Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

9134results about How to "Easy construction" patented technology

Web application internationalization

A system and method is described for internationalization of web pages by extracting translatable content from extensible mark-up language (XML), or similar data-centric meta-language representations of web pages or data used to build web pages. The extracted translatable content is stored in a translation task repository (TTR) accessible by the web developer and the translator. The XML representation is then modified to include selection control logic to select the appropriate translations for insertion into the final web page. The translator accesses the TTR to translate the appropriate content and saves the translations back to the TTR associated with the original translatable data. The translations are obtained from the TTR as selection cases for the selection control logic of the XML representation. As the XML is converted into the web source code, the selection logic and translations are embedded therein facilitating building the web site in multiple different languages.
Owner:ADOBE INC

Method for predicting battery swap demand of battery swap station based on deep learning

The invention belongs to the field of battery replacement demand prediction, and relates to a battery replacement station battery replacement demand prediction method based on deep learning, and the method comprises the following steps: A, obtaining historical battery replacement data of a battery replacement station, and obtaining weather data and holiday and festival data; step B, preprocessing historical battery replacement data, weather data and holiday and festival data of the battery replacement station; step C, a battery replacement demand prediction model based on deep learning TCN-BiGRU-Attention is established; step D, model training and verification; e, analyzing the effectiveness of the model; f, model prediction and application; the method has the advantages that the method has high prediction precision and strong generalization ability, can integrate a battery replacement demand prediction model of various influence factors, and can provide more accurate and efficient decision support for operation of an electric vehicle battery replacement station.
Owner:JILIN UNIVERSITY

Forest carbon sink remote sensing monitoring method and system

The invention relates to the technical field of forest carbon sequestration, in particular to a forest carbon sequestration remote sensing monitoring method and system, and aims to solve the problems that in the prior art, a carbon sequestration prediction result can be obtained by inputting a target area image into a preset carbon sequestration model, a more comprehensive carbon reserve prediction model cannot be constructed in combination with a vegetation index, and the carbon sequestration prediction result cannot be obtained by using the preset model. The problem that the prediction result is inaccurate due to the fact that the features of specific tasks cannot be effectively handled is solved. According to the invention, ground survey data and vegetation indexes are combined through the prediction model construction module to construct a comprehensive carbon reserve prediction model, and the carbon reserve prediction model is obtained through machine training learning and can effectively cope with the characteristics of a specific task, so that the prediction accuracy and flexibility are improved; and a high-resolution carbon reserve distribution map is generated through an efficient machine learning algorithm, scientific decision and management are supported, and an important tool is provided for carbon reserve research.
Owner:SHAANXI ARROW BIOTECHNOLOGY CO LTD

Fly ash-slag based geopolymer cementing material and preparation method thereof

The invention relates to the technical field of solid waste resource recycling and green low-carbon cementing materials, in particular to a fly ash-slag based geopolymer cementing material and a preparation method thereof. The material comprises 66-74 parts of fly ash, 28-32 parts of blast furnace granulated slag, 6-7 parts of an exciting agent, 47-52 parts of a solvent and 3-7 parts of bacillus. The preparation method comprises the following steps: preferentially preparing the exciting agent, then mixing the exciting agent with the fly ash and the blast furnace granulated slag, finally inoculating the bacillus, and fully stirring and mixing to form the fly ash-slag based geopolymer cementing material. The method has the advantages that cement is partially replaced; the economical problems of solid waste resource storage and resource application can be effectively solved; a high-performance material with condensation flow characteristics and mechanical strength characteristics is simple and economical in material taking, rapid and convenient to construct and reliable and stable in curing effect; microorganisms are introduced, so that the impermeability is better improved; the curing effect is good.
Owner:HAINAN UNIV +2

Self-adaptive dynamic feedback brain-computer interface training method and system based on virtual reality

