157 results about "Underpinning" patented technology

In construction or renovation, underpinning is the process of strengthening the foundation of an existing building or other structure. Underpinning may be accomplished by extending the foundation in depth or breadth so it either rests on a more supportive soil stratum or distributes its load across a greater area. Use of micropiles and jet grouting are common methods in underpinning. An alternative to underpinning is the strengthening of the soil by the introduction of a grout, including expanding urethane-based engineered structural resins.

Underground space development method for underpinning existing building by using foundation pit reverse construction system

The invention belongs to the field of urban renewal and underground space development, and relates to an underground space development method for underpinning an existing building by using a foundation pit reverse construction system. The method comprises the steps that firstly, an underpinning structure and a temporary reinforcing component of an existing building are constructed, and then a vertical supporting pile system of the underpinning structure is constructed and connected with a foundation underpinning structure; the existing building is lifted to the elevation capable of meeting the construction space through a lifting device, shallow earth excavation is conducted, and a newly-built basement top plate is constructed; constructing a falling new foundation of the existing building on the top plate; the existing building falls back to the final state and is connected with the new foundation; the basement floor slab structure is further excavated downwards and subjected to reverse construction; and all basement top-down construction is completed. According to the method, the existing building can be underpinned only through one-time foundation conversion, foundation underpinning vertical supporting is also used as reverse structure beam plate vertical supporting at the same time, the existing building has effective supporting and stability in the underpinning process, and the elevation of the existing building can be flexibly adjusted.
Owner:EAST CHINA ARCHITECTURE DESIGN AND RESEARCH INSTITUTE CO LTD +1

Dual underpinning structure for underground storey addition of existing building in narrow and small space

The utility model relates to the technical field of constructional engineering, in particular to a double underpinning structure for underground storey adding of an existing building in a narrow space, which comprises an anchor rod pile arranged within the range of the existing building, and an underpinning pile and a fender post which are arranged outside the range of the existing building, wherein the anchor rod pile is anchored into the foundation, the anchor rod pile and the foundation are connected into an integral structure, the underpinning pile is located on the outer side of the anchor rod pile, the underpinning pile and the anchor rod pile are connected through an underpinning beam plate to form an underpinning system, and the fender post is located on the outer side of the underpinning pile and connected through a foundation pit support. The utility model has the advantages that the safety of the existing building (structure) in the underground storey-adding construction process can be ensured, the cost of underpinning protection of the building is reduced, the convenience of underground storey-adding earthwork excavation of the existing building (structure) can be improved, the construction period is shortened, and the safety and economy requirements of the existing building protection are met.
Owner:SHANGHAI GEOTECHN INVESTIGATIONS & DESIGN INST

Deformation calculation method for shield underneath passing existing tunnel structure based on deep learning

The invention discloses a deep learning-based deformation calculation method for a shield under-crossing existing tunnel structure, and belongs to the technical field of tunnel engineering pile foundation underpinning. The method comprises the following steps: establishing a deep learning prediction model to obtain ground surface settlement caused by a new shield tunnel; the stratum loss rate is obtained through inversion according to a Loganthan-Poulos ground surface settlement analysis formula; calculating the displacement of the soil body at the buried depth of the existing tunnel; calculating the longitudinal additional load of the existing tunnel structure; calculating the longitudinal equivalent flexural rigidity and equivalent shear rigidity of the existing tunnel structure; and calculating the vertical displacement on the axis of the existing tunnel structure under the action of the additional load, and calculating the longitudinal deformation of the tunnel structure under the additional load. According to the method, the problem that the stratum loss rate is difficult to determine due to stratum difference can be effectively solved, and the ground surface settlement value caused by shield construction and the soil displacement at the buried depth of the existing tunnel can be rapidly and accurately obtained.
Owner:CHINA CONSTR FIFTH ENG DIV CORP LTD +1

