Prefabricated building production line and prefabricated building structure

A prefabricated building production line and a prefabricated building structure. The prefabricated building production line comprises an assembly conveyor line, a functional module conveyor line, a transfer mechanical arm, an assembly mechanical arm, and a control platform; an assembly area, a testing area, and an inspection area are arranged in order along a transport direction of the assembly conveyor line; the assembly conveyor line is used for conveying a building unit main body to be assembled; a plurality of functional module conveyor branch lines are arranged at the side of the functional module conveyor line away from the assembly conveyor line; the functional module conveyor line and the functional module conveyor branch lines are used for transporting a functional module; the transfer mechanical arm is used for carrying a functional module and the building unit main body to be assembled; and the assembly mechanical arm is used for installing the functional module on the building unit main body to be assembled. The prefabricated building structure comprises: a lifting device for prefabricated building installation, an prefabricated building ventilation structure, a prefabricated building automated production fixture, etc.
Owner:BEIJING DYNAFLOW LAB SOLUTIONS CO LTD

Pollution source online monitoring and analyzing system and method

The invention relates to the technical field of environment monitoring, in particular to a pollution source online monitoring and analysis system and method, and the system comprises a map building unit which is used for carrying out the three-dimensional map modeling of a target monitoring area; the man-machine interaction unit is used for issuing a monitoring control command; the acquisition monitoring unit is used for calculating data sampling density and acquiring environment data; the threshold value early warning unit is used for comparing data to judge whether the pollution source is a suspected pollution source or not; the pollution confirmation unit is used for setting an identification framework for the received environmental data of the suspected pollution source so as to judge whether the suspected pollution source is a real pollution source or not; and the diffusion analysis unit is used for matching the environmental data of the real pollution source with the pollutant diffusion model to obtain the diffusion range of the real pollution source. According to the invention, through environment data acquisition of the unmanned ground vehicle, multiple environment data of a water area and soil can be obtained in real time in a target monitoring area, so that pollution conditions can be found and responded in time, and potential hazards caused by environment pollution are reduced.
Owner:WENZHOU HUANKE ENVIRONMENTAL PROTECTION TECH CO LTD

Anti-seismic reinforcing method and reinforcing system suitable for historical building

The invention discloses an anti-seismic strengthening method and system suitable for historical buildings, and relates to the technical field of existing building strengthening. The invention discloses an anti-seismic reinforcement system suitable for historical buildings. The anti-seismic reinforcement system comprises a data modeling module, a risk assessment module, a disturbance analysis module, a buffer decision module, a reinforcement early warning module, a component reinforcement decision module, a collaborative reinforcement decision module and a scheduling optimization module. According to the method, the linkage stress relation and the collaborative response characteristics are identified by establishing the structure coupling model of the adjacent buildings and a strength correlation analysis method, and a theoretical basis and a judgment standard are provided for collaborative reinforcement of cross-building units; the collaborative reinforcement strategy is generated according to the linkage requirement, the collaborative mode and the deployment position are defined, and the overall coordination of the community-level reinforcement scheme and the linkage toughness of the structural system are enhanced.
Owner:厦门工学院

Dynamic building heat load simulation method and device, heat supply system and medium

The invention discloses a dynamic building thermal load simulation method and device, heat supply equipment and a medium, and relates to the technical field of load prediction.The method comprises the steps that when the environment temperature changes, the first building unit area thermal load before change is determined, and the second building unit area thermal load after change is determined; determining a first heat change of the building external envelope structure and a second heat change of the building internal envelope structure caused by the environment temperature change; according to the difference value of the unit area thermal load of the first building and the unit area thermal load of the second building, the delay time is determined in combination with the heat change of the building envelope; and based on the delay time, the outdoor temperature before the delay time and the current indoor temperature are utilized to correct the unit area thermal load of the second building. By adopting the method, the calculation complexity of dynamic building thermal load simulation can be simplified, and the calculation of the delay time is more practical and operable.
Owner:RUINA INTELLIGENT EQUIP CO LTD

Heterogeneous building air conditioner group quick response control method based on physical information deep learning

