The present application relates to the field of
building construction technology, specifically to a kind of building
joist column and composite board hollow drum reinforcement integrated construction technology. Including the following steps: S1, the influence area of
joist column, existing composite floor and surrounding structure are detected, construction parameters are determined based on
simulation and
collaborative design scheme is formulated, central control platform is established, S2, overall strengthening structure construction is implemented, including
vertical load-bearing component reinforcement, beam strengthening structure construction, wall and roof strengthening structure construction, beam end node reinforcement and transfer beam section enlargement reinforcement, full support unloading, plate top reinforcement layer construction and prestressed cable installation, integrated overall strengthening structure is formed, S3, in the hollow drum area of composite board, pre-bury intelligent grouting
pipe, S4, install space temporary
support system. The beneficial effects of the present application are: the technical problem that the existing technology considers
joist column and composite board hollow drum repair as independent process, collaborative deficiency is solved.