Annular three-lining underpinning structure for pile foundation in tunnel hole

The invention provides a three-lining underpinning structure for a pile foundation in a tunnel hole, and belongs to the technical field of pile foundation underpinning construction. The three-lining underpinning structure is provided for solving the problem that an existing bridge pile intrudes into a tunnel, the three-lining structure comprises a primary lining structure, a secondary lining structure and a third lining structure, the secondary lining structure is tightly combined with the pile and is tightly combined with an intruded tunnel pile foundation to form a whole, and then the part, intruded into the tunnel structure, of the pile foundation is cut off by clinging to a newly-added lining face; the bridge load is transmitted to the soil layer by cutting off the remaining piles and the newly-added secondary lining structure, so that the underpinning purpose is achieved; by combining detailed bearing capacity analysis and calculation and mainly considering safety verification of a second-lining structure, a scientific basis is provided for tunnel structure design, reasonability and reliability of structural design are ensured, and the three-lining annular underpinning structure is an overall stress structure, has better anti-seismic and anti-pulling performance for an upper structure, and is suitable for large-scale popularization and application. The problem of conflict between the bridge pile and the tunnel is effectively solved, and bridge safety is guaranteed.
Owner:THE FIRST ENGINEERING COMPANY OF CCCC FOURTH HARBOUR ENGINEERING CO LTD +2

Layer-adding construction method for basement with existing box type foundation and multi-layer frame structure

The invention discloses a storey-adding construction method for a basement with an existing box type foundation and a multi-layer frame structure, and belongs to the technical field of constructional engineering and city renewing.The storey-adding construction method comprises the following steps that S1, storey-adding buildings of the existing basement are evaluated; s2, underground diaphragm wall construction; s3, reinforcing the existing basement storey-adding building foundation; s4, the overground structure of the existing basement storey-adding building is reinforced; s5, foundation underpinning construction is conducted; s6, earth excavation is conducted at the storey-adding position of the existing basement; s7, construction of a storey-adding foundation bottom plate; and S8, layer-adding underpinning column and top plate construction. According to the storey-adding construction method for the basement with the box type foundation and the multi-layer frame structure, storey-adding transformation is conducted on the basement of an existing building, the usable area of the building is effectively increased, the construction efficiency is improved, the influence on the surrounding environment is reduced, and the urban development and the ever-increasing space requirements of people are met.
Owner:CHINA CONSTR EIGHTH BUREAU TIANJIN CONSTR ENG CO LTD

Raft foundation existing building basement storey adding method

The invention discloses a basement storey adding method for a raft foundation existing building. Belongs to the technical field of constructional engineering in civil engineering, and utilizes steel drum concrete piles which are inserted into floppy foundation soil after being rotated and stirred from drilling holes in the top surface of a raft foundation to support a building load, so that columns of an original building are lengthened, and the columns and a basement bottom plate form an integral new foundation. The foundation soil under the basement bottom plate and the steel drum concrete piles jointly bear the load of the upper building; according to the method, an original raft foundation is locally holed to form a soil outlet to provide conditions for excavation of a soil body below the original raft foundation, surrounding soil bodies are supported and blocked through the original raft foundation, an additionally-arranged force transmission plate belt and a foundation pit supporting and blocking structure, horizontal deformation of the excavated soil bodies is controlled, and therefore storey adding is conducted on the basement. According to the method, construction is convenient, and soil deformation and building deformation in the foundation underpinning and foundation pit excavation process can be strictly controlled.
Owner:JIANGSU UNIV OF SCI & TECH

Temporary structure suitable for assembly type station ending end and construction method

The invention discloses a temporary structure suitable for an assembly type station ending end, which comprises a temporary support structure arranged in a shape like a Chinese character'tian ', the temporary support structure is divided into a foundation support frame provided with an outer ring and a cross-shaped inner support frame body arranged between the foundation support frames, and the temporary structure further comprises an underpinning system arranged in the temporary support structure; through the construction method and structure of firstly building temporary steel beam columns and firstly supporting and then underpinning, the assembly starting point and end point positions of the full-prefabricated rectangular flat-top assembly type station are suitable for the working condition, the method can solve the problem of space and time conflict between the assembly trolley and the temporary steel stand columns, it is ensured that the assembly trolley is normally put into use, and the construction efficiency is improved. Meanwhile, the mounting and dismounting workload of the temporary section steel beam column is reduced, the construction efficiency is improved on the premise of ensuring the splicing quality, the high-place operation risk is reduced, meanwhile, normal construction of a post-pouring beam column system can be ensured, and the mounting and dismounting amount of large section steel components is reduced.
Owner:中交(广州)建设有限公司 +2

Cluster synchronous jacking and underpinning method and system based on control algorithm

