Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

148 results about "Lifting capacity" patented technology

As suggested by the name, the lifting capacity of a machine refers to the maximal weight that it can safely lift. For optimal results when it comes to using a crane, be sure to identify its lifting capacity. Failing to do so can result in serious damage to the machine or even serious injury.

Hybrid systems for drones and other modes of transport

A hybrid system for drones and other modes of transport. A combustion engine provides range and / or lifting capacity for drones while electric motors / generators provide both control and maneuverability. One or more combustion engines, in conjunction with one or more electric motors / generators form a propulsion system whereby each is connected to and drives its own driving pinion in one or more planetary gear sets, and provide continuously variable transmission for driving propellers or driveshafts. The combustion engine may be connected directly to one of the planetary gear's driving pinions, or can drive one of the planetary gear's driving pinions. If the propellers are only driven by either a combustion engine, or an electric motor / generator, the other engine / motor will be kept at rest by a braking device for a combustion engine or a braking device for an electric motor / generator.
Owner:HEGGEN LARS HARALD

Weldless integral high-strength feeding drill rod and preparation method thereof

The invention discloses a weldless integral high-strength feeding drill rod and a preparation method thereof. The drill rod comprises a female connector, an elevator groove, a thick-wall slip clamping section, a drill rod pipe body and a male connector which are integrally formed and have the same inner diameter. The drill rod is manufactured by integrally machining a solid bar or a thick-wall pipe body. The yield strength of the drill rod pipe body, the yield strength of the thick-wall slip clamping section and the yield strength of the elevator groove are 135 ksi-180 ksi, and the yield strength of the male connector and the yield strength of the female connector are 130 ksi-150 ksi; the outer diameter of the thick-wall slip clamping section is larger than that of the drill rod pipe body; the outer diameter of the elevator groove is smaller than that of the clamping section of the thick-wall slip; the outer diameter of the elevator groove is not smaller than that of the drill rod pipe body. The outer diameter of the connector does not need to be obviously increased, meanwhile, enough elevator lifting capacity is guaranteed, and the problem of poor structure performance caused by friction welding seams and welding area heat treatment is avoided. Complicated welding, postweld heat treatment and other procedures are omitted, the possibility that a weld joint serves as a performance weak link is avoided, higher comprehensive tensile mechanical performance is achieved, and the method is suitable for well drilling application of extra-deep wells, ocean deep wells and the like.
Owner:SHANGHAI HILONG DRILL PIPE MATERIALS INST +2

Ultra-large single-pile offshore construction method

The present invention discloses a method for offshore construction of an extra-large single pile: by using a full-rotation crane vessel, a jack-up pile-stabilizing platform, a set of main hoisting ropes of a balance beam, and a set of auxiliary hoisting ropes of a pile-turning clamp, and adopting the method of single-vessel single-hook stern lifting, the offshore construction of the extra-large single pile is realized. Among them, the main and auxiliary hoisting riggings of the single pile are installed by berthing the transport ship parallel to the crane vessel, and the transport ship is rotated to the stern position convenient for the crane vessel to lift through the main hoisting machine and cable ropes of the crane vessel, so as to realize the lifting, turning over and pile driving of the extra-large single pile, giving full play to the construction flexibility of the crane of an ordinary full-rotation crane vessel and the lifting capacity of the fixed stern lifting of the crane, alleviating the contradiction of the shortage of construction vessels and machinery for extra-large single piles in China, and optimizing the single-pile construction process to improve work efficiency.
Owner:GUANGZHOU SALVAGE BUREAU

Wave rider capable of vertically lifting

The invention provides a wave rider capable of vertically ascending and descending, and belongs to the technical field of wide-speed-range aircrafts, the wave rider specifically comprises a front edge shock wave generating surface, a central fuselage and sweepback wings located on the two sides of the central fuselage, the two sweepback wings are provided with mounting holes penetrating through the upper surface and the lower surface of the wave rider, and lift fans are mounted in the mounting holes; the lift fans are embedded into the mounting holes and used for providing vertical lift force for the wave rider, the axes of the lift fans are parallel to the vertical axis of the wave rider, and the lift fans on the two sweepback wings are symmetrically distributed on the two sides of the central fuselage. According to the treatment scheme, the vertical lifting capacity is provided for the wave rider, and the high-speed flight aerodynamic performance is considered.
Owner:XIAMEN UNIV INNOVATION RES INST TIANFU NEW DISTRICT SICHUAN +1

