Vertical mixed connection structure and method of prefabricated internal wallboards for assembling shear wall structure

InactiveCN102433945AGuaranteed shear resistanceImprove ductilityWallsShock proofingRebarWall plate
The invention discloses a vertical mixed connection structure and method of prefabricated internal wallboards for assembling a shear wall structure. On the structure, edge components of upper-layer and lower-layer prefabricated internal wallboard structures are overlapped through vertical steel bars and U-shaped ribs, and horizontal reinforcing ribs and local cast-in-place concrete are arranged in a closed ring so as to realize the edge components equivalent to the cast-in-place concrete, the vertically distributed steel bars at the middle part of the components are connected in a manner of indirect overlapping by use of mortar anchor steel bars of a retention metal mortar anchor pipe so as to form an entire shear wall. By utilizing the local cast-in-place concrete moist joint at the edgecomponent part formed by the mixed connection and the dry joint of bedding and grouting at the part of the vertically distributed steel bars, the shear strength and rigidity of the horizontal jointing part of the prefabricated internal wallboards are improved; casting holes reserved at the bottom of the edge components can be used for solving the problem of casting the local cast-in-place concrete; and the vertically distributed steel bars are connected in a manner of indirect overlapping by use of the mortar anchor, which facilitates the installation and temporary fixation of the wallboards on a concrete floor. The mixed connection structure of the prefabricated internal wallboards, provided by the invention, ensures the overall performance of the shear wall; and construction is convenient.
Owner:SOUTHEAST UNIV

Prefabricated tunnel lining segment

The invention discloses a prefabricated tunnel lining segment, belonging to the field of tunnel construction technology and aiming at simplifying the production and processing technique of prefabricated segments, optimizing the connection mode of segments and improving the prefabricated segment splicing and lining construction efficiency of a shield tunnel, especially round cross section, and the like. The concrete lining in the cross section of a round tunnel is divided into six prefabricated concrete segments, arcs are arranged on the cross sections of the six concrete prefabricated concrete segments, the six concrete prefabricated concrete segments include a top sealing block, two abutting blocks and three standard blocks, and two end surfaces of each block are provided with concave-convex steps which have symmetric or reverse structures; the top sealing block is shaped like a regular wedge which has a symmetrical structure, the two abutting blocks are both partially wedge-shaped and have reverse structures; the two standard block have reverse structures; after a circle of closed lining can be completed by splicing the six concrete prefabricated concrete segments, one ends, provided with bulges, of all segments in the circle are embedded in the cylindrical grooves of the spliced segments in the last circle so as to splice the segments. The prefabricated tunnel lining segment is mainly used for lining of the shield tunnel.
Owner:SOUTHWEST JIAOTONG UNIV

Basement outer wall single-side steel formwork supporting system and construction method thereof

The invention provides a basement outer wall single-side steel formwork supporting system and a construction method thereof, and relates to the technical filed of constructional engineering equipment. Aiming at the problems that the labor intensity of construction personnel is high and formwork supporting work efficiency is low existing in the available supporting system, the basement outer wall single-side steel formwork supporting system and the construction method thereof are provided. The basement outer wall single-side steel formwork supporting system comprises a pair of tracks, bases, and a plurality of supporting trusses, wherein the pair of tracks is laid at a foundation slab and parallel to an outer wall steel formwork, the bases are arranged on the tracks and can slide along the tracks, and the multiple supporting trusses are vertically arranged at intervals and are connected with the outer wall steel formwork; and bottom parts of the supporting trusses are hinged to the bases, and the supporting trusses are detachably connected with top ends of the bases through a plurality of adjusting rod pieces. The construction method comprises the steps that the steel formwork supporting system is spliced and fixed, after outer wall concrete is poured, a ground anchor assembly and a diagonal bracing are disassembled, an adjusting rod piece is retracted, so that the demoulded outer wall steel formwork are made to be supported on the base, and the next working section is started to continue pouring construction of outer wall concrete.
Owner:SHANGHAI CONSTR NO 5 GRP CO LTD

Device and method for casting concrete continuous walls along gob-side entry retaining by mining working face