The invention provides a cluster synchronous jacking and underpinning method and system based on a control algorithm, and relates to the technical field of constructional engineering reinforcement and renovation. The method comprises the steps that displacement and stress of each jacking point at each moment in the jacking process are obtained; the displacement and stress deviation of each jacking point at each moment and the displacement deviation between the jacking points are calculated; jacking points needing to be regulated and controlled are screened according to the deviation; and the jacking point needing to be regulated and controlled is regulated and controlled based on a proportional integral differential control algorithm and the deviation until jacking is completed. By monitoring the state of each jacking point in real time, when the deviation of each jacking point exceeds the precision range or the synchronous error between the jacking points exceeds the allowable range, the displacement and stress of each jacking point are controlled by regulating and controlling the hydraulic device through the proportional integral differential control algorithm; the precision and synchronism of the jacking point in the jacking process are effectively improved, automatic jacking point regulation and control are achieved, and the stability and safety of the jacking process are ensured.
Owner:CHINA RAILWAY ENG CONSULTING GRP CO LTD

Underground storey-adding method for existing building in operation

The invention belongs to the field of constructional engineering, and relates to an underground storey-adding method for an existing building in operation, which comprises the following steps of: when the existing building is a building with a pile foundation in operation, supporting an enclosure structure by utilizing the residual bearing capacity of the existing pile foundation and the horizontal rigidity of the existing foundation, and then downwards excavating shallow earthwork to form a construction space; the underpinning pile foundation is constructed through micro-disturbance low-clearance construction equipment; a hydraulic jack is arranged between the basement conversion top plate and the existing foundation and can adjust deformation of the existing building in real time according to settlement monitoring data, and safety of the existing building in operation is guaranteed. The problem of deformation control of the existing building in operation and the problem of stress conversion in the excavation stage of the underground space are solved, the application range of the low-clearance underpinning pile in underground space development of the existing pile foundation building is widened, the horizontal rigidity of the existing foundation and all layers of additionally-built structures is fully utilized, and a large number of temporary horizontal supporting systems are omitted.
Owner:EAST CHINA ARCHITECTURE DESIGN AND RESEARCH INSTITUTE CO LTD

Integrated underpinning structure for bridge in deep foundation pit of urban tunnel and construction method

The present invention relates to an integrated underpinning structure for a bridge in a deep foundation pit of an urban tunnel, the integrated underpinning structure comprising an original bridge bearing platform, an expansion bearing platform and a tunnel reverse constructed roof slab‌, wherein the original bridge bearing platform, the expansion bearing platform and the tunnel reverse constructed roof slab ‌are sequentially and fixedly connected into an integrated structure from inside to outside; the integrated structure serves as both a bridge underpinning force transmission structure and a roof slab‌ of a newly-built tunnel, and the integrated structure also serves as a first support for a tunnel deep foundation pit enclosure structure; a bridge pier and a bridge structure are sequentially provided on the upper portion of the original bridge bearing platform from bottom to top, and an original bridge pile is provided on the lower portion of the original bridge bearing platform; a reinforcement pile is provided at the bottom of the expansion bearing platform, and a temporary buttress is provided at the top during construction; a jack is provided on the top surface of the temporary buttress and is used to assist in controlling the bridge structure to settle into a safety range during tunnel construction; and two sides of the tunnel reverse constructed roof slab‌ extend to the top ring beam of the tunnel in a direction of the cross section of the foundation pit and are connected to the top ring beam. The underpinning structure provided in the present invention serves as both the bridge underpinning force transmission structure and the roof slab‌ of the newly-built tunnel.
Owner:JSTI GRP CO LTD +2

Construction method for pile foundation underpinning structure in tunnel hole through shallow-buried excavation method

The invention provides a construction method for a pile foundation underpinning structure in a tunnel hole through a shallow-buried excavation method, and is suitable for the technical field of tunnel engineering pile foundation underpinning. The construction method of the pile foundation underpinning structure in the tunnel hole through the shallow-buried excavation method comprises the steps of preparation before construction, advance support construction, benching method excavation, secondary lining side wall and vault construction, tunnel area pile truncation, secondary lining inverted arch construction and tertiary lining construction. The piles conflicting with the tunnel in the tunnel area are connected with the reinforced secondary lining structure, then the original piles in the tunnel are partially cut off, the load borne by the original piles is transmitted to the soil layer below the tunnel through the tunnel secondary lining structure, and the safety of the upper structure of the original piles and the tunnel is guaranteed by adding the tertiary lining structure; the problems that according to a traditional pile foundation underpinning construction method, noise pollution and dust pollution are caused, extra spoil is added, the work amount is large, and the construction period is long are solved.
Owner:THE FIRST ENGINEERING COMPANY OF CCCC FOURTH HARBOUR ENGINEERING CO LTD +2

