Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

13429results about "Building repairs" patented technology

Ancient building restoration method and system based on three-dimensional laser scanning technology

The invention provides an ancient building restoration method and system based on a three-dimensional laser scanning technology, and the method comprises the following steps: 1, carrying out the three-dimensional laser scanning at an ancient building site, and obtaining the three-dimensional point cloud data of an ancient building; through the three-dimensional laser scanning technology, the three-dimensional point cloud data of the historic building are rapidly obtained, the workload and time of manual measurement are reduced, the working efficiency is improved, the historic building is comprehensively and carefully scanned through the multi-station scanning technology, and accurate data support is provided for follow-up work; the Gaussian filtering algorithm is used for data processing, the accuracy of the data is improved, the three-dimensional point cloud data collected at different angles or at different time are automatically spliced, manual intervention and errors are reduced, the damage position and degree are automatically recognized in damage diagnosis, and the accuracy and efficiency of diagnosis are improved; all data are stored in a digital form, so that data sharing, transmission and long-term storage are facilitated, and the problem that paper data are easy to damage and lose is avoided.
Owner:YANGZHOU YIJIANGXUAN LANDSCAPE & CLASSIC ARCH CONSTR CO LTD

Digital auxiliary repair method for ancient building

PCT designated stage expiredWO2025145591A1Image enhancementImage analysisPoint cloudComputer printing
A digital auxiliary repair method for an ancient building. The method comprises: point cloud data acquisition, point cloud model establishment, point cloud model optimization and model printing, which involve: scanning and photographing a damaged ancient building by using a three-dimensional scanner and an industrial camera, so as to obtain three-dimensional point cloud data of the ancient building; performing preprocessing, such as data registration, data denoising, data simplification and data segmentation, on the point cloud data to obtain data for establishing a three-dimensional model; optimizing the three-dimensional model; and by means of a 3D printer, obtaining a mold for a damage position of the ancient building, and on the basis of requirements, using the mold to perform molding to obtain a wooden or brick-mixed workpiece.
Owner:SHANGHAI BUILDING DECORATION ENG GRP CO LTD

Robotic system for facade operation of a building facade and the method thereof

Disclosed is a robotic system for facade operation of a building facade, including: a plurality of propelling elements on an unmanned aerial vehicle to enable the unmanned aerial vehicle to hover in any position for various tasks; one or more end effectors on the unmanned aerial vehicle to perform various tasks; and an enclosed system to confine the operation space of the unmanned aerial vehicle.
Owner:SKYBOTICS TECHNOLOGY LTD

Multi-element historic building maintenance and restoration method based on three-dimensional laser scanning

The invention discloses a multi-element historic building maintenance and restoration method based on three-dimensional laser scanning, and relates to the technical field of computer processing, and the method comprises the following steps: S01, obtaining the three-dimensional point cloud data of a historic building foundation through a ground laser scanner, the basic three-dimensional point cloud data comprises geometric information of a building facade, a ground structure and a near-ground decoration component; s02, an unmanned aerial vehicle carries a multi-line laser scanning device to scan the top and the high-altitude structure of the building, supplementary point cloud data is generated, and the millimeter-level precision three-dimensional coordinates of the pitched roof, the tower eave and the cornice bracket are covered with the supplementary point cloud data; and S03, synchronously acquiring surface texture data of the historic building by adopting multispectral imaging equipment. According to the method, the millimeter-level precision of three-dimensional reconstruction of the historic building is realized through multi-source data fusion and a hierarchical optimization algorithm, and the maintenance decision efficiency is improved by combining automatic disease recognition and a multi-modal analysis technology.
Owner:ZHEJIANG COLLEGE OF CONSTR

House waterproof maintenance system based on intelligent detection and self-repairing technology

