Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

8641results about "Protective foundation" patented technology

Ecological restoration method for mine slope

The invention relates to the technical field of mine side slope restoration, in particular to a mine side slope ecological restoration method which comprises the following steps: S1, performing field investigation and evaluation, and performing comprehensive surveying and mapping on the landform of a mine side slope by using a high-precision surveying and mapping instrument; the anti-seismic effect and the prevention and control of water and soil loss are prominent, the anti-seismic performance is enhanced through deep rock mass anchoring reinforcement, large-diameter and high-strength anchor cables are adopted, bed rock is deeply stabilized, prestress is applied, the integrity of the rock mass is enhanced, reinforced concrete anti-sliding piles are arranged near potential sliding surfaces, the anti-sliding capacity is improved, and the anti-seismic effect is achieved. When a damping ditch is dug between a slope top and a blasting area, loose gravel is filled to weaken vibration energy, the anti-seismic performance of the side slope is comprehensively improved, and water and soil loss is prevented, a drainage system is constructed to intercept surface water, vegetation is reasonably configured, planting grooves and fish-scale pits are arranged, an ecological restoration composite structure layer is built, and a grass spraying and planting and vine climbing system is combined. And water and soil loss is reduced through multiple measures.
Owner:YELLOW RIVER INST OF HYDRAULIC RES YELLOW RIVER CONSERVANCY COMMISSION

Anticorrosive and impermeable anchor rod structure for new buildings

The present invention discloses an anti-corrosion and anti-seepage anchor structure for new buildings, which includes multiple steel strands arranged in an anchor hole. The top of the anchor hole includes a cushion layer, a bottom plate and a surface layer from bottom to top; a tension end anchor assembly is arranged at the top ends of the multiple steel strands and is located in the bottom plate below the surface layer. The tension end anchor assembly includes a settlement type winged anchor backing plate, which is arranged at the top of the multiple steel strands and is located at the top surface of the bottom plate. The settlement type winged anchor backing plate has a cylindrical structure, and the cylindrical structure includes a cylinder head part, a cylinder body part and a cylinder tail part from top to bottom. Among them, the tension anchor of the tension end anchor assembly is arranged at the cylinder head part; a connecting pipe is sleeved outside the multiple steel strands, and the upper end of the connecting pipe is hermetically connected to the lower end of the cylinder tail part; a water-stop steel ring assembly is embedded in the bottom plate and the cushion layer at the same time, and the lower end of the connecting pipe extends into the water-stop steel ring assembly; a front anchor carrier assembly is arranged at the other ends of the multiple steel strands. It can solve the problem of upward seepage of underground foundation water.
Owner:ZHEJIANG ZHONGQIAO PRESTRESSING EQUIP CO LTD

Ecological slope protection structure and construction method thereof

The invention discloses an ecological slope protection structure and a construction method thereof.The ecological slope protection structure comprises an ecological vegetation layer formed by splicing a plurality of units, and a vegetation planting groove is formed in each unit; the regulation and control layer comprises a honeycomb-shaped coarse aggregate layer, a corrugated plate laminated middle aggregate layer and a fractal tree-root-shaped fine aggregate layer of which the porosity decreases progressively from top to bottom; the drainage mechanism comprises a drainage channel in the ecological vegetation layer, a porous drainage framework and a water collecting well arranged at the slope bottom; the anchoring mechanism comprises a plurality of umbrella-shaped expansion anchor rods, and the lower end of each anchor rod is perpendicular to the slope surface and is inserted into the slope surface soil layer; the lower end of each anchor rod is provided with four sets of extensible 120-degree arc-shaped anchor flukes, and the surfaces of the anchor flukes are provided with bionic ground gripping grooves consistent with the anti-sliding ribs in trend. By innovatively designing the ecological vegetation layer, the regulation and control layer, the drainage mechanism and the anchoring mechanism, stability of the slope protection structure in mechanical property and sustainable development of the ecological environment are achieved, and coordination and unification of vegetation growth and slope stability are promoted.
Owner:SINOHYDRO BUREAU 6 CO LTD