The invention provides a heterogeneous building air conditioner group quick response control method based on physical information deep learning, and the method comprises the steps: 1, obtaining a real-time discrete step scheduling instruction issued by a power grid, obtaining the thermodynamic parameters and equipment inertia time constants of all building units in a heterogeneous building group, obtaining the outdoor temperature, and carrying out the real-time discrete step scheduling instruction; the solar radiation intensity and the indoor air temperature of each building unit; step 2, extracting spatial-temporal characteristics of each building unit based on a multi-head self-attention mechanism, and generating initial distribution target power of the air conditioner; 3, inputting the initial allocation target power into a pre-trained cascaded physical information neural network (PINN), and predicting power and temperature evolution tracks in a future scheduling period; 4, calculating an out-of-limit risk index of each unit, judging whether to execute a quantile risk migration strategy or not, and generating a final distribution target power of the air conditioner; and 5, calculating the transient climbing deviation between the actual aggregation power and the target power of the power grid, and carrying out deviation compensation.
Owner:HOHAI UNIV

Model building apparatus, model building method, computer program and recording medium

A model building apparatus includes: a building unit that builds a generation model that outputs an adversarial example, which causes misclassification by a learned model, when a source sample is entered into the generation model; and a calculating unit that calculates a first evaluation value and a second evaluation value, wherein the first evaluation value is smaller as a difference is smaller between an actual visual feature of the adversarial example outputted from the generation model and a target visual feature of the adversarial example that are set to be different from a visual feature of the source sample, and the second evaluation value is smaller as there is a higher possibility that the learned model misclassifies the adversarial example outputted from the generation model. The building unit builds the generation model by updating the generation model such that an index value based on the first and second evaluation values is smaller.
Owner:NEC CORP

Submarine cable construction ship extremely-short-term motion response prediction method and system

The invention discloses a submarine cable construction ship extremely-short-term motion response prediction method and system, and relates to the technical field of ship motion control in ocean engineering. Comprising the following steps: acquiring six-degree-of-freedom time sequence data based on a ship-borne inertial measurement unit of a submarine cable construction ship, and constructing a data set; the data set is preprocessed; constructing a model CNN-RSBU-BiLSTM (Convolutional Residual Shrinkage-Bidirectional Long Short Term Memory) with fusion of the convolutional residual shrinkage; the model CNN-RSBU-BiLSTM is trained by means of the data set obtained after preprocessing is carried out on the model CNN-RSBU-BiLSTM; and inputting the six-degree-of-freedom time sequence data acquired and preprocessed in real time into the trained model, and outputting an extremely short-term six-degree-of-freedom motion response prediction result of the submarine cable construction ship. According to the method, the multi-scale feature extraction capability of the one-dimensional convolutional neural network, the noise reduction enhancement effect of the residual shrinkage building unit and the digging capability of the bidirectional long-short-term memory network on the time sequence dependency relationship are combined, so that accurate prediction of the extremely-short-term six-degree-of-freedom motion response of the submarine cable construction ship is realized, and the prediction accuracy is effectively improved.
Owner:POWERCHINA HUADONG ENG CORP LTD +3

Modular building unit

PCT designated stage expiredWO2025008335A1FloorsFoundation engineeringBuilding unitMechanical engineering
There is disclosed a modular building unit (12) comprising a side structure (100) and a ceiling assembly (102) connected to the side structure. The side structure comprises an upper surface (104). The ceiling assembly is connected to the side structure, and comprises: a load transfer section (106) configured to transfer a load to the side structure, the load transfer section comprising a lower surface (112) seated on the upper surface of the side structure; and a ceiling section (108) configured to define or support a ceiling (110) of the modular building unit. The ceiling section is disposed inwardly of the load transfer section and connected to it, and comprises a lower surface (114) disposed at a position that is lower than the upper surface of the side structure. There is also disclosed a modular building assembly (14) comprising the modular building unit (12), and a building (10) comprising the modular building unit. A method of constructing a modular building unit, and a method of constructing a building comprising a modular building unit, are also disclosed.
Owner:SANO DEV LTD

Building design effect picture automatic generation method and system, medium and program product