The invention relates to the technical field of brain-computer interfaces, and discloses a self-adaptive dynamic feedback brain-computer interface training method and system based on virtual reality. The training method comprises the steps that a user performs motor imagery according to a training scene presented by the VR display device; the electroencephalogram acquisition equipment acquires electroencephalogram signals; configuring a data processing module, and operating a motor imagery continuous control model to calculate characteristic parameters by taking the electroencephalogram signals as input; under the condition that the task exists, the characteristic parameters are used as input, and a dynamic self-adaptive characteristic-feedback mapping model is operated to calculate control parameters; sending the control parameters to a functional electrical stimulation device to load electrical stimulation of corresponding intensity to the muscle to obtain tactile feedback; meanwhile, the dynamic adaptive feature-feedback mapping model is dynamically updated according to latest input feature parameters; the control parameters are sent to the VR display device to present visual feedback, and the user adjusts the motor imagery based on the visual feedback and the haptic feedback. The participation sense of the user and the training efficiency can be improved.
Owner:TIANJIN UNIV +1

High-strength lightweight concrete containing hollow glass beads and preparation method thereof

The invention relates to the technical field of building materials, and particularly discloses high-strength lightweight concrete containing hollow glass beads and a preparation method of the high-strength lightweight concrete. The high-strength lightweight concrete containing the hollow glass beads is prepared from cement, fly ash, carbon fiber grafted hollow glass beads, lightweight sand, deionized water, polypropylene fiber grafted rubber particles and a water reducing agent according to the mass ratio of (58-75): (25-38): (45-65): (20-40): (42-55): (35-55): (5-12) through mixing, mold filling, vibration molding, covering and demolding. The addition amount of the hollow glass beads is strictly controlled, the influence on the overall strength of the concrete is avoided, the density and weight of the concrete are reduced due to the addition of the light sand and the hollow glass beads, the compactness and integrity of the concrete are improved due to the synergistic effect of the two added fibers, and the raw materials have excellent cohesiveness; the concrete can effectively absorb and disperse stress, and has the advantages of excellent strength, light weight, good durability and excellent comprehensive performance.
Owner:CHINA FIRST HIGHWAY ENGINEERING CO LTD +2

Method, device and equipment for determining safe distance of karst cave and storage medium

The invention discloses a karst cave safety distance determination method, device and equipment and a storage medium, and the method comprises the steps: obtaining the geological exploration data of a target karst region, and constructing a geological simulation model of the target karst region according to the geological exploration data; according to the feature information of the target karst cave, constructing a spatial simulation distribution model of the target karst cave; based on tunnel design parameters, integrating the geological simulation model and the spatial simulation distribution model to obtain a tunnel construction model of the target karst cave; pre-selected vehicle information is embedded into the tunnel construction model, and a corresponding tunnel operation model is obtained; and creating each catastrophe simulation event, performing risk prediction on the tunnel operation model, and determining the safety distance of the target karst cave according to a risk prediction result. According to the karst cave safe distance determination method, device and equipment and the storage medium, tunnel design and construction are optimized, tunnel construction and operation safety is ensured, and accurate data model support is provided for actual tunnel engineering.
Owner:GUANGZHOU METRO GRP CO LTD +3

Inhaul cable vibration control device and vibration control method

The invention provides an inhaul cable vibration control device and a vibration control method. The device comprises a speed type damping unit and a tuned mass damping unit, the speed type damping unit and the tuned mass damping unit are arranged close to the cable beam anchoring end of the inhaul cable, the speed type damping unit comprises two speed type dampers, and the two speed type dampers are symmetrically arranged on the two sides of the cable face of the inhaul cable; the two ends of the speed type damper are connected with the inhaul cable and the ground respectively. The method comprises the following steps: determining the relative arrangement positions of a speed type damping unit and a tuned mass damping unit on the inhaul cable according to the determined broadband vibration order and narrow-band vibration order of the inhaul cable; and configuration parameters of the speed type damping unit and the tuned mass damping unit are determined, the inhaul cable is configured according to the determined damping coefficient of the speed type damper and the cable direction installation positions of the speed type damping unit and the tuned mass damping unit, and vibration control is achieved through the configured inhaul cable. The method has the advantages of guaranteeing the vibration reduction effect of the inhaul cable, being convenient to construct and the like.
Owner:HUNAN UNIV

Limited micro-space pile foundation construction method based on multifunctional pile machine

The invention discloses a limited micro-space pile foundation construction method based on a multifunctional pile machine, and belongs to the technical field of constructional engineering pile foundations. The limited micro-space pile foundation construction method comprises the following construction steps that S1, a matched drilling tool is selected according to the type of a pile foundation, wherein the type of the pile foundation at least comprises one of a cast-in-situ bored pile, a stirring pile, a high-pressure jet grouting pile and a threaded expanding body steel pile; s2, pile machine equipment is assembled and placed in place, wherein the pile machine equipment comprises a main machine assembly, a drilling rig assembly, a power head assembly and a multi-channel telescopic drilling rod; and S3, pile foundation construction is conducted, specifically, corresponding pile machine equipment and auxiliary equipment are started according to different pile foundation technologies to conduct pile foundation construction. According to the multifunctional pile machine, various pile foundation types can be constructed on one pile machine, the power head with the multi-channel flow divider and the multi-channel telescopic drill rod are matched, so that the pile machine can achieve efficient and environment-friendly pile foundation construction in a limited space, the adaptability and the integration degree of equipment are improved, continuous work in construction is reduced, and the construction efficiency is improved. And the construction efficiency is improved, and various geological conditions and construction requirements can be met.
Owner:JIANGSU JIANYUAN CONSTR CO LTD +1

Power generation equipment fault diagnosis method based on large language model

The invention discloses a power generation equipment fault diagnosis method based on a large language model. According to the method, firstly, an expert knowledge base is converted into a fault knowledge base composed of criterion nodes and edges, and fault retrieval is completed through the knowledge base; synthesis of natural language texts is completed by using input based on text function segmentation, cue word templates are constructed based on calculation types of different criteria, and a large model is promoted to complete calculation reasoning tasks of the criteria; multi-dimensional equipment state monitoring time sequence data are input, a cue word set at the current time is automatically generated in combination with the cue word template, the cue word set is input into a large language model for computational reasoning, and a current state set of equipment is generated; using a knowledge base to retrieve the state set to obtain a fault diagnosis result; and then a visualization system is designed to collect and visualize a large model output result and a fault diagnosis result, and input and interaction interfaces are provided for cue word template construction. The fault diagnosis completed by the method has good practicability and expansibility.
Owner:HANGZHOU DIANZI UNIVERSITY SHANGYU INSTITUTE OF SCIENCE & ENGINEERING CO LTD

Coal quality evaluation method and system based on spectrum and image feature fusion

PendingCN119000670ARealize fusion analysis and evaluationEnsure evaluation accuracyColor/spectral properties measurementsManufacturing computing systemsEvaluation resultFeature evaluation
The invention discloses a coal quality evaluation method and system based on spectrum and image feature fusion, and solves the problem that the existing method cannot perform fusion analysis evaluation based on coal type physical features and image features, thereby affecting accurate feature evaluation representation of pulverized coal data. Dividing the pulverized coal sample data into a training set and a test set, pre-constructing a coal quality evaluation model based on spectrum and image feature fusion, and training the coal quality evaluation model by adopting the training set; the coal quality evaluation model performs feature fusion analysis on the preprocessing set and outputs a coal quality evaluation result; according to the method, the coal quality evaluation model based on spectrum and image feature fusion is pre-constructed, the training set is adopted to train the coal quality evaluation model, and the precision of the coal quality evaluation model is tested through the test set, so that fusion analysis and evaluation of the coal type physical features and the image features are realized, the coal powder evaluation precision is ensured, and the coal powder evaluation efficiency is improved. And classification support is provided for pulverized coal utilization.
Owner:国能南京煤炭质量监督检验有限公司 +1

