Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

11823results about "Protective foundation" patented technology

Ecological restoration method for mine slope

The invention relates to the technical field of mine side slope restoration, in particular to a mine side slope ecological restoration method which comprises the following steps: S1, performing field investigation and evaluation, and performing comprehensive surveying and mapping on the landform of a mine side slope by using a high-precision surveying and mapping instrument; the anti-seismic effect and the prevention and control of water and soil loss are prominent, the anti-seismic performance is enhanced through deep rock mass anchoring reinforcement, large-diameter and high-strength anchor cables are adopted, bed rock is deeply stabilized, prestress is applied, the integrity of the rock mass is enhanced, reinforced concrete anti-sliding piles are arranged near potential sliding surfaces, the anti-sliding capacity is improved, and the anti-seismic effect is achieved. When a damping ditch is dug between a slope top and a blasting area, loose gravel is filled to weaken vibration energy, the anti-seismic performance of the side slope is comprehensively improved, and water and soil loss is prevented, a drainage system is constructed to intercept surface water, vegetation is reasonably configured, planting grooves and fish-scale pits are arranged, an ecological restoration composite structure layer is built, and a grass spraying and planting and vine climbing system is combined. And water and soil loss is reduced through multiple measures.
Owner:YELLOW RIVER INST OF HYDRAULIC RES YELLOW RIVER CONSERVANCY COMMISSION

Anticorrosive and impermeable anchor rod structure for new buildings

The present invention discloses an anti-corrosion and anti-seepage anchor structure for new buildings, which includes multiple steel strands arranged in an anchor hole. The top of the anchor hole includes a cushion layer, a bottom plate and a surface layer from bottom to top; a tension end anchor assembly is arranged at the top ends of the multiple steel strands and is located in the bottom plate below the surface layer. The tension end anchor assembly includes a settlement type winged anchor backing plate, which is arranged at the top of the multiple steel strands and is located at the top surface of the bottom plate. The settlement type winged anchor backing plate has a cylindrical structure, and the cylindrical structure includes a cylinder head part, a cylinder body part and a cylinder tail part from top to bottom. Among them, the tension anchor of the tension end anchor assembly is arranged at the cylinder head part; a connecting pipe is sleeved outside the multiple steel strands, and the upper end of the connecting pipe is hermetically connected to the lower end of the cylinder tail part; a water-stop steel ring assembly is embedded in the bottom plate and the cushion layer at the same time, and the lower end of the connecting pipe extends into the water-stop steel ring assembly; a front anchor carrier assembly is arranged at the other ends of the multiple steel strands. It can solve the problem of upward seepage of underground foundation water.
Owner:ZHEJIANG ZHONGQIAO PRESTRESSING EQUIP CO LTD

Ecological slope protection structure and construction method thereof

The invention discloses an ecological slope protection structure and a construction method thereof.The ecological slope protection structure comprises an ecological vegetation layer formed by splicing a plurality of units, and a vegetation planting groove is formed in each unit; the regulation and control layer comprises a honeycomb-shaped coarse aggregate layer, a corrugated plate laminated middle aggregate layer and a fractal tree-root-shaped fine aggregate layer of which the porosity decreases progressively from top to bottom; the drainage mechanism comprises a drainage channel in the ecological vegetation layer, a porous drainage framework and a water collecting well arranged at the slope bottom; the anchoring mechanism comprises a plurality of umbrella-shaped expansion anchor rods, and the lower end of each anchor rod is perpendicular to the slope surface and is inserted into the slope surface soil layer; the lower end of each anchor rod is provided with four sets of extensible 120-degree arc-shaped anchor flukes, and the surfaces of the anchor flukes are provided with bionic ground gripping grooves consistent with the anti-sliding ribs in trend. By innovatively designing the ecological vegetation layer, the regulation and control layer, the drainage mechanism and the anchoring mechanism, stability of the slope protection structure in mechanical property and sustainable development of the ecological environment are achieved, and coordination and unification of vegetation growth and slope stability are promoted.
Owner:SINOHYDRO BUREAU 6 CO LTD

