The invention relates to a construction method and construction equipment for a high-pressure jet grouting pedestal
pile. The construction method comprises the steps that S1, the equipment enters
a site; s2, taking a fixed
pile cylinder, and pressing the fixed
pile cylinder to a bearing stratum at a pile position; s3, the soil body in the hollow part of the fixed pile cylinder is taken out; s4, jet grouting
cutting or expanding
cutting is carried out in the undisturbed soil body at the bottom of the fixed pile cylinder to form an expanded pit; s5, molded concrete is fed into the expanded pit in a pressed mode, the molded concrete is limited to
upwelling in the hollow part of the fixed pile
barrel, and cemented soil in the expanded pit is extruded into the undisturbed soil body on the
peripheral side of the expanded pit and the gap between the fixed pile
barrel and the pile hole; an expanding body, a lower surrounding body, a reinforcing body and an upper surrounding body are respectively formed; and S6, concrete is poured into the hollow part of the fixed pile cylinder to form a pile body. During construction, surrounding soil is basically not disturbed,
noise is low, the pile can be exploded, the upper surrounding body and the lower surrounding body which are integrally solidified and formed wrap and protect the joint part between the pile body and the expansion body, and the anti-shearing capacity of the joint part of the pile body and the expansion body can be greatly improved.