364results about "Cable cars" patented technology

Process method for construction of steel-structured suspension bridge and light type cable carrying crane specially used in same

The invention provides a process method for the construction of a steel-structured suspension bridge and a light type cable carrying crane specially used in the same, wherein the process flow comprises the steps of construction preