Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

1361results about "Special building" patented technology

Prefabricated building production line and prefabricated building structure

A prefabricated building production line and a prefabricated building structure. The prefabricated building production line comprises an assembly conveyor line, a functional module conveyor line, a transfer mechanical arm, an assembly mechanical arm, and a control platform; an assembly area, a testing area, and an inspection area are arranged in order along a transport direction of the assembly conveyor line; the assembly conveyor line is used for conveying a building unit main body to be assembled; a plurality of functional module conveyor branch lines are arranged at the side of the functional module conveyor line away from the assembly conveyor line; the functional module conveyor line and the functional module conveyor branch lines are used for transporting a functional module; the transfer mechanical arm is used for carrying a functional module and the building unit main body to be assembled; and the assembly mechanical arm is used for installing the functional module on the building unit main body to be assembled. The prefabricated building structure comprises: a lifting device for prefabricated building installation, an prefabricated building ventilation structure, a prefabricated building automated production fixture, etc.
Owner:BEIJING DYNAFLOW LAB SOLUTIONS CO LTD

Molded plastic storage shed structure

The present subject matter discloses an outdoor storage shed utilizing molded plastic components or panels. A storage shed structure can comprise foldable corner panels and one or more interlocked teeth couplings. The foldable corner panel can pivot at integrated folding grooves to serve as corners. The interlocked teeth couplings comprise a plurality of protrusions and matched recesses arranged on both sides of engaged panels. Furthermore, the storage shed can come with pre-constructed shelf grooves in the foldable corner panels. The storage shed can have a concaved door frame and a recessed door.
Owner:THREE STONE LLC

Storage shed structure

The present subject matter discloses an outdoor storage shed utilizing plastic components or panels. A storage shed structure can comprise foldable corner panels, which pivot at integrated folding grooves to serve as corners. Each leaf of a foldable corner panel can be fitted with a unique coupling mechanism to interact with an additional panel. Furthermore, the storage shed structure can come with pre-constructed shelf grooves in the foldable corner panels. Storage shelves can be slotted into these grooves, thereby boosting the overall stability of the storage shed.
Owner:THREE STONE LLC

Optimized wall strcture of a prefab modular shed

The present subject matter discloses an improved wall structure for a modular plastic shed, designed for easy on-site assembly using pre-constructed modular panels. The enhanced wall structure features T-shaped connection accessories that securely install the wall to the floor panels. Additionally, support columns with integrated reinforcement ribs are incorporated to further strengthen the overall structure. These support columns also feature pre-formed sockets, allowing for quick and straightforward attachment of the wall panels, simplifying the assembly process and improving structural integrity.
Owner:YIXIANG BLOW MOLDING FURNITURE (NINGBO) CO LTD

Reinforced roof structure of a prefab modular shed

The present subject matter discloses a novel roof designs of a blow-molded storage shed that enhances structural stability while ensuring ease of assembly and disassembly. The roof assembly features a beam support frame with multiple interconnected beam columns and crossbars, providing robust support for the roof structure. A central roof panel, equipped with an embedded seamless folding groove, folds to create a roof peak during installation. Additionally, side roof panels are connected to the central roof panel, forming a cohesive and durable roof assembly. This design optimizes both strength and ease of construction.
Owner:YIXIANG BLOW MOLDING FURNITURE (NINGBO) CO LTD

Molded plastic storage shed structure

The present subject matter discloses an outdoor storage shed utilizing molded plastic components or panels. A storage shed structure can comprise foldable corner panels and one or more interlocked teeth couplings. The foldable coner panel can pivot at integrated folding grooves to serve as corners. The interlocked teeth couplings comprise a plurality of protrusions and matched recesses arranged on both sides of engaged panels. Furthermore, the storage shed can come with pre-constructed shelf grooves in the foldable corner panels. The storage shed can have a concaved door frame and a recessed door.
Owner:THREE STONE LLC

Outdoor storage shed

The present subject matter discloses an outdoor storage shed utilizing plastic components or panels. A storage shed structure can comprise foldable corner panels, which pivot at integrated folding grooves to serve as corners. Each leaf of a foldable corner panel can be fitted with a unique coupling mechanism to interact with an additional panel. Furthermore, the storage shed structure can come with pre-constructed shelf grooves in the foldable corner panels. Storage shelves can be slotted into these grooves, thereby boosting the overall stability of the storage shed.
Owner:THREE STONE LLC

