The invention discloses a rotary drilling rig socketed
pile construction method under complex geological conditions, and relates to the technical field of geological construction, and the method comprises the following construction steps: S1, intelligent construction preparation, S2, self-adaptive
pile casing burying, S3, dynamic
slurry regulation and circulation, S4, rock stratum intelligent identification drilling, S5, composite socketed drilling, S6, digital hole cleaning and hole inspection, and S7, intelligent pouring and maintenance. Through the steps of S1 intelligent construction preparation, S4 rock stratum intelligent identification drilling and S5 composite rock-socketed drilling, the effects of accurately coping with complex geological conditions and improving the drilling efficiency and safety are achieved; through the steps of S3, dynamic
slurry regulation and circulation, S6, digital hole cleaning and hole inspection and S7, intelligent pouring and maintenance, the effects that the construction quality is controllable in the whole process, and green and environment-friendly are achieved; through the steps of S2, self-adaptive
pile casing burying, S5, composite rock-socketed drilling and S7, intelligent pouring and maintenance, the effects that the overall stability of the pile foundation is enhanced, and construction continuity is improved are achieved.