Reusable foundation underpinning construction device

The invention discloses a reusable foundation underpinning construction device, and relates to the technical field of underpinning construction auxiliary devices. Two rubber gaskets are arranged on the inner sides of the two steel plates, a brick wall body is located between the two rubber gaskets, anchoring nuts are arranged on the outer sides of the left steel plate and the right steel plate, one end of an anchoring screw rod penetrates through the anchoring nut on one side, and the other end of the anchoring screw rod penetrates through the four connecting holes and the brick wall body in sequence and is in threaded connection with the anchoring nut on the other side. A rubber gasket is arranged between the steel plate and the brick wall body, the problem of poor contact caused by unevenness between the steel plate and the brick wall body is effectively prevented by utilizing the rubber gasket, and the friction force between the steel plate and the brick wall body is increased, so that the stability of the device is ensured when the foundation of the position, needing to be replaced, of the brick wall body is replaced; the device can replace the bricked foundation after the steel plate is matched with the bricked wall body. And after the brick wall body is replaced, the brick wall body is dismantled and can be reused.
Owner:CHINA RAILWAY SEVENTH GRP CO LTD +1

Method for adjusting elevation and landing in place in building translation construction

The invention belongs to the field of urban renewal construction, and relates to a method for adjusting elevation and landing in place in building translation construction. In the process that a building returns and resets to a newly-built basement top plate, firstly, a temporary platform composed of a heightening steel beam and a heightening steel cushion block is laid on the newly-built basement top plate in advance so as to solve the height difference problem existing between the newly-built basement top plate and a translation rail. Secondly, triangular haunching plates are additionally arranged at the corners of the wall clamping beams for supporting the building; and a landing jack is directly arranged below the haunching plate. By means of the arrangement mode, the eccentric bending moment borne by the underpinning structure is greatly reduced, and absolute safety in the landing process is ensured. And finally, a set of repeatable standardized circulating steps is designed, and the effect that the existing building is always reliably supported in the landing process is achieved. The invention aims to overcome the defects in the prior art, and provides the building translation landing method which is safe to operate, accurate to control and capable of effectively coordinating the foundation height difference and optimizing the landing stress path.
Owner:EAST CHINA ARCHITECTURE DESIGN AND RESEARCH INSTITUTE CO LTD

Multi-functional underpinning trolley

The present application relates to the technical field of tunnel excavation, in particular to a multifunctional underground excavation trolley, comprising: a trolley frame, a rotary excavating arm arranged on the trolley frame, the rotary excavating arm comprising a deflection assembly, a first movable assembly, a second movable assembly, a rotary driving member and an excavating assembly; a bucket detachably mounted on the rotary excavating arm; a mechanical arm detachably mounted on the rotary excavating arm, the mechanical arm detachably mounting a drilling mechanism and a nozzle clamping mechanism; a grouting system connected to the drilling mechanism or the nozzle clamping mechanism; and a scraper conveyor fixed on the trolley frame. The present application can satisfy the operation of tunnel excavation, slagging, drilling, arching and auxiliary spraying, cover all processes in the process of shallow underground excavation of power tunnel and primary support, and solve the problems of frequent site conversion of multiple equipment, inability to change lanes due to small tunnel, long equipment conversion time, low construction efficiency, high construction cost and the like.
Owner:CHINA RAILWAY CONSTR HEAVY IND

Construction method for cross-shaped subway transfer station with underneath pass of bunching type structure