Settling winged anchor backing plate for construction

The present invention discloses a sunken winged anchor backing plate for construction, which is applied to an anti-corrosion and anti-seepage anchor rod structure for construction. The body of the sunken winged anchor backing plate is in a cylindrical structure, and the body includes a cylinder head part, a cylinder body part, a cylinder tail part, an inner hole part and a plurality of reinforcing wing plates; the cylinder head part is arranged at the uppermost part of the body; the cylinder body part is coaxially connected to the lower part of the cylinder head part; the cylinder tail part is coaxially connected to the lower part of the cylinder body part; wherein the outer dimensions of the cylinder head part, the cylinder body part and the cylinder tail part gradually decrease; the inner hole part is coaxially arranged on the body with the cylinder head part, the cylinder body part and the cylinder tail part; and the plurality of reinforcing wing plates are evenly spaced along the axial direction and are arranged around the outer wall of the cylinder tail part. It can solve the problem of upward seepage of underground foundation water.
Owner:ZHEJIANG ZHONGQIAO PRESTRESSING EQUIP CO LTD

Seabed data center pile foundation anti-scouring device and building and assembling method

The invention discloses an anti-scouring device for a seabed data center pile foundation and a building and assembling method, and belongs to the technical field of marine foundation protection. The device comprises a fixing structure, an inclination angle structure used for controlling the inclination angle and the inclination direction, a rotating structure used for controlling the rotating angle and an anti-scour structure, the tidal current direction and the seabed surface scouring and silting condition are detected in real time through a water flow sensor and a terrain scanner, and the inclination angle and the rotating angle of the device are dynamically adjusted through a control system; the scouring and erosion effects of ocean current on the pile foundation are reduced; the construction and assembly method comprises the steps of an anti-scour device design stage, block prefabrication, assembly, first-time qualification inspection, pile foundation construction, second-time qualification inspection, anti-scour device installation and seabed data center installation. The performance of the device under the simulated marine environment condition is kept consistent with that in the actual environment, the safety and reliability of marine pile foundation and seabed data are improved, and long-term stable operation is ensured.
Owner:CCCC FOURTH HARBOR ENG INST CO LTD

Construction method of layered solidified side slope anti-scouring greening base material

The invention relates to a construction method of a layered solidified side slope anti-scouring greening base material. The slope is reinforced from shallow to deep through surface mineralization, shallow mineralization, deep anchoring and greening base material spray-seeding and maintenance, the whole set of construction process is easy and efficient to operate, a multi-layer slope reinforcing structure is effectively formed, the cohesiveness of the greening base material and slope surface soil is enhanced, the base material layer can be prevented from being peeled off, and the service life of the slope is prolonged. Therefore, the stability and greening level of the side slope are improved. The microbial mineralization technology is introduced into preparation of the slope greening base material, so that the structure of the slope base material is optimized, the overall strength and rain wash resistance of the slope base material are improved, and erosion and loss of the base material are effectively reduced. The components of the greening base material are more beneficial to a soil environment for vegetation growth, a microenvironment in which vegetation and microorganisms are harmonious and symbiotic is constructed, rapid growth of vegetation can be promoted, and restoration of a regional ecological system is accelerated.
Owner:FUZHOU UNIV +1

Scouring pile foundation reinforcing method based on MICP curing principle

The invention discloses a scouring pile foundation reinforcement method based on an MICP curing technology, which comprises the following steps: acquiring initial environment information such as scouring pit parameters, water flow parameters, tide period and seawater salinity of a delimited area around a pile, and determining grouting parameters such as a grouting window period and a safe flow velocity threshold value and a matching numerical value of a bacterial liquid concentration, a urea concentration and a calcium ion concentration; a grouting assembly composed of a first grouting pipe and a second grouting pipe which are spliced up and down is arranged, and grouting holes are formed in the side wall of the second grouting pipe which is pre-buried in a soil layer; after MICP slurry is prepared according to blending parameters, the slurry is injected into a soil layer in combination with grouting parameters, and meanwhile, the grouting process is dynamically adjusted by monitoring the resistivity of a soil body in real time; and after grouting is completed, the assembly is dismantled, and supplementary grouting is conducted on the local area according to the detection result. According to the method, the accuracy and reliability of pile foundation reinforcement are achieved through environmental parameter adaptation, grout dynamic regulation and control and layered detection and reinjection.
Owner:FUJIAN UNIV OF TECH