A method for hoisting an ultra-high superstructure section of an ultra-large container ship

The application discloses a hoisting method for an ultra-high superstructure unit section of an ultra-large container ship, and is mainly used for hoisting the complete superstructure unit section of the ultra-large container ship. The method solves the problems of the interference and the ultra-highness of the superstructure after the structure of the superstructure is completed, and ensures the safety of hoisting the superstructure under the premise of the complete structure by means of reasonable hoisting methods and strengthened design under the condition that the lifting capacity and lifting height of the gantry crane are limited. The hoisting scheme comprises a lifting ring on a cab deck, structure strengthening, temporary strengthening and a steel wire rope of the gantry crane. The application can solve the problem of the structural integrity of the superstructure, shorten the dock period, reduce the high-altitude operation, and ensure the safety of hoisting the ultra-high superstructure.
Owner:HUDONG ZHONGHUA SHIPBUILDINGGROUP +1

Loader load process prediction method based on simulation data driving

The invention relates to the technical field of data simulation analysis, in particular to a simulation data driving-based loader load process prediction method. The method comprises the following steps that a loading lifting capacity optimization mechanical relation model is established based on structure parameters of the skid steer loader; establishing a multi-domain loader oil way-dynamics simulation coupling model; and carrying out loading machine lifting mechanical collaborative optimization processing on the multi-domain loading machine oil way-dynamics simulation coupling model through the loading lifting capacity optimization mechanical relation model so as to obtain a loading machine working condition multi-domain collaborative simulation model. Transmitting the loading machine working condition multi-source load data to a loading machine working condition multi-domain collaborative simulation model to analyze loading machine multi-domain collaborative simulation load process characteristic data; and based on the loader multi-domain collaborative simulation load history characteristic data, establishing a loader multi-domain collaborative precision optimization load history prediction mapping relationship, and generating an optimized loader multi-domain collaborative load history prediction model. According to the invention, accurate prediction of the loading process of the loader is realized.
Owner:SHANDONG WECAN TECH

Large-lifting-capacity multi-claw lifting hook as well as assembly method and detection method thereof

The invention discloses a large-lifting-capacity multi-claw lifting hook and an assembling method and a detecting method thereof, and belongs to the technical field of lifting hooks. The large-lifting-capacity multi-claw lifting hook comprises a lifting rod, and a thrust self-aligning roller bearing is installed on the lifting rod; the hook body comprises a hook body and a hook tip, and the hook body and the hook tip are welded; the thrust self-aligning roller bearing supports the hook body, the self-aligning roller bearing is installed on the hook body, the suspender penetrates through the self-aligning roller bearing and the center of the hook body, and the hook body rotates relative to the suspender. And the large lifting capacity is more than 3500t. According to the invention, the large-lifting-capacity multi-claw lifting hook can be assembled and detected.
Owner:WUXI XINHUA LIFTING TOOLS CO LTD

Bridge prefabricated box girder hoisting method and hoisting positioning device

The invention relates to the technical field of bridge engineering, and discloses a bridge prefabricated box girder hoisting method and a hoisting positioning device.The bridge prefabricated box girder hoisting method comprises the following steps that S1, a box girder is placed on a transport trailer, and the transport trailer is moved to a bridge head; s2, a main crane and an auxiliary crane are adopted for cooperative operation, the rated lifting weight of the main crane is larger than that of the auxiliary crane, and the main crane and the auxiliary crane both stay at a bridge head; s3, the main crane is used for hoisting the far end of the box girder relative to the bridge head, the auxiliary crane is used for hoisting the near end of the box girder relative to the bridge head, the main crane bears the main hoisting moment, the auxiliary crane assists in adjusting the posture of the box girder, and the box girder is hoisted to the designated position; in the hoisting process, the total station is used for monitoring the axis deviation of the box girders relative to the supports and the height difference of the adjacent box girders in real time. The adverse effect of box girder installation on river passage can be reduced.
Owner:FUJIAN JINDING CONSTR DEV CO LTD