Settling winged anchor backing plate for construction

The present invention discloses a sunken winged anchor backing plate for construction, which is applied to an anti-corrosion and anti-seepage anchor rod structure for construction. The body of the sunken winged anchor backing plate is in a cylindrical structure, and the body includes a cylinder head part, a cylinder body part, a cylinder tail part, an inner hole part and a plurality of reinforcing wing plates; the cylinder head part is arranged at the uppermost part of the body; the cylinder body part is coaxially connected to the lower part of the cylinder head part; the cylinder tail part is coaxially connected to the lower part of the cylinder body part; wherein the outer dimensions of the cylinder head part, the cylinder body part and the cylinder tail part gradually decrease; the inner hole part is coaxially arranged on the body with the cylinder head part, the cylinder body part and the cylinder tail part; and the plurality of reinforcing wing plates are evenly spaced along the axial direction and are arranged around the outer wall of the cylinder tail part. It can solve the problem of upward seepage of underground foundation water.
Owner:ZHEJIANG ZHONGQIAO PRESTRESSING EQUIP CO LTD

Scouring pile foundation reinforcing method based on MICP curing principle

The invention discloses a scouring pile foundation reinforcement method based on an MICP curing technology, which comprises the following steps: acquiring initial environment information such as scouring pit parameters, water flow parameters, tide period and seawater salinity of a delimited area around a pile, and determining grouting parameters such as a grouting window period and a safe flow velocity threshold value and a matching numerical value of a bacterial liquid concentration, a urea concentration and a calcium ion concentration; a grouting assembly composed of a first grouting pipe and a second grouting pipe which are spliced up and down is arranged, and grouting holes are formed in the side wall of the second grouting pipe which is pre-buried in a soil layer; after MICP slurry is prepared according to blending parameters, the slurry is injected into a soil layer in combination with grouting parameters, and meanwhile, the grouting process is dynamically adjusted by monitoring the resistivity of a soil body in real time; and after grouting is completed, the assembly is dismantled, and supplementary grouting is conducted on the local area according to the detection result. According to the method, the accuracy and reliability of pile foundation reinforcement are achieved through environmental parameter adaptation, grout dynamic regulation and control and layered detection and reinjection.
Owner:FUJIAN UNIV OF TECH

Self-adaptive scouring protection structure for coastal pile foundation

The invention relates to the technical field of pile foundation protection, in particular to a coastal pile foundation self-adaptive scouring protection structure which comprises a pile foundation, an annular protection sleeve is arranged on the outer side of the pile foundation in a sleeving mode, and a plurality of flow guide mechanisms which are distributed at equal intervals and can adapt to water flow impact to change angles so as to restrain vortexes are arranged on the outer side of the protection sleeve in the circumferential direction of the protection sleeve. A transmission mechanism with a one-way transmission function is arranged at the position, corresponding to each flow guide mechanism, in the protection sleeve, and angle changes of the flow guide mechanisms push the transmission mechanisms to be arranged at the bottom of the protection sleeve in a linkage mode and used for lifting water flow on the lower portion of the pile foundation so as to achieve the effects of gathering silt and damaging vortex forming. The flow adjusting mechanisms correspond to the transmission mechanisms in number and position. The arc-shaped flow guide plates in the flow guide mechanism deflect in a self-adaptive mode within the range of 30-60 degrees, water flow separation is delayed at the low flow speed, vortex cores are blocked at the high flow speed, vortex generation can be remarkably and actively inhibited, the strength of the vortex can be remarkably and actively inhibited, and the vortex is actively inhibited.
Owner:RIZHAO BISHUI CONSTR & INSTALLATION ENG DEPT

Splicing construction method for three-layer overlapping assembly type station

The invention relates to the technical field of station construction, in particular to a three-layer overlapping assembly type station assembling construction method, and an overlapping assembly type station comprises a bottom plate, prefabricated side walls, cast-in-place side walls, middle stand columns, middle longitudinal beams, middle plates, top longitudinal beams, a prefabricated top plate and a cast-in-place top plate. The construction method specifically comprises the steps that concrete is poured in situ to form the bottom plate, then the prefabricated side walls are assembled, the cast-in-place side walls are poured, then the middle stand columns and the middle longitudinal beams are assembled, connecting joint concrete is poured, the middle plate is erected, the concrete is symmetrically poured at the two ends of the middle plate for forming, and single-layer construction is completed. When the station is constructed to the top sealing of the uppermost layer, the middle plate serves as the foundation, the cast-in-place side walls, the prefabricated side walls, the middle stand columns and the top longitudinal beams are spliced and poured in sequence, the prefabricated top plate is erected, and the cast-in-place top plate is poured to complete top sealing; the method is easy to control, the accuracy of structure construction is guaranteed, the construction period is short, the construction quality is stable and reliable, and the construction efficiency can be obviously improved.
Owner:CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD

Offshore wind turbine foundation scouring analysis reference surface elevation determination method and system

The invention relates to a method and a system for determining the elevation of an offshore wind turbine foundation scouring analysis datum plane, and the method comprises the steps: carrying out three-dimensional modeling through seabed three-dimensional point cloud data, analyzing the thickness of shallow sludge through high-frequency and low-frequency sounding data, and obtaining stratum distribution through combining with shallow profile data; calculating a theoretical scouring depth based on the water flow data, and reconstructing a three-dimensional grid data model; calculating and screening a suitable area through a terrain gradient factor, and constructing a seabed base plane calculation data set; and calculating the average elevation of each fan basic area as the datum level elevation of scouring analysis. According to the method, refined reconstruction of the regional landform of the offshore wind turbine foundation is realized, the accuracy and scientificity of determining the elevation of the reference surface are improved, reliable data support is provided for stability evaluation and design optimization of the offshore wind turbine foundation, the structural safety risk caused by scouring is remarkably reduced, and the economic benefit is improved. And the overall safety and economic benefits of the offshore wind power plant are improved.
Owner:POWERCHINA FUJIAN ELECTRIC POWER SURVEY & DESIGN INST CO LTD

Electrolytic cell sand-proof and dust-proof device based on Coanda effect

The invention discloses a Coanda effect-based sand-proof and dust-proof device for an electrolytic bath, which is characterized in that a surrounding dust cover structure which is in flexible contact with the electrolytic bath or keeps a non-contact gap with the electrolytic bath is formed at the periphery of a full-load-bearing movable bracket, and the dust cover structure forms a semi-closed protection structure between a foundation and the electrolytic bath; dustproof cover structures composed of fences are arranged on the two sides of a foundation with profile steel as the foundation, each dustproof cover structure at least comprises a vertical fence wall arranged on the side portion of the full-bearing type movable bracket, the bottom of each vertical fence wall is connected with the foundation, and the top of each vertical fence wall makes flexible contact with the electrolytic cell or forms a non-contact gap with the electrolytic cell. A continuous variable-curvature Coanda curved surface is adopted, the airflow speed is increased through the wall attachment effect, a laminar flow air curtain is formed, and curvature-flow velocity coupling optimization is formed. Compressed air is injected through the narrow slit nozzle, ambient air is pried to form a large-flow air curtain, the actually measured air curtain coverage area is 3.2 times that of a traditional flow guide plate, and the unit energy consumption is reduced by 57%.
Owner:JIANG SU SHUANG LIANG QING NENG YUAN KE JI YOU XIAN GONG SI

Film storage tank pump tower base device and mounting method thereof

ActiveCN119877592AProtective foundation
The invention discloses a thin film storage tank pump tower base device and an installation method thereof. The thin film storage tank pump tower base device comprises a main base, a supporting platform, a plurality of supporting bases, a corrugated plate and a wing plate. The main base and the supporting seat are respectively mounted above and below the supporting platform; the supporting seat penetrates through the wing plate, one end is connected with the supporting platform, and the other end extends into the concrete foundation to be connected with the steel plate; the wing plate is connected with the corrugated plate to form a shielding layer; the shielding layer is located below the supporting platform. The problem that the pump tower base interferes with the corrugation continuity can be solved.
Owner:SINOTECH ENERGY CO LTD

Fabricated prestressed concrete tower footing for land wind turbine generator and construction method

The invention relates to the technical field of concrete tower footings, and discloses a fabricated prestressed concrete tower footing for a land wind turbine generator and a construction method, a bottom framework is placed in a foundation pit under the supporting action of a corresponding supporting frame, and an annular seat penetrates through the supporting frame and realizes positioning of the supporting frame; the inner framework is supported at the center in the outer framework; under the combined action of the top fixing mechanism and the bottom fixing mechanism, the outer framework and the inner framework are kept vertical. By arranging the inner framework, the outer framework can be supported, the inner framework and the outer framework form a whole after the concrete is solidified, and the overall structural strength is high. Under the combined action of the top fixing mechanism and the bottom fixing mechanism, the space between the outer framework and the inner framework can be ensured to be consistent up and down, and the relative positions of the outer framework and the inner framework are prevented from deviating during concrete pouring, so that the overall structural strength of the outer framework and the inner framework meets the requirement after the concrete is solidified.
Owner:CGN NANZHAO COUNTY NEW ENERGY CO LTD DENGZHOU BRANCH