The invention discloses an automatic building design effect picture generation method and system, a medium and a program product, and the method comprises the steps: obtaining three-dimensional geometric data of a building group, and building a spatial visual importance network of the building group according to the three-dimensional geometric data; the building group is divided into a plurality of visual correlation sub-regions based on the spatial visual importance network, the spatial entropy value of each visual correlation sub-region is calculated, and the spatial entropy values are used for representing the spatial distribution complexity degree of building units in the visual correlation sub-regions; according to the spatial entropy values and the three-dimensional geometric data of the building units in the visual association sub-regions, generating a multi-level detail model corresponding to each visual association sub-region; constructing a rendering pipeline based on the multi-stage detail model and the connection weight; and performing visual consistency synthesis on the output result of the rendering pipeline to generate a building design effect picture of the building group. The real-time performance and practicability of building design effect picture generation are improved.
Owner:HANGZHOU JINGCAI DIGITAL TECH CO LTD

Building cluster demand response coordinated multi-objective optimization scheduling method and system

The invention discloses a building cluster demand response coordinated multi-objective optimization scheduling method and system, and the method comprises the steps: predicting the energy demand and supply information of a building cluster, and building an energy transaction model of a building unit and the cluster based on renewable energy supply and battery storage electric energy; the building cluster is integrated into a single entity, the energy supply of the single entity is the total energy supply of all buildings, the energy demand is the total energy demand of all buildings, the battery capacity is the total battery capacity of all buildings, and the energy transaction model takes a cost function of the whole cluster as a target function; and optimizing the overall cost function of the building cluster through an iterative demand response algorithm, calculating to obtain an optimal operation parameter, controlling the operation of each building unit according to the optimal operation parameter of the cluster by using a nonlinear programming algorithm, and carrying out multi-target optimization scheduling on the building cluster. Flexible resources in the building cluster can be fully utilized, and efficient utilization and supply and demand balance of energy are achieved.
Owner:GUIZHOU POWER GRID CO LTD

Method and system for retreating and supplementing liquid for electronic brake booster and automobile

The invention discloses an electronic brake booster rollback fluid infusion method and system and an automobile, and the method comprises the steps that in the braking process, a pressure buildup unit is controlled to build brake pressure for a wheel end brake cylinder; acquiring a liquid quantity state of a brake system; the liquid quantity state of the braking system comprises the braking demand liquid quantity V1 needing to be consumed by a brake cylinder at the wheel end after braking during current driving, the maximum effective braking liquid quantity V2 capable of being provided by the braking system after braking during current driving and the total consumed liquid quantity V3 when the braking intention of a driver is reached after braking during current driving; determining whether the liquid quantity state of the brake system meets a liquid supplementing condition or not; and if yes, the pressure buildup unit is controlled to obtain the brake fluid from the brake fluid storage pot. According to the system, it can be ensured that enough liquid amount exists in the system to support pressure building, the situation that after the ABS function of a vehicle is activated, the brake liquid amount in the pressure building unit is not enough to continue to support the brake requirement of the next cycle is prevented, and the time of returning and liquid supplementing of the brake system can be accurately recognized.
Owner:DEEPAL AUTOMOBILE TECH CO LTD

Multi-site resource and task scheduling system and scheduling method based on improved DQN

The invention discloses a multi-site resource and task scheduling system and scheduling method based on an improved DQN, and the system comprises a multi-dimensional model building module which is used for building a multi-dimensional model for dynamic resource scheduling and comprises a resource space formalized definition unit, a task space multi-dimensional modeling unit, a multi-objective optimization problem building unit and a dynamic scheduling process formalized description unit; the improved DQN scheduling model construction module is used for constructing a scheduling model based on an improved DQN and comprises a Markov decision modeling unit, a double-flow Q value estimation network construction unit, a spatial-temporal feature encoder construction unit, a priority experience playback mechanism construction unit and a training optimization strategy unit; according to the method, the efficiency and accuracy of resource scheduling in various fields can be improved, the model algorithm can quickly adapt to new scenes through fine adjustment, repeated parameter adjustment is reduced, and the method has wide application prospects and remarkable economic benefits.
Owner:CHINESE PEOPLES LIBERATION ARMY UNIT 63679

Modular building unit

A floor frame assembly for a modular building unit comprises: a floor support portion comprising an upper surface configured to support at least part of a floor structure 30 of the modular building un
Owner:SANO DEV LTD