The invention discloses a construction method of an underpass subway cross transfer station by utilizing a bunching structure. The construction method comprises the following steps: 1, respectively constructing a bunching structure starting well and a bunching structure receiving well with the same depth as that of a newly-built underground station on two sides of an existing subway station and at positions corresponding to two ends of the newly-built underground station; 2, pipe joint jacking construction of a bunching structure is conducted in the soil body below the existing subway station; 3, under the condition that the soil body is not excavated, prestress tensioning construction of the bunching structure is completed; 4, soil in the bunching structure is excavated, and underpinning construction is conducted on the bunching structure; and 5, construction of the underpass section, located below the existing subway station, of the newly-built underground station is completed. The construction risk is better controlled, the engineering investment is reduced, the construction period is shortened, and the low-carbon and green construction requirements of the engineering construction process are met.
Owner:SHANGHAI URBAN CONSTRUCTION DESIGN & RESEARCH INSTITUTE (GROUP) CO LTD

Bridge pile foundation underpinning structure and bridge

The utility model belongs to the field of bridge buildings, and discloses a bridge pile foundation underpinning structure and a bridge, and the bridge pile foundation underpinning structure introduces a supplementary pile foundation structure on the basis of retaining an original pile foundation structure; the supplementary pile foundation structure comprises a supplementary pile foundation and a bearing platform. The supplementary pile foundations are arranged on the outer sides of the original pile foundations, the bearing platforms are connected to the straining beams, through arrangement of the supplementary pile foundations and connection of the bearing platforms, loads of the original pile foundation structure are effectively transferred and dispersed, and therefore the stability and safety of the bridge are remarkably improved. Under the structure, the original pile foundation structure does not directly bear external force in the bridge pile foundation underpinning structure, and the load originally borne by the original pile foundation structure is transferred and dispersed to the supplementary pile foundation structure. The bridge comprises the bridge pile foundation underpinning structure, so that the bridge also has the advantages of the bridge pile foundation underpinning structure.
Owner:HUNAN PROVINCIAL COMM PLANNING SURVEY & DESIGN INST CO LTD

Isolation structure and method for reducing displacement of railway pile foundation caused by shield construction

The application discloses an isolation structure and method for reducing displacement of a railway pile foundation caused by shield construction, and the isolation structure comprises underpinning beams and 2N columns of inclined piles, and N is greater than or equal to 2; the underpinning beams are located below an existing railway subgrade; each column of inclined piles comprises a plurality of inclined piles with the same inclination direction and inclination angle; the 2N columns of inclined piles are divided into two groups; the pile bottoms of one group of the inclined piles are located on one side of a to-be-constructed shield tunnel, and the pile bottoms of the other group of the inclined piles are located on the other side of the to-be-constructed shield tunnel; two adjacent columns of inclined piles in the same group are arranged in an X-shaped cross mode; the pile tops of the two groups of the inclined piles are connected with the underpinning beams and form a portal type support structure; the to-be-constructed shield tunnel passes through the portal frame surrounded by the inclined piles and the underpinning beams; and the two groups of the inclined piles are located between original railway pile foundations and the to-be-constructed shield tunnel. The application can resist the horizontal deformation of the original railway pile foundations caused by the shield tunnel construction, reduce the settlement of the railway subgrade, and effectively protect the normal operation of the railway.
Owner:CHINA RAILWAY BEIJING ENG BUREAU GRP TIANJIN ENG CO LTD +3

A method for replacing a tunnel pile foundation

The application discloses a tunnel pile foundation underpinning construction method, and the construction method comprises the following steps: S100, construction preparation; S200, tunnel bench method construction to underpinning pile; S300, construction of advanced support; S400, pile body concrete removal, construction of initial support; S500, excavation of soil bodies on both sides of the lower part of the underpinning pile, and timely initial support closure; S600, pouring of side wall and arch part secondary lining; S700, removal of temporary cross brace after the secondary lining concrete reaches the design strength; S800, bottom plate construction; S900, repeating S200-S800 until all pile foundation underpinning is completed. The tunnel pile foundation underpinning construction method effectively utilizes the transformation of the initial support and the secondary lining of the tunnel to the load of the fire pool, guarantees the safety and normal use of the fire pool structure, and has small engineering quantity, and can save investment. By utilizing the mechanism of passive underpinning, the pile foundation bears the force by itself, the pile foundation intruding into the tunnel is removed and cut step by step and root by root, and the safety and normal use of the fire pool structure are guaranteed.
Owner:CHINA RAILWAY NO 5 ENGINEERING GROUP CO LTD GUIZHOU SUBSIDIARY +1