The invention provides a house waterproof maintenance system based on an intelligent detection and self-repairing technology, and the system comprises an intelligent sensing layer which is used for collecting multi-dimensional physical parameters of building waterproof key nodes in real time; the edge calculation analysis layer is used for performing fusion analysis and risk prediction on the perception data; the dynamic self-repairing execution layer is used for triggering a multi-stage repairing mechanism according to an analysis result; the cloud management layer is used for realizing visual management and control and strategy optimization of the whole system, and relates to the technical field of building waterproofing, the building state is monitored in real time through a multi-mode sensing network, water leakage risk prediction is realized in combination with an edge calculation algorithm, and collaborative repair of a microcapsule repair agent, a shape memory alloy grid and an electrodialysis module is triggered; the system remarkably improves the timeliness and reliability of waterproof maintenance, reduces the manual intervention cost, and is suitable for intelligent maintenance of residential buildings, industrial buildings and historical protection buildings.
Owner:HENAN COMM INVESTMENT GRP CO LTD ZHUMADIAN BRANCH

Safety risk monitoring method for high-altitude large steel structure corridor

The invention provides a safety risk monitoring method for a high-altitude large-scale steel structure corridor, and belongs to the technical field of high-altitude large-scale steel structure corridors, and the method comprises the steps: selecting a plurality of representative monitoring points, monitoring the vibration and deformation data of a corridor structure, building a small-scale model, and carrying out the experimental test, and feature intervals of different risk levels are divided by adopting a clustering analysis method. And then establishing a mapping relationship among the vibration and deformation parameters and the risk index of the corridor structure by using a machine learning method to obtain a corridor real-time risk index analysis model. And finally, inputting actual corridor monitoring data into the analysis model, comparing the actual corridor monitoring data with a preset risk threshold value, and sending out an early warning signal in time, thereby providing a basis for corridor safety monitoring and management. According to the method, measured data and simulation experiment data are fully utilized, the advanced data analysis technology is combined, the safety condition of the corridor structure can be effectively evaluated, and the technical problems that in the prior art, the detection means is single, and the early warning capacity is weak are solved.
Owner:CHINA CONSTR EIGHTH BUREAU DEV & CONSTR CO LTD +1

Water jet forcible entry equipment and forcible entry method thereof

The invention belongs to the technical field of viaduct renewal, and discloses water jet forcible entry equipment and a forcible entry method.The equipment comprises a main body structure, an auxiliary supporting structure, a spray head structure and a control structure, the main body structure is movably arranged on the road surface, and the auxiliary supporting structure is arranged on the side, away from an anti-collision wall, of the main body structure; the supporting rods are driven to rotate through stretching and retracting of the linear driving mechanism, so that the auxiliary supporting wheels abut against the ground, anti-toppling supporting force is provided for the main body structure, the situation that the equipment topples due to the counter-acting force of water flow is avoided, the stability of the whole equipment in the moving process is ensured, and the operation danger is reduced. The spray head structure comprises a mounting base and a spray head, the mounting base is movably arranged at the end of the main body structure, and the spray head is rotatably arranged on the mounting base so as to achieve multi-angle forcible entry of the anti-collision wall. The control structure is arranged on the main body structure and can control movement of the main body structure, movement of the mounting base and rotation, start and stop of the spray head, and intelligent operation is achieved.
Owner:SHANGHAI MECHANIZED CONSTR GRP

Reamer bit and concrete repairing method

The invention relates to the field of constructional engineering concrete detection, in particular to a reamer bit and a concrete repairing method.The reamer bit comprises a mounting base, at least two drill arms and at least two supporting rods; one end of the drill arm is hinged with the mounting seat, a fixing pipe is arranged between the hinge points of the drill arm and the mounting seat, the fixing pipe is connected with a positioning rod in a sliding manner, one end of the supporting rod is hinged with the positioning rod, and the other end of the supporting rod is hinged with the drill arm. When the reamer bit is used, the angle of the drill arm can be flexibly adjusted by pressing the positioning rod, the hole diameter of a reaming hole can be accurately controlled according to actual repairing requirements, and the reamer bit is suitable for repairing scenes of coring holes of different sizes and depths; the formed horn mouth with the wide inside and the narrow outside can be embedded into original concrete like a tenon after concrete is poured, the combining capacity of new concrete and old concrete is greatly improved, and it is guaranteed that a repaired area is not prone to separation.
Owner:SICHUAN CHENGZHENG ENG TESTING TECH CO LTD

Remote control forcible entry robot for nuclear facility decommissioning and forcible entry method