ActiveCN101649744AGood top connection effectFilled tightlyUnderground chambersTunnel liningFiberSteel bar
The invention discloses a device and a method for casting concrete continuous walls along gob-side entry retaining by a mining working face. A fiber flexible template is in cuboid shape or in cubicalshape, which is formed by a main body template and a top joint template and is connected with a flange, a casting opening, a reinforcing steel bar implanting opening, a spacing hole and a tiepiece. The method comprises the following steps: the fiber flexible template is manufactured in advance; the flexible template is hung over on a top plate of a coal seam through an individual hydraulic prop oran anchor rod by the flange; the exposure end of the implanted reinforcing steel bar is inserted in the flexible template through the reinforcing steel bar implanting opening; a leading screw penetrates into the spacing hole and two ends thereof are fixed by tray nuts; the casting opening is inserted with a concrete conveying pipe and is bonded; concrete is poured into the flexible template through the conveying pipe by a concrete pump; and finally the concrete continuous walls are formed. The invention has simple structure, high-speed construction, high work efficiency, good impermeability,uneasily slurry leaking property, densely filled concrete and good top joint effect, can carry out mechanized operation, adapts to the change of gradient of the roof and floor, and can be widely usedin the following industries, such as coal mine, metallurgical mine, water conservancy, underground construction and national defense and the like.
Owner:SHAANXI PIONEERING ARCHITECTURAL TECH

BIM (building information models)-based mass concrete real-time temperature monitoring and warning method

The invention discloses a BIM (building information models)-based mass concrete real-time temperature monitoring and warning method. The BIM-based mass concrete real-time temperature monitoring and warning method includes 1, carrying out BIM solid modeling on buildings according to design requirements; 2, establishing mass concrete pouring temperature field computing modules, concrete pouring temperature monitoring and warning modules and five-dimensional temperature field databases by means of BIM secondary development; 3, formulating temperature monitoring schemes; 4, arranging wireless temperature measuring instruments on sites according to the temperature monitoring schemes, transmitting five-dimensional temperature field variation of various monitoring points in real time, automatically processing transmission data by the aid of BIM and storing the transmission data in the temperature field databases; 5, retrieving concrete pouring five-dimensional temperature field data on the BIM by means of BIM secondary development; 6, automatically warning site constructors when the difference between the internal temperatures and the external temperatures of site concrete is higher than a warning threshold value and reminding the site constructors of curing the concrete. The BIM-based mass concrete real-time temperature monitoring and warning method has the advantages that temperature field variation in integral pouring procedures can be visually displayed by the aid of the BIM, and effective warning modes can be provided for timely guiding implementation of curing measures on the sites.
Owner:NANTONG SIJIAN CONSTR GRP

Construction technology of one-time molding of concrete pouring on top of construction column and construction device thereof

The invention provides a construction technology of one-time molding of concrete pouring on the top of a construction column and a construction device thereof. The construction device comprises a concrete beam plate, a reinforcement cage and a first construction column template; the reinforcement cage is arranged on the lower portion of the concrete beam plate, and the reinforcement cage is connected with the concrete beam plate in an anchoring mode; a first construction column template and a second construction column template are correspondingly arranged on two sides of a wall body; and template wood beams are arranged on the outer sides of the first construction column template and the second construction column template. Through improvement of the construction technology of the one-time molding of the concrete pouring on the top of the construction column and the construction device thereof, the construction column being cast and molded at one time is realized; and the protruded concrete at the feed opening portion at the top end does not need to be chiseled. The construction technology and the construction device have the advantages that the operation is convenient, the pouring quality is excellent, recycle is convenient, manpower is saved, the construction cost is lowered and the construction period is shortened, and therefore the problem and the defect in the backgroundtechnology are effectively solved.
Owner:JIANGSU SUZHONG CONSTR GROUP

Fabricated frame strip steel bracket long column and construction method thereof

The invention discloses a fabricated frame strip steel bracket long column and a construction method of the fabricated frame strip steel bracket long column. The column body is a composite column consisting of three parts, namely steel pipe outer reinforced concrete, a steel pipe and steel pipe inner concrete; the steel pipe and the steel pipe inner concrete penetrate through the whole long column; the steel pipe inner concrete is subjected to primary prefabrication to form a steel pipe concrete column; concrete at a steel pipe outer joint or total concrete is poured in advance at the second time; a steel bracket is welded with the steel pipe. The long column has the advantages that 1, a multi-layer frame column is manufactured into a long column, the manufacture is simple, and the installation is convenient; 2, the column body is a composite column, the compression bearing capacity and shear capacity of the column are 2-4 times that of a reinforced concrete column with the same section, and the bearing capacity and anti-seismic property of the frame column are obviously improved; 3, the steel bracket is arranged and can be connected with a steel beam or a cast-in-place reinforcedconcrete beam, and the connection is convenient and reliable; and 4, high-strength concrete in the steel pipe is prefabricated in a factory, and the construction cost of the column is greatly reducedcompared with that of a conventional composite column. Therefore, the long column is suitable for various multi-story and high-rise prefabricated buildings and is wide in market prospects.
Owner:CHINA AVIATION PLANNING & DESIGN INST GRP