Bridge pile foundation protection device

The utility model discloses a bridge pile foundation protection device which comprises a protection pile foundation clamping plate, a buffering protection plate, a flow guide plate, a flow guide plate driving structure, an anti-collision buffering assembly and an anti-collision buffering balance assembly. The protective pile foundation clamping plate is detachably arranged on the side wall of a pile foundation and fixed to the pile foundation through a fastening assembly. Buffering protection plates are circumferentially distributed on the outer sides of the protection pile foundation clamping plates and used for bearing impact force of foreign objects. An anti-collision buffering assembly is arranged between the buffering protection plate and the protection pile foundation clamping plate and used for buffering and absorbing force generated when foreign matters collide with the buffering protection plate. An anti-collision buffering balance assembly is arranged on the periphery of the anti-collision buffering assembly and used for balancing the buffering protection plate; and a flow guide plate is movably arranged on the buffer protection plate, is unfolded under the action of a flow guide plate driving structure and is used for guiding and dividing flood flow. The river-crossing bridge pile foundation structure solves the problem that a river-crossing bridge pile foundation can be damaged under the impact effect of flood flow.
Owner:CHINA RAILWAY 19 BUREAU GRP CO LTD +1

High-performance green environment-friendly single-component polymer cement waterproof dry blend and preparation method thereof

The invention discloses a high-performance green and environment-friendly single-component polymer cement waterproof dry blend and a preparation method thereof, and relates to the technical field of building materials, the high-performance green and environment-friendly single-component polymer cement waterproof dry blend comprises the following components: an inorganic cementing material, latex powder, graded quartz sand, a functional filler, cellulose ether, an organic silicon defoamer, a polycarboxylic acid water reducer and compound fibers; the functional filler is modified waste glass powder prepared through mechanical activation and silanization modification; the compound fiber is a mixture of modified glass fiber and modified polypropylene fiber; the preparation of the modified glass fiber comprises tannic acid and polyethyleneimine combined modification and graphene oxide modification, and the preparation of the modified polypropylene fiber comprises plasma activation. The polymer cement waterproof dry blend prepared by the method adopts the glass powder to replace natural mineral filler, is energy-saving and environment-friendly, and the cement matrix is modified by various fibers, so that the prepared polymer cement dry blend is excellent in comprehensive performance.
Owner:临海市忠信新型建材有限公司

Double-row steel sheet pile cofferdam construction method

The invention discloses a double-row steel sheet pile cofferdam construction method, which comprises the following steps of: before construction, measuring the original riverbed elevation of a cofferdam piling area, organizing steel pipes to enter a site according to a cross-section diagram and a construction sequence of a cofferdam, timely removing and recording if stone blocks and the like at the river bottom are measured in the measurement process, and before construction, checking and maintaining all mechanical equipment, so that the construction efficiency is improved. After entering the field, the steel pipes are stacked according to specifications, varieties and classifications, before pile conveying, the models and the number of the steel pipes used during construction are determined, and the steel pipes are arranged strictly according to the designed section. Compared with a construction scheme of adopting a Larsen steel sheet pile cofferdam and a temporary construction platform, the construction cost, the rental cost, the earthwork transportation cost, the earthwork compaction cost, the earthwork filling excavation filling cost and the like of temporary facilities can be saved, building construction is carried out in a water area needing a large area, the construction period is long, and the construction cost is low. The method is more economical and reasonable when being used for constructing structures in water under the conditions of high water level and the like.
Owner:CHINA RAILWAY NO 9 BUREAU GRP NO 1 CONSTR CO LTD

Artificial underground water recharge system and method based on roof rainwater collection

The invention provides an artificial groundwater recharge system and method based on roof rainwater collection, and relates to the technical field of groundwater recharge. The system comprises a rainwater recycling unit, a rainwater purifying unit and a rainwater recharging unit which are connected in sequence, and the rainwater recycling unit is used for collecting roof rainwater; the rainwater purifying unit is used for purifying the collected rainwater, and the rainwater recharging unit is used for inputting the purified rainwater into an underground aquifer. A set of feasible manual supply and recharge technical system is constructed, and various aspects of manual supply are organically integrated and connected, so that the water quality of recharged rainwater can be improved, the underground water supply quality is effectively ensured, the supply efficiency of a manual supply project can be maintained or improved, and the blockage risk is reduced; the time for keeping high-efficiency recharge of manual supply is prolonged, and then the recharge water amount is increased.
Owner:WATER RESOURCES RES INST OF SHANDONG PROVINCE