The invention discloses a remote control forcible entry robot for nuclear facility decommissioning and a forcible entry method, and relates to the technical field of nuclear facility decommissioning. The remote control forcible entry robot comprises a crawler-type chassis, a hydraulic arm, a hydraulic system and a hydraulic tool head quick-change mechanism; the crawler-type chassis comprises a vehicle body chassis, a swing mechanism installed on the vehicle body chassis, crawler systems installed on the left side and the right side of the vehicle body chassis, and supporting leg systems installed at the two ends of the front end of the vehicle body chassis. The hydraulic arm is mounted on the slewing mechanism and comprises a multi-stage arm and an arm oil cylinder which are hinged; the hydraulic tool head quick-change mechanism is used for being connected with a target tool head in a quick-change mode. The robot can perform decommissioning demolition operation on nuclear facilities to be decommissioned under manual remote control operation, the working time of operators in radioactive places can be shortened, and the exposure dose of the operators is reduced.
Owner:SICHUAN ENVIRONMENTAL PROTECTION ENG CO LTD CNNC

Method for controlling and repairing cracks of concrete structure

The invention relates to the technical field of building structure repair, in particular to a concrete structure crack control repair method which comprises the following steps: S1, determining a repair priority; s2, impurities and moisture in the cracks are removed, and meanwhile, the roughness of the surfaces of the cracks is increased through laser etching, so that the adhesive force of a subsequent filling material is enhanced; s3, preparing a repairing material according to the crack condition; s4, the crack is evenly filled with the repairing material prepared in the S3; s5, applying low-frequency vibration to the repair area by using micro-vibration equipment after the repair material is injected; s6, after curing, the repaired face is ground and polished; and S7, finally, an epoxy group sealing coating is sprayed to the repaired face, and sealing treatment is conducted. According to the method, through efficient evaluation and an accurate material injection technology, rapidness and economical efficiency of crack repairing are achieved, meanwhile, the quality and durability of a repaired structure are ensured, and environmental friendliness and construction convenience are reflected in the whole process.
Owner:THE FIRST CONSTR ENG COMPANY LTD OF CHINA CONSTR SECOND ENG BUREAU +1

Old wind power plant fan foundation small-to-large capacity increasing structure and transformation construction method

The invention discloses an old wind power plant fan foundation small-to-large capacity increasing structure and a transformation construction method. The old wind power plant fan foundation small-to-large capacity increasing structure comprises an original fan foundation, a newly-poured reinforced concrete foundation, a vertical anchor bolt cage connecting system and a radial anchor bolt connecting system. The connecting structure of the bottom section of the new fan tower drum and the new fan foundation comprises a vertical anchor bolt cage connecting system and a radial anchor bolt connecting system. The vertical anchor bolt cage connecting system is fixed in the original fan foundation, and the radial anchor bolt connecting system is fixed in the newly-poured reinforced concrete foundation. According to the new fan foundation, the diameter of the middle pier is expanded so as to arrange a new tower tube, the height of the middle pier is not changed, the height of the middle pier of the newly-poured foundation almost does not need to be increased, and the using amount of concrete is greatly reduced. Meanwhile, according to the structure, an original vertical anchor bolt cage connecting system is reserved, a radial anchor bolt connecting system is adopted for enhancing connection between the bottom section of the fresh air fan tower barrel and the fan foundation, the transformation cost and the connection reliability are effectively controlled, and the maximization of reutilization of the original fan foundation and the controllability of the cost of the fresh air fan foundation are achieved.
Owner:POWERCHINA HUADONG ENG CORP LTD

Movable wall reinforcing device

The invention discloses a movable wall reinforcing device, and relates to the technical field of constructional engineering wall reinforcing equipment.The technical scheme is that the movable wall reinforcing device comprises reinforcing equipment, the reinforcing equipment comprises a supporting folding device, a reinforcing assembly and a bottom plate assembly, and the top face of the bottom plate assembly is connected with the bottom face of the supporting folding device; the bottom of the reinforcing assembly is located above one side of the top face of the bottom plate assembly, and the supporting and folding device comprises a sliding groove base, a hydraulic rod, a connecting block, a lifting assembly, a guide connecting frame, a threaded rod and a limiting ring. The wall reinforcing device has the beneficial effects that the connecting block at the top of the sliding groove base is connected with the bottom end of the hydraulic rod, so that the angle of the hydraulic rod can be adjusted to meet different wall reinforcing requirements; a worker can adjust the number of the supporting folding devices installed on the sliding strip columns according to the pressure bearing capacity of the wall, and maximum efficiency adaptation of supporting force is achieved. The labor cost and the material cost can be reduced, and the construction efficiency is improved.
Owner:THE SECOND CONSTR OF CHINA CONSTR EIGHTH ENG DIV