Upper surface raising structure of building unit

To make an entire upper surface of a building unit having a stepped shape flat, mainly when it rains, by covering from above with a surface material.SOLUTION: In an upper surface raising structure of a building unit 2, a surface material 21 is installed on an upper surface 11 of the building unit 2 having a stepped shape in which an inner part 13 is lower than a peripheral edge part 12. The surface material 21 covers the entire upper surface 11 of the building unit 2 to make it a flat surface that is the same height as the peripheral edge part 12 or slightly higher than the peripheral edge part 12. The upper surface raising structure 1 of the building unit 2 is provided with at least one of a slip prevention member 22 that prevents the surface material 21 from slipping laterally relative to the upper surface 11 of the building unit 2 and a plurality of support members 23 that support the surface material 21 above the inner part 13.SELECTED DRAWING: Figure 3
Owner:SEKISUI CHEMICAL CO LTD

Modular building unit manufacturing

PCT designated stage expiredWO2025008328A1FloorsFoundation engineeringBuilding unitMechanical engineering
A method of manufacturing a modular building unit. The method comprises constructing a floor assembly and walls extending upwardly from the floor assembly and separately constructing a ceiling assembly. The ceiling assembly includes a load transfer section configured to transfer load to the walls. The method further comprises coupling building services equipment to the ceiling assembly. Finally, the ceiling assembly is lifted onto the walls and the walls secured to the load transfer section such that the walls connect the floor and ceiling frame assemblies.
Owner:SANO DEV LTD

Frame structure analysis method and system under impact load effect

The invention relates to a frame structure analysis method and system under the impact load effect, and the method comprises the steps: carrying out the modeling of a frame structure based on the basic information of the frame structure of a preset building unit, and obtaining a frame structure model; a load time history curve of the impact load acting on the preset building unit is constructed, and the load time history curve represents the change of the acting force of the impact load along with time; and based on the frame structure model and the load time history curve, solving a frame structure analysis result of the preset building unit under the action of the impact load. By means of the method, dynamic anti-explosion analysis combining the frame structure model and the load time history curve is achieved, the limitation of a traditional equivalent static method or a simplified dynamic model is broken through, the influence of key parameters on a structure damage mode can be quantified, transient nonlinear response under the action of shock waves can be accurately captured, and the anti-explosion effect is improved. The problem of how to accurately analyze the frame structure of the building under the action of the impact load is solved.
Owner:ZHEJIANG UNIV

Power industry network security collaborative defense system based on threat hunting technology

The invention discloses a power industry network security collaborative defense system based on a threat hunting technology, and particularly relates to the technical field of network security defense, and constructs a threat intelligence defense model comprising a threat intelligence sharing platform, a multi-layer defense architecture building unit, a network attack behavior analysis unit and a risk visual display unit. Security log information in a power system is collected and analyzed in real time, potential network security threats are found in time, and early warning is automatically given out. Acquiring network security threat information by building a threat intelligence sharing platform and a multi-layer defense architecture building unit; therefore, rich intelligence resources are provided for the risk visualization display unit, the risk visualization display unit can identify and analyze potential threats more accurately, quick response and effective disposal of the threats are achieved by establishing a linkage response mechanism among the hierarchies, and the risk visualization display unit is more efficient. The problem that in the prior art, a power industry network security cooperative defense system cannot provide perfect network security threat information is solved.
Owner:HUANENG LANCANG RIVER HYDROPOWER CO LTD

Clustering analysis-based protection delay strategy optimization system for e-commerce platform

The invention, which relates to the technical field of the e-commerce platform, discloses a cluster analysis-based extended insurance policy optimization system for an e-commerce platform, comprising a policy optimization module for optimizing the formulation of a pricing policy under an extended insurance policy of the e-commerce platform; the strategy optimization module comprises a strategy making unit, a function construction unit and a price making unit, the strategy making unit is connected with the function construction unit through a network, and the function construction unit is connected with the price making unit through the network. According to the invention, the strategy optimization module is designed, so that the optimal platform extended insurance strategy selection function of the e-commerce platform in the supply chain environment of manufacturer competition is realized, the operation efficiency and market response capability of the e-commerce platform are improved, and the scientificity and accuracy of the e-commerce platform in the extended insurance strategy making process are improved.
Owner:HEFEI UNIV OF TECH

