and separation is achieved, separated blood components meet relevant standards, and blood resources are utilized to the maximum extent.
Owner:钟世良

Four-roll roll-arranging type profile steel blooming mill

The invention provides a four-roll roll-arranging type profile steel blooming mill, belongs to a metal rolling mill, and particularly relates to a three-roll type steel rolling mill. A rolling mill base is provided with an upper roll a and a lower roll b, the two rolls are the same in length and roll diameter, the roll faces are each provided with 5-7 rolling grooves, and the rolling grooves are the same in position and shape. A middle roll is at least configured with a middle roller body c and a middle roll body d, the middle roll body c and the middle roll body d are the same in structure and provided with rolling grooves, and the rolling grooves correspond to the rolling grooves in the upper roll and in the lower roll. The upper roll a, the middle roll c and the lower roll b are fixed to the rolling mill base from top to bottom according to the primary roll-arranging type of the upper roll a, the middle roll c and the lower roll b, or the upper roll a, the middle roll c and the lower roll b are fixed to the rolling mill base from top to bottom according to the roll-replacing roll-arranging type of the lower roll b, the middle roll c and the upper roll a. The four-roll roll-arranging type profile steel blooming mill has the advantages that the two rolling rolls of the same structure are adopted, the two middle roll bodies of the same structure are adopted, the two rolling rolls are dispatched in an up-down mode to be used in cooperation with the two middle roll bodies, all the rolling grooves of the rolling rolls are fully utilized, the utilization rate of the rolling rolls is increased, and 1/3 the rolling roll cost is saved; when roll-replacing and roll-arranging are conducted, the process of transporting new rolling rolls is omitted, the roll replacing time is saved, and smooth steel rolling production is guaranteed.
Owner:MAGANG (GROUP) HOLDING CO LTD +1

Construction method for milling cement soil stirring wall waterproof curtain through double wheels

The invention discloses a construction method for milling a cement soil stirring wall waterproof curtain through double wheels. The construction method is characterized by comprising the following steps that firstly, surveying and setting out are conducted for positioning; secondly, a trench is excavated; thirdly, a double-wheel pile milling machine is arranged in place, a positioning red line is pulled to the construction side of the excavated trench, a framing point is set according to a surveying and setting-out result and marked, and the double-wheel pile milling machine is arranged in place; fourthly, at each frame of station, the double-wheel pile milling machine is used, a cutter head conducts cutting and digging and sinks to the target depth, meanwhile, cement grout is injected in a jetting manner, and the cement grout is injected in the jetting manner and stirred while the cutter head is elevated; and fifthly, after one frame of wall is constructed, the double-wheel pile milling machine is moved to the next position, the fourth step is repeated, and the next frame of wall is constructed till construction of the waterproof curtain is finished. According to the construction method, connectors are few, the water leakage risk caused by construction of cold joints can be completely avoided, and the construction efficiency is high. In the construction process, vibration is avoided, and safety performance is good. Replacement soil is little, environment friendliness is achieved, and outward transporting of slurry is reduced.
Owner:ZHONGYIFENG CONSTR GRP

Road cushion layer

The invention discloses a road cushion layer which solves the problem that the use effect of an existing construction waste road cushion layer is not good. According to the technical scheme, the roadcushion layer is characterized in that the road cushion layer comprises a concrete mortar face layer, a steel fiber concrete layer, a permeable layer, a knitted net layer, a waterproof layer, a soil basic layer and a construction waste road cushion layer, all of which are sequentially arranged from top to bottom, the construction waste road cushion layer comprises smashed construction waste crushed material laid below the soil basic layer, and gaps of the construction waste crushed material are filled with rubber cushion layers. By the adoption of the road cushion layer, construction waste canbe better used by the construction waste road cushion layer to replace a broken stone cushion layer, the requirement for the strength of a road surface structure and a road foundation is met, construction waste outward transport can be effectively reduced, construction cost is greatly reduced, and the use effect is better; and the gaps of the construction waste crushed material are filled with the rubber cushion layers so that the construction waste crushed material can be effectively bonded, and the firmness and stability of the construction waste road cushion layer are further improved.
Owner:温州伟国建设有限公司

Reversing sensor probe

The invention discloses a reversing sensor probe which comprises a terminal seat shell, an upper cover and an annular buckle which are assembled on the terminal seat shell in a matched manner, and a detector and a circuit board which are arranged in a cavity in the terminal seat shell and are connected with each other, wherein the size of the terminal seat shell assembled with the upper cover and the annular buckle is smaller than the aperture of a reversing sensor mounting hole in an automobile bumper, so that the terminal seat shell can penetrate through the reversing sensor mounting hole in the direction from the outer side of the automobile bumper to the inner surface and is connected with the outer surface of the automobile bumper in a pressing manner through the annular buckle. The reversing sensor probe is simple in structure, convenient to manufacture, attractive in appearance, lower in cost, reliable in quality and high in practicability; the structure of the whole reversing sensor probe is simplified, the directionality of on-site mounting is changed, and one-step mounting operation on the site is realized; the whole reversing sensor probe can be directly assembled from the outer surface of the automobile bumper, can be mounted in place and is high in firmness; manufacturing and assembling are industrialized, batch production is facilitated, and the production cost is reduced.
Owner:同致电子科技(昆山)有限公司