Safety monitoring method and system for construction area

The invention discloses a safety monitoring method and system for a construction area, and relates to the field of construction safety monitoring, and the main scheme is as follows: collecting multiple types of data of the construction area in real time; respectively calculating a safety helmet identification index, an equipment fault risk index, a comprehensive health index and a comprehensive environment safety index to obtain a risk assessment value, and comparing the risk assessment value with a preset threshold to judge whether the construction area is in a risk state; calculating the coverage proportion of the monitoring area, and comparing the coverage proportion with a coverage proportion threshold of the monitoring area to judge whether the coverage proportion of the current monitoring area meets the requirement or not; calculating an unmonitored area proportion, further obtaining a risk assessment index, finally obtaining a construction efficiency index, and comparing the construction efficiency index with a construction efficiency index threshold value to judge the construction efficiency; according to the method, the risk of the construction area can be comprehensively evaluated, risk early warning is realized, monitoring coverage is optimized, and construction safety and efficiency are guaranteed.
Owner:BEIJING NELDA TECH CO LTD

A method for constructing an offshore wind power single pile foundation and a special vessel

The present invention relates to the field of offshore wind power construction, and in particular to a method for constructing a single-pile foundation for offshore wind power and a special ship. After the method is accurately positioned according to the pile driving positioning system, the construction of a fixed guide platform is first carried out; after the platform construction is completed, the special ship crane completes the lifting and flipping of the steel pile, and feeds the steel pile into the guide platform clamp. After adjusting the verticality, the steel pile begins to sink into the mud by its own weight, and the self-weight entry into the mud is completed. The special ship crane lifts the hydraulic hammer to the top of the pile and starts hammering the pile. During the process, the verticality is measured to ensure that the pile is sunk until the pile is sunk; after the pile is sunk in place, the special ship dismantles the guide platform, hoists the auxiliary structure, and the construction is completed and the ship is moved to the next position.
Owner:GUANGDONG HUAERCHEN OFFSHORE WIND POWER ENG

Self-adaptive multi-hop retrieval knowledge graph construction method for large language model questions and answers

The invention discloses a self-adaptive multi-hop retrieval knowledge graph construction method for large language model questions and answers. The method comprises the following steps: extracting triples of an input question and a corpus; self-adaptive multi-hop retrieval matching is carried out, and a specific triple related to the question in the corpus is retrieved and recognized; constructing a knowledge graph by using the question in the adaptive multi-hop retrieval matching process and a corpus triple; the answer predictor model comprises node embedding, message passing and selective filtering, and the node embedding is used for encoding questions and a knowledge graph; carrying out message transmission based on the coded problem and the knowledge graph based on a graph convolutional network; selective filtering is used for filtering redundant information of the knowledge graph; according to the method, the problem that the large language model generates illusion can be relieved, the complex reasoning process can be understood, and therefore the question answering and logical reasoning performance of the large language model is improved.
Owner:CHANGAN UNIV

Electric power knowledge graph construction method and system based on active learning

The invention discloses an active learning-based electric power knowledge graph construction method and system, and relates to the technical field of electric power market transaction data analysis, and the method comprises the steps: collecting data, cleaning the collected data, generating word prediction task data of an electric power transaction scene, and training an electric power field word embedding model; generating an entity relationship training sample, inputting a word embedding model, performing entity relationship label prediction through an entity relationship joint extraction model, extracting a high-quality sample based on active learning to perform part-of-speech tagging, and training the model based on a tagged sample; and applying the trained entity relationship joint extraction model to power transaction data to construct a knowledge graph, performing manual correction and entity unification, and storing the knowledge graph into a Neo4j database. According to the method, active learning and deep learning are combined, so that the sample labeling cost is effectively reduced, and meanwhile, the model performance is ensured.
Owner:GUANGXI POWER GRID CORP

Underwater riprap foundation bed tamping method based on sand compaction pile ship