Construction method for controlling perpendicularity and deviation of steel latticed column inserted into cast-in-place pile

The invention discloses a construction method for controlling perpendicularity and deviation of a steel latticed column inserted in a cast-in-place pile, and relates to the field of engineering construction. Secondly, cast-in-place pile hole forming and reinforcement cage construction are conducted; 3, inserting construction of the profile steel latticed columns is conducted; fourthly, concrete pouring is conducted; and step 5, quality monitoring and deviation processing. A three-level measurement system is constructed, and the pile position deviation is smaller than or equal to 3 mm; the straightness of the standard jig frame prefabricated latticed column is smaller than or equal to L / 1000 and smaller than or equal to 10 mm, and the perpendicularity of formed holes is controlled to be smaller than or equal to 1% through a rotary drilling rig; a three-dimensional guiding system and dynamic monitoring are utilized, the insertion deviation plane is smaller than or equal to 20 mm (the insertion deviation plane is smaller than or equal to 10 mm in a reverse construction method), and the perpendicularity is smaller than or equal to L A guide pipe method is adopted for concrete pouring, and a composite anti-floating measure is combined to prevent deviation; quantitative monitoring and staged processing are carried out in the whole process, fine control of the whole process is achieved, and precision and safety are improved.
Owner:ANHUI SANJIAN ENG

Modified bentonite-cement-based concrete self-repairing material and preparation method thereof

The modified bentonite-cement-based concrete self-repairing material comprises the following components in parts by weight: 20-30 parts of modified bentonite, 15-30 parts of cement and 50-80 parts of water, the mass ratio of the modified bentonite to the cement is 0.8-1, and the water-solid mass ratio is (0.5-2): 1. The concrete self-repairing material comprises bacillus mycoides and bacillus cereus which are screened from a landfill, the bacillus mycoides and the bacillus cereus serve as nucleation sites of calcium carbonate precipitation and are used in cooperation with a nutrient solution and chitosan, the speed of the strains for utilizing the mineralization effect at cracks is increased, calcite is accelerated to be generated and deposited along the surfaces of the cracks, and the effect of calcium carbonate precipitation on the surfaces of the cracks is improved. And a good repairing effect is achieved on the cracks of the barrier material. The repairing material is applied to a landfill site, has the effects of seepage prevention, sun crack resistance and erosion resistance, and realizes effective control of pollutants.
Owner:CHINA UNIV OF PETROLEUM (EAST CHINA)

Ultra-long concrete post-cast strip structure and manufacturing method

The invention relates to the technical field of concrete structure construction, and discloses a super-long concrete post-cast strip structure and a manufacturing method.The structure comprises an interface treatment layer, a fiber grid layer, a micro-expansion concrete layer and a steel fiber protection layer which are sequentially arranged from bottom to top, and the interface treatment layer is used for providing combination transition of new concrete and old concrete; the fiber grid layer is used for achieving deformation constraint and stress transfer, the micro-expansion concrete layer is used for forming an autonomous compensation deformation area, and the steel fiber protection layer is used for providing final structure protection and load distribution. The interface treatment layer is a concrete base surface treated by high-pressure water jet, and is coated with a silane-based interface treatment agent. The bonding strength of new concrete and old concrete is enhanced through the interface treatment layer, the fiber grid layer provides effective deformation constraint, the micro-expansion layer achieves automatic shrinkage compensation, the steel fiber layer controls crack development, the layers are matched with one another to form a complete anti-crack system, the problem that the anti-crack performance of a traditional post-cast strip is insufficient is solved, and the overall anti-crack performance is improved.
Owner:FUJIAN ZHUOYUE CONSTR ENG DEV CO LTD

Anti-scouring device applied to offshore wind power single pile

The anti-scour device comprises a protective cover and a spoiler, the protective cover is used for being arranged on a pile body of the wind power single pile in a sleeving mode and enabling the protective cover to be arranged on a gravel layer around the pile body in a covering mode, a flow guide face is arranged on the outer side of the protective cover, and the flow guide face gradually rises from the periphery of the protective cover to the middle of the protective cover. The spoilers are arranged on the outer side of the protective cover at intervals in the circumferential direction of the protective cover, one ends of the spoilers in the length direction face the middle of the protective cover, and the other ends of the spoilers in the length direction face the periphery of the protective cover. And under the action of the protective cover and the spoiler, the anti-scouring performance of the whole anti-scouring device applied to the offshore wind power single pile is improved, and the mounting stability of the wind power single pile is guaranteed.
Owner:GUANGDONG ENERGY GROUP SCIENCE & TECHNOLOGY RESEARCH INSTITUTE CO LTD