Tunnel concrete lining formwork apparatus

The present invention discloses a tunnel concrete lining template device comprising a template system and needle beam system for bearing; the template system comprises template assembly and template pylon; the template assembly comprises arced left die, right die, top die and bottom die; the left die, right die, top die and bottom die are correspondingly connected to form template assembly with round section; the template pylon is hung on the top die; and bottom of the template pylon is respectively installed with left die, right die and telescopic standing demoulding device connected by the bottom die; the needle beam system comprises bearing needle beam placed in the upper part of the tunnel and pre and post supporting leg device for supporting the bearing needle beam; upper end face of the bearing needle beam is in slide contact with the top die and the needle beam is placed on the template pylon; and the bottom die is in the detachable structure; the bottom die in the detachable structure is installed with opening part which is able to execute trowel-finishing on the surface of the tunnel bottom arch concrete after detaching or turning over when the concrete is initially set. The template device effectively removes the problem of foam of the traditional whole section template bottom arc foam and improves the internal appearance molding quality of the bottom arc concrete.
Owner:SINOHYDRO BUREAU 14 CO LTD

Intelligent concrete distribution control system and method for transverse folding arm concrete spreader

The invention discloses an intelligent concrete distribution control system and method for a transverse folding arm concrete spreader, and belongs to the field of construction engineering machinery. The intelligent concrete distribution system comprises an intelligent terminal, a PLC, a first driver, a second driver, a flow valve, an angle sensor and a flow sensor. According to the system and method, control parameters are sent to the PLC through the intelligent terminal, the first driver and the second driver are controlled by the PLC, and angle control over a rotary mechanism and opening degree control over the flow valve are realized, so that automatic intelligent concrete distribution can be realized through the horizontal folding arm concrete spreader, the concrete distribution position and flow can be precisely controlled, the labor cost is reduced, the concrete distribution efficiency is improved, and the industrialization level of the construction concrete spreader is improved.Meanwhile, the rotation angle of an arm frame, the concrete pouring flow, the position of a discharging port of a pump pipe and the concrete pouring progress can be monitored, precise concrete pouring is achieved, and the concrete pouring quality is improved.
Owner:SHANGHAI CONSTRUCTION GROUP

Integral casting process for reinforced concrete wastewater tank in predrilling engineering

The invention discloses an integral casting process for a reinforced concrete wastewater tank in predrilling engineering. The integral casting process comprises the following steps of a, construction of a foundation and a bedding layer, digging a foundation pit, and casting the concrete bedding layer after determining that the foundation bearing force meets the design requirements; b, manufacturing and installation of reinforced bars, manufacturing and installing on site, wherein the overlapping length of the reinforced bars should not be less than 40 times of the diameter (mm) of each reinforced bar, and the overlapping area of the reinforced bars same in cross section should not be more than 50% of the total area; c, supporting of die plates, binding the die plates into the shapes of the bottom and the wall of a concrete tank; d, casting of concrete, after completing the construction of the reinforced bars and the die plates, carrying out the casting construction of concrete, firstly casting the bottom of the concrete tank and the wall with the height less than 1m, leveling the top of the wall of the concrete tank, and reserving no step to complete the first time of casing; casting the residual wall of the concrete tank in at least one hour after completing the first time of casting; and e, removal of the die plates, removing the die plates when the strength of the cast concrete being more than 1.2MPa. The integral casting process has the advantages that the construction time of the wastewater tank in the predrilling engineering is reduced, the construction period of the whole predrilling engineering is shortened, the condition of drilling machines not waiting for well fields is ensured, the construction seams are not reserved in the construction, and the leakage problem caused by the construction seams is avoided.
Owner:CHINA NAT PETROLEUM CORP CHUANQING DRILLING ENG CO LTD

Underpinning and reinforcing structure for seismic isolation bearing of existing brick-concrete structure and construction method for underpinning and reinforcing structure