Quickly installed, expandable, and modularly designed louver awning

A quickly installed, expandable, and modularly designed louver awning includes several leg tubes, a ring beam frame disposed on upper ends of the leg tubes, and a louver system disposed on the ring beam frame. The ring beam frame includes several ring beams slidably installed on the leg tubes, ring beam linings are firmly disposed in ends of the ring beams, and the ring beam linings are connected to the leg tubes through first fasteners. The ring beams and the leg tubes are connected through leg tube linings and the ring beam linings, so that structural strength of the ring beams and the leg tubes is increased, a part quantity is reduced, assembly is easier to operate with a smaller error, and the fasteners are not exposed, thereby providing better aesthetic appearance.
Owner:ZHEJIANG YOTRIO GRP CO LTD

Integrated door assembly of a prefab modular shed

The present subject matter discloses an integrated door assembly for a prefabricated shed constructed from modular plastic components or panels. The door assembly comprises a door panel that includes a door side panel and a door body, which are integrally formed through blow molding. The door body is connected to the door side panel via an embedded folding groove, featuring a thinner plastic material at the fold to allow for flexibility and ease of movement. Additionally, the door assembly incorporates a pivotable frame bracket that encases the edges of the hinged, rotating panels, enhancing both strength and durability.
Owner:YIXIANG BLOW MOLDING FURNITURE (NINGBO) CO LTD

A cave-type data center built based on an underground river, and its construction method and operation method

The present invention discloses a cave-type data center constructed based on an underground river, as well as its construction method and operation method, belonging to the technical field of cave-type data center construction. The data center includes a mountain body, in which an underground river is developed, and the underground river flows through a karst cave in the mountain body. On one side or both sides of the underground river in the mountain body, a number of equipment storage tunnels are provided. The number of the equipment storage tunnels are respectively connected to the karst cave through a slope connecting tunnel. An equipment cabinet and a liquid heat exchanger are arranged in the equipment storage tunnel. A river water conveying assembly is connected to the liquid heat exchanger. One end of the river water conveying assembly far away from the liquid heat exchanger passes through the slope connecting tunnel and extends into the underground river. The liquid cooling method is used to cool and dissipate heat from the equipment cabinet. This direct temperature control method significantly improves the heat dissipation and cooling effect on the IT equipment cabinet. At the same time, the heat exchange efficiency is high, and the operation energy consumption of the data center can be reduced.
Owner:GUIZHOU TRANSPORTATION PLANNING SURVEY & DESIGN ACADEME

Prefabricated / modular sauna

Disclosed are a prefabricated / modular sauna and methods of manufacturing and assembling a prefabricated / modular sauna. For instance, a prefabricated / modular sauna may include: a base frame; a plurality of posts; a plurality of panels; a roof frame; and a roof panel. The base frame and the roof frame include beams and have beam intersections between adjacent beams, each beam intersection is formed of a lap joint and a connector. The panels are secured in post dados of the posts and beam dados of the beams. The posts are secured in notches of base frame beams and roof frame beams. In some cases, the panels include a pre-packaged sauna assembly panel. In some cases, panels and posts are secured against loading forces, lateral forces, or compression forces by (1) interconnected beams and posts in compression or tension, and (2) mechanical connectors (e.g., pins, bolts, screws).
Owner:THE SUPERIOR SAUNA CO LLC

Display system for hydrothermal sanitary components and associated method

The present disclosure relates to a display system (1, 1′) for hydrothermal sanitary components (10a-10d), comprising:at least a first device or module (1), comprising an exhibition panel (2) configured to lay, in use, at least partially on a plane substantially inclined with respect to a horizontal plane and destined and configured to support a plurality of hydrothermal sanitary components (10a-10d); andat least a retainer (2f, 4, 10p, 11) configured to realize a removable connection between the exhibition panel (2) and the hydrothermal sanitary components (10a-10d), the retainer (2f, 4, 10p, 11) being further destined and configured to allow a user to arrange, and repeatedly re-arrange multiple times, the hydrothermal sanitary components (10a-10d) on the exhibition panel (2) according to a plurality of user-defined and re-definable patterns or spatial configurations, simulating a real installation of said hydrothermal sanitary components (10a-10d) in an operating environment, such as a bathroom or similar.
Owner:GESSI SPA

Positive-pressure antifouling gamma-ray energy spectrum automatic monitoring square cabin

The invention discloses a positive pressure antifouling gamma-ray spectrum automatic monitoring square cabin, and relates to the technical field of nuclear emergency monitoring and square cabins, the positive pressure antifouling gamma-ray spectrum automatic monitoring square cabin comprises a cabin body, a transition cabin is arranged in the cabin body, the transition cabin divides the interior of the cabin body into a sealed measurement cabin and a sample preparation cabin, and one side of the transition cabin is provided with an air-tight door capable of communicating the sealed measurement cabin with the sample preparation cabin; a sample conveying cabin used for allowing a sample to go in and out of the sealed measuring cabin and the sample preparation cabin is arranged on the side, away from the airtight door, of the inner wall of the transition cabin, the cabin body is overall designed into three areas, and the to-be-detected sample treatment area and the electric refrigeration high-purity germanium gamma-ray energy spectrometer are effectively isolated; filtered clean air is continuously introduced into the measurement cabin, the pressure in the sealed measurement cabin is maintained to be greater than the external pressure, the requirements of air cleanliness and positive pressure are ensured, and the background of the surrounding environment of the electric refrigeration high-purity germanium gamma-ray energy spectrometer is prevented from being changed after external radioactive pollution air enters the sealed measurement cabin, so that the measurement is prevented from being influenced.
Owner:GUANGDONG ENVIRONMENTAL RADIATION MONITORING CENT

Integrated seabed data center structure based on negative pressure barrel foundation

The invention discloses an integrated seabed data center structure based on a negative pressure barrel foundation, the integrated seabed data center structure comprises a negative pressure barrel body, a data center cabin is integrally formed on the top surface of the negative pressure barrel body, and a circulating cooling pipe is arranged in the data center cabin. Large-scale construction of the submarine data center can be realized, structural parameters of the negative pressure barrel and the data center cabin can be adjusted according to construction requirements, and a plurality of data cabins can be mounted in the data center cabin, so that the whole data center cabin shares one negative pressure barrel foundation, and the construction cost of the submarine data center is reduced; the negative pressure barrel body and the data center cabin are prefabricated through concrete, compared with steel materials, the economical efficiency is better, the construction cost is reduced, meanwhile, seabed sinking installation of the data center cabin is achieved through the negative pressure principle, large piling equipment is not needed, and the installation speed is high.
Owner:CCCC THIRD HARBOR ENGINEERING CO LTD

Intelligent leveling and ground pressure self-adaption system of modularized movable laboratory

The invention provides an intelligent leveling and ground pressure self-adaption system of a modularized movable laboratory, and relates to the technical field of laboratory leveling, the system realizes high-precision leveling through six-degree-of-freedom hydraulic support legs, is equipped with pressure and displacement sensors, and is combined with spherical hinge universal joints to compensate ground inclination. And the reliability and the safety of the system are improved through the backup design of the double hydraulic pumps and the energy accumulator. The system further has a ground pressure self-adaption function, the pressure of the supporting legs is dynamically adjusted based on the ground type and a bearing capacity model, local overload is prevented, and an anti-sedimentation strategy is set. In addition, the system integrates technologies of Beidou / GNSS positioning assistance, multi-modal data fusion, block chain traceability and the like, and the leveling efficiency, stability and traceability are enhanced. The system is suitable for mobile laboratory deployment under complex terrains, and has the characteristics of high efficiency, accuracy and reliability.
Owner:XIAMEN NEVC ADVANCED ELECTRIC POWERTRAIN TECH INNOVATION CENT +1

Apparatus and system for receiving and delivering parcels from a drone

An apparatus and system for receiving parcels from a drone is provided. The apparatus comprises: a storage compartment having a housing defining an aperture for receiving a drone and a parcel. A barrier is mounted to a track, the track mounted on an uppermost portion of the housing. The barrier is configured to move to a first barrier position for closing the aperture restricting access to an interior of the storage compartment, and to a second barrier position for opening the aperture to provide access to the interior of the storage compartment. A landing platform is defined by the housing, the landing platform configured to move to a first platform position proximate to the aperture or to a second platform position away from the aperture. An actuator is provided to move the landing platform to the first platform position or the second platform position.
Owner:IERADI GIUSEPPE

Container-based house for large-span structure and mounting method

The invention belongs to the technical field of fast assembly houses, and discloses a container-based house for a large-span structure and a mounting method, a plurality of containers are arranged in two rows, and the two rows of containers are oppositely arranged in pairs; the two opposite containers are connected through an arched roof truss; corner connecting pieces are arranged at the corners of the container; a sliding groove assembly is installed at the top of the container and comprises a sliding groove rail with a sliding groove, a sliding seat is installed in the sliding groove of the sliding groove rail in a sliding mode, a sliding connecting piece is installed on the sliding seat, a fixing bolt ball is arranged at the top of the sliding connecting piece, and the end of the arch roof truss is connected with the fixing bolt ball. According to the invention, the movable installation and repeated disassembly and assembly of the house for the large-span structure can be realized, the problems of bearing horizontal thrust and releasing temperature stress of a large-span building structure supported on the top of the container are solved, and meanwhile, the sliding adjustment connection between the roof truss structure and the support structure can also be realized.
Owner:CHINESE PEOPLES LIBERATION ARMY UNIT 32181

Portable protective enclosure

A portable protective enclosure for equipment located outside, such as, for example pumps, it preassembled and towable to an in-service position for enclosing the equipment and protecting it from cold weather environments. The enclosure has first and second skids being arranged parallel and spaced to one another defining a space therebetween, the first and second skids having a first end and an opposite second end. The enclosure may further have a building supported on the skids for movement therewith, the building comprising first and second end walls each extending across the skids, first and second side walls one each extending along a length of a respective skid, and a roof spanning the first and second end walls and the first and second side walls, the building being free of a floor.
Owner:KOLISNEK KURTIS

Movable assembly type shower room and construction method

The invention discloses a movable assembly type shower room and a construction method, and belongs to the technical field of buildings. The shower room comprises a vertical pipeline, two adjacent edges of the vertical pipeline extend outwards to form two outer frame plates which are perpendicular to each other, and the outer frame plates are attached to a wall body to form an air cavity groove during installation; the exhaust grooves are formed in the wall faces of the two sides of the vertical pipeline at equal intervals in the vertical direction, and folding baffles are arranged in the exhaust grooves; the piston is arranged in the vertical pipeline in a sliding mode, the piston is connected with a telescopic rod, and the telescopic rod is connected with a driver; an exhaust part is arranged at the bottom of the vertical pipeline, the piston is pushed by the telescopic rod to suck gas in the gas cavity groove into the vertical pipeline, and the gas is exhausted through the exhaust part. By means of the shower room, the whole shower room can be rapidly installed and fixed to the wall corner, and the wall does not need to be damaged by drilling. And the shower room is installed in a special form of air pressure fitting, so that the whole shower room and the wall body are fixed more conveniently and quickly.
Owner:HANGZHOU YILIKANG SANITARY WARES CO LTD

Interoperable prefabricated mobile structure

PendingUS20250206522A1Large containersSpecial building
A method of moving a prefabricated mobile structure, comprising: aligning a spreader configured to engage with corner fittings of a standard freight container to connect with respective attachment points on the prefabricated mobile structure; engaging attachment mechanisms of the spreader with the attachment points of the prefabricated mobile structure; using the spreader to lift the prefabricated mobile structure; and using the spreader to place the prefabricated mobile structure onto a vehicle. The prefabricated mobile structure comprises: a rectangular prism shaped body having a length that is shorter than that of a standard shipping container; and extension members that extend substantially beyond a front or rear face of the mobile structure, each comprising one of the attachment points, where the extension members extend far enough beyond the front or rear face of the prefabricated mobile structure to allow the attachment mechanisms of the spreader to connect with the attachment points.
Owner:IRISH DAWG IND LLC

Support assembly for a building structure

A first support assembly for supporting a building structure includes: a pile adapted to be anchored into a ground surface; a first bracket extending from the pile in a first lateral direction; a second bracket extending from the pile in a second lateral direction substantially perpendicular to the first lateral direction; a top surface for receiving a beam; a first attachment member for connecting the first bracket to a first beam supported by a second support assembly in the first lateral direction; and a second attachment member for connecting the second bracket to a second beam supported by a third support assembly in the second lateral direction. A method is also described.
Owner:GOLIATHTECH

High-speed rail platform canopy anti-falling construction device and method

The invention provides a high-speed rail platform canopy anti-falling construction device and method. The device comprises a construction trolley, a concrete formwork and an auxiliary supporting unit. The concrete formwork comprises a canopy formwork and a column formwork; the building trolley and the auxiliary supporting unit are configured to support a canopy formwork; the canopy template comprises a main body template, and a dripping eave template and a beam bottom template which are positioned at the two ends of the main body template; an embedded assembly is arranged on the dripping eave template; one end of the embedded assembly is located in the concrete structure, and the other end of the embedded assembly is connected with the dripping eave formwork. The canopy formwork is fixed in the concrete structure of the canopy body through the pre-embedded assembly, formwork falling caused by abnormity of the auxiliary supporting unit is avoided, and the risk that workers are injured by crashing is eliminated.
Owner:JIANG SU HENG GUI CHUANG KE ZHI NENG KE JI YOU XIAN GONG SI +1