Pipe pile grouting expanded head pile forming process special for prestressed concrete water jet cutter and pipe

The invention relates to a pipe pile grouting expanded head pile forming process special for a prestressed concrete water jet cutter and a pipe, and belongs to the field of pipe pile construction. The large-head concrete block is integrally connected with the lower end of the tubular pile body and is in an irregular shape, the tubular pile body sequentially comprises a pile cap, a plurality of pipe joints and an inverted-cone-shaped pile head from top to bottom, the tubular pile body is provided with at least one high-pressure water or cement paste channel in the axial direction of the tubular pile body, and the pile head is provided with a material water hole communicated with the high-pressure water or cement paste channel. During construction, even if a special stratum is encountered, the hard stratum is impacted through the high-pressure water jet cutter, and static pressure or hammering is matched, so that the problem that an existing pipe pile is difficult to descend is solved. When the designed elevation is reached, guniting is carried out through high-pressure water or a cement paste channel in the pipe pile body, and a sphere-like expanded head is formed at the bottom of the pipe pile; the bearing capacity of a single pile can be improved, settlement of the pile body is limited, local displacement of the pile body is eliminated, and the anti-floating effect of the pile body is achieved.
Owner:BEIJING ZHENCHONG INTERNATIONAL TRADE CO LTD

Preparation of salt-resistant nano bentonite-polymer composite material

The invention relates to the field of civil engineering waterproof materials, in particular to a nano bentonite-polymer composite material with high salt tolerance and a preparation method thereof, and the nano bentonite-polymer composite material is especially suitable for a sodium-based bentonite waterproof blanket in a saline soil area or a marine environment, and the preparation method comprises the following steps: (1) preparing nano bentonite lamellar colloidal dispersion liquid; (2) introducing and mixing an electrostatic screening agent and a polymerizable monomer; (3) carrying out in-situ free radical polymerization reaction; and (4) post-treatment and finished product preparation. By constructing a three-dimensional interpenetrating hierarchical structure composed of a covalent grafted polymer network, a physically anchored electrostatic screening agent and a stripped bentonite nanosheet layer, effective protection of a bentonite core anti-seepage unit is realized, so that the adaptability and long-term stability of the material under a complex water quality condition are remarkably improved.
Owner:HANGZHOU HEIDIS NEW MATERIAL CO LTD

Method for constructing underground space in peripheral area of existing building through open caisson

A method for constructing an underground space in a peripheral area of an existing building by using an open caisson belongs to the technical field of open caisson construction, and comprises the following steps: arranging an open caisson construction area in an area between the existing buildings, and constructing an uplift pile in an internal area of the open caisson to be constructed; the counter-force beam is constructed, so that the counter-force beam is fixedly connected with the uplift pile, the two ends of the counter-force beam are fixedly connected with the existing building, and the weight of the existing building is used as counter-force to play a role in assisting sinking of the open caisson; after the counter-force beam is constructed, the open caisson is constructed, the uplift piles are arranged in the open caisson, the stress state of the counter-force beam can be improved, the cross section of the counter-force beam can be reduced, in the area with the high underground water level, the uplift piles on the lower portion of the open caisson can serve as anti-floating components of the open caisson, the uplift piles in the open caisson can serve as partial columns of a basement, cost is effectively reduced, and the construction period is shortened. The uplift pile is arranged in the open caisson, and compared with the uplift pile arranged near the outer wall of the open caisson, the uplift pile has higher bearing capacity and can better play a role.
Owner:SHANDONG JIANZHU UNIV