The invention discloses an underwater riprap foundation bed tamping method based on a sand compaction pile ship. The method comprises a sand compaction pile ship transformation process and a tamping and leveling process. When the flow of transforming the sand compaction pile ship is carried out, sand outlet guide doors at the lower ends of the three pile sinking sleeves on the sand compaction pile ship are cut off firstly; the lower ends of the three pile sinking sleeves are each connected with a bottom flange; the three tamping plate devices are connected to the bottom flanges of the three pile sinking sleeves in a one-to-one correspondence mode, and each tamping plate device comprises a tamping sinking pipe, a top flange, a tamping sinking bottom plate, an enclosure plate, a middle plate, a plurality of upper-layer stiffening plates and a plurality of lower-layer stiffening plates; when the tamping and leveling process is carried out, underwater riprap operation on the lowest layer of the foundation bed is carried out firstly, and then the transformed sand compaction pile ship is moved to a vibrating tamping position on the underwater riprap surface of the lowest layer of the foundation bed for tamping and leveling; and then the ship is moved to the next ship position for tamping and leveling of the next vibrating tamping position. The construction efficiency in the drop hammer tamping process of the underwater riprap foundation bed can be improved.
Owner:CCCC THIRD HARBOR ENGINEERING CO LTD

Precast wall type damper plugging structure and construction method thereof

The invention relates to a prefabricated wall type damper plugging structure and a construction method thereof, the plugging structure comprises two steel frameworks on the back side and the front side of a metal damper, and a ceiling keel is fixed at the lower end of an upper cantilever wall; the vertical keels are divided into a left keel bundle and a right keel bundle, and metal dampers are arranged in the interval between the two sets of vertical keels. The ground keel is used for connecting the lower ends of the vertical keels of the left keel bundle and the right keel bundle; a reserved interval is arranged at the upper ends of the ground keel and the lower cantilever wall and filled with cement mortar. The construction method comprises the steps that firstly, a steel framework is manufactured, cement mortar is smeared at the top end of a lower cantilever wall according to the reserved interval height, then the steel framework is installed between an upper cantilever and a lower cantilever, the upper end of the steel framework is fixedly connected with an upper cantilever wall, and the lower end of the steel framework falls on the top face of the cement mortar; transverse keels are mounted on the steel framework on the back side of the metal damper to reinforce the frame body, and an access door area is reserved on the steel framework on the front side; rock wool is filled in the space of the steel skeleton, panel and surface layer construction is carried out, and finally an access door is installed.
Owner:CHINA MCC22 GROUP CORP LTD +1

Preparation method of high-thermal-conductivity polymer taking modified boron nitride as filler

The invention belongs to the technical field of polymer heat conduction, and particularly relates to a preparation method of a high-heat-conductivity polymer with modified boron nitride as filler, which comprises the following steps: (1) dissolving boron nitride nanosheets into tetrahydrofuran, ultrasonically dispersing uniformly, adding a modifier for reaction, then removing tetrahydrofuran by using a rotary evaporator, transferring into deionized water, and drying to obtain a boron nitride nano-sheet; drying to obtain a modified boron nitride nanosheet; (2) dispersing carbon nanotubes in deionized water, stirring and carrying out ultrasonic treatment, adding the modified boron nitride nanosheets, and then carrying out freeze orientation treatment and freeze drying treatment to obtain a porous foamed composite heat-conducting filler; and (3) carrying out melt blending on the composite heat-conducting filler and polyethylene glycol terephthalate, and carrying out hot press molding to finally prepare the modified high-heat-conductivity polymer. According to the invention, the composite heat-conducting filler improves the interfacial compatibility and dispersity with a polymer matrix, and reduces the interfacial thermal resistance of the composite material, so that the modified polymer has good application in the aspect of heat dissipation of electronic equipment.
Owner:EAST CHINA UNIV OF SCI & TECH