Construction equipment for blocking barrier of contaminated site

The invention belongs to the field of building of structures in polluted sites, and discloses construction equipment for a barrier of a polluted site, which can realize quick movement, does not need to be disassembled when entering and exiting the site, and improves the construction efficiency of the barrier. The construction equipment comprises a walking type base, a traction arm, a stirring cutter assembly, a material storage unit, a monitoring unit and a control unit, wherein the stirring cutter assembly is connected with the base through a traction arm, and the traction arm can drive the stirring cutter assembly to rotate around the axis of the traction arm; the material storage unit is connected with the pipeline assembly; one end of the pipeline assembly is fixed on the stirring cutter assembly; the monitoring unit is used for monitoring the pH value and the conductivity of the barrier material in the stirring process of the stirring cutter assembly; and the control unit is used for controlling the working state of the storage unit.
Owner:JIANGSU PROVINCIAL ACAD OF ENVIRONMENTAL SCI

Anti-freezing electric transmission line tower supporting foundation suitable for frozen earth area

The invention discloses an anti-freezing power transmission line tower supporting foundation suitable for a frozen soil area, relates to the technical field of power transmission line tower supporting, and aims to solve the problem that an existing power transmission line tower supporting foundation cannot resist freezing and cannot keep supporting efficiency under season replacement. Comprising a pile foundation cylinder, a pile foundation cylinder inner supporting column, an arc-shaped heat conduction pipe and a frost heaving piercing mechanism. A pile foundation cylinder top seat and a power transmission line tower connecting frame are mounted at the top of the pile foundation cylinder; the pile foundation cylinder inner supporting column is embedded in the pile foundation cylinder, circulating flow channels are designed between the pile foundation cylinder inner supporting column and the pile foundation cylinder and between the pile foundation cylinder inner supporting column and the arc-shaped heat conduction pipe, and an equipment mounting inner cavity is formed in the top of the pile foundation cylinder inner supporting column. When the soil body is subjected to frost heaving, the transverse anchor rods can pierce into the surrounding soil body, so that the pile foundation cylinder and the surrounding soil body are anchored together, and the frost heaving is further resisted.
Owner:HEILONGJIANG ELECTRIC POWER SCIENCE RESEARCH INSTITUTE +4

Self-adaptive scouring protection structure for coastal pile foundation

The invention relates to the technical field of pile foundation protection, in particular to a coastal pile foundation self-adaptive scouring protection structure which comprises a pile foundation, an annular protection sleeve is arranged on the outer side of the pile foundation in a sleeving mode, and a plurality of flow guide mechanisms which are distributed at equal intervals and can adapt to water flow impact to change angles so as to restrain vortexes are arranged on the outer side of the protection sleeve in the circumferential direction of the protection sleeve. A transmission mechanism with a one-way transmission function is arranged at the position, corresponding to each flow guide mechanism, in the protection sleeve, and angle changes of the flow guide mechanisms push the transmission mechanisms to be arranged at the bottom of the protection sleeve in a linkage mode and used for lifting water flow on the lower portion of the pile foundation so as to achieve the effects of gathering silt and damaging vortex forming. The flow adjusting mechanisms correspond to the transmission mechanisms in number and position. The arc-shaped flow guide plates in the flow guide mechanism deflect in a self-adaptive mode within the range of 30-60 degrees, water flow separation is delayed at the low flow speed, vortex cores are blocked at the high flow speed, vortex generation can be remarkably and actively inhibited, the strength of the vortex can be remarkably and actively inhibited, and the vortex is actively inhibited.
Owner:RIZHAO BISHUI CONSTR & INSTALLATION ENG DEPT

Splicing construction method for three-layer overlapping assembly type station

The invention relates to the technical field of station construction, in particular to a three-layer overlapping assembly type station assembling construction method, and an overlapping assembly type station comprises a bottom plate, prefabricated side walls, cast-in-place side walls, middle stand columns, middle longitudinal beams, middle plates, top longitudinal beams, a prefabricated top plate and a cast-in-place top plate. The construction method specifically comprises the steps that concrete is poured in situ to form the bottom plate, then the prefabricated side walls are assembled, the cast-in-place side walls are poured, then the middle stand columns and the middle longitudinal beams are assembled, connecting joint concrete is poured, the middle plate is erected, the concrete is symmetrically poured at the two ends of the middle plate for forming, and single-layer construction is completed. When the station is constructed to the top sealing of the uppermost layer, the middle plate serves as the foundation, the cast-in-place side walls, the prefabricated side walls, the middle stand columns and the top longitudinal beams are spliced and poured in sequence, the prefabricated top plate is erected, and the cast-in-place top plate is poured to complete top sealing; the method is easy to control, the accuracy of structure construction is guaranteed, the construction period is short, the construction quality is stable and reliable, and the construction efficiency can be obviously improved.
Owner:CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD

Fluidized solidified soil as well as preparation method and application construction method thereof

The invention provides flow-state solidified soil as well as a preparation method and an application construction method thereof, and relates to the technical field of civil engineering. The flow-state solidified soil comprises rock weathered soil and / or pore-forming muck and further comprises a curing agent, and the curing agent comprises cement, superfine slag powder, fly ash, silicon powder, a water reducing agent and water glass. Rock weathered soil or field pore-forming muck is used as a main material of flow-state solidified soil, and the main material is solidified through cement, superfine slag powder and fly ash; various rock weathered soil or field pore-forming muck generated by excavation of a foundation pit is adopted as a main component, engineering muck generated in urban construction can be consumed on a large scale, a new thought is provided for treatment and solving of the engineering muck, and the engineering muck can be recycled and utilized in a green and pollution-free mode; the strength of the poured flow-state solidified soil is higher than that of concrete and is higher than that of a traditional concrete plain pile.
Owner:SHENZHEN HONGYEJI GEOTECHNICAL TECH CO LTD

Offshore wind turbine foundation scouring analysis reference surface elevation determination method and system

The invention relates to a method and a system for determining the elevation of an offshore wind turbine foundation scouring analysis datum plane, and the method comprises the steps: carrying out three-dimensional modeling through seabed three-dimensional point cloud data, analyzing the thickness of shallow sludge through high-frequency and low-frequency sounding data, and obtaining stratum distribution through combining with shallow profile data; calculating a theoretical scouring depth based on the water flow data, and reconstructing a three-dimensional grid data model; calculating and screening a suitable area through a terrain gradient factor, and constructing a seabed base plane calculation data set; and calculating the average elevation of each fan basic area as the datum level elevation of scouring analysis. According to the method, refined reconstruction of the regional landform of the offshore wind turbine foundation is realized, the accuracy and scientificity of determining the elevation of the reference surface are improved, reliable data support is provided for stability evaluation and design optimization of the offshore wind turbine foundation, the structural safety risk caused by scouring is remarkably reduced, and the economic benefit is improved. And the overall safety and economic benefits of the offshore wind power plant are improved.
Owner:POWERCHINA FUJIAN ELECTRIC POWER SURVEY & DESIGN INST CO LTD

Electrolytic cell sand-proof and dust-proof device based on Coanda effect

The invention discloses a Coanda effect-based sand-proof and dust-proof device for an electrolytic bath, which is characterized in that a surrounding dust cover structure which is in flexible contact with the electrolytic bath or keeps a non-contact gap with the electrolytic bath is formed at the periphery of a full-load-bearing movable bracket, and the dust cover structure forms a semi-closed protection structure between a foundation and the electrolytic bath; dustproof cover structures composed of fences are arranged on the two sides of a foundation with profile steel as the foundation, each dustproof cover structure at least comprises a vertical fence wall arranged on the side portion of the full-bearing type movable bracket, the bottom of each vertical fence wall is connected with the foundation, and the top of each vertical fence wall makes flexible contact with the electrolytic cell or forms a non-contact gap with the electrolytic cell. A continuous variable-curvature Coanda curved surface is adopted, the airflow speed is increased through the wall attachment effect, a laminar flow air curtain is formed, and curvature-flow velocity coupling optimization is formed. Compressed air is injected through the narrow slit nozzle, ambient air is pried to form a large-flow air curtain, the actually measured air curtain coverage area is 3.2 times that of a traditional flow guide plate, and the unit energy consumption is reduced by 57%.
Owner:JIANG SU SHUANG LIANG QING NENG YUAN KE JI YOU XIAN GONG SI

Film storage tank pump tower base device and mounting method thereof

ActiveCN119877592AProtective foundation
The invention discloses a thin film storage tank pump tower base device and an installation method thereof. The thin film storage tank pump tower base device comprises a main base, a supporting platform, a plurality of supporting bases, a corrugated plate and a wing plate. The main base and the supporting seat are respectively mounted above and below the supporting platform; the supporting seat penetrates through the wing plate, one end is connected with the supporting platform, and the other end extends into the concrete foundation to be connected with the steel plate; the wing plate is connected with the corrugated plate to form a shielding layer; the shielding layer is located below the supporting platform. The problem that the pump tower base interferes with the corrugation continuity can be solved.
Owner:SINOTECH ENERGY CO LTD

Fabricated prestressed concrete tower footing for land wind turbine generator and construction method