Multi-stage gripper shoe type reaming vertical shaft heading machine

The invention discloses a multi-stage gripper shoe type chambering vertical shaft heading machine, and belongs to the technical field of vertical shaft heading. The equipment comprises a tunneling module used for reaming excavation of a vertical shaft; the lining module is arranged above the tunneling module and used for subsequent pouring lining of the wall face of the vertical shaft, and the lining module comprises a step changing unit; the rear matched supporting columns are arranged between the tunneling module and the lining module, and the rear matched supporting columns are used for connecting the tunneling module and the lining module and providing supporting points for descending and propelling of the subsequent lining module; according to the invention, during the tunneling process, the weight of the lining module is directly transmitted to the double-layer gripper shoe assembly in the tunneling module through the rear supporting column, so that the requirement on the hoisting capacity of a wellhead is reduced, and the well wall lining support closely follows the excavation operation, so that the bareness time of surrounding rock is shortened; in the step changing process, the weight of the tunneling module is borne by the lining module and does not depend on the integrity and strength of the rock stratum in front of the cutterhead any more, and the construction safety is improved.
Owner:HANGZHOU EAST CHINA UNDERGROUND ENG INTELLIGENT EQUIP RES INST CO LTD +2

Lifting system and loading and unloading lifting machine

The invention discloses a lifting system and a loading and unloading lifting machine, and relates to the technical field of lifting machines, in particular to the lifting system and the loading and unloading lifting machine, the lifting system comprises a cross beam, the near end of the cross beam is provided with a near-end guide wheel set, the far end of the cross beam is provided with a far-end guide wheel set, and the rotating shaft position of the far-end guide wheel set is provided with a pin shaft sensor; the traction rope is wound between the near-end guide wheel set and the far-end guide wheel set, the two ends of the traction rope are wound in the winding drum, and any section of the traction rope between the near-end guide wheel set and the far-end guide wheel set is wound in the combined pulley set. According to the lifting system and the loading and unloading lifting machine, the mode that the winch assembly is arranged at one end of the cross beam is adopted, the self weight of the walking trolley is reduced, the single traction rope is reused in the mode that the traction rope is turned and folded back at the far-end guide wheel set, and therefore the overall maximum lifting capacity of equipment is improved.
Owner:HANGZHOU HUAXIN MECHANICAL & ELECTRICAL ENGINEERING CO LTD +1

Large pile-circling crane base and construction method thereof

The present invention relates to the field of shipbuilding technology, and discloses a large pile-circling crane base, comprising a base, a mounting base disposed on top of the base, and a connecting base disposed on top of the mounting base. The bottom of the base is fixedly connected to the hull structure, and the mounting base includes three box-shaped legs, which enclose a mounting cavity for mounting a lifting device, and a mounting hole for a lifting unit assembly of the lifting device is formed between two adjacent box-shaped legs. The three box-shaped legs are respectively a first box-shaped leg, a second box-shaped leg, and a third box-shaped leg. The first box-shaped leg is a long strip box-shaped structure, and the second and third box-shaped legs are both triangular box-shaped structures, and the second and third box-shaped legs are axially symmetrical structures. The present invention can solve the problem of difficult installation and disassembly of the lifting unit assembly of the lifting device, has low overall processing difficulty, and is suitable for large pile-circling cranes with a lifting capacity of more than 2,000 tons.
Owner:CSSC HUANGPU WENCHONG SHIPBUILDING CO LTD

An installation method of a construction platform for an enclosure system

The present application provides an installation method for a construction platform of an enclosure system, including building the construction platform on a bracket platform; arranging a plurality of mobile trolleys at the bottom of the construction platform, and installing a first track on the bracket platform so that the plurality of mobile trolleys can carry the construction platform and move along the first track; marking a plurality of column positioning points on the inner bottom of the liquid cargo hold and installing a second track so that the mobile trolleys can move along the second track; lifting and moving the bracket platform so that the upper surface of the bracket platform is flush with the upper surface of the inner bottom of the liquid cargo hold, and the first track is aligned with the second track; separating the bottom of the column from the bracket platform, mounting the construction platform on the plurality of mobile trolleys, sliding the mobile trolleys onto the second track so that each column of the construction platform is aligned with the corresponding column positioning point on the inner bottom of the liquid cargo hold; lowering the column and fixing it on the inner bottom of the liquid cargo hold. This method enables the overall positioning and installation of the construction platform module into the liquid hold without the need for lifting capacity.
Owner:JIANGNAN SHIPYARD (GRP) CO LTD +1