Steel sheet pile construction method

A steel sheet pile construction method, comprising: a first step of performing an anti-corrosion treatment on steel sheet piles (4); a second step of placing, according to a design drawing, a plane position line for pile sinking, controlling designed elevations of the steel sheet piles (4) according to an existing elevation point, and performing measurement, paying-off and positioning; a third step of mounting a steel sheet pile guide frame (3) on a trestle (1) pre-built behind a berth and a pre-driven cast-in-place pile (2); a fourth step of marking a number on each of the steel sheet piles (4) according to a driving sequence, marking scale water lines on the steel sheet piles (4), transporting the steel sheet piles (4) to the trestle (1) behind the berth, and brushing lock catches of the steel sheet piles (4) with butter; a fifth step of driving the steel sheet piles (4) with the aid of the steel sheet pile guide frame (3); and a sixth step of mounting an anode protection block on an underwater portion of each steel sheet pile (4). The method is used in combination with a steel sheet pile guiding mechanism, which enables accurate positioning and driving of the steel sheet piles.
Owner:CHINA HARBOUR ENGINEERING

Composite high-weather-resistance rubber waterstop and preparation process thereof

The invention relates to the field of waterproof sealing materials, and discloses a composite high-weather-resistance rubber waterstop which is composed of an outer layer, a middle layer and an inner layer. The outer layer contains 3%-8% of nano titanium dioxide, 2%-5% of nano zinc oxide, 50%-70% of a rubber matrix and 1%-3% of an ultraviolet light absorber, and the total proportion of the outer layer is 10%-20%. The middle layer is composed of 70%-85% of EPDM, 5%-10% of carbon fiber and 5%-10% of plasticizer, and the total proportion of the middle layer is 60%-75%. The inner layer is a dynamic covalent bond rubber material and contains 5%-10% of a vulcanizing agent and 1%-3% of an antioxidant, the rubber material accounts for 80%-90%, and the inner layer accounts for 15%-25% in total. Through a multi-layer composite structure, a dynamic covalent bond self-repairing material and an optimized vulcanization process, the comprehensive performance of the water-stop belt is remarkably improved, and particularly the durability and the service life of the water-stop belt in a long-term exposure environment are improved.
Owner:HEBEI BAOLI ENG EQUIP GRP CO LTD

Offshore single-pile structure foundation and construction method thereof

The invention discloses an offshore single-pile structure foundation and a construction method thereof, the offshore single-pile structure foundation is composed of a main pile, a suction barrel assembly and a grouting sealing cover, the outer part of the main pile is annularly sleeved with the suction barrel assembly, and the top of the suction barrel assembly is provided with the grouting sealing cover. The structural form that the variable-diameter single pile and the multi-subdivision annular suction barrel are combined is adopted, the advantages of extremely high vertical bearing of the single pile and horizontal reinforcing supporting of the suction barrel are fully played, the horizontal swing load resisting capacity of the single pile on the mud surface section is effectively improved, and the horizontal swing load resisting capacity of the single pile on the mud surface section is effectively improved through horizontal reinforcing of the external suction barrel structure. Meanwhile, the structural rigidity is improved, the stability is improved, and long-term use is stable and reliable; the independent center supporting sleeve is arranged in the middle of the suction barrel assembly, so that when a single pile is scoured, the inner ring of the suction barrel can avoid a scouring pit, self-sinking sealing is achieved without being affected, the suction barrel can smoothly sink to the designed depth, and the bearing requirement is met.
Owner:NEPTUNE OFFSHORE ENG DEV +1

Replaceable tower concrete pile foundation protection device

The invention relates to the field of pole tower pile foundation protection, and discloses a replaceable pole tower concrete pile foundation protection device which comprises a pole tower pile foundation embedded in underwater sludge; the foundation pit is arranged on the underwater sludge, the depth of the foundation pit reaches the middle position of the tower pile foundation base, and the foundation pit is filled with broken stones to form a broken stone hardcore; the mounting plates are arranged on the pole tower pile foundation; the protection plate is arranged on the mounting plate and is rotatably arranged on the mounting plate; and the protection plates can automatically rotate according to the strength and direction of water flow, and are matched with the anchoring effect of the inserting rods, so that the gravel hardcore is effectively stabilized, the gravel layer is prevented from being lost, and the stability and anti-scouring capacity of the pile foundation are further enhanced. Through the design of the clearing rod, sediments on the outer wall of the tower pile foundation can be regularly cleared away, unsmooth water flow or uneven scouring caused by sediment accumulation is avoided, and the situation that the service life of the pile foundation is shortened due to biological corrosion is prevented. And through the effective sliding and scraping effects of the removing rod, the corrosion influence of attachments on the pile foundation can be reduced, and smooth water flow is ensured.
Owner:TONGLING POWER SUPPLY CO OF STATE GRID ANHUI ELECTRIC POWER CO +1