Combined tunnel segment structure

The utility model relates to the technical field of tunnel construction, and provides a combined tunnel segment structure which comprises six arc-shaped block bodies including a bottom block, two side lower blocks, two side upper blocks and a top block, and the six block bodies are spliced together in sequence to form an annular segment structure. Wherein a first splicing face and a second splicing face are arranged at the two ends of each block body in the annular direction, the included angle between the first splicing face and the second splicing face ranges from 60 degrees to 150 degrees, and any first splicing face abuts against the second splicing face adjacent to the first splicing face in the annular direction; the first splicing face and the second splicing face which abut against each other are the same in length. According to the combined tunnel segment structure, an annular supporting structure can be rapidly formed during construction, the assembly workload is greatly reduced, the process time is shortened, and the purpose of controlling the whole construction period is achieved.
Owner:ROAD & BRIDGE INT CO LTD +1

Cement-based underwater repair material and preparation method thereof

The invention discloses a cement-based underwater repair material and a preparation method thereof, and relates to the technical field of inorganic nonmetallic materials, and the cement-based underwater repair material is prepared from the following components in parts by weight: 85-94 parts of cement, 4-10 parts of acrylamide, 1.5-3.5 parts of an initiator, 0.01-0.03 part of a cross-linking agent and 0.8-1 part of an anti-scouring agent. The cement-based underwater repair material has the effect of improving the impact resistance of the repair material while improving the binding power of the cement-based underwater repair material to an underwater damaged structure.
Owner:WUHAN UNIV

Large-scale excavation high slope aging deformation mechanism analysis method under ultra-deep unloading condition

The invention discloses an aging deformation mechanism analysis method for large-scale excavation of a high slope under an ultra-deep unloading condition, belongs to the technical field of reservoir bank slope deformation analysis, and obtains key parameters such as the volume, the sliding direction and the water level change of an accumulation body by integrating technical means such as geological exploration, hydrological monitoring and displacement measurement. By utilizing the parameters, a slope stability index, an energy function and a water-force coupling equation are constructed, and a set of complete analysis system is formed. According to the method, the accuracy and the real-time performance of slope stability evaluation are improved, and deep understanding of a slope deformation mechanism is realized through numerical simulation and an optimization algorithm. In addition, the scheme also provides prevention and control measures based on an evaluation result, and active prevention of risk management is realized. Through application of the scheme, the safety and management efficiency of the reservoir bank slope can be remarkably improved, and powerful support is provided for sustainable development of hydropower engineering.
Owner:CHINA POWER CONSRTUCTION GRP GUIYANG SURVEY & DESIGN INST CO LTD +3

Superimposed beam and connecting method thereof

The invention provides a superposed beam which is characterized in that the superposed beam comprises ceiling beams and floor beams, every two adjacent ceiling beams are horizontally connected, every two adjacent floor beams are horizontally connected, and the ceiling beams and the floor beams are vertically connected; first studs are uniformly arranged on the inner wall of a lower flange of the ceiling beam, second studs are uniformly arranged on the top of the ceiling beam, and first through holes are uniformly formed in a web plate of the ceiling beam; third studs are uniformly arranged on the inner wall of an upper flange of the floor beam, second through holes are uniformly formed in a lower flange of the floor beam, and third through holes are uniformly formed in a web plate of the floor beam; horizontal and vertical connection of the combined modules can be achieved, cooperative stress of multiple beams can be achieved, the integrity and stress performance of a modular building are improved, the assembling efficiency is high, and construction is rapid and convenient.
Owner:UNIV OF SCI & TECH BEIJING

Mental stress monitoring system based on clustering processing

The invention discloses a mental stress monitoring system based on clustering processing. The system comprises a data acquisition module, a data preprocessing module, a mental stress state classification model building module, a mental stress state classification model parameter searching module and a mental stress monitoring module. The invention belongs to the technical field of data processing, and particularly relates to a mental stress monitoring system based on clustering processing, which introduces a similarity factor and entropy to obtain a comprehensive distance, calculates the probability that data is selected as an initial clustering center, determines the initial clustering center according to the cumulative probability, and clusters the initial clustering center; designing a random lookup vector to update a clustering center; a degree factor is introduced to divide parameter search into earlier-stage search and later-stage search, a random opposite position and a search direction are introduced to design an earlier-stage search method, a variation amplitude control factor is introduced to design a later-stage search method, optimal model parameters are determined, the performance and reliability of the model are improved, and judgment on the mental stress condition is accurately completed.
Owner:石家庄市第八医院(石家庄市精神病医院)