Gas well shaft drainage device capable of continuously moving

The utility model relates to the field of petroleum and natural gas drainage and gas recovery, in particular to a gas well shaft drainage device capable of moving continuously. Comprising a device body and connecting pieces detachably and symmetrically connected with the two ends of the device body correspondingly. A first fluid channel is formed in the top of the device body, a second fluid channel is formed in the bottom of the device body, moving parts are arranged in the first fluid channel and the second fluid channel, openings communicated with the first fluid channel and the second fluid channel respectively are formed in the device body, and the moving parts move in the first fluid channel or the second fluid channel. The bypass mechanism is composed of the first fluid channel, the second fluid channel and the opening, opening and closing of the bypass mechanism are achieved by means of movement of the moving part, stability of the bypass mechanism in the operation process is guaranteed, accidental closing of the bypass mechanism in the midway is effectively prevented, and the safety of the bypass mechanism is improved. And the problem of insufficient water lifting capacity caused by bypass failure is avoided.
Owner:PETROCHINA CO LTD

Auxiliary crane and installation method of arm laying frame of auxiliary crane

The invention relates to an auxiliary crane and a mounting method of an arm laying frame thereof, which comprises the following steps of: before a ship enters water, mounting a main body on a ship deck; a supporting tool is manufactured according to the theoretical height of an arm placing frame of the auxiliary crane; the supporting tool is installed to a designated position on a ship deck, and the arm placing frame is installed to the supporting tool; one end of the suspension arm is connected with the main body, and the other end of the suspension arm is folded and installed on the arm placing frame; and stringing, wiring and debugging of the auxiliary crane are completed. After the ship is launched, the arm placing frame is separated from the supporting tool; and after the arm placing frame is separated from the supporting tool, the arm placing frame is hoisted to the theoretical installation position of the ship broadside through the auxiliary crane. According to the installation method, construction operations such as fixing of the arm placing frame, installation of the suspension arm and threading of the steel wire rope can be completed before the ship is launched, and installation of the arm placing frame can be achieved through the hoisting capacity of the auxiliary crane after the ship is launched. Therefore, the overall installation procedure of the ship auxiliary crane is moved forward, the construction cost is greatly reduced, and the ship building period is shortened.
Owner:HAIYANG CIMC RAFFLES OFFSHORE +4

Deep sea self-propelled self-elevating offshore wind power installation ship and design method thereof

This invention provides a deep-sea self-propelled and self-elevating offshore wind power installation vessel and its design method. The installation vessel includes: a streamlined main hull design; an elevator system comprising legs, pile shoes, cofferdams and guide structures, a pile clamping chamber and pile clamping and lifting equipment; four sets of cofferdams and guide structures are respectively located at the four corners of the main hull; each cofferdam contains one leg; the upper part of the leg is connected to the pile clamping chamber and pile clamping and lifting equipment, and the bottom of the leg is connected to a pile shoe; the leg length is greater than or equal to 130m; the main crane has a lifting capacity of 1600t and a lifting height of 175m; the main crane is integrated with one of the elevator systems, utilizing the cofferdams and guide structures as the support structure for the crane; excluding the elevator equipment and the bow living area, the remaining deck surface of the main hull is designed as a flat surface, with a deck area greater than or equal to 3400m². 2 The deck is designed to withstand 15 t / m 2 The uniform load distribution is enhanced. This invention can reduce navigation resistance and improve navigation capacity; it also solves the problems of insufficient operating water depth and lifting capacity.
Owner:GUANGZHOU SHIPYARD INTERNATIONAL LTD