Prestress reinforcing device for newly-built concrete pole

The invention relates to a newly-built concrete electric pole prestress reinforcing device, and belongs to the technical field of power transmission line engineering, the newly-built concrete electric pole prestress reinforcing device comprises an electric pole body, a prestress assembly is installed on the electric pole body, the prestress assembly comprises a connecting hoop and an adjusting assembly, and the connecting hoop is installed at the top end of the adjusting assembly; the adjusting assembly comprises four hinge rods which are sequentially connected end to end to form a parallelogram structure and arranged outside the electric pole body in a sleeving mode, a hinge piece is installed at the connecting position of any two connected hinge rods, and the ends of the hinge rods and the hinge pieces are installed in a hinged mode. A pair of pulleys installed on the electric pole body is further arranged between the connecting hoop and the adjusting assembly, the two U-shaped connecting blocks are both connected with steel twisted ropes, and the free ends of the steel twisted ropes penetrate through the through holes, bypass the pulleys and then are fixedly connected with the connecting hoop. Tensioning and applying of prestress can be achieved, the strength and the anti-overturning capacity of the concrete electric pole are effectively improved, and the service life of the concrete electric pole is effectively prolonged.
Owner:STATE GRID FUJIAN POWER ELECTRIC CO ECONOMIC RESEARCH INSTITUTE +1

Repair system and construction method of reinforced concrete column based on triple cooperative constraints

The invention relates to the technical field of concrete structure repairing, in particular to a repairing system of a reinforced concrete column based on triple cooperative constraint, which comprises a core area concrete column formed by removing a failed concrete protection layer from a rusted reinforced concrete column; the longitudinal bars are arranged on the peripheral side of the core area concrete column; the four-corner star-shaped stirrups are hooped on the outer side of the core area concrete column at intervals in the axial direction of the core area concrete column and are fixed to the longitudinal bars; the anti-stress pieces are arranged at the four corners of the core area concrete column and fixedly connected with the four corner ends of the four-corner star-shaped stirrups; and the FRP grid-ECC composite sandwich structure is arranged on the outer side of the core area concrete column. According to the method, through a material performance complementation and interface stress coordination mechanism, the purpose of multi-target collaborative optimization of axial compression-bending shear coupling bearing capacity reconstruction, interface durability improvement, secondary corrosion inhibition and the like of the repaired concrete column is achieved. The invention further correspondingly discloses a construction method of the repairing system.
Owner:GUILIN UNIVERSITY OF TECHNOLOGY +2

Fabricated overhanging protection device

The utility model relates to the technical field of overhanging protection, in particular to an assembly type overhanging protection device which comprises a wall body and an overhanging main body, the overhanging main body is arranged in the middle of the front side of the wall body, a supporting structure is arranged below the overhanging main body and comprises a supporting plate, a transverse plate is arranged below the supporting plate, and the transverse plate is connected with the wall body. A vertical plate is assembled on the rear side of the transverse plate through a bolt and assembled on the side wall of a wall through an expansion bolt, an assembly hole is formed in the vertical plate, a pulling and hoisting structure is arranged on the side edge of the cantilever body and comprises pulling blocks, the pulling blocks are fixed to the two ends of a supporting plate, and pulling rods are inserted into the pulling blocks in a penetrating mode. The middle of the pull rod is sleeved with a pull sleeve, a pull lug is welded to the upper end of the pull sleeve, a hanging rod is assembled in the pull lug through a bolt, and the upper end of the hanging rod is assembled in the hanging plate through a bolt. According to the utility model, rapid assembling, supporting and hoisting can be conveniently carried out according to actual conditions, so that the protection construction is more convenient and efficient.
Owner:XUCHANG HENGDA HANGXIAO CONSTR TECH CO LTD