Track inspection robot

The utility model discloses a track inspection robot which comprises a track and an inspection robot body, the top of the inspection robot body is fixedly connected with a frame, a walking mechanism is arranged in the frame, an electric telescopic rod is fixedly connected in the inspection robot body, and the output end of the electric telescopic rod is fixedly connected with a holder. The bottom of the cradle head is fixedly connected with a bidirectional motor, one side of the cradle head is fixedly connected with an infrared thermal imager, the lifting type track inspection robot is provided with a special robot track, the track is a high-strength aluminum alloy profile track, the sectional size of the track is small, the overall installation size requirement space is small, and engineering construction is convenient. And meanwhile, the track has excellent surface corrosion resistance and surface hardness, so that the wear resistance is improved on the premise that the smooth passing of the robot is met, and the inconvenience caused by ground movement can be solved by the lifting type track inspection robot.
Owner:CHANGDIAN NEW ENERGY CO LTD +1

Construction method of synchronous pouring type precast concrete fragmented bent cap and component mold and component manufacturing method of synchronous pouring type precast concrete fragmented bent cap

The invention discloses a construction method of a synchronous pouring type precast concrete split cover beam, a component mold of the synchronous pouring type precast concrete split cover beam and a component manufacturing method.The combined component mold is composed of a bottom mold, a side mold, a first side mold and a second side mold, and a baffle is arranged in a pouring area of the component mold; a plurality of components can be synchronously manufactured at a time through the mold, then the multiple components are spliced on site and cast in situ to form the component-piece-type prefabricated concrete cover beam, manufacturing of the large-cantilever prefabricated cover beam under the special working conditions that the construction site is narrow, the distance between supporting stand columns is small, cantilevers on the two sides are large, and the stress requirement is high can be achieved, and due to the fact that the prefabricated concrete cover beam is heavy, manufacturing cost is low. The prefabricated concrete cover beam is simple in structure and high in transportation difficulty, the transportation and hoisting difficulty is reduced by manufacturing the multiple components in a split mode, the manufacturing difficulty of the prefabricated concrete cover beam is reduced, meanwhile, manufacturing of the prefabricated concrete cover beam with the larger size and weight can be achieved, and the requirements for the prefabricated concrete cover beam in different projects are effectively met.
Owner:SHANGHAI CONSTR BUILDING MATERIALS TECH GRP CO LTD

Early-strength nano C-S-H crystal nucleus concrete under low-temperature curing environment and preparation method thereof

The invention discloses early-strength nano C-S-H crystal nucleus concrete in a low-temperature curing environment and a preparation method thereof. The concrete is composed of the following substances in parts by weight: 260-300 parts of PO52.5 ordinary Portland cement; 135 to 155 parts of slag; 60 to 70 parts of fly ash; the water-binder ratio is 0.27 to 0.31; the sand ratio is 0.40 to 0.44; the water reducing agent accounts for 1% of the mass of the gel body; the nano C-S-H crystal nucleus accounts for 6%-10% of the mass of the gel body; 1080 to 1210 parts of coarse aggregate; and 770 to 870 parts of fine aggregate. The method comprises the following steps: (1) respectively weighing the cement, the slag and the fly ash according to the parts by weight, putting into a stirrer, and stirring for 1 minute; 2) continuously adding sand and stone into the concrete mixer, and continuously stirring for about 2 minutes; and 3) adding the water, the water reducing agent and the nano C-S-H crystal nucleus into the mixture, and uniformly stirring for 2 minutes. The method effectively solves the problem of slow development of concrete strength in a low-temperature environment, also solves the problems of long construction period and high maintenance cost of a concrete structure in winter, and has obvious engineering significance and relatively strong economic benefits.
Owner:ROAD & BRIDGE INT CO LTD +4