A weight-controlled lifting device

This application discloses a weight-controlled lifting device, belonging to the field of lifting equipment machinery. It involves adding multiple sets of winches to the top of the lifting arm, each set corresponding to a main rope. The bottom ends of these main ropes are connected to a pressure detector mounted on the hook via an upper load-bearing cable. The pressure detector measures the weight of the load lifted by the hook and compares it with the maximum lifting capacity of the winches. This allows for the selection of whether to use a single main rope or multiple main ropes in combination to drive the load, achieving reasonable lifting without overloading. The added winding roller, winding belt, and magnetic collar work together to wind up the connected main ropes. This prevents unwinded main ropes from tangling at the bottom when only a single winch or a few winches are used for winding, which could affect normal lifting. This reduces the number of times the drive equipment needs to be used and improves safety.
Owner:ZHEJIANG HAI ZHONG HEAVY IND CO LTD +1

Force limiting electric control system

The utility model discloses a force limiting electric control system, and aims to provide a force limiting electric control system which solves the influence of the lifting capacity on the stability of a whole vehicle in the engineering machinery and agricultural machinery industries. The system comprises a power controller which is used for providing a stable power supply for the control system; the controller is connected with a control valve block and is electrically connected with the power controller; the operating handle is electrically connected with the controller; the force limiter is electrically connected with the controller; the force limit display is electrically connected with the controller; the big arm oil cylinder group is electrically connected with the control valve block; and the accessory oil cylinder group is electrically connected with the control valve block. The utility model has the beneficial effects that the influence of the lifting capacity on the stability of the whole vehicle in engineering machinery and agricultural machinery industries is solved, and the stability of the whole vehicle is greatly improved.
Owner:LOU XIAO ZHONG GONG YOU XIAN GONG SI

Multi-capacity combined crane hoist

The invention discloses a multi-capacity combined type travelling crane hoist which comprises a walking track, a rack parallel to the walking track is arranged at the bottom of the walking track, a driving crane and an auxiliary crane are connected to the walking track, a connecting frame is arranged at the bottom of the driving crane and the bottom of the auxiliary crane, and a first hoist and a second hoist are arranged at the bottom of the connecting frame. An electrical control box is arranged on the side wall of the connecting frame. The invention designs a multi-capacity combined electric travelling crane hoist, two hoists share one travelling crane, have different lifting capacities and lifting speeds, and comprise main components such as a driving travelling crane, an auxiliary travelling crane, a connecting frame, a high-capacity hoist and a low-capacity hoist. Through the integrated electrically-driven crane and the connecting frame, hoists with different high and low capacities can run under one crane, the beam hanging requirement is reduced, the cost is saved, the space requirement is reduced, and furthermore, an auxiliary line remote control device is further arranged, so that different hoists can be switched at any time to lift objects and walk along a track beam.
Owner:CHINA MERCHANTS HEAVY IND JIANGSU

Movable sliding table for carrying mold

The utility model discloses a movable sliding table for carrying a mold, and belongs to the technical field of carrying devices. Comprising a walking track which is provided with a mold production station and a mold replacement station; the moving platform is movably arranged on the walking track, and the moving platform is used for bearing a mold and transferring the mold between a mold production station and a mold replacement station; and the at least two fixed platforms are symmetrically arranged on the two sides of the mold replacement station of the walking track and are respectively used for bearing a to-be-replaced mold and receiving a replaced mold. Compared with a traditional traveling crane, the movable sliding table design specially considers the carrying requirement of a large mold, it is guaranteed that the large-weight mold can be stably borne and transferred, and the problems caused by the fact that the traveling crane is limited by the lifting capacity are effectively solved.
Owner:NINGBO FANGLI TECH