A bridge underpass support device and construction method under low clearance

This invention relates to a bridge underpinning support device and construction method under low clearance conditions. φ900 steel pipe columns support crossbeams, longitudinal beams, and connecting beams on both sides of the piers of the bridge section to be underpinned. The longitudinal and crossbeams are fixed using limiting devices. Distribution beams and stiffening plates are symmetrically installed below the crossbeams. Jacks and φ609 steel pipe columns are symmetrically installed between the distribution beams and stiffening plates and the bridge, with the jacks installed upside down. A conversion cap is installed between the jacks and the φ609 steel pipe columns. This invention solves the problem of limited clearance under existing bridges, making traditional component hoisting methods unusable. By breaking down the bridge support into smaller parts, the original elevation is lowered by 2-3 meters. Multiple replacements of jacks, conversion sections, and standard sections are used to raise the support to the original elevation, meeting the requirements for bridge underpinning construction. Through modular adaptive adjustment, the installation difficulties of underpinning supports under existing operating bridges are successfully solved.
Owner:SHANGHAI FOUNDATION ENGINEERING GROUP CO LTD

A method for constructing a subgrade culvert foundation underpinning

This invention discloses a method for underpinning culvert foundations in roadbeds, relating to the field of civil engineering technology. The method includes the following steps: cleaning the culvert to expose the culvert foundation; installing support components on both sides of the culvert foundation to support the cover plate; breaking the bottom slab in the middle of the culvert and re-pouring reinforced concrete at the bottom slab location; installing support components on the re-pouring reinforced concrete to support the cover plate; breaking the bottom slabs on both sides of the culvert and under the support walls, and then re-pouring reinforced concrete to replace the original bottom slabs; after the re-pouring reinforced concrete reaches its design strength, removing the support components inside the culvert to restore its drainage function. The aforementioned method for underpinning culvert foundations is applicable to natural foundation underpinning of frame structures. During the underpinning process, the building can be used normally without speed restrictions, which helps reduce the impact of the underpinning on the surrounding area.
Owner:YSD RAIL TRANSIT CONSTR CO LTD +2

Air curtain drag reduction underpinning method and underpinning structure

The invention provides an air curtain anti-drag underpinning method and an underpinning structure, and relates to the technical field of ruin protection engineering, a stable air curtain can be formed between the underpinning structure and a soil body through the designed air curtain, friction force is remarkably reduced, disturbance to a ruin is reduced, and integrity and stability of the ruin are protected to the maximum extent; gradual air curtain starting, accurate jacking and micro-disturbance control measures in the construction process ensure that the underpinning process is accurate and controllable, and the influence on the ruins is further reduced; in the construction process, according to the counter-force requirement of vertical underpinning, dynamic balance control over vertical deformation of the site building is achieved through gas pressure control of the gas curtain system.
Owner:SHANGHAI TIANYAN BUILDING RELOCATION ENG CO LTD

Stand column repairing method

The invention discloses a stand column repairing method which comprises the steps that S1, a defective stand column is detected, and a defective section of the defective stand column is found out; s2, temporary supporting pieces are arranged on earthworks on the two sides, in the length direction of the supporting beam, of the faulty stand column correspondingly, each temporary supporting piece is provided with a supporting end capable of moving in the vertical direction, the supporting ends are connected to the supporting beam, and the temporary supporting pieces are started to lift the supporting beam; s3, earthwork between the faulty stand column and the temporary supporting piece is excavated till the faulty section of the faulty stand column is completely exposed; s4, the problem segments are cleaned; s5, concrete is poured on the outer side of the problem segment to form a repaired concrete segment; and S6, the supporting beams are reinforced. Compared with the prior art, the problem stand column can be repaired in situ, two stand column piles and cross beams do not need to be newly constructed for underpinning according to a conventional scheme, and the construction period and the manufacturing cost can be better saved.
Owner:GUANGZHOU MUNICIPAL ENGINEERING GROUP LTD

