2316 results about "Conductor pipe" patented technology

The Conductor Pipe is a large diameter pipe that is set into the ground to provide the initial stable structural foundation for a borehole or oil well. It can also be referred to as a drive pipe because it is often driven into the ground with a pile driver.

Vertical shaft construction method under unfavorable geological condition

The invention discloses a vertical shaft construction method under a unfavorable geological condition, comprising the following construction steps of: 1, pouring cover-weight concrete at a position wherein a well head of a vertical shaft is; 2, arranging two circles of advance consolidation grouting holes in the cover-weight concrete and arranging anchor bar bundles in the grouting holes, wherein the depths of the grouting holes are the same as the depth of the vertical shaft and the depths of the anchor bar bundles are the same as the depths of the grouting holes; 3, drilling pilot holes from top to bottom of the vertical shaft by utilizing a raise-boring machine; 4, drilling pilot shafts from bottom to top of the vertical shaft by utilizing the raise-boring machine; 5, carrying out advance support before expanding excavation; 6, carrying out hole drilling , blasting and the expanding excavation from top to bottom on the vertical shaft; and 7, carrying out reinforced support after the expanding excavation. By means of the vertical shaft construction method disclosed by the invention, the problems of the excavation of the light-section deep vertical shaft under the unfavorable geological condition are solved; and through the advance consolidation before the pilot hole construction, the advance support of small pipes before the expanding excavation and the steel support and bolt-spray support after the excavation, the influences of hole collapsing during the pilot shaft excavating and collapse after the expanding excavation on the construction are effectively eliminated.
Owner:SINOHYDRO BUREAU 5

Rotor with elastic diaphragm defining a liquid separating chamber of varying volume

A rotor for collecting and centrifuging biological fluids in a range of volumes. The rotor includes an elastic impermeable diaphragm which defines at least a portion of a variable-volume processing chamber, where the fluid is centrifuged. The rotor includes a rigid mounting member, to which the diaphragm is mounted and which is held and spun by a chuck. Preferably, this rigid mounting member includes a boundary wall which together with the elastic diaphragm defines the chamber. The boundary wall may be a substantially imperforate circular wall which extends to the periphery of the processing chamber but defining one opening, preferably near the axis of rotation, permitting a conduit or conduits to pass therethrough so as to be in fluid communication with the processing chamber. The rotor may include a separate structure for controlling the flow of liquid out of the chamber into the conduit. In a preferred embodiment, this outlet-control structure is a perforate, substantially rigid wall or plate, located within the processing chamber and mounted adjacent the rigid boundary wall. In an alternative embodiment, the outlet-control structure for controlling flow from the processing chamber to the conduit may include at least one tube or preferably a set of tubes, wherein each tube provides fluid communication between the chamber and the conduit. In one preferred embodiment, grooves in the boundary wall may be used as the outlet-control structure.
Owner:HAEMONETICS

Submarine shallow layer non-stratified natural gas hydrate pilot hole pull-back jet break-up exploitation method and exploitation device

ActiveCN107642346AAvoid Buried ProblemsAvoid burialMineral miningFluid removalPilot holePipeflow
The invention discloses a submarine shallow layer natural gas hydrate pilot hole pull-back jet break-up exploitation method and exploitation device, and belongs to the technical field of submarine hydrate exploitation. The exploitation method mainly comprises the following steps that a water insulation pipe is lowered to the position adjacent to a hydrate deposit, turn drilling is conducted in thehydrate deposit by means of mechanical or jet-flow drilling, and a pilot hole with a certain inclined angle is formed; after drilling reaches a preset position, a continuous pipe and an exploitationcrushing system are pulled back, meanwhile the surrounding hydrate ore body is crushed by means of a spray head jet flow, hydrate particles formed are collected into a closed pipeline with seawater, silt in the crushed particles is separated out by means of an in-pipe downhole separator, curing agent is added, then the particles are backfilled to a gob in situ, and the hydrate particles after separation are pumped to the sea surface for treatment together with the seawater. By means of the exploitation method and the exploitation device, efficient, safe and sustainable exploitation of the submarine shallow layer natural gas hydrate is achieved, the exploitation efficiency is ensured, and meanwhile a potential safety problem is effectively avoided.
Owner:SOUTHWEST PETROLEUM UNIV +2

Diaphragm wall and construction method thereof

InactiveCN102312445AGuarantee the stability of the tank wallBreak hydraulic connectionArtificial islandsExcavationsSlurry wallSlag
The invention discloses a diaphragm wall and a construction method thereof, wherein the construction method is carried out according to the following steps: step 1, the underground obstacles at the trench section position and the two sides of the trench section of the diaphragm wall are cleared; step 2, two ranges of cement stirring piles are respectively and symmetrically distributed at the two inner sides of the trench section of the diaphragm wall to reinforce; step 3, an integral pouring type concrete guide wall is formed at the top parts of the cement stirring piles, the cross section of the guide wall is L-shaped, one end of the guide wall is arranged at the inner sides of the cement stirring piles, and the other end of the guide wall crosses the top parts of the cement stirring piles; after the guide wall is built, an integral pouring type concrete rigid terrace is formed at the other end of the guide wall; step 4, the trench construction is carried out between the two ranges of cement stirring piles through a trench machine, and the bentonite mud is adopted in the trench section to protect the wall during the trenching; step 5, after the trenching is completed and reaches the scale height, slags of the trench bottom are removed, a diaphragm wall reinforcement cage is hoisted to be placed in the trench section, and a guide pipe method is adopted to carry out underwater concrete pouring; and step 6, after the concrete reaches the design strength, high pressure grouting is carried out on the bottom of the diaphragm wall. The diaphragm wall can integrate soil blocking, water resisting and bearing into a whole through the method, so good social and economic benefits are obtained.
Owner:CCCC THIRD HARBOR CONSULTANTS

