Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

6626results about How to "Easy construction" patented technology

Web application internationalization

A system and method is described for internationalization of web pages by extracting translatable content from extensible mark-up language (XML), or similar data-centric meta-language representations of web pages or data used to build web pages. The extracted translatable content is stored in a translation task repository (TTR) accessible by the web developer and the translator. The XML representation is then modified to include selection control logic to select the appropriate translations for insertion into the final web page. The translator accesses the TTR to translate the appropriate content and saves the translations back to the TTR associated with the original translatable data. The translations are obtained from the TTR as selection cases for the selection control logic of the XML representation. As the XML is converted into the web source code, the selection logic and translations are embedded therein facilitating building the web site in multiple different languages.
Owner:ADOBE INC

Forest carbon sink remote sensing monitoring method and system

The invention relates to the technical field of forest carbon sequestration, in particular to a forest carbon sequestration remote sensing monitoring method and system, and aims to solve the problems that in the prior art, a carbon sequestration prediction result can be obtained by inputting a target area image into a preset carbon sequestration model, a more comprehensive carbon reserve prediction model cannot be constructed in combination with a vegetation index, and the carbon sequestration prediction result cannot be obtained by using the preset model. The problem that the prediction result is inaccurate due to the fact that the features of specific tasks cannot be effectively handled is solved. According to the invention, ground survey data and vegetation indexes are combined through the prediction model construction module to construct a comprehensive carbon reserve prediction model, and the carbon reserve prediction model is obtained through machine training learning and can effectively cope with the characteristics of a specific task, so that the prediction accuracy and flexibility are improved; and a high-resolution carbon reserve distribution map is generated through an efficient machine learning algorithm, scientific decision and management are supported, and an important tool is provided for carbon reserve research.
Owner:SHAANXI ARROW BIOTECHNOLOGY CO LTD

Self-adaptive dynamic feedback brain-computer interface training method and system based on virtual reality

The invention relates to the technical field of brain-computer interfaces, and discloses a self-adaptive dynamic feedback brain-computer interface training method and system based on virtual reality. The training method comprises the steps that a user performs motor imagery according to a training scene presented by the VR display device; the electroencephalogram acquisition equipment acquires electroencephalogram signals; configuring a data processing module, and operating a motor imagery continuous control model to calculate characteristic parameters by taking the electroencephalogram signals as input; under the condition that the task exists, the characteristic parameters are used as input, and a dynamic self-adaptive characteristic-feedback mapping model is operated to calculate control parameters; sending the control parameters to a functional electrical stimulation device to load electrical stimulation of corresponding intensity to the muscle to obtain tactile feedback; meanwhile, the dynamic adaptive feature-feedback mapping model is dynamically updated according to latest input feature parameters; the control parameters are sent to the VR display device to present visual feedback, and the user adjusts the motor imagery based on the visual feedback and the haptic feedback. The participation sense of the user and the training efficiency can be improved.
Owner:TIANJIN UNIV +1

High-strength lightweight concrete containing hollow glass beads and preparation method thereof

The invention relates to the technical field of building materials, and particularly discloses high-strength lightweight concrete containing hollow glass beads and a preparation method of the high-strength lightweight concrete. The high-strength lightweight concrete containing the hollow glass beads is prepared from cement, fly ash, carbon fiber grafted hollow glass beads, lightweight sand, deionized water, polypropylene fiber grafted rubber particles and a water reducing agent according to the mass ratio of (58-75): (25-38): (45-65): (20-40): (42-55): (35-55): (5-12) through mixing, mold filling, vibration molding, covering and demolding. The addition amount of the hollow glass beads is strictly controlled, the influence on the overall strength of the concrete is avoided, the density and weight of the concrete are reduced due to the addition of the light sand and the hollow glass beads, the compactness and integrity of the concrete are improved due to the synergistic effect of the two added fibers, and the raw materials have excellent cohesiveness; the concrete can effectively absorb and disperse stress, and has the advantages of excellent strength, light weight, good durability and excellent comprehensive performance.
Owner:CHINA FIRST HIGHWAY ENGINEERING CO LTD +2