Breakwater system for combined type seabed data center

The invention discloses a combined type seafloor data center breakwater system which comprises a honeycomb protection layer, an energy dissipation middle cavity layer, a supporting wall layer and a flow guide adjusting mechanism, and the honeycomb protection layer, the energy dissipation middle cavity layer, the supporting wall layer and the combined type seafloor data center are sequentially arranged in the water flow and wave direction. The flow guide adjusting mechanism is installed on the supporting wall layer, the honeycomb protection layer and the energy dissipation middle cavity layer, the supporting wall layer and the honeycomb protection layer communicate with each other, the flow guide adjusting mechanism is used for adjusting the overflowing area of water flow flowing to the combined type seabed data center, and therefore the flow speed of the water flow is adjusted, and the honeycomb protection layer and the energy dissipation middle cavity layer are used for weakening vibration energy in waves. And the flow velocity influence of water flow is reduced. Wave dissipation and heat dissipation of the combined type seabed data center are well achieved, and the wave dissipation efficiency can be adjusted according to the sea condition.
Owner:CCCC FOURTH HARBOR ENG INST CO LTD +1

Wall building system

A wall building system includes panels for walls, floors, ceilings, roofs, eaves, and lofts that positively couple together via one or more couplers. The panels may include an insulating core. The one or more couplers incorporate features for receiving plumbing, vents, drains, electrical, coax, CAT5, HVAC, and any other utilities or technology. The panels are designed such that the utilities are concealed until an electrical outlet, drain or water is required, at which time the panel is cut to expose the one or more couplers, which are subsequently cut to reveal a hollow cavity within. The system is aesthetically pleasing and reduces construction time considerably. The system is also extremely energy efficient, fireproof, soundproof, insect proof, virus proof, resists hurricane force winds, is EMP proof, fallout proof, can support a heavy snow load, and is faster to build with and structurally stronger than other construction methods.
Owner:RECORD SCOTT

Vertical tool shed

The invention discloses a vertical tool shed which includes a top plate, a bottom plate, a back plate, side plates, door plates and upright columns, where an inner wall of the door plate is provided with a mounting plate, the mounting plate is provided with a hook assembly, an inner wall of the back plate is provided with a detachable storage plate assembly, and the inner wall of the back plate or an inner wall of the side plate is provided with a detachable hanging assembly. The invention provides a plurality of hook assemblies for hanging, which are not only simple in structure, but also detachably mounted, and adjustable in mounting position.
Owner:LINHAI SHANGLAI LEISURE PROD

Integral toilet module

The embodiment of the invention provides an integral toilet module which is mainly composed of a concrete chassis, a structural framework, a built-in system and an electromechanical system which are integrally formed in a pouring mode and can be matched with a steel structure fabricated building. The chassis is prefabricated by concrete and is integrally sealed and waterproof. And the structural framework is fixed on the chassis and is provided with the light enclosure wallboards, so that the overall weight of the module is effectively reduced, the transportation and construction cost is reduced, and the assembly efficiency is improved. The enclosure wallboards can be made of light materials such as foaming ceramics and have the properties of heat preservation, heat insulation, fire prevention, water prevention and the like. According to the module, pre-integration of all structures, built-in systems and electromechanical systems is completed in a factory, the module can be used only by being hoisted in place and connected with a main body structure on site, and rapid, efficient and reliable assembly type construction is achieved.
Owner:CHINA CONSTR SCI & IND CORP LTD

EMP hardened enclosure

An enclosure to protect people and instruments from the effects of an electromagnetic pulse (EMP) is provided. The enclosure includes a floor assembly; walls extending upward on a first, second, third, and fourth side of the floor assembly; a roof; and a ceiling. On the interior of the enclosure, a shield layer is provided such that the enclosure forms a six-sided Faraday cage. Fasteners and other conductive securement materials such as copper tape help achieve the conductivity of the shield layer. Extending through the walls of the enclosure may be secure points of entry allowing for people, air, and conductors to securely enter and exit the enclosure. The enclosure contains a grounding system to assist with protecting the contents of the enclosure from the effects of the EMP.
Owner:TRACHTE LLC