Lateral earth pressure sensor embedment method and device in earth

The invention relates to a method for embedding a side-direction soil pressure sensor in the soil and a device thereof, which belongs to the technical field of construction engineering. The device comprises a sensor installation pipe, an extension pipe, a soil pressure sensor, a protective steel jacket, a U-shaped protective steel clip, a rigging screw, a connector pipe, a data transmission guide wire and a data collection instrument. The data transmission guide wire of the soil pressure sensor is connected with the data collection instrument. A notch is arranged in the center of the sensor installation pipe; the soil pressure sensor is put into the protective steel jack and then the soil pressure sensor and the protective steel jack are embedded in the notch; the U-shaped protective steel clip and the rigging screw are used to fix; the connector pipe is used to extend the sensor installation pipe and the extension pie to the design length; the pipes are put into a soil drilling hole; the guide pipes are fixed temporarily, and then fine sand is backfilled into the drilling hole; after the fine sand is consolidated, and the side direction soil pressure test is carried out. The invention has the advantages of convenient installation and operation, economy and practicality, high survival rate of the sensor embedded, capability of quite accurately measuring the side direction soil pressure in the soil, and accurate and reliable test result.
Owner:SHANGHAI JIAO TONG UNIV

Treatment method for fault fracture zone collapse in tunnel construction process

InactiveCN104196546AReduce the risk of secondary landslidesLess investmentUnderground chambersTunnel liningShotcreteFracture zone
The invention discloses a treatment method for fault fracture zone collapse in the tunnel construction process. The method includes the steps that firstly, arch reinforcement is conducted on every two adjacent surrounding rocks in a collapse segment; secondly, a collapse body is removed, and concrete is jetted to the collapse tunnel face after the collapse body is removed to close the collapse segment; thirdly, a lifting jack acts on the four corners of each bottom of racks of formworks, the interval identical to the width of a steel arch is reserved between the formworks, formwork erection is conducted in time, and the formworks and the steel arch jointly form a supporting layer; fourthly, through holes reserved in the formworks in advance, an arch apex concrete layer is formed in a high-pressure grouting mode, and small grouting guide pipes are punched into arch springs and the side walls of the steel arch; fifthly, the front end of a bottom die composed of the formworks and the steel arch is grouted and reinforced through the small guide pipes, operation of the next construction circulation stage of the collapse segment is conducted, and the first step, the second step, the third step and the fourth step are specifically repeated; sixthly, after second circulation is finished, supports of arch protecting layer concrete are formed through conveying ports embedded through the second step.
Owner:SHANDONG UNIV

Method and apparatus for estimating fouling factor and/or inverse soluble scale thickness in heat transfer equipment

Scale deposition on a heat transfer surface in a liquid system such as a heat exchanger is estimated by directing of small portion of the liquid flow through a test cell, consisting of a sensor positioned on and projecting through a conduit wall. The sensor consists of a conductive block containing a heater and having a heated wetted test surface that is flush with the inside of the conduit wall and in contact with the flow through the conduit. Within the conductive block are two temperature sensors which are at different distances from the heated wetted test surface and the heater. The periphery of the apparatus is designed to reduce heat flow through the periphery and allow greater heat flow through the heated wetted test surface. By comparing the temperature differential between the two temperature sensors to the differential when no scale is present, the presence of and amount of scale can be determined, based on reduced heat transfer through the heated wetted surface caused by the accumulated scale. The change in the temperature differential is directly proportional to the scale thickness for a given type of scale. When the thickness of the scale is determined by another means, the nature of the scale can be implied. The sensitivity of the measurement can be adjusted to accommodate a very wide range of bulk liquid or ambient temperature via adjustment of the heat flux through the provided secondary heat flux path.
Owner:SOLENIS TECH CAYMAN

Indoor model testing apparatus for analyzing influences of shield tunnel grouting construction on adjacent pile foundations

The invention relates to an indoor model testing apparatus for analyzing influences of shield tunnel grouting construction on adjacent pile foundations. The indoor model testing apparatus comprises a model box, a tunnel grouting construction simulator, a tunnel lining model and a pile foundation model. The model box is filled with sandy soil mass, the tunnel lining model comprises longitudinally-segmented aluminum alloy hollow pipes and is placed in the left half part of the model box, and lining segments are separated by annular thin rubber plates; the pile foundation model is placed in the right half part of the model box and vertical to the tunnel lining model; a displacement meter support is fixed to the top surface of the model box; multiple displacement meters are respectively fixed to the corresponding sandy soil mass and the surfaces of piled raft foundations of the pile foundation model through the displacement meter support; the tunnel grouting construction simulator comprises a latex film surrounding the periphery of the tunnel lining model and an annular liquid cavity formed between the tunnel model and the latex film, the annular liquid cavity is filled with grouting liquid, one end of the annular liquid cavity is connected with a liquid injection guide pipe provided with a liquid injection solenoid valve, and a liquid discharge guide pipe provided with a liquid discharge solenoid valve is arranged at the other end of the annular liquid cavity in the horizontal direction.
Owner:UNIV OF SHANGHAI FOR SCI & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products