Steel structure or concrete outer wall cleaning robot and control system thereof

PendingCN119055143AStable and powerful adsorption capacityimprove energy efficiencyCarpet cleanersFloor cleanersControl systemClassical mechanics
The invention relates to a steel structure or concrete outer wall cleaning robot and a control system thereof. The steel structure or concrete outer wall cleaning robot comprises a robot body, an adsorption assembly, a cleaning assembly and a moving assembly. The adsorption assembly comprises an electric permanent magnet adsorption system which is arranged at the bottom of the robot body, and the robot body is adsorbed to the steel structure or the concrete outer wall by generating magnetic attraction with steel bars in the steel structure or the concrete outer wall. The cleaning assembly is used for completing cleaning work and comprises a high-pressure water gun and a brush. The moving assembly is used for driving the robot body to move on the surface of a steel structure or a concrete outer wall. The cleaning robot can efficiently and intelligently complete outer wall cleaning work and is suitable for various outer wall surface conditions.
Owner:GUIZHOU CONSTR VOCATIONAL & TECH COLLEGE

Alkali-resistant urease-producing microbial flora for biomineralization of construction joints and preparation method of alkaline-resistant urease-producing microbial flora

The invention relates to the technical field of biomineralization, and particularly discloses an alkali-resistant urease-producing microbial flora for biomineralization of construction joints and a preparation method of the alkali-resistant urease-producing microbial flora. The microbial flora disclosed by the invention is prepared from the following strains with relative abundance: 4.4 to 5.2 percent of bacillus, 0.39 to 0.46 percent of enterococcus, 4.8 to 5.7 percent of alcaligenes, 0.50 to 0.58 percent of cellulomonas, 22.4 to 24.2 percent of lysobacter, 1.7 to 2.4 percent of pseudomonas, 10.8 to 11.9 percent of Savagea, 15.1 to 16.2 percent of sarcina, 30.8 to 32.2 percent of chloridomonas and 0.41 to 0.48 percent of bacillus. The alkali-resistant microbial compound flora with high urease activity in the limited oxygen and normal environment can effectively overcome the defects that urease microorganisms are low in mineralization efficiency under the anoxic condition, and the strength of an obtained consolidated body is not high.
Owner:BEIJING ZHONGJIAN CONSTR RES INST CO LTD +4

Fabricated anti-seismic reinforcing structure for n-shaped frame and anti-seismic reinforcing method of fabricated anti-seismic reinforcing structure

The invention discloses an assembly type anti-seismic reinforcing structure for a door-shaped frame and an anti-seismic reinforcing method thereof.The door-shaped frame comprises two frame columns arranged at intervals and a frame beam connected to the tops of the two frame columns, and the anti-seismic reinforcing structure comprises two prefabricated columns, two supporting columns, two supporting columns and two supporting columns; the two prefabricated columns are connected to the opposite inner sides of the two frame columns correspondingly, each prefabricated column comprises a first steel core and first concrete poured outside the first steel core, and the top of the first steel core extends upwards out of the first concrete and forms a first extending section; the precast beam comprises a second steel core and second concrete poured outside the second steel core, the two ends of the second steel core extend out of the second concrete and form two second extending sections, and the two second extending sections are connected to the two first extending sections correspondingly; by arranging the anti-seismic reinforcing structure, the construction efficiency is improved.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

Method for replacing web members of steel towers and device for replacing web members

To provide a method for replacing web members of steel towers and a device for replacing web members of steel towers that can reinforce the range of web member replacement and replace the web members even when the work for replacing web members of steel towers takes several days or the stress borne by reinforcement materials is large.SOLUTION: A device for replacing web members of steel towers comprises upper and lower horizontal reinforcement members that are attached between main pillar members near above and below the range of web member replacement; and temporary reinforcement members that are attached to be inclined from a fixing point of the upper horizontal reinforcement member of one main pillar member to a fixing point of the lower horizontal reinforcement member of the other main pillar member, the temporary reinforcement member is divided into first and second temporary members, the first and second temporary members are arranged with flange joints provided at one end facing each other with a predetermined gap, and the flange joints are connected with connecting bolts to introduce a predetermined axial stress into the first and second temporary members according to the amount of fastening, and an adjustment plate is inserted between the flange joints and fixed with fastening parts.SELECTED DRAWING: Figure 1
Owner:DENRO CORP