Hoisting balance beam of adjustable rolling mill stand

The utility model relates to the technical field of hoisting balance beams, in particular to an adjustable rolling mill stand hoisting balance beam which comprises a balance beam body, the balance beam body is of two plate beam structures, the two sides of the balance beam body are fixedly connected through limiting check blocks, adjustable lifting lug assemblies are arranged on the outer sides of the two ends of the balance beam body in a sleeved mode, and a hoisting ring is arranged in the middle of the balance beam body in a sleeved mode. A middle groove is formed in the bottom end of the hoisting ring, butt joint grooves are formed in the two sides of the middle groove in the bottom end of the hoisting ring in a penetrating mode, connecting assemblies are arranged in the butt joint grooves, and a rolling mill rack is fixed to the bottom ends of the connecting assemblies. The connecting assembly comprises a flange plate fixed to the top end of a rolling mill rack, a rack lifting lug fixed to the top end of the flange plate and a pin shaft arranged in the middle of the rack lifting lug and in a butt joint groove in a sleeved mode, and the two-side adjustable lifting lug assembly comprises sliding lifting lugs and hook rods arranged at the top ends of the sliding lifting lugs. The rolling mill stand structure can be lifted more stably, and the problem of installation of a rolling mill with insufficient lifting capacity of a single travelling crane is solved.
Owner:CHINA THIRD METALLURGICAL GRP

Disassembly-free counterweight device capable of shifting on load for crane

The utility model discloses a dismounting-free on-load displacement counterweight device for a crane. The counterweight device comprises a vehicle body, a crane main body is mounted on the vehicle body, supporting assemblies are symmetrically arranged at the bottom end of the rear part of the vehicle body, a connecting plate is arranged on the vehicle body through an adjusting mechanism, a counterweight assembly is arranged on the connecting plate, and the connecting plate is connected with the vehicle body through a positioning assembly. The position of the counterweight assembly can be conveniently adjusted according to use requirements, the lifting capacity and stability of the automobile crane can be remarkably improved by adjusting the position of the counterweight device, the operation performance of the crane can be improved by adjusting the counterweight position, the vibration of an arm frame can be reduced by optimizing the counterweight position, and the service life of the crane is prolonged. The stability and safety of the crane are improved, the crane is relatively simple and convenient, positioning and fixing can be carried out after adjustment is completed, and firmness during use is ensured.
Owner:CHANGCHUN SHUANGLONG SPECIAL PURPOSE VEHICLE MFR

Lifting device for rescue ship

The utility model discloses a lifting device for a rescue ship, and relates to the technical field of marine rescue equipment, the lifting device comprises a climbing rod arranged on the rescue ship, a support frame arranged at the bottom of the climbing rod and a bottom plate mounted on the rescue ship, and a plurality of limiting sleeves for mounting lifting ropes are symmetrically and fixedly mounted on the climbing rod. According to the lifting device, articles at one end of the lifting rope can be lifted while discharging is conducted through the lifting rope, lifting operation can be completed, assemblies easy to mount, dismount and replace are adopted, then the assemblies can be flexibly combined according to the size and requirements of the rescue boat, the foldable lifting arm is adopted, and the lifting device is convenient to use. The space occupation is reduced when the device is not used, the space utilization rate of the ship is improved, accessories such as the size, the pipe diameter and the roller skating set of the climbing rod can be replaced according to different types and main hook lifting capacity of the rescue ship, the device has the advantages of being low in cost and easy to operate, meanwhile, the efficiency is improved, and the device is suitable for various rescue scenes.
Owner:TANGSHAN ZHONGXIN SHIP SERVICE CO LTD

Integral lifting guide device for floating construction platform and construction method

The invention discloses a floating construction platform integral lifting guide device and a construction method.The device comprises a supporting steel anchor pile, a guide system, a cable collecting system, a pile top reinforcement and a lifting system, and the lifting system comprises a lifting jack, a lifting beam, a steel strand, an anchor bed, an anchor box, a reinforcing plate and a bottom anchor. The supporting steel anchor piles are inserted into rock and hinged to a seabed, supporting force can be provided for lifting the construction platform, the guiding system is used for resisting wave force of the construction platform, the cable collecting system connects the construction platform with gravity anchors through cables, and the construction platform can be accurately anchored and positioned. A lifting jack is installed at the top of a supporting steel anchor pile, a steel strand penetrates into the lifting jack, penetrates through a reserved hole in a construction platform and is fixedly connected with a bottom anchor, and a reinforcing plate is installed at the bottom of the reserved hole, so that stress safety is guaranteed, and a lifting system is formed. The lifting capacity is high, positioning is accurate, the safety performance is high, the overall lifting risk of the offshore floating type construction platform can be reduced, and the construction efficiency is improved.
Owner:THE 5TH ENG MBEC +1