The invention relates to the technical field of concrete tower footings, and discloses a fabricated prestressed concrete tower footing for a land wind turbine generator and a construction method, a bottom framework is placed in a foundation pit under the supporting action of a corresponding supporting frame, and an annular seat penetrates through the supporting frame and realizes positioning of the supporting frame; the inner framework is supported at the center in the outer framework; under the combined action of the top fixing mechanism and the bottom fixing mechanism, the outer framework and the inner framework are kept vertical. By arranging the inner framework, the outer framework can be supported, the inner framework and the outer framework form a whole after the concrete is solidified, and the overall structural strength is high. Under the combined action of the top fixing mechanism and the bottom fixing mechanism, the space between the outer framework and the inner framework can be ensured to be consistent up and down, and the relative positions of the outer framework and the inner framework are prevented from deviating during concrete pouring, so that the overall structural strength of the outer framework and the inner framework meets the requirement after the concrete is solidified.
Owner:CGN NANZHAO COUNTY NEW ENERGY CO LTD DENGZHOU BRANCH

Use method of geomembrane in reservoir bottom seepage prevention and whole reservoir basin membrane seepage prevention system

The invention discloses a use method of a geomembrane in reservoir bottom seepage prevention and a whole reservoir basin membrane seepage prevention system, and belongs to the technical field of geomembranes. A use method of geomembranes in reservoir bottom seepage prevention comprises the steps that 1 # TPO geomembranes are laid in a reservoir bottom filling area, HDPE geomembranes are laid in an excavation area, transition membranes are laid at drainage galleries, and then the geomembranes laid in all the areas are firmly pressed through sandbags; the transition membrane is connected with the 1 # TPO geomembrane and the HDPE geomembrane in a welded mode, then the sandbag is moved away, and the geomembranes in all the areas are covered with concrete or compacted with clay; wherein the transition membrane is formed by welding a 2 # TPO geomembrane and a novel geomembrane, one end, far away from the novel geomembrane, of the 2 # TPO geomembrane is connected with the 1 # TPO geomembrane, and one end, far away from the 2 # TPO geomembrane, of the novel geomembrane is connected with the HDPE geomembrane. Effective connection between two different types of geomembranes of HDPE and TPO is achieved, and concentrated leakage of a reservoir bottom membrane anti-seepage structure caused by the clamp effect is avoided.
Owner:SHANDONG JIANTONG PLASTIC TECH CO LTD

Bridge pile foundation protection device

The utility model discloses a bridge pile foundation protection device which comprises a protection pile foundation clamping plate, a buffering protection plate, a flow guide plate, a flow guide plate driving structure, an anti-collision buffering assembly and an anti-collision buffering balance assembly. The protective pile foundation clamping plate is detachably arranged on the side wall of a pile foundation and fixed to the pile foundation through a fastening assembly. Buffering protection plates are circumferentially distributed on the outer sides of the protection pile foundation clamping plates and used for bearing impact force of foreign objects. An anti-collision buffering assembly is arranged between the buffering protection plate and the protection pile foundation clamping plate and used for buffering and absorbing force generated when foreign matters collide with the buffering protection plate. An anti-collision buffering balance assembly is arranged on the periphery of the anti-collision buffering assembly and used for balancing the buffering protection plate; and a flow guide plate is movably arranged on the buffer protection plate, is unfolded under the action of a flow guide plate driving structure and is used for guiding and dividing flood flow. The river-crossing bridge pile foundation structure solves the problem that a river-crossing bridge pile foundation can be damaged under the impact effect of flood flow.
Owner:CHINA RAILWAY 19 BUREAU GRP CO LTD +1

High-performance green environment-friendly single-component polymer cement waterproof dry blend and preparation method thereof

The invention discloses a high-performance green and environment-friendly single-component polymer cement waterproof dry blend and a preparation method thereof, and relates to the technical field of building materials, the high-performance green and environment-friendly single-component polymer cement waterproof dry blend comprises the following components: an inorganic cementing material, latex powder, graded quartz sand, a functional filler, cellulose ether, an organic silicon defoamer, a polycarboxylic acid water reducer and compound fibers; the functional filler is modified waste glass powder prepared through mechanical activation and silanization modification; the compound fiber is a mixture of modified glass fiber and modified polypropylene fiber; the preparation of the modified glass fiber comprises tannic acid and polyethyleneimine combined modification and graphene oxide modification, and the preparation of the modified polypropylene fiber comprises plasma activation. The polymer cement waterproof dry blend prepared by the method adopts the glass powder to replace natural mineral filler, is energy-saving and environment-friendly, and the cement matrix is modified by various fibers, so that the prepared polymer cement dry blend is excellent in comprehensive performance.
Owner:临海市忠信新型建材有限公司