Self-adaptive heavy-load wheeled vehicle for moving building

PendingCN122039846ABuilding repairsLifting devicesMoving floorJackscrew
The invention discloses a self-adaptive heavy-load wheeled vehicle for building moving, and mainly relates to the field of building moving. Comprising a vehicle body arranged below a building underpinning beam, the vehicle body comprises a multi-cylinder jack and a lifting barrel base, a plurality of cylinder bodies are arranged in the multi-cylinder jack, piston rods are slidably connected into the cylinder bodies in the vertical direction, an oil inlet nozzle and an oil return nozzle are arranged on the multi-cylinder jack, and a plurality of lifting holes are formed in the positions, corresponding to the piston rods, of the lifting barrel base. Lifting columns are slidably connected into the lifting holes, wheel set supports are arranged at the bottoms of the lifting columns, and rolling wheels are rotatably connected to the wheel set supports. The device has the beneficial effects that the technical problem that a building is easily damaged due to uneven stress of a walking mechanism when the building encounters an uneven or settlement condition in the moving process can be solved, and the downward extending distance of the wheel set bracket and the rollers can be automatically adjusted according to the condition of a walking surface; the stability of vertical supporting force of all positions of the bottom of the building is guaranteed, the building is prevented from being damaged, and the integrity of the building after movement is guaranteed.
Owner:ENGINEERING RESEARCH INSTITUTE OF APPRAISAL AND STRENGTHENING SHANDONG JIANZHU UNIVERSITY +2

A underpinning jacking platform for a lintel

ActiveCN224396120Uefficient connectionRealize lifting and unloadingBuilding repairsArchitectural engineeringJoist
The utility model discloses a kind of for joist pulls out column's underpinning jacking platform, including frame body underpinning platform and jacking platform;Frame body underpinning platform is set to the lower outer periphery of column to be constructed, and by four steel columns fixedly supported on foundation respectively arranged at its corner position;Jacking platform is set to the upper outer periphery of column to be constructed, jacking platform is connected by being anchored with the column to be constructed by multiple along its circumferential uniform setting of planting nail, and the gap between jacking platform and the column to be constructed is filled with grouting material;Four corner positions between the frame body underpinning platform and the jacking platform are respectively provided with underpinning support, and four edges of the frame body underpinning platform and the jacking platform are respectively provided with vertical jack.The utility model guarantees the effective connection of underpinning platform and the upper structure of column to be constructed, realizes the jacking unloading of upper structure of column to be constructed, and effectively reduces the operation risk in jacking unloading construction process.
Owner:SHAANXI ACAD OF ARCHITECTONICS +3

Construction method for shield tunneling machine to penetrate through existing pile foundation

The invention discloses a construction method for a shield to pass through an existing pile foundation, which belongs to the technical field of interval shield tunnel underpass, and comprises four parts of pile foundation underpinning design, pile foundation underpinning automatic monitoring and precision control, shield active direct grinding crossing and shield crossing automatic monitoring and cooperative control. According to the pile foundation underpinning design, the stratum disturbance influence of shield crossing is fully considered, and the strength, rigidity and node design of an underpinning structure are optimized; an automatic monitoring system is adopted for pile foundation underpinning and shield crossing, synchronous transmission and fusion analysis of monitoring data are achieved, high-precision control measures are combined, the construction state is fed back in real time, and automatic deviation correction is achieved. The method has the advantages that the problems that in the prior art, shield crossing influences are not considered in pile foundation underpinning design, the passive cutting risk of shield crossing is high, and cooperative control over the two is insufficient are solved, the construction safety, reliability and efficiency are improved, and the method is suitable for shield crossing pile foundation engineering in urban dense building areas.
Owner:CHINA RAILWAY 24TH BUREAU GROUP CO LTD

A method for construction of a underpinning pile and a detection anchor pile

The application relates to the technical field of building municipal foundation pit support and foundation piles, in particular to a construction method of underpinning piles and anchor piles for detection. The construction method comprises the following steps: S1. early construction; S2. determining a pile position; S3. small geological drilling machine construction; S4. small rotary jet drilling machine construction; S5. small spiral anchor rod drilling machine construction; S6. underpinning pile construction; S7. anchor pile construction; S8. cyclic construction; S9. static load test; and S10. slope protection pile construction. In the construction method, four to five small-diameter steel pipes are used to replace a large-diameter steel pipe as the underpinning piles and the anchor piles, the problem of insufficient power of the remanufactured small long spiral drilling machine is solved, and the problem that the reaction force of the large-diameter steel pipe is difficult to provide after rotary jetting and static pressure implantation is solved, so that the application has the effect of adapting to the narrow construction site of old house reconstruction, and large-scale mechanical equipment cannot enter the site.
Owner:BEIJING BUILDING MATERIALS & GEOLOGICAL ENG CO LTD +2