Farm wall reinforcing equipment

The invention discloses a farm wall reinforcing device. Farm wall reinforcing equipment comprises an adjusting sliding frame, an even number of reinforcing devices are installed on the adjusting sliding frame, protective cover baffles are installed on the surfaces of the reinforcing devices, pouring mold clamping plates are arranged in the reinforcing devices, inner grooves are formed in the upper portions of the pouring mold clamping plates, and an even number of steel bar fixing frames are arranged between the inner grooves. A turnover sealing cover which is movably hinged is installed on the inner groove, a fixing steel bar is installed in the steel bar fixing frame, and an on-plate clamping groove is formed in the surface of the pouring mold clamping plate. The adjusting sliding frame is installed at the position of the root of a wall needing to be reinforced, then the reinforcing devices are installed on the adjusting sliding frame in a back-to-back mode, the reinforcing devices clamp the wall in a butt mode, then the threaded anchor rods are sequentially inserted into the pouring mold clamping plates in a matched mode to form opposite pulling, and the threaded anchor rods are clamped and fastened; and finally, after a wall inserting fixing rod, a wall body connecting clamp and a fixing steel bar are inserted, concrete is poured into a guiding and conveying groove, the concrete and the wall body are combined and solidified, and the reinforcing work of the wall body is completed.
Owner:FUJIAN SHENGZE BIOLOGICAL TECH DEV CO LTD

Multifunctional cleaning device of curtain wall cleaning unmanned aerial vehicle and cleaning method

The invention provides a multifunctional cleaning device of a curtain wall cleaning unmanned aerial vehicle and a cleaning method. The multifunctional cleaning device comprises a cleaning assembly, and the cleaning assembly comprises a machine shell, a supporting arm, an L-shaped connecting rod and a small motor. A water pump and a pressure pump are started at the same time to spray water added with a cleaning agent to the curtain wall so as to wash the curtain wall, a small motor is started to drive a six-edge connecting rod to rotate so as to drive cleaning cotton to rotate, the unmanned aerial vehicle is remotely controlled to get close to the glass curtain wall, and the cleaning cotton and water scraping cotton are attached to the curtain wall at the same time; the sprayed curtain wall is cleaned from top to bottom through the rotating cleaning cotton, water of the cleaned curtain wall is scraped off through the water scraping cotton above the cleaning cotton, watermarks are left after the water is dried, a cleaning worker does not need to hang the curtain wall in front of a lifting platform or a lifting rope to manually scrub the curtain wall, time and labor are saved, and the cleaning efficiency is improved. And the cleaning cost is low, cleaning is safe, high-altitude operation is not needed, and the life safety of workers is guaranteed.
Owner:SHENZHEN SANHE XINYI TECH DEV CO LTD

Underground space development method for underpinning existing building by using foundation pit reverse construction system

The invention belongs to the field of urban renewal and underground space development, and relates to an underground space development method for underpinning an existing building by using a foundation pit reverse construction system. The method comprises the steps that firstly, an underpinning structure and a temporary reinforcing component of an existing building are constructed, and then a vertical supporting pile system of the underpinning structure is constructed and connected with a foundation underpinning structure; the existing building is lifted to the elevation capable of meeting the construction space through a lifting device, shallow earth excavation is conducted, and a newly-built basement top plate is constructed; constructing a falling new foundation of the existing building on the top plate; the existing building falls back to the final state and is connected with the new foundation; the basement floor slab structure is further excavated downwards and subjected to reverse construction; and all basement top-down construction is completed. According to the method, the existing building can be underpinned only through one-time foundation conversion, foundation underpinning vertical supporting is also used as reverse structure beam plate vertical supporting at the same time, the existing building has effective supporting and stability in the underpinning process, and the elevation of the existing building can be flexibly adjusted.
Owner:EAST CHINA ARCHITECTURE DESIGN AND RESEARCH INSTITUTE CO LTD +1

Leaking stoppage device and method for underground structure leakage water treatment