Offshore pile foundation anti-scouring device, offshore wind power pile foundation and offshore wind power equipment

The invention provides an offshore pile foundation anti-scour device, an offshore wind power pile foundation and offshore wind power equipment. The offshore pile foundation anti-scour device comprises a rotary connecting piece, a flow guide assembly and a flow blocking plate. The flow guide assembly comprises a rotating body and a plurality of blades, the rotating body is connected with a pile barrel of the offshore pile foundation through a rotating connecting piece, the rotating axis and the axis of the pile barrel are collinear, and the blades are distributed in the circumferential direction of the rotating body. The two spoilers are arranged at the top and the bottom of the flow guide assembly respectively. Aiming at downflow in front of the pile, the spoiler at the top can effectively prevent the downflow from scouring the bottom layer of the sediment. For the incoming flow in front of the pile, due to the fact that the pressure of the blades on the two sides of the rotating body is unbalanced, the rotating body is driven to rotate under the condition of unbalanced reverse pressure, then the incoming flow is disturbed, ocean current energy is consumed, and the incoming flow in front of the pile is prevented from further forming downcomer scouring. And the spoiler at the bottom can greatly reduce sediment loss caused by sand carried by wake flow behind the pile, so that the degree of pile foundation scouring is further reduced.
Owner:CHINA NATIONAL OFFSHORE OIL (CHINA) CO LTD +1

Double-row steel sheet pile cofferdam construction method

The invention discloses a double-row steel sheet pile cofferdam construction method, which comprises the following steps of: before construction, measuring the original riverbed elevation of a cofferdam piling area, organizing steel pipes to enter a site according to a cross-section diagram and a construction sequence of a cofferdam, timely removing and recording if stone blocks and the like at the river bottom are measured in the measurement process, and before construction, checking and maintaining all mechanical equipment, so that the construction efficiency is improved. After entering the field, the steel pipes are stacked according to specifications, varieties and classifications, before pile conveying, the models and the number of the steel pipes used during construction are determined, and the steel pipes are arranged strictly according to the designed section. Compared with a construction scheme of adopting a Larsen steel sheet pile cofferdam and a temporary construction platform, the construction cost, the rental cost, the earthwork transportation cost, the earthwork compaction cost, the earthwork filling excavation filling cost and the like of temporary facilities can be saved, building construction is carried out in a water area needing a large area, the construction period is long, and the construction cost is low. The method is more economical and reasonable when being used for constructing structures in water under the conditions of high water level and the like.
Owner:CHINA RAILWAY NO 9 BUREAU GRP NO 1 CONSTR CO LTD

Artificial underground water recharge system and method based on roof rainwater collection

The invention provides an artificial groundwater recharge system and method based on roof rainwater collection, and relates to the technical field of groundwater recharge. The system comprises a rainwater recycling unit, a rainwater purifying unit and a rainwater recharging unit which are connected in sequence, and the rainwater recycling unit is used for collecting roof rainwater; the rainwater purifying unit is used for purifying the collected rainwater, and the rainwater recharging unit is used for inputting the purified rainwater into an underground aquifer. A set of feasible manual supply and recharge technical system is constructed, and various aspects of manual supply are organically integrated and connected, so that the water quality of recharged rainwater can be improved, the underground water supply quality is effectively ensured, the supply efficiency of a manual supply project can be maintained or improved, and the blockage risk is reduced; the time for keeping high-efficiency recharge of manual supply is prolonged, and then the recharge water amount is increased.
Owner:WATER RESOURCES RES INST OF SHANDONG PROVINCE

Bidirectional vibration reduction and isolation structure and construction method thereof