Track-traveling crane

To provide a track-traveling crane capable of maximizing lifting capacity during work.SOLUTION: A track-traveling crane 1 that is provided with legs 9 having a plurality of running wheels 10 that can roll freely along rails 2, on a running body 3, and travels on the rails 2 using the running body 3 to perform loading and unloading operations, is equipped with a wheel pressure detector that detects the wheel pressure acting on each running wheel 10 of the legs 9, and a control device that controls the tilting angle and swivel angle of a jib 6 so that they do not exceed their limits in order to ensure stability during work, and in parallel with this control, monitors the wheel pressure detected by the wheel pressure detector to ensure that it does not exceed the allowable wheel pressure of the foundation.SELECTED DRAWING: Figure 1
Owner:IHI TRANSPORT MASCH CO LTD

Double-cylinder multi-section arm telescopic system and crane

The utility model relates to a double-cylinder multi-section-arm telescopic system and a crane. The double-cylinder multi-section-arm telescopic system comprises a telescopic arm assembly, a telescopic oil cylinder, a telescopic arm mechanism and a telescopic arm mechanism, the extending arm mechanism comprises an extending arm pulley II arranged at the arm head of the fourth-section arm, an extending arm pulley III arranged at the arm tail of the fifth-section arm, an extending arm pulley IV arranged at the arm head of the fifth-section arm, and an extending arm inhaul cable II which bypasses the extending arm pulley II and the extending arm pulley III in sequence and connects the arm tail of the second-section arm with the arm head of the fourth-section arm; the extending arm inhaul cable III bypasses the extending arm pulley IV and is used for connecting the tail of the fourth-section arm with the head of the sixth-section arm; and the arm retracting mechanism comprises an arm retracting pulley III arranged at the arm tail of the fifth-section arm and an arm retracting inhaul cable III which bypasses the arm retracting pulley III and connects the arm head of the fourth-section arm with the arm tail of the sixth-section arm. The utility model has the advantages of high telescopic efficiency, simple telescopic control, high reliability, small stress on the inhaul cable, low cost and high hoisting capacity.
Owner:XUZHOU HEAVY MASCH CO LTD

Lifting mechanism overcoming contact impact of two connecting rods and control method

This invention discloses a lifting mechanism and control method for overcoming the impact of two-link contact. The lifting mechanism includes an upper cover plate, a push block, two links, a base, and a scissor lift device. The lower end of the scissor lift device is connected to the base, and the upper end is connected to the upper cover plate. The two links consist of a first link, a second link, and a shock absorber. One end of the first link is connected to the push block, and the other end is hinged to one end of the second link. The other end of the second link is hinged to the scissor lift device. The shock absorber is fixedly installed on the first link. The push block is installed on a ball screw, which is driven by a motor. The control method includes the following steps: 1) Calculate the motor's initial limit speed v0 based on the shock absorber deformation S; 2) The motor runs at the initial speed. After detecting contact between the first and second links, the motor speed decreases to half of the initial speed; 3) When the motor current drops below the threshold current, the controller issues a command to increase the motor speed back to the initial speed v. The invention has a simple structure, and the shock absorber effectively reduces the additional impact from the flexible impact point. Combined with the control method, it can achieve greater lifting capacity without replacing the high-power motor.
Owner:HANGZHOU YANJIANG INTELLIGENT TECH CO LTD

Radiation type electric heater structure

The utility model relates to the technical field of heaters, in particular to a radiation type electric heater structure which comprises a radiation type electric heater body. A plurality of supporting blocks are installed at the bottom of the radiation type electric heater body in the length direction at equal intervals, a base is jointly installed at the bottoms of the supporting blocks, a plurality of wheel grooves are evenly formed in the two sides of the bottom of the base in the length direction, the inner tops of the wheel grooves communicate with lifting assembly boxes installed on the upper side of the base, and lifting type rolling mechanisms are arranged in the wheel grooves. The lifting type rolling mechanism comprises rolling wheels rotationally arranged in the wheel grooves, the tops of the rolling wheels are connected with lifting assemblies used for controlling the rolling wheels to be transferred in the wheel grooves, the lifting assemblies are arranged in the wheel grooves and the lifting assembly boxes, and hydraulic cylinder operation grooves are formed in the positions, on one sides of the wheel grooves, of the bottom of the base. The structure can provide rapid lifting capacity for the radiation type heater, so that the radiation type heater can be efficiently transported and transferred, and the use occasion capacity of the radiation type heater is improved.
Owner:ZHEJIANG WANSEN ELECTRIC HEATING EQUIP CO LTD