Inhaul cable vibration control device and vibration control method

The invention provides an inhaul cable vibration control device and a vibration control method. The device comprises a speed type damping unit and a tuned mass damping unit, the speed type damping unit and the tuned mass damping unit are arranged close to the cable beam anchoring end of the inhaul cable, the speed type damping unit comprises two speed type dampers, and the two speed type dampers are symmetrically arranged on the two sides of the cable face of the inhaul cable; the two ends of the speed type damper are connected with the inhaul cable and the ground respectively. The method comprises the following steps: determining the relative arrangement positions of a speed type damping unit and a tuned mass damping unit on the inhaul cable according to the determined broadband vibration order and narrow-band vibration order of the inhaul cable; and configuration parameters of the speed type damping unit and the tuned mass damping unit are determined, the inhaul cable is configured according to the determined damping coefficient of the speed type damper and the cable direction installation positions of the speed type damping unit and the tuned mass damping unit, and vibration control is achieved through the configured inhaul cable. The method has the advantages of guaranteeing the vibration reduction effect of the inhaul cable, being convenient to construct and the like.
Owner:HUNAN UNIV

Limited micro-space pile foundation construction method based on multifunctional pile machine

The invention discloses a limited micro-space pile foundation construction method based on a multifunctional pile machine, and belongs to the technical field of constructional engineering pile foundations. The limited micro-space pile foundation construction method comprises the following construction steps that S1, a matched drilling tool is selected according to the type of a pile foundation, wherein the type of the pile foundation at least comprises one of a cast-in-situ bored pile, a stirring pile, a high-pressure jet grouting pile and a threaded expanding body steel pile; s2, pile machine equipment is assembled and placed in place, wherein the pile machine equipment comprises a main machine assembly, a drilling rig assembly, a power head assembly and a multi-channel telescopic drilling rod; and S3, pile foundation construction is conducted, specifically, corresponding pile machine equipment and auxiliary equipment are started according to different pile foundation technologies to conduct pile foundation construction. According to the multifunctional pile machine, various pile foundation types can be constructed on one pile machine, the power head with the multi-channel flow divider and the multi-channel telescopic drill rod are matched, so that the pile machine can achieve efficient and environment-friendly pile foundation construction in a limited space, the adaptability and the integration degree of equipment are improved, continuous work in construction is reduced, and the construction efficiency is improved. And the construction efficiency is improved, and various geological conditions and construction requirements can be met.
Owner:JIANGSU JIANYUAN CONSTR CO LTD +1

Power generation equipment fault diagnosis method based on large language model

The invention discloses a power generation equipment fault diagnosis method based on a large language model. According to the method, firstly, an expert knowledge base is converted into a fault knowledge base composed of criterion nodes and edges, and fault retrieval is completed through the knowledge base; synthesis of natural language texts is completed by using input based on text function segmentation, cue word templates are constructed based on calculation types of different criteria, and a large model is promoted to complete calculation reasoning tasks of the criteria; multi-dimensional equipment state monitoring time sequence data are input, a cue word set at the current time is automatically generated in combination with the cue word template, the cue word set is input into a large language model for computational reasoning, and a current state set of equipment is generated; using a knowledge base to retrieve the state set to obtain a fault diagnosis result; and then a visualization system is designed to collect and visualize a large model output result and a fault diagnosis result, and input and interaction interfaces are provided for cue word template construction. The fault diagnosis completed by the method has good practicability and expansibility.
Owner:HANGZHOU DIANZI UNIVERSITY SHANGYU INSTITUTE OF SCIENCE & ENGINEERING CO LTD