IPN multi-element heat-conducting structural adhesive resistant to high and low temperature damp heat and preparation method thereof

The invention discloses an IPN multi-element heat-conducting structural adhesive resistant to high and low temperature damp heat and a preparation method thereof, and belongs to the field of IPN multi-element structural adhesives. The structural adhesive is prepared by matching a component A and a component B according to a volume ratio of 0.9: 1.1-1, the component A is prepared from the following raw materials in parts by weight: 10 to 20 parts of silane modified polyether resin A, 10 to 20 parts of silane modified polyether resin B, 2 to 5 parts of amino-containing silane coupling agent, 0.1 to 0.5 part of catalyst, 1 to 2 parts of epoxy curing agent A, 0.5 to 1 part of self-made epoxy curing agent B, 0.1 to 1 part of catalyst, 1 to 3 parts of first aid, 0.01 to 0.03 part of color paste and 50 to 70 parts of first heat-conducting filler; the component B is prepared from the following raw materials: 10 to 20 parts of epoxy resin A, 5 to 10 parts of self-made epoxy resin B, 5 to 10 parts of reactive diluent, 50 to 70 parts of second heat-conducting filler, 0.1 to 1 part of second aid, 0.01 to 0.03 part of color paste and 1 to 1.5 parts of water. The adhesive is environment-friendly in component, has excellent heat-conducting property and excellent operation performance, is smooth in construction, and can be used for firmly bonding a base material.
Owner:BEIJING COMENS NEW MATERIALS

Anti-freezing pile foundation pulling supporting device

The invention provides an anti-freezing pile foundation supporting device which comprises a pile foundation cylinder, a pile foundation cylinder top seat, a pile foundation cylinder base and a frost heaving piercing mechanism, the pile foundation cylinder top seat is fixedly mounted at the top of the pile foundation cylinder, and the pile foundation cylinder top seat is used for being connected with a to-be-supported target; a pile foundation cylinder base is arranged at the bottom of the pile foundation cylinder, and a plurality of threaded drill rod assemblies are arranged on the pile foundation cylinder base; the frost heaving piercing mechanism is fixedly installed on the cylinder wall of the pile foundation cylinder. When a soil body is subjected to frost heaving, a transverse anchor rod of the frost heaving piercing mechanism can transversely pierce into the soil body outwards, so that the pile foundation cylinder and the surrounding soil body are anchored together, and the anti-freezing and anti-pulling effect is achieved.
Owner:NORTHWEST INST OF ECO ENVIRONMENT & RESOURCES CAS

Offshore photovoltaic platform structure provided with box transformer substation platform and cable trestle and construction method of offshore photovoltaic platform structure

The invention provides an offshore photovoltaic platform structure provided with a box transformer substation platform and a cable trestle and a construction method of the offshore photovoltaic platform structure. The offshore photovoltaic platform structure comprises a steel truss platform erected on the sea; the steel pipe piles are connected with the steel truss platform and used for supporting the steel truss platform, and the steel truss platform and the steel pipe piles are connected through inclined strut units; the photovoltaic module is laid in the steel truss platform; the box transformer substation platform is arranged on the north side of the steel truss platform; and a cable trestle is arranged on the steel truss platform. The box-type transformer substation platform installed on the steel truss platform is adopted, a traditional box-type transformer substation platform is often separated from a photovoltaic support, independent piling is needed, the box-type transformer substation platform is integrated on the steel truss platform, steel and offshore construction operation procedures are reduced, and the purposes of convenient construction and low cost are achieved; by adopting an integral construction method, the photovoltaic module, the steel truss platform, the box transformer substation platform, the cable trestle and the diagonal bracing system can be integrally transported to a site to be welded with the steel pipe piles after being subjected to welding, bolt connection and anti-corrosion processes in an onshore processing factory, so that the on-site offshore construction operation time and procedures are reduced, and the construction difficulty and the economic cost are reduced.
Owner:POWERCHINA HUADONG ENG CORP LTD