Self-installation type installation method for ocean module drilling machine

The invention discloses a self-installation type installation method for an ocean module drilling machine, which comprises the following steps: firstly, a constructor climbs on a platform, and assembles a first-stage small crane by utilizing manpower and a simple tool; then, the installed crane is used as a hoisting means, and a second-stage crane, a third-stage crane and a fourth-stage crane with higher hoisting capacity are sequentially installed; the fourth-stage crane is used for installing a deck fifth-stage crane serving as a platform main crane; then, a drilling support module and a larboard fifth-stage crane are installed through a deck fifth-stage crane, and a starboard fifth-stage crane is installed on the basis of the drilling support module and the larboard fifth-stage crane; and finally, the fifth-stage cranes on the left board and the right board are used for combined operation, and installation of all the remaining drilling machine modules is completed. The method thoroughly gets rid of the dependence on large floating cranes and barges through the platform self-building hoisting capacity and the step-by-step lifting installation logic, and has the advantages that the construction cost is low, the cycle arrangement is flexible, the limitation of external resources and sea conditions is small, and all cranes and modules can be repeatedly used for different platforms.
Owner:LANZHOU LS PETROLEUM EQUIP ENG CO LTD

crane

This invention provides a crane with a boom mounted on a chassis and capable of variable-amplitude rotation relative to the chassis in a vertical plane. A super-boom can rotate relative to the boom in both vertical and horizontal planes, driving the boom's variable-amplitude rotation. A lateral tension adjustment mechanism is connected between the two super-booms, capable of extending and retracting relative to the super-booms and adjusting the lateral tension length to laterally limit the super-booms in a horizontal plane. In a preparation and verification mode, the controller is configured to: acquire the operating condition command and the initial lateral tension length of the lateral tension adjustment mechanism; release the rated lifting capacity limit of the boom; and enter the lifting protection mode. This invention, by adding a lateral tension adjustment mechanism between the two super-booms, limits the outward bending tendency of the super-booms, reducing their deformation and stress. Furthermore, by matching the operating condition command with the initial lateral tension length and initial super-boom swing angle, it completes the preparation and verification of the boom before formal operation, eliminating operational safety risks and improving the crane's operational safety.
Owner:ZOOMLION HEAVY INDUSTRY SCIENCE AND TECHNOLOGY CO LTD

Liftable water blocking door for coal mine shaft

The application discloses a liftable water-blocking door for a coal mine shaft and relates to the technical field of mine roadway water blocking, which comprises an I-steel base arranged at the bottom of a mine roadway, two I-steel door frames arranged on the I-steel base, a foundation pit groove arranged on one side of the mine roadway of the I-steel base, a foundation frame arranged on the inner wall of the foundation pit groove, the lower part of a water-blocking door connected to the inner side of the front end of the foundation frame through a hinge seat, an oil cylinder base arranged at the bottom of the front end of the foundation frame, the upper part of the water-blocking door hinged to the oil cylinder base through an extension oil cylinder, the I-steel door frames fixed on the inner wall of the mine roadway through a channel steel support frame and then filled and poured with a concrete layer to be firm, and the foundation pit groove arranged on one side of the mine roadway of the I-steel base, the door plate assembly and the water-blocking door assembly installed in the foundation pit groove, so as to form a hydraulic water-blocking door with lifting capacity, which is closely combined with the I-steel door frame when lifted to play a water-blocking role, and is substantially horizontal with the ground when lowered, thus not hindering personnel walking and material carrying.
Owner:OTUOKE QIANQI GREAT WALL NO 3 MINING CO LTD