The invention relates to the field of leakage repairing equipment, in particular to a leaking stoppage device and method for underground structure leakage water governing The leaking stoppage device comprises a lifting platform, a grouting machine is fixedly mounted on the peripheral side of the lifting platform, a grouting head is connected to the grouting machine through a pipeline, and a mounting plate is mounted on the top side of the lifting platform; electric drill bodies are sequentially arranged on the mounting plate away from the lifting platform, a moving mechanism is mounted between the electric drill bodies and the mounting plate, the moving mechanism is used for driving the electric drill bodies to be close to or away from the mounting plate, and a mounting seat is fixedly mounted on the side, away from the mounting plate, of each electric drill body; the electric drill body is provided with a drill rod and a plurality of grouting nails, the mounting seat is provided with a first magnetic attraction groove, the mounting plate is provided with a switching mechanism, and the switching mechanism is used for selectively placing the grouting head, the drill rod and the grouting nails into the first magnetic attraction groove. The method has the effect of reducing the repairing difficulty.
Owner:CSCEC STRAIT CONSTR & DEV

Middle partition wall floor support changing structure for foundation pit separate construction

The utility model discloses a mid-partition floor support changing structure for pit division construction of a foundation pit. The mid-partition floor support changing structure comprises a mid-partition; the pre-construction floor slab is arranged on one side of the middle partition wall in a jacking mode, and a steel bar connector is pre-embedded in the side, facing the middle partition wall, of the pre-construction floor slab; the post-construction floor slab is arranged on the side, away from the pre-construction floor slab, of the mid-partition wall at intervals and corresponding to the position of the pre-construction floor slab, joint bars are pre-buried on the side face of the side, facing the mid-partition wall, of the post-construction floor slab, one end of each joint bar is buried in the mid-partition wall, and the other end of each joint bar extends to the position between the post-construction floor slab and the mid-partition wall; the corbel is connected between the post-construction floor and the mid-partition wall, the top surface of the corbel is connected to the bottom surface of the post-construction floor, and the side surface of the corbel is connected to the side surface of the mid-partition wall; the first supporting rod is arranged on the bottom face of a pre-constructed floor in an abutting mode. The second supporting rod is arranged on the bottom face of the bracket in an abutting mode. The steel bar connecting device is continuous in structure and continuous in force transmission, and can meet the joint staggering rate of steel bar connection.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD +1

Demolishing and building integrated construction method for old rigid frame bridge and newly-built tied arch bridge

A dismantling and building integrated construction method for an old rigid frame bridge and a newly-built tied-arch bridge comprises the steps that firstly, a first-span approach bridge of the old bridge is dismantled, piers of the newly-built tied-arch bridge are constructed, then main and side span bridge floors of the old rigid frame bridge are used as platforms to build a temporary bridge floor system, and arch bridge tie bars are installed and constructed on the temporary bridge floor. The method comprises the following steps of: mounting an arch ring and a suspender of an arch bridge on an old bridge by adopting a bracket method, mounting two on-arch cranes on the arch ring, dismounting a side span and a main span of the old bridge by utilizing the two on-arch cranes in a matched manner, and finally hoisting and mounting a bridge deck of the newly-built tied-arch bridge by utilizing the on-arch cranes, thereby completing the dismounting of the old rigid frame bridge and the construction of the newly-built tied-arch bridge. Bridge dismounting and bridge building are conducted in a crossed mode, some procedures can be conducted synchronously, and the construction period can be shortened; the old bridge deck is used as an arch bridge straining beam mounting and arch ring assembling platform, so that the cost can be saved; the new bridge arch ring is used as a crane bearing system for dismantling the old rigid frame bridge, the equipment investment is low, and the safety is high.
Owner:ROAD & BRIDGE INT CO LTD

