The invention discloses railway roadbed grouting reinforcement construction equipment, which relates to the technical field of roadbed construction, and comprises a rack main body with rollers, a
slurry storage tank and a
punching and grouting mechanism, the
punching and grouting mechanism comprises a grouting supporting frame, a lifting bearing table plate, a hollow spiral grouting
drill rod piece, a
slurry guide rotating end sleeve, a lock catch part, a lifting
rope unit and a drilling driving
assembly. A lower plugging piece and a plugging ejector rod part are arranged in the hollow spiral grouting
drill rod piece. The lower plugging piece can plug the lower end opening of the hollow spiral grouting
drill rod piece, a lock catch part is arranged at the top of the plugging ejector rod part, in the initial state, the lock catch part is clamped on the fastening
flange, and when the lifting
rope unit pulls the lock catch part upwards, the lock catch part is disengaged from the fastening
flange. The hollow spiral grouting drill rod piece is simple in structure, blockages in the hollow spiral grouting drill rod piece can be effectively cleaned, it is guaranteed that grouting construction is conducted orderly, grouting liquid can be accurately guided into the roadbed reinforcing position, the
bearing capacity of a roadbed is effectively improved, and practicability is convenient.