Safety monitoring method and system for construction area

The invention discloses a safety monitoring method and system for a construction area, and relates to the field of construction safety monitoring, and the main scheme is as follows: collecting multiple types of data of the construction area in real time; respectively calculating a safety helmet identification index, an equipment fault risk index, a comprehensive health index and a comprehensive environment safety index to obtain a risk assessment value, and comparing the risk assessment value with a preset threshold to judge whether the construction area is in a risk state; calculating the coverage proportion of the monitoring area, and comparing the coverage proportion with a coverage proportion threshold of the monitoring area to judge whether the coverage proportion of the current monitoring area meets the requirement or not; calculating an unmonitored area proportion, further obtaining a risk assessment index, finally obtaining a construction efficiency index, and comparing the construction efficiency index with a construction efficiency index threshold value to judge the construction efficiency; according to the method, the risk of the construction area can be comprehensively evaluated, risk early warning is realized, monitoring coverage is optimized, and construction safety and efficiency are guaranteed.
Owner:BEIJING NELDA TECH CO LTD

Self-adaptive multi-hop retrieval knowledge graph construction method for large language model questions and answers

The invention discloses a self-adaptive multi-hop retrieval knowledge graph construction method for large language model questions and answers. The method comprises the following steps: extracting triples of an input question and a corpus; self-adaptive multi-hop retrieval matching is carried out, and a specific triple related to the question in the corpus is retrieved and recognized; constructing a knowledge graph by using the question in the adaptive multi-hop retrieval matching process and a corpus triple; the answer predictor model comprises node embedding, message passing and selective filtering, and the node embedding is used for encoding questions and a knowledge graph; carrying out message transmission based on the coded problem and the knowledge graph based on a graph convolutional network; selective filtering is used for filtering redundant information of the knowledge graph; according to the method, the problem that the large language model generates illusion can be relieved, the complex reasoning process can be understood, and therefore the question answering and logical reasoning performance of the large language model is improved.
Owner:CHANGAN UNIV

Electric power knowledge graph construction method and system based on active learning

The invention discloses an active learning-based electric power knowledge graph construction method and system, and relates to the technical field of electric power market transaction data analysis, and the method comprises the steps: collecting data, cleaning the collected data, generating word prediction task data of an electric power transaction scene, and training an electric power field word embedding model; generating an entity relationship training sample, inputting a word embedding model, performing entity relationship label prediction through an entity relationship joint extraction model, extracting a high-quality sample based on active learning to perform part-of-speech tagging, and training the model based on a tagged sample; and applying the trained entity relationship joint extraction model to power transaction data to construct a knowledge graph, performing manual correction and entity unification, and storing the knowledge graph into a Neo4j database. According to the method, active learning and deep learning are combined, so that the sample labeling cost is effectively reduced, and meanwhile, the model performance is ensured.
Owner:GUANGXI POWER GRID CORP

Underwater riprap foundation bed tamping method based on sand compaction pile ship

The invention discloses an underwater riprap foundation bed tamping method based on a sand compaction pile ship. The method comprises a sand compaction pile ship transformation process and a tamping and leveling process. When the flow of transforming the sand compaction pile ship is carried out, sand outlet guide doors at the lower ends of the three pile sinking sleeves on the sand compaction pile ship are cut off firstly; the lower ends of the three pile sinking sleeves are each connected with a bottom flange; the three tamping plate devices are connected to the bottom flanges of the three pile sinking sleeves in a one-to-one correspondence mode, and each tamping plate device comprises a tamping sinking pipe, a top flange, a tamping sinking bottom plate, an enclosure plate, a middle plate, a plurality of upper-layer stiffening plates and a plurality of lower-layer stiffening plates; when the tamping and leveling process is carried out, underwater riprap operation on the lowest layer of the foundation bed is carried out firstly, and then the transformed sand compaction pile ship is moved to a vibrating tamping position on the underwater riprap surface of the lowest layer of the foundation bed for tamping and leveling; and then the ship is moved to the next ship position for tamping and leveling of the next vibrating tamping position. The construction efficiency in the drop hammer tamping process of the underwater riprap foundation bed can be improved.
Owner:CCCC THIRD HARBOR ENGINEERING CO LTD

Preparation method of high-thermal-conductivity polymer taking modified boron nitride as filler

The invention belongs to the technical field of polymer heat conduction, and particularly relates to a preparation method of a high-heat-conductivity polymer with modified boron nitride as filler, which comprises the following steps: (1) dissolving boron nitride nanosheets into tetrahydrofuran, ultrasonically dispersing uniformly, adding a modifier for reaction, then removing tetrahydrofuran by using a rotary evaporator, transferring into deionized water, and drying to obtain a boron nitride nano-sheet; drying to obtain a modified boron nitride nanosheet; (2) dispersing carbon nanotubes in deionized water, stirring and carrying out ultrasonic treatment, adding the modified boron nitride nanosheets, and then carrying out freeze orientation treatment and freeze drying treatment to obtain a porous foamed composite heat-conducting filler; and (3) carrying out melt blending on the composite heat-conducting filler and polyethylene glycol terephthalate, and carrying out hot press molding to finally prepare the modified high-heat-conductivity polymer. According to the invention, the composite heat-conducting filler improves the interfacial compatibility and dispersity with a polymer matrix, and reduces the interfacial thermal resistance of the composite material, so that the modified polymer has good application in the aspect of heat dissipation of electronic equipment.
Owner:EAST CHINA UNIV OF SCI & TECH

Large-scale excavation high slope aging deformation mechanism analysis method under ultra-deep unloading condition

The invention discloses an aging deformation mechanism analysis method for large-scale excavation of a high slope under an ultra-deep unloading condition, belongs to the technical field of reservoir bank slope deformation analysis, and obtains key parameters such as the volume, the sliding direction and the water level change of an accumulation body by integrating technical means such as geological exploration, hydrological monitoring and displacement measurement. By utilizing the parameters, a slope stability index, an energy function and a water-force coupling equation are constructed, and a set of complete analysis system is formed. According to the method, the accuracy and the real-time performance of slope stability evaluation are improved, and deep understanding of a slope deformation mechanism is realized through numerical simulation and an optimization algorithm. In addition, the scheme also provides prevention and control measures based on an evaluation result, and active prevention of risk management is realized. Through application of the scheme, the safety and management efficiency of the reservoir bank slope can be remarkably improved, and powerful support is provided for sustainable development of hydropower engineering.
Owner:CHINA POWER CONSRTUCTION GRP GUIYANG SURVEY & DESIGN INST CO LTD +3

Track inspection robot

The utility model discloses a track inspection robot which comprises a track and an inspection robot body, the top of the inspection robot body is fixedly connected with a frame, a walking mechanism is arranged in the frame, an electric telescopic rod is fixedly connected in the inspection robot body, and the output end of the electric telescopic rod is fixedly connected with a holder. The bottom of the cradle head is fixedly connected with a bidirectional motor, one side of the cradle head is fixedly connected with an infrared thermal imager, the lifting type track inspection robot is provided with a special robot track, the track is a high-strength aluminum alloy profile track, the sectional size of the track is small, the overall installation size requirement space is small, and engineering construction is convenient. And meanwhile, the track has excellent surface corrosion resistance and surface hardness, so that the wear resistance is improved on the premise that the smooth passing of the robot is met, and the inconvenience caused by ground movement can be solved by the lifting type track inspection robot.
Owner:CHANGDIAN NEW ENERGY CO LTD +1

Construction method of synchronous pouring type precast concrete fragmented bent cap and component mold and component manufacturing method of synchronous pouring type precast concrete fragmented bent cap

The invention discloses a construction method of a synchronous pouring type precast concrete split cover beam, a component mold of the synchronous pouring type precast concrete split cover beam and a component manufacturing method.The combined component mold is composed of a bottom mold, a side mold, a first side mold and a second side mold, and a baffle is arranged in a pouring area of the component mold; a plurality of components can be synchronously manufactured at a time through the mold, then the multiple components are spliced on site and cast in situ to form the component-piece-type prefabricated concrete cover beam, manufacturing of the large-cantilever prefabricated cover beam under the special working conditions that the construction site is narrow, the distance between supporting stand columns is small, cantilevers on the two sides are large, and the stress requirement is high can be achieved, and due to the fact that the prefabricated concrete cover beam is heavy, manufacturing cost is low. The prefabricated concrete cover beam is simple in structure and high in transportation difficulty, the transportation and hoisting difficulty is reduced by manufacturing the multiple components in a split mode, the manufacturing difficulty of the prefabricated concrete cover beam is reduced, meanwhile, manufacturing of the prefabricated concrete cover beam with the larger size and weight can be achieved, and the requirements for the prefabricated concrete cover beam in different projects are effectively met.
Owner:SHANGHAI CONSTR BUILDING MATERIALS TECH GRP CO LTD

Early-strength nano C-S-H crystal nucleus concrete under low-temperature curing environment and preparation method thereof

The invention discloses early-strength nano C-S-H crystal nucleus concrete in a low-temperature curing environment and a preparation method thereof. The concrete is composed of the following substances in parts by weight: 260-300 parts of PO52.5 ordinary Portland cement; 135 to 155 parts of slag; 60 to 70 parts of fly ash; the water-binder ratio is 0.27 to 0.31; the sand ratio is 0.40 to 0.44; the water reducing agent accounts for 1% of the mass of the gel body; the nano C-S-H crystal nucleus accounts for 6%-10% of the mass of the gel body; 1080 to 1210 parts of coarse aggregate; and 770 to 870 parts of fine aggregate. The method comprises the following steps: (1) respectively weighing the cement, the slag and the fly ash according to the parts by weight, putting into a stirrer, and stirring for 1 minute; 2) continuously adding sand and stone into the concrete mixer, and continuously stirring for about 2 minutes; and 3) adding the water, the water reducing agent and the nano C-S-H crystal nucleus into the mixture, and uniformly stirring for 2 minutes. The method effectively solves the problem of slow development of concrete strength in a low-temperature environment, also solves the problems of long construction period and high maintenance cost of a concrete structure in winter, and has obvious engineering significance and relatively strong economic benefits.
Owner:ROAD & BRIDGE INT CO LTD +4

IPN multi-element heat-conducting structural adhesive resistant to high and low temperature damp heat and preparation method thereof

The invention discloses an IPN multi-element heat-conducting structural adhesive resistant to high and low temperature damp heat and a preparation method thereof, and belongs to the field of IPN multi-element structural adhesives. The structural adhesive is prepared by matching a component A and a component B according to a volume ratio of 0.9: 1.1-1, the component A is prepared from the following raw materials in parts by weight: 10 to 20 parts of silane modified polyether resin A, 10 to 20 parts of silane modified polyether resin B, 2 to 5 parts of amino-containing silane coupling agent, 0.1 to 0.5 part of catalyst, 1 to 2 parts of epoxy curing agent A, 0.5 to 1 part of self-made epoxy curing agent B, 0.1 to 1 part of catalyst, 1 to 3 parts of first aid, 0.01 to 0.03 part of color paste and 50 to 70 parts of first heat-conducting filler; the component B is prepared from the following raw materials: 10 to 20 parts of epoxy resin A, 5 to 10 parts of self-made epoxy resin B, 5 to 10 parts of reactive diluent, 50 to 70 parts of second heat-conducting filler, 0.1 to 1 part of second aid, 0.01 to 0.03 part of color paste and 1 to 1.5 parts of water. The adhesive is environment-friendly in component, has excellent heat-conducting property and excellent operation performance, is smooth in construction, and can be used for firmly bonding a base material.
Owner:BEIJING COMENS NEW MATERIALS

Yarrowia lipolytica engineering strain for efficiently producing eicosapentaenoic acid through cofactor strategy, construction method and application

The invention belongs to the technical field of genetic engineering, and discloses a Yarrowia lipolytica engineering strain capable of efficiently producing eicosapentaenoic acid through a cofactor strategy, Yarrowia lipolytica Po1f is used as an original strain, and genes of delta 9 elongase, delta 8 desaturase, delta 5 desaturase and delta 17 desaturase are over-expressed, so that the eicosapentaenoic acid can be efficiently produced. And simultaneously overexpressing glucose-6-phosphate dehydrogenase (G6PDH) and malic enzyme (ME) to obtain the gene. The construction method is suitable for constructing a genetic engineering strain for producing eicosapentaenoic acid, the aim of simply, conveniently, effectively and accurately constructing the strain is achieved, the constructed engineering strain is further applied to production of eicosapentaenoic acid, and an effective way is provided for commercially producing eicosapentaenoic acid by applying yarrowia lipolytica.
Owner:NANJING NORMAL UNIVERSITY

Structure capable of controlling large-volume water gate crack and construction method thereof

The invention provides a structure capable of controlling a large-volume water gate crack and a construction method thereof, and belongs to the technical field of water gates. The structure comprises a gate bottom plate and a gate pier which are formed by pouring concrete, and the gate pier is arranged above the gate bottom plate; hole cavities are at least formed in the gate piers and reserved in the concrete pouring process. The hole cavity is used as a self-constrained stress hole; and the tough material is used for absorbing stress, is filled in the pore cavity and is connected with the inner wall of the pore cavity. The method comprises the steps of S1, construction preparation; s2, foundation treatment; s3, gate bottom plate construction; s4, gate pier construction: S41, construction lofting; s42, gate pier reinforcing steel bars are bound and installed; s43, a gate pier formwork is erected above the gate bottom plate; s44, a hole forming device is installed at the designed position; s45, concrete pouring, vibrating and curing are conducted; and S46, after initial setting of the concrete, the hole forming device is pulled out of the pipe, and a formed hole cavity is filled with a tough material. The sluice pier crack can be effectively controlled, and the use durability and safety of the sluice are improved.
Owner:SHANDONG JIAOTONG UNIV +4

Full-prefabricated assembly type concrete frame structure

The utility model discloses a full-prefabricated assembly type concrete frame structure in the technical field of prefabricated building structures. The full-prefabricated assembly type concrete frame structure comprises connecting stand columns, upper stand columns, cross beams, column end splicing pieces, supporting rods and jacking bolts. The connecting stand column and the protruding block form a T-shaped structure. The upper upright post and the cross beam are straight rods; the column end splicing piece and the beam end splicing piece are locked into an overall stress structure through the locking plate, the supporting barrel and the supporting nut are locked through the supporting rod, a prefabricated piece can be used, a butt joint position anchoring device is additionally arranged, splicing positions can be aligned more quickly, the splicing precision and speed are improved, the construction efficiency is improved, and the construction cost is reduced. Due to the fact that the structure is simple, the steel bars are accurately pre-embedded in the prefabrication process, site construction is not needed, the steel bar embedding accuracy is greatly improved, and construction quality and construction convenience are improved; the cast-in-place work is reduced, the prefabrication rate and the construction efficiency can be improved, and therefore the construction cost is reduced.
Owner:FUJIAN ACAD OF BUILDING RES CO LTD +4

Modified asphalt-based hard carbon as well as preparation method and application thereof

The invention belongs to the technical field of battery materials, and discloses modified asphalt-based hard carbon as well as a preparation method and application thereof. The preparation method comprises the following steps: mixing asphalt and a nitrogen-containing compound, carrying out a first heating reaction in a protective gas atmosphere, cooling, and carrying out a second heating reaction to obtain doped asphalt, carrying out oxidation treatment on the doped asphalt to obtain an oxidized material; and carrying out pre-carbonization and carbonization treatment on the oxidized material in a protective gas atmosphere to obtain the modified asphalt-based hard carbon. The doping of the gradient heating nitrogen element is beneficial to the construction of a three-dimensional conductive network and a flexible skeleton, and the conductivity and the structural stability of the modified asphalt-based hard carbon are enhanced, so that the electrochemical performance of the modified asphalt-based hard carbon is improved.
Owner:WUHAN BISIDI BATTERY MATERIAL CO LTD

Methyl paraoxon detection test strip based on oxygen vacancy-cerium dioxide and preparation method of methyl paraoxon detection test strip

The invention discloses a methyl paraoxon pesticide detection test strip based on oxygen vacancy-cerium dioxide and a preparation method of the methyl paraoxon pesticide detection test strip, and belongs to the technical field of biosensors. The test strip is characterized in that a large amount of oxygen vacancy-cerium dioxide is loaded. The oxygen vacancy-cerium dioxide nano enzyme can show simulated phosphatase activity under specific conditions, and the enzyme activity can cut off P-O and P-S bonds of organophosphorus pesticides and promote methyl paraoxon to be hydrolyzed into a yellow product p-nitrophenol. The detection limit of a nano-enzyme system is discussed, so that the portable visual quantitative detection of the paraoxon methyl pesticide is realized. The test strip established on the basis of the principle can quickly detect paraoxon methyl, has the advantages of simplicity and convenience in operation, high sensitivity, low cost and the like, and provides a new method for instant test of paraoxon methyl pesticide.
Owner:JILIN UNIVERSITY

Double-row steel sheet pile soil core combined cofferdam structure and construction method

The invention discloses a double-row steel sheet pile and soil core combined cofferdam structure and a construction method. The double-row steel sheet pile and soil core combined cofferdam structure comprises double-row pile connecting units, steel sheet piles, brackets, steel enclosing purlins, dredger fill and drainage plates. Each double-row pile connecting unit is formed by welding an upper connecting plate between two connecting steel sheet piles; the double-row pile connecting units are inserted into a soil body, and a steel sheet pile is inserted between every two double-row pile connecting units; corbels are welded to the outer sides of the steel sheet piles, steel enclosing purlins are arranged on the corbels, and the steel enclosing purlins, the steel sheet piles and the corbels are connected in a welded mode; dredger fill is filled between the two rows of steel sheet piles and is compacted by a hammer-attached soil squeezer; a drainage plate is inserted into the dredger fill; earth excavation is conducted on the side, close to water, of the double-row pile cofferdam to form a foundation pit; when shallow excavation is conducted on the foundation pit, no sand filling pipe bag is arranged; when the foundation pit is deeply excavated, a slope section is reserved; sand filling pipe bags are arranged on the outer side of the slope section and stacked on the outer side of the slope section in a staggered mode. The hammer-attached soil squeezing device comprises an attached hammer, a pressing plate, water permeable holes, geotechnical cloth and a brush.
Owner:ZHEJIANG UNIV CITY COLLEGE

Data downsampling method and device

The invention provides a data down-sampling method, and relates to the field of databases, the method comprises the following steps: receiving a user-defined down-sampling strategy of multiple levels, the down-sampling strategy of each level indicating that after original data is stored in multiple time partitions and a defined time interval is passed, the down-sampling strategy of each level is stored in the multiple time partitions; carrying out downsampling on the data in the plurality of time partitions according to a defined sampling period; according to a first time interval after first original data is stored in a first time partition, a first downsampling strategy is determined from the multiple levels of downsampling strategies, and the longer the first time interval is, the longer the sampling period of the first downsampling strategy is; obtaining first data currently stored in the first time partition; and down-sampling the first data according to the first down-sampling strategy to obtain second data. And a user can set a downsampling strategy according to own needs, so that the applicability of downsampling is improved.
Owner:HUAWEI CLOUD COMPUTING TECHNOLOGIES CO LTD

Structural health monitoring intelligent concrete for airport and preparation method of structural health monitoring intelligent concrete

The invention relates to structural health monitoring intelligent concrete for airports and a preparation method thereof, and the method comprises the following steps: adding a polycarboxylic acid water reducing agent into water, and mixing to obtain a water reducing agent solution; adding carboxylated multi-walled carbon nanotubes, silica fume and fly ash into the water reducing agent solution, and mixing to obtain a carbon nanotube suspension; performing ultrasonic treatment on the carbon nanotube suspension to obtain a carbon nanotube dispersion liquid; and adding the carbon nanotube dispersion liquid into the dry material mixture, and mixing to obtain the structural health monitoring intelligent concrete for the airport. Compared with the prior art, the conductivity of the concrete can be effectively improved, so that the concrete has the function of monitoring structural health.
Owner:TONGJI UNIV

Fresh water pond culture tail water treatment system

The utility model discloses a freshwater pond culture tail water treatment system which comprises ecological ditches arranged among culture ponds, and a sedimentation tank, a filter dam I, an aeration tank, a filter dam II and an ecological purification tank which are sequentially connected with one side of each ecological ditch, tail water is primarily purified through the ecological ditch, suspended solids and other substances in the water body are precipitated through the sedimentation tank, the suspended solids in the water are further removed through the first filter dam and the second filter dam, aeration equipment in the aeration tank is used for increasing dissolved oxygen in the water body and accelerating decomposition of organic matter in the water body, and nitrogen and phosphorus nutritive salt in the water body is absorbed through the ecological purification tank. The freshwater pond culture tail water treatment system is simple in structure, reasonable in design, reasonable in layout, high in tail water treatment efficiency and good in treatment effect, the area of the freshwater pond culture tail water treatment system accounts for more than 10% of the total aquaculture area, new technologies and new processes such as physical and biological purification treatment are applied to the whole system, construction of a pond circulation treatment system is accelerated, and the cost is reduced. The aquaculture tail water resource utilization or up-to-standard discharge is promoted, and the healthy and green development of the aquaculture industry is promoted.
Owner:安徽省巢湖市富煌水产开发有限公司

Tunnel grouting material and preparation method thereof

ActiveCN119143452AMeet early stability requirementsThere is the ability to continue to expand in the later periodSolid waste managementSlagCarbonization
The invention relates to the technical field of cement-based building materials, in particular to a tunnel grouting material and a preparation method thereof.The tunnel grouting material is prepared by adopting cement as a cementing material, adding a large amount of industrial solid waste as an admixture, modifying steel slag to prepare semi-carbonized steel slag powder, and matching with phosphorus slag powder, carbide slag and desulfurized fly ash as the admixture. According to the preparation method, the water reducing agent and the SAP particles are added as additives, all the raw materials cooperate with one another, the grouting material which is good in flowability, compactness and mechanical property, has a long-term expansion effect in a humid environment and is good in sealing and anti-seepage effect is prepared, and efficient utilization of industrial solid waste is achieved at the same time.
Owner:SHIJIAZHUANG TIEDAO UNIV +1

Composite reinforcement type suction barrel device based on microbial induction and use method of composite reinforcement type suction barrel device

The invention discloses a composite reinforcement type suction barrel device based on microorganism induction and a use method thereof. The composite reinforcement type suction barrel device based on microorganism induction comprises a suction barrel model system, a microorganism cement reinforcement system and a test monitoring system. The suction cylinder model system comprises a suction cylinder, a grouting pipeline and hydraulic equipment, and the grouting pipeline is laid on the inner wall of the suction cylinder and used for injecting microorganism cement grout; the hydraulic equipment is connected to the suction barrel and used for controlling lifting and pressing-in of the suction barrel. The microbial cement reinforcement system comprises liquid storage equipment and negative pressure equipment, and the liquid storage equipment is connected to the grouting pipeline and used for storing and providing microbial cement grout for the grouting pipeline; the negative pressure equipment is connected to the suction barrel and used for applying negative pressure to the interior of the suction barrel in the grouting process, and permeation of microorganism cement grout is promoted. The test monitoring system is used for testing mechanical parameters of a soil body, monitoring the suction barrel and carrying out a loading test on the suction barrel.
Owner:TSINGHUA SHENZHEN INTERNATIONAL GRADUATE SCHOOL

Floating offshore wind power suction anchor foundation mooring lifting lug structure

The utility model relates to a floating type offshore wind power suction anchor foundation mooring lifting lug structure which comprises a suction anchor cylinder body, a main eye plate and a cylinder body thickening plate, the cylinder body thickening plate is fixed on the inner side wall of the suction anchor cylinder body, the main eye plate is fixed on the outer side surface of the suction anchor cylinder body, and the cylinder body thickening plate is fixed on the inner side wall of the suction anchor cylinder body. The main eye plate penetrates through the side wall of the suction anchor cylinder and the cylinder thickening plate and is fixedly connected with a first connecting plate, a second connecting plate is fixed to the other side of the first connecting plate, and the second connecting plate is fixed to the inner side wall of the other side of the suction anchor cylinder. According to the utility model, the suction anchor cylinder body can form a whole with a stable structure.
Owner:FUJIAN YONGFU POWER ENG