Building units for machine learning models for denoising images and systems and methods for using same

In some examples, a machine learning model may be trained to denoise an image. In some examples, the machine learning model may identify noise in an image of a sequence based at least in part, on at least one other image of the sequence. In some examples, the machine learning model may include a recurrent neural network. In some examples, the machine learning model may have a modular architecture including one or more building units. In some examples, the machine learning model may have a multi-branch architecture. In some examples, the noise may be identified and removed from the image by an iterative process.
Owner:MICRON TECHNOLOGY INC

A training method for a carbon emission prediction model

The present invention relates to a training method for a carbon emission prediction model, belonging to the technical field of carbon emission prediction, and solves the problem of low prediction accuracy in the prior art. The method includes: obtaining the historical carbon emissions of a construction unit and the corresponding carbon emission-related factor data; constructing a training sample set based on the historical carbon emissions and the corresponding carbon emission-related factor data; constructing a multi-step time series prediction model for predicting the carbon emissions in multiple future time steps; the multi-step time series prediction model includes: a static feature extraction module for extracting static features based on static data; a time series feature extraction module for extracting time series features based on multi-dimensional time series data; a feature fusion module for fusing the static features and the time series features; a prediction module for predicting the carbon emissions in multiple future time steps based on the fused features; training the multi-step time series prediction model based on the training sample set to obtain a carbon emission prediction model. Accurate carbon emission prediction of construction units is achieved.
Owner:CHINA ARCHITECTURE DESIGN & RES GRP CO LTD

Zero-carbon park planning method based on full-life-cycle carbon neutralization

The invention relates to a zero-carbon park planning method based on full-life-cycle carbon neutralization, belongs to the technical field of carbon emission planning, and solves the problem that refined carbon control planning cannot be performed in the prior art. The method comprises the following steps: acquiring historical carbon emission of a park building unit and corresponding carbon emission related factor data; constructing a training sample set based on the historical carbon emission of the building unit and the corresponding carbon emission related factor data; constructing a time sequence prediction neural network model, and training the time sequence prediction neural network model based on the training sample set to obtain a carbon emission prediction model; predicting the carbon emission of each building unit in the park based on the carbon emission prediction model, and determining a key management and control building unit based on the predicted carbon emission; and determining planning improvement measures of the key management and control building units based on the sample data of the key management and control building units. And refined carbon control planning is realized.
Owner:CHINA ARCHITECTURE DESIGN & RES GRP CO LTD

Heat exchange station circulating pump control system based on tail end pressure difference

The invention discloses a heat exchange station circulating pump control system based on tail end pressure difference, and relates to the technical field of heat supply system automation control. Comprising a tail end pressure difference monitoring module which is arranged on a water supply and return pipeline of a building unit at the tail end of the heat supply pipe network and used for collecting pressure signals of a water supply pipe and a water return pipe in real time; the data transmission module is used for uploading the pressure signal to the cloud platform; the data processing and control module comprises a cloud platform and a heat exchange station PLC, the cloud platform receives the pressure signal and obtains an actual pressure difference delta P, the actual pressure difference delta P is compared with a preset expected pressure difference delta P, and an adjusting instruction is generated; and the execution module comprises a frequency converter and a two-network circulating pump, and the PLC adjusts the output frequency of the frequency converter according to the adjusting instruction so as to change the rotating speed of the circulating pump, so that the actual pressure difference delta P approaches the expected pressure difference delta P. The real-time pressure difference of the pipe network tail end is remotely monitored, the rotating speed of the two-network circulating pump is dynamically adjusted, it is ensured that the heat supply pressure of a tail end user is stable, and meanwhile system energy consumption is reduced.
Owner:DALIAN HAIXIN COMPUTER CO LTD