The invention discloses a bidirectional vibration reduction and isolation structure and a construction method thereof, and relates to the technical field of building vibration isolation, the bidirectional vibration reduction and isolation structure comprises an L-shaped groove, a transverse vibration reduction and isolation assembly and a vertical vibration reduction and isolation assembly, and the L-shaped groove comprises a transverse groove and a vertical groove; the transverse vibration reduction and isolation assembly is arranged on the broken stone hardcore of the transverse groove and comprises a rubber material layer, a prefabricated reinforced concrete plate, a compression spring structure, a cast-in-place concrete plate and foam concrete which are sequentially arranged on the periphery of the pile foundation. The vertical vibration reduction and isolation assembly is arranged in the vertical groove and comprises cast-in-place concrete walls cast on the inner wall of the vertical groove, an EPS mixed material arranged between the cast-in-place concrete walls in a filling mode and a water stop plate. According to the construction method of the bidirectional vibration reduction and isolation structure, the L-shaped vibration reduction and isolation structure is adopted, vibration waves are limited in the horizontal direction and the vertical direction, vibration wave energy is dissipated twice, and the vibration influence is reduced.
Owner:CHINA CONSTR EIGHTH ENG BUREAU HUAZHONG CONSTR CO LTD

Connecting device for deformation joint at civil engineering structural plate and using method of connecting device

The invention relates to the technical field of civil engineering structure plate deformation joint connection, and discloses a civil engineering structure plate deformation joint connecting device and a using method thereof.The civil engineering structure plate deformation joint connecting device comprises at least two adjacent concrete plates, and a deformation joint is arranged between the concrete plates; the elastic rubber belt is arranged in the deformation joint, and the elastic rubber belt is arranged in the length direction of the deformation joint and used for connecting the adjacent concrete slabs and providing telescopic connection to adapt to thermal expansion and cold contraction or other deformation of the concrete slabs; the supporting structures are located on the two sides of the elastic rubber belt, and each supporting structure comprises a first supporting plate and a second supporting plate. The elastic rubber belts are arranged in the length direction of the deformation joint, flexible connection can be provided between the concrete slabs, thermal expansion and cold contraction or other displacement deformation of the concrete slabs caused by temperature changes and foundation settlement are effectively absorbed through the design, and therefore the situation that the concrete slabs crack or are unstable in structure is avoided.
Owner:POWERCHINA JIANGXI ELECTRIC POWER ENGINEERING CO LTD

Construction method for controlling perpendicularity and deviation of steel latticed column inserted into cast-in-place pile

The invention discloses a construction method for controlling perpendicularity and deviation of a steel latticed column inserted in a cast-in-place pile, and relates to the field of engineering construction. Secondly, cast-in-place pile hole forming and reinforcement cage construction are conducted; 3, inserting construction of the profile steel latticed columns is conducted; fourthly, concrete pouring is conducted; and step 5, quality monitoring and deviation processing. A three-level measurement system is constructed, and the pile position deviation is smaller than or equal to 3 mm; the straightness of the standard jig frame prefabricated latticed column is smaller than or equal to L / 1000 and smaller than or equal to 10 mm, and the perpendicularity of formed holes is controlled to be smaller than or equal to 1% through a rotary drilling rig; a three-dimensional guiding system and dynamic monitoring are utilized, the insertion deviation plane is smaller than or equal to 20 mm (the insertion deviation plane is smaller than or equal to 10 mm in a reverse construction method), and the perpendicularity is smaller than or equal to L A guide pipe method is adopted for concrete pouring, and a composite anti-floating measure is combined to prevent deviation; quantitative monitoring and staged processing are carried out in the whole process, fine control of the whole process is achieved, and precision and safety are improved.
Owner:ANHUI SANJIAN ENG

Modified bentonite-cement-based concrete self-repairing material and preparation method thereof

The modified bentonite-cement-based concrete self-repairing material comprises the following components in parts by weight: 20-30 parts of modified bentonite, 15-30 parts of cement and 50-80 parts of water, the mass ratio of the modified bentonite to the cement is 0.8-1, and the water-solid mass ratio is (0.5-2): 1. The concrete self-repairing material comprises bacillus mycoides and bacillus cereus which are screened from a landfill, the bacillus mycoides and the bacillus cereus serve as nucleation sites of calcium carbonate precipitation and are used in cooperation with a nutrient solution and chitosan, the speed of the strains for utilizing the mineralization effect at cracks is increased, calcite is accelerated to be generated and deposited along the surfaces of the cracks, and the effect of calcium carbonate precipitation on the surfaces of the cracks is improved. And a good repairing effect is achieved on the cracks of the barrier material. The repairing material is applied to a landfill site, has the effects of seepage prevention, sun crack resistance and erosion resistance, and realizes effective control of pollutants.
Owner:CHINA UNIV OF PETROLEUM (EAST CHINA)