Steel structure sliding system monitoring method

The invention belongs to the technical field of building construction, and relates to a steel structure slippage system monitoring method, which comprises the following steps: carrying out simulation analysis on the whole slippage construction process to obtain a simulation calculation value of the whole slippage process; in slip construction, stress-strain monitoring is performed on the large-span structural member and the slip supporting structural member, and the slip construction is performed according to the condition that the deformation of at least the slip supporting structural member has a rod member in the slip construction satisfies the condition that the deformation is greater than or equal to the first multiple of the analog calculation value and less than or equal to the second multiple of the analog calculation value. The opportunity for repairing the corresponding rod piece is determined according to the synchronous state of the sliding shoes; and after sliding construction is completed, standing is conducted, the stress-strain of the large-span structural member and the stress-strain of the sliding supporting structural member are continuously monitored, and sliding monitoring is completed when the deformation amount is smaller than the first multiple of the analog calculation value. According to the method, the repair work of the rod piece can be reduced, and the construction efficiency of overall sliding is improved.
Owner:MCC (SHANGHAI) STEEL STRUCTURE TECHNOLOGY CORP LTD +2

Reinforcing device for bolt-sphere net rack pull rod node

The utility model relates to the technical field of bolt-sphere net racks, in particular to a bolt-sphere net rack pull rod node reinforcing device which comprises a bolt-sphere body, a pull rod is connected to the outer surface of the bolt-sphere body in an embedded mode, a connecting frame is fixedly installed on the outer surface of the pull rod, and the bolt-sphere net rack pull rod node reinforcing device comprises a bolt-sphere body. The spring is fixedly connected to the inner wall of the connecting frame, a limiting frame is fixedly installed at the top of the spring, a circle of U-shaped plates arranged at equal intervals are connected to the interior of the limiting frame in an embedded mode, and the fixing plate is fixedly connected to the bottoms of the U-shaped plates. Through the arrangement of the limiting frame, the springs, the fixing plates, the pull rod and the U-shaped plate, the multiple fixing plates can be rapidly installed on the pull rod, so that the difficulty of high-altitude reinforcing operation is reduced, the reinforcing efficiency is improved, in addition, the fixing plates, the fastening bolts and the nuts are arranged, the multiple fixing plates are connected together, the bolt-sphere net rack is more stable, and the service life of the bolt-sphere net rack is prolonged. And the device is safer.
Owner:THE FOURTH CONSTR ENG COMPANY LTD OF CHINA CONSTR SECOND ENG BUREAU

Ceramic tile renovating coating system and ceramic tile renovating method

The invention relates to a ceramic tile renovating coating system and a ceramic tile renovating method. The coating system comprises a ceramic tile surface treating agent and water-based ceramic tile color-changing paint, the ceramic tile surface treating agent comprises the following raw materials in parts by weight: 90-96 parts of deionized water, 0.5-1.0 part of carboxymethyl cellulose, 0.1-0.3 part of a cleaning agent, 1-4 parts of an alcohol ether solvent, 0.4-0.8 part of a base material wetting agent, 0.3-0.4 part of organic acid and 1-2 parts of fluorine-containing salts. The ceramic tile renovating method adopts the coating system. The renovated coating is good in adhesive force, few in construction procedures, convenient to construct, less in generated construction waste, green and environmentally friendly.
Owner:XIAMEN GOOK PAINT GRP CO LTD

Building wall dismantling device capable of guaranteeing integrity of old bricks

The invention relates to the technical field of wall dismantling, and discloses a building wall dismantling device capable of guaranteeing the integrity of old bricks, the building wall dismantling device comprises an enclosing wall and a bearing box, and further comprises a dismantling unit arranged on the bearing box, and the dismantling unit comprises a leveling component and a cutting component which are arranged in the bearing box; the flat laying part comprises rotating shafts arranged on the two sides of the inner wall of the bearing box, a deflection frame arranged on the rotating shafts and a plurality of connecting rods arranged on the inner wall of the deflection frame; through the dismantling unit, when a constructor dismantles the wall body, the wall body can be divided into a plurality of wall body units, the wall body units are slowly put down in sequence, the wall body units which are put down are cut in the horizontal direction through the cutting unit, the wall body units are sequentially divided into strip shapes, and therefore the wall body units can be conveniently detached. And then the strip-shaped wall is cut into single bricks, so that the safety when the wall is dismantled is effectively improved, the completeness of the bricks is ensured, the construction cost is reduced, and the utilization rate of resources is improved.
Owner:ARCHITECTURAL DESIGN & RES INST OF TSINGHUA UNIV +1