Underpinning structure for post-dismantling and supporting construction of main building area of deep foundation pit engineering

The utility model provides a deep foundation pit engineering main building area rear support dismounting construction underpinning structure which comprises a basement top plate and a negative second floor top plate, the basement top plate is arranged above the negative second floor top plate, a plurality of crossed supporting beams are arranged below the basement top plate, and steel stand columns extending downwards to penetrate through the negative second floor top plate are arranged on connecting joints of the supporting beams. Underpinning steel pipes parallel to the steel stand columns are arranged at the bottom of the basement top plate, and the tops of the underpinning steel pipes are arranged beside the connecting joints of the supporting beams. According to the structure, part of the main building can be provided with the supporting beams for underpinning, and the project progress can be guaranteed.
Owner:THE SECOND CONSTRUCTION ENGINEERING CO LTD CCSEB

Construction method for micro pile group foundation reinforcement and foundation underpinning in subsurface tunnel

The invention discloses a construction method for micro pile group foundation reinforcement and foundation underpinning in a subsurface tunnel, which comprises the following steps of: 1) pre-burying steel sleeves: pre-burying the steel sleeves at the front end and the rear end of a primary support inverted arch grid and between two adjacent grid steel frames during construction of a primary support structure; 2) improving the down-the-hole drill; (3) drilling a micro pile hole in the pre-buried steel sleeve; (4) forming a micro pile; (5) carrying out bearing capacity acceptance inspection on the micro piles; (6) waterproof treatment is conducted, specifically, waterproof treatment is conducted on the pile head after the tunnel waterproof isolation layer is constructed; and (7) tunnel secondary lining construction is conducted, the pile heads of the micro piles are anchored into a secondary lining bottom plate, and the secondary lining bottom plate is supported by the micro pile groups. The tunnel primary lining can be effectively prevented from being damaged and disturbed; main body structure sinking and cracking caused by foundation problems in the later period can be avoided, and the durability and the service life of a building are improved; and flexible construction can be carried out in a limited space in the tunnel by adopting a standardized construction process.
Owner:CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION CO LTD

Bridge underpinning jacking equipment

The utility model discloses bridge underpinning and jacking equipment which comprises a device body, and the device body comprises an original bearing table, a group of first steel supports, a group of second steel supports, a group of supporting blocks, a supporting bridge and a section steel transverse connection reinforcing device. The first steel support, the second steel support and the supporting block are all installed on the top of an original bearing table, the supporting bridge is supported on the first steel support and the second steel support, and the multiple sets of profile steel transverse connection reinforcing devices are installed between the first steel support and the second steel support. The first steel support and the second steel support are each of a cylindrical structure, and conversion connectors are installed on the tops of the first steel support and the second steel support. The device is good in economical efficiency, the early-stage installation time of the steel support and the installation and replacement time of the steel support during jacking are greatly shortened, the work efficiency is improved, and the construction safety risk of workers is greatly reduced.
Owner:SHANGHAI ZHIPEI URBAN RENEWAL CONSTRUCTION CO LTD

A conversion method of a small-bay basement shear wall top-down construction system

The application discloses a conversion method of a small-bay basement shear wall reverse construction system, which comprises the following steps: removing internal supporting pile columns of a basement structure to be constructed, retaining supporting pile columns of an outer contour and a central axis position of a shear wall wall limb to be constructed; erecting a main underpinning beam on the top of the retained supporting pile columns; adding supporting pile column one at a position where a vertical supporting structure is absent at the bottom of the main underpinning beam, and moving part of the supporting pile columns deviated from the position of the intersection of the main underpinning beam to the adjacent intersection as supporting pile column two; erecting a secondary underpinning beam under the shear wall wall limb to be constructed in the removed internal supporting pile columns, and prolonging both ends of the secondary underpinning beam to be connected with the main underpinning beam as a whole; pouring a structural plate between the main underpinning beam and the secondary underpinning beam to complete the construction of the basement B0 layer structure; excavating and constructing the basement B1-Bn layer main underpinning beam, the secondary underpinning beam and the structural plate by using a reverse construction method, and constructing an upper main body structure upwards; and backfilling the basement shear wall to complete the construction of the basement structure.
Owner:SHANGHAI CONSTRUCTION GROUP CO LTD