The invention relates to the technical field of
submarine shield waterproof construction, in particular to a waterproof construction method for air pushing of a
submarine tunnel
shield tunneling machine, which comprises the following steps of: measuring and trimming a mine section primary support and an air pushing starting chamber, constructing a multi-layer
grout stopping
protection system, constructing a guide table and rechecking the precision. Calculating and implementing cutter head
front loading to provide equivalent reverse thrust, arranging a
mortar backfilling pipeline and preparing high-performance
mortar, stopping propelling when the
shield tunneling machine is tunneled to a preset condition, mounting wedge-shaped ring
pipe pieces according to a preset sequence and fastening a longitudinal annular connecting structure, and forming a longitudinal annular connecting structure through a combined mode of synchronous grouting, directional pressure filling of the high-performance
mortar and secondary mortar supplementing. According to the method, through a three-dimensional constraint
system, the constraint reaction force needed by the duct piece and quantitative calculation of the early strength of the high-performance mortar are combined, the
structural integrity and sealing performance of the duct piece are guaranteed, and the long-term operation stability of a tunnel is improved.