Anti-freezing pile foundation pulling supporting device

The invention provides an anti-freezing pile foundation supporting device which comprises a pile foundation cylinder, a pile foundation cylinder top seat, a pile foundation cylinder base and a frost heaving piercing mechanism, the pile foundation cylinder top seat is fixedly mounted at the top of the pile foundation cylinder, and the pile foundation cylinder top seat is used for being connected with a to-be-supported target; a pile foundation cylinder base is arranged at the bottom of the pile foundation cylinder, and a plurality of threaded drill rod assemblies are arranged on the pile foundation cylinder base; the frost heaving piercing mechanism is fixedly installed on the cylinder wall of the pile foundation cylinder. When a soil body is subjected to frost heaving, a transverse anchor rod of the frost heaving piercing mechanism can transversely pierce into the soil body outwards, so that the pile foundation cylinder and the surrounding soil body are anchored together, and the anti-freezing and anti-pulling effect is achieved.
Owner:NORTHWEST INST OF ECO ENVIRONMENT & RESOURCES CAS

Garden system and construction method thereof

The invention relates to the technical field of garden construction, and provides a garden system and a construction method thereof.The garden system comprises vegetation, a road and a pool, the pool comprises a plurality of pile plates, side plates and a bottom plate which are connected with one another, the pile plates are prefabricated rectangular flat plates, the bottom ends of the pile plates are of conical structures, and the length of the bottom ends of the pile plates is larger than that of the side plates; the pile plates and the side plates are arranged in a crossed mode, and the side plates and the bottom plate are cast-in-place plates. The prefabricated pile plate serves as a positioning pile of the pool, serves as the inner wall of the pool after being pressed into the ground and supports an excavated soil pit, only soil in the positioning pile needs to be excavated, a large excavation scheme of traditional construction is avoided, the construction progress can be accelerated, the prefabricated pile plate is of a flat plate structure, universality is high, the assembly cost is lower, and the construction efficiency is improved. And meanwhile, during construction, the bottom plate and the two adjacent pile plates are poured into a whole through a reinforcement cage, construction is convenient, reliable and stable, the same cast-in-place effect can be achieved, the waterproof performance is better, and the construction quality is improved.
Owner:CHINA CONSTR GUANGSHA (FUJIAN) CONSTR CO LTD

Ultra-long concrete post-cast strip structure and manufacturing method

The invention relates to the technical field of concrete structure construction, and discloses a super-long concrete post-cast strip structure and a manufacturing method.The structure comprises an interface treatment layer, a fiber grid layer, a micro-expansion concrete layer and a steel fiber protection layer which are sequentially arranged from bottom to top, and the interface treatment layer is used for providing combination transition of new concrete and old concrete; the fiber grid layer is used for achieving deformation constraint and stress transfer, the micro-expansion concrete layer is used for forming an autonomous compensation deformation area, and the steel fiber protection layer is used for providing final structure protection and load distribution. The interface treatment layer is a concrete base surface treated by high-pressure water jet, and is coated with a silane-based interface treatment agent. The bonding strength of new concrete and old concrete is enhanced through the interface treatment layer, the fiber grid layer provides effective deformation constraint, the micro-expansion layer achieves automatic shrinkage compensation, the steel fiber layer controls crack development, the layers are matched with one another to form a complete anti-crack system, the problem that the anti-crack performance of a traditional post-cast strip is insufficient is solved, and the overall anti-crack performance is improved.
Owner:FUJIAN ZHUOYUE CONSTR ENG DEV CO LTD

Suspension protection excavation method for existing pipeline

The invention discloses a suspension protection excavation method for an existing pipeline, which can effectively protect the pipeline, reduce the disturbance of soil around the pipeline in the underground structure construction process and ensure the stability of the pipeline in the underground structure construction process under the condition that the pipeline is not migrated. The suspension protection excavation method for the existing pipeline comprises the steps that construction preparation is conducted, and earth surface sundries in a construction area are removed; the current pipeline is searched, the position of the current pipeline is marked, and then support piles are constructed around the excavation construction area; crown beams are constructed, and the adjacent supporting piles are connected; a first foundation pit inner support is constructed, and the opposite supporting piles are connected; mounting a supporting beam and a suspension beam; earthwork is excavated layer by layer at the crown beams on the two sides of the pipeline, and retaining walls are constructed; and the pipelines are suspended, earthwork is excavated in a layered mode in an excavation construction area defined by the supporting piles, and a retaining wall is constructed till construction reaches the foundation elevation.
Owner:CCCC FOURTH HARBOR ENG CO LTD