Industrial big data informatization system for industrial production

The invention relates to the technical field of industrial production data optimization, in particular to an industrial big data informatization system for industrial production, which comprises a dust concentration monitoring unit, a physical model building unit, a machine learning algorithm unit and a dynamic compensation mechanism unit, the dust concentration monitoring unit obtains dust concentration, particle size and density information through a laser beam and a photoelectric detector, the physical model building unit builds an illumination intensity correction model and a pressure sensor mechanical model based on the Mie scattering theory, the Lambert-Beer law and the like, and real-time optimization is conducted through the self-adaptive optimization module. After the machine learning algorithm unit preprocesses sensor and dust data, a support vector regression algorithm is utilized to predict data deviation, the signal compensation module adjusts a compensation value in combination with a physical model correction result, and the dynamic compensation mechanism unit corrects an original output signal of the sensor in real time according to a model calculation and machine learning correction result. The industrial production efficiency is improved.
Owner:QUANZHOU BAIBIANXING TECHNOLOGY RESEARCH INSTITUTE CO LTD

Modularized combined steel-concrete building unit and production method and installation method thereof

The invention discloses a modular combined steel-concrete building unit which comprises a steel column, a top beam, a bottom beam and an L-shaped steel piece. The top beam and the bottom beam are connected to the top and the bottom of the steel column respectively to form a rectangular box type structure. The L-shaped steel pieces are fixed to the steel columns and located on the first outer vertical face and the second outer vertical face of the modular combined steel-concrete building unit, and the first outer vertical face and the second outer vertical face are two opposite vertical faces of the modular combined steel-concrete building unit. The postures of the L-shaped steel parts located on the first outer vertical face and the postures of the L-shaped steel parts located on the second outer vertical face are inverted, and through holes used for installing bolts are formed in the L-shaped steel parts. The L-shaped steel parts of the left side modular combined steel-concrete building unit are engaged with the inverted L-shaped steel parts of the right side modular combined steel-concrete building unit; the steel columns of the adjacent modular combined steel-concrete building units are connected together, and the bearing capacity of the whole building is improved.
Owner:SHANGHAI JIEYI CONSTR TECH CO LTD

Automated systems and methods for floor and ceiling units in the construction of modular building units

A system and method for assembling framing assemblies for use as ceiling or floor structures of modular building units using automation are disclosed. The framing assemblies include trusses that are attached at the lateral edges thereof by a joist including at least one layer of dimensional lumber to form a substantially rigid framework. Cover panels are positioned over and attached to an inner surface of the framing assembly.
Owner:BUILDZ LLC

Heat supply pipe network monitoring method and system based on temperature balance, medium and product

The invention discloses a heat supply pipe network monitoring method and system based on temperature balance, a medium and a product, and relates to the field of data monitoring. According to the method, the monitoring system periodically collects the real-time operation parameters of all the building units in the heat supply pipe network, the initial flow distribution coefficient of all the building units is calculated according to the water supply and return pressure difference, and the final flow distribution coefficient is obtained by combining building unit occupancy rate correction. And the monitoring system calculates the temperature balance degree of each building unit according to the return water temperature and the indoor temperature so as to determine the temperature balance index of the heat supply pipe network, further draws a pipe network temperature balance change curve, and determines the adjustment sensitive time period according to the curve slope. According to the dynamic monitoring mode based on temperature balance, heat supply abnormity can be found in time, the data collection frequency and the alarm threshold value are adjusted in a self-adaptive mode according to the sensitive time period where the building unit is located, the abnormity detection accuracy is improved, meanwhile, resource waste caused by excessive collection is avoided, and refined monitoring of the heat supply pipe network is achieved.
Owner:TANGSHAN CITY HEATING POWER IND DEV

Gas-permeable electronically conductive plate for use as porous transport layer for an electrolyzer

PendingUS20250215588A1CellsThermodynamicsBuilding unit
Described are a gas-permeable electronically conductive plate for use as porous transport layer for an electrolyzer and a process for preparing said gas-permeable electronically conductive plate. a building unit for an electrolyzer, and an electrolyzer.
Owner:BASF SE

Systems and methods for stereolithography three-dimensional printing

The present disclosure provides systems and methods for printing three-dimensional (3D) objects. A system for printing a 3D object may comprise at least one platform configured to hold a film of at least one mixture, a deposition unit for providing the film of the at least one mixture, and a building unit for forming at least a portion of the 3D object from the film of the at least one mixture. The system may further comprise a controller operatively coupled to the at least one platform. The controller may be configured to direct the at least one platform to move from the deposition unit to the building unit, or vice versa, along a plurality of non-overlapping paths.
Owner:HOLO INC