Uplift precast pile structure

The utility model relates to the field of pile foundations, in particular to an uplift precast pile structure which comprises a precast hollow pile and an anchoring device, the anchoring device is connected with the precast hollow pile, a plurality of unbonded prestressed steel strands are arranged in the precast hollow pile, and the anchoring device comprises a pile bottom anchoring part and a pile top anchoring part. The anti-pulling precast pile solves the problem that an anti-pulling precast pile in the prior art cannot be used as a long pile or an ultra-long pile, improves the anti-pulling bearing capacity of a single pile, improves the stress performance of the anti-pulling pile, and enables the anti-pulling pile to have better integrity and anti-pulling ductility.
Owner:ZHEJIANG PROVINCE INST OF ARCHITECTURAL DESIGN & RES +1

Active anti-floating drainage model test device and test method considering saturation change

The invention discloses an active anti-floating drainage model test device and test method considering saturation change, and belongs to the technical field of active anti-floating of buildings. The test device comprises a boundary model box, a building model box, a plurality of pore pressure sensors, a plurality of dielectric constant sensors, a pressure limiting drainage pipe for simulating active anti-floating equipment in an actual building, a water head control device and a rainfall simulation device, and can simulate a seepage field of an underground space under the condition of active anti-floating measures during rainfall. The drainage condition of the underground space under the condition is reproduced; the pore pressure sensor and the dielectric constant sensor monitor the saturation change of the soil body in real time, the vacancy of the existing test device in the saturation change factor of the soil body is filled up, the drainage condition of the active anti-floating measure and the seepage law of the soil body in the unsaturated-saturated transition process of the soil body under different rainfall and different stratum conditions can be demonstrated, and the test device has a wide application prospect. Scientific basis and data support are provided for optimization application of active anti-floating measures under different saturation working conditions.
Owner:CHENGDU UNIVERSITY OF TECHNOLOGY +1

Anti-scouring structure of offshore wind power pile foundation

The invention relates to an offshore wind power pile foundation anti-scouring structure, and belongs to the technical field of offshore wind power construction, and the offshore wind power pile foundation anti-scouring structure comprises a pile foundation main body, a plurality of spoilers, a protective cylinder, a sand seepage cover and filling stones; the pile foundation main body is columnar, and the pile foundation main body is configured to be inserted into a seabed of a preset area; the pile foundation body is sleeved with the protection barrel, one end of the protection barrel is located on a seabed, the other end of the protection barrel is covered with the sand seepage cover, and a plurality of through holes are formed in the barrel wall of the protection barrel. The multiple spoilers are arranged outside the protective cylinder in the circumferential direction of the protective cylinder and connected with the protective cylinder, each spoiler comprises a spoiler vertical plate and a spoiler side plate, the spoiler vertical plate is parallel to the axis direction of the pile foundation body, and an acute included angle is formed between the spoiler side plate and the spoiler vertical plate; the space between the protective cylinder and the pile foundation body is filled with the filling stone, and the beneficial effect of prolonging the service life of the offshore wind power pile foundation is achieved.
Owner:NORTHWEST ENGINEERING CORPORATION LIMITED

Temperature control type anti-frost heaving retaining wall structure and design method thereof

The invention provides a temperature control type anti-frost-heaving retaining wall structure and a design method thereof, and belongs to the technical field of infrastructure retaining engineering in cold regions, the temperature control type anti-frost-heaving retaining wall structure comprises a retaining wall body, a ground temperature energy conversion system and an intelligent control system, and the ground temperature energy conversion system is connected with the retaining wall body; the ground temperature energy conversion system is used for absorbing ground temperature energy, converting a gas-state heating medium from a low-pressure state into a high-pressure state, adjusting the flow of a liquid-state heating medium, reducing the pressure of the heating medium and dissipating the ground temperature energy into the retaining wall body, and the intelligent control system is electrically connected with the ground temperature energy conversion system; the controller is used for monitoring the temperature of filling soil on one side of the retaining wall body and controlling the ground temperature energy conversion system to operate according to the filling soil temperature so as to control the retaining wall body temperature and filling soil heat. The technical problems that the retaining wall frost heaving disease control difficulty is large, and the frost damage prevention and control effect is poor are solved, and the technical effects that the retaining wall and the filling temperature can be controlled, frost heaving disease control is easy, and the frost damage prevention and control effect is good are achieved.
Owner:SHIJIAZHUANG TIEDAO UNIV