The invention discloses an underpinning and reinforcing structure for a seismic isolation bearing of an existing brick-concrete structure. The underpinning and reinforcing structure comprises an enlarged foundation arranged on the original foundation, a lower supporting pier arranged on the upper part of the enlarged foundation, a seismic isolation pad lower embedded board arranged on the upper part of the lower supporting pier, a seismic isolation pad arranged on the upper part of the seismic isolation pad lower embedded board, a seismic isolation pad upper embedded board arranged on the upper part of the seismic isolation pad, double supporting beams arranged on the upper part of the seismic isolation pad upper embedded board and a seismic isolation board arranged on the upper parts of the double supporting beams; pin keys are further arranged inside the double supporting beams; and the double supporting beams, the pin keys and the seismic isolation board are of an integrated type poured and molded structure. The invention further provides a construction method for the underpinning and reinforcing structure for the seismic isolation bearing of the existing brick-concrete structure. In this way, the underpinning and reinforcing structure is stable in structure, is high in safety, and has relatively good seismic resistance; besides, the mounting and constructing are relatively convenient, and the efficiency is high.
Owner:JIANGSU DINGDA BUILDING NEW TECH +1

Underground engineering mixed construction method

The invention discloses an underground engineering mixed construction method which comprises the following steps that (1) the surface of a road is transversely divided into a section A, a section B and a section C, the section A is sealed, reinforced concrete construction is carried out on the section A, and an underground continuous wall is obtained; (2) the surface layer earthwork is excavated to obtain a basement top slab of the section A; (3) earth is backfilled to recover the traffic of the road face of the section A; (4) the section B is sealed, and reinforced concrete construction is carried out on the section B to obtain an underground continuous wall; (5) the surface earthwork is excavated to obtain a basement top slab of the section B; (6) earth is backfilled to recover the traffic of the road face of the section B; (7) the section C is sealed, the surface earthwork is excavated, and basement bottom slabs of the section A, the section B and the section C are obtained; (8) a basement top slab of the section C is obtained and connected with the top slab of the section A and the top slab of the section B; (9) earth is backfilled, and the road face traffic is recovered. By means of the underground engineering mixed construction method, efficient and safe construction on the road face is achieved, bi-directional traffic is achieved, and the problems that a cover and cut-top down method is limited by excavation depth and is low in excavation speed are solved.
Owner:李涛 +2

Method for constructing combined steel and concrete column of large metallurgy industrial factory building

The invention discloses a method for constructing a combined steel and concrete column of a large metallurgy industrial factory building, belongs to the technical field of factory building construction and production, and provides a method for constructing the combined steel and concrete column of the large metallurgy industrial factory building, which can guarantee the manufacturing quality of the combined steel and concrete column. The method for constructing the combined steel and concrete column of the large metallurgy industrial factory building comprises the following steps of: firstly, arranging a steel framework which consists of a steel column and a steel beam on the basis of arrangement, and regulating the arrangement quality of the steel column by arranging a regulation base plate and a cable wind rope; secondly, arranging the outer side of the steel column and the outer side of the steel beam on the steel framework sequentially; then arranging concrete reinforcement on the connection part between the steel column and the steel beam sequentially, and supporting a concrete casting template of the steel column on the outer side of the concrete reinforcement of the steel column, wherein the concrete on the inner side and the outer side of the steel column box body are cast by a high toss and vibrating casting method and a fixed point positioning vibrating casting method; and finally, removing casting template curing concrete after the concrete strength meets the design requirement.
Owner:CHINA 19TH METALLURGICAL CORP

CRTS III type slab ballastless track self-compacting concrete casting tooling and method

The invention provides a CRTS III type slab ballastless track self-compacting concrete casting tooling and method. The casting tooling comprises a base slab, a track slab, a transferring hopper, a casting funnel, a slurry blocking template, a three-dimensional fine regulator, a track slab pressing device, a track slab lateral sliding preventing device and a slurry blocking template pressing device. The middle casting mode is changed into the lateral surface casting, and the problems of casting efficiency and air exhaust in the CRTS III type slab ballastless track construction are solved. The track slab lateral sliding preventing device, the track slab pressing device and the slurry blocking template pressing device effectively solve the problems of upward floating, lateral sliding and slurry leakage of the track slab in the casting process, so the fine regulation and the casting construction of the CRTS III type slab ballastless track are more convenient and fast, and the casting quality is better. The construction process has the advantages that in the use process, the weight is light, the rigidity is high, the efficiency is high, the operation is simple and convenient, the work intensity is low, and the construction process can adapt to the construction of road segments such as bridges, tunnels and roadbeds.
Owner:LANGFANG HELI TIANYI MACHINERY & EQUIP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products