Movable facade hard rock slotting machine and construction technology thereof

The invention provides a movable facade hard rock slotting machine and a construction technology thereof. The movable facade hard rock slotting machine comprises a crawler travelling mechanism (1) forallowing the slotting machine to move, a working platform (2) for allowing staff to operate, an electric hydraulic pump (3) which controls circulation of hydraulic oil, levelling supporting leg cylinders (4) used for supporting the slotting machine to guarantee integral levelness of the slotting machine and perpendicularity of a cutting blade, a travelling and adjusting operation mechanism (5) used for operating the crawler travelling mechanism (1), a travelling electric control cabinet (6) which supplies power to the travelling and adjusting operation mechanism (5), a cutting machine movingrail rack (7) used for mounting the cutting blade, and a cutting blade up-down moving mechanism (8) used for adjusting the up-down displacement of the cutting blade. According to the movable facade hard rock slotting machine, an electric double-wheel cutting machine is mounted on a chassis of the crawler travelling mechanism, upright post groove lines can be cut on facade hard rock through the cutting blade capable of moving up and down and front and back, then, a cut rock body is broken through a self breaking hammer of the cutting machine or an excavator matched with construction, and upright post grooves are formed.
Owner:CHINA RAILWAY TUNNEL GROUP CO LTD

Portable plankton concentration device

The invention discloses a portable plankton concentration device which comprises a sample feeding system, a manual separation system and a filtrate collecting system, the manual separation system comprises a filter membrane support leg, a filter membrane support net, a filter membrane, a raw water storage cavity, a piston push-pull rod and a filtrate collecting cavity; the filter membrane supporting leg is arranged at the open end in the filtrate collecting cavity, the filter membrane support net is laid on the filter membrane support leg, the filter membrane is placed on the filter membrane support net, the other end of the filtrate collecting cavity is provided with a filtrate outlet, the piston push-pull rod is arranged in the raw water storage cavity, a raw water inlet is formed in thebottom of the raw water storage cavity, the filtrate collecting cavity is in matched connection with the raw water storage cavity through threads, the sample feeding system is communicated with the manual separation system through the raw water inlet, and the filtrate collecting system is communicated with the manual separation system through the filtrate outlet. The portable plankton concentration device is simple in structure, convenient to use and capable of effectively reducing the labor intensity and improving the working efficiency.
Owner:INST OF AQUATIC LIFE ACAD SINICA

Air conditioning, cold drying and air water making integrated machine

The invention discloses an air conditioning, cold drying and air water making integrated machine. The air conditioning, cold drying and air water making integrated machine comprises a compressor, a condenser, a condensation draught fan, a liquid storage device, a drying filter, a throttling element for air conditioning, an evaporator, an evaporation draught fan, an evaporation pressure regulator, a gas-liquid separator, a throttling element for making water, an air dryer, a connecting water disk, a first air filter, a second air filter, a first ventilation valve, a second ventilation valve, a third ventilation valve, a cold drying draught fan, a water collecting barrel, a water pump, a check valve, a disinfecting and purifying device, a high-pressure water storage barrel, a cold water valve, a cold water heating device and a hot water valve. A compressor refrigerating circulating system, a compressor water making circulating system, a cold drying air circulating system and a water processing circulating system are respectively formed. A traditional compressor refrigerating technology, a cold drying air technology, a disinfecting and purifying technology and the like are applied to the air conditioning, cold drying and air water making integrated machine, and the multiple functions of refrigerating, dehumidification, cold drying of air, making of drinking water and the like are integrated.
Owner:合肥天鹅制冷科技有限公司

Large pipeline non-cutout dredging and desilting construction method

InactiveCN109680790ASolve the problem of dredging and dredgingOutbound Volume ReductionSewer cleaningChemical treatmentPipeflow
The invention relates to a large pipeline non-cutout dredging and desilting construction method which comprises the following steps of 1, performing detection on a pipeline firstly for knowing the blockage condition of the pipeline; 2, putting down an underground sewage pipeline high-pressure dredging device, and performing dredging and desilting on sludge in the pipeline under the non-cutout condition; 3, separating silts from dirty water with slit-water separation equipment; 4, adding a chemical agent in the separated water, and recharging the water into the pipeline; 5, performing secondarydetection, comparing a result with the pipeline blockage condition before dredging, and detecting the desilting effect; and 6, packaging the sludge, transporting the sludge outwards to an appointed place, and finishing desilting. According to the large pipeline non-cutout dredging and desilting construction method, dredging and desilting are performed on the large pipeline under the non-cutout condition, and physical separation and chemical treatment are performed on the muddy water; the transportation size of the separated sludge is greatly reduced compared with muddy water, the quality of the sewage after chemical treatment is clear, and the sewage flows back into the sewage pipeline again for normal circulation; and therefore, the large pipeline dredging and desilting problem can be solved, outward transportation of the silts and the water are greatly reduced at the same time, and a promotion effect is exerted to environmental protection.
Owner:SHANGHAI FOUND ENG GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products