The invention relates to the technical field of
offshore construction, in particular to an inclined shallow covering layer batholith
seabed steel
cofferdam inner support conversion construction method which comprises the steps that S1, steel
pipe piles are inserted and driven in a
seabed; s2, throwing a sand bag; s3,
filling materials; s4, inserting and building a steel
cofferdam at the filler; s5, long supports are arranged on the steel
cofferdam, and
water pumping is conducted; s6, the steel cofferdam is filled with materials, and a concrete
cushion layer is constructed; s7, a first-layer bearing platform is constructed, after the strength reaches the standard, a first short support is arranged between the first-layer bearing platform and the steel cofferdam, and then a long support is dismantled; s8, a second-layer bearing platform is constructed, after the strength reaches the standard and anti-
corrosion construction is conducted, a second short support is arranged between the second-layer bearing platform and the steel cofferdam, and then the first short support is dismantled; s9, anti-
corrosion construction is conducted on the first layer of bearing platform; s10, the steel cofferdam and the inner
supporting system are dismantled, and the
seabed is cleared. According to the construction method, the loss of steel materials can be reduced, the occupied construction space is reduced, and the problem that cofferdam steel sheet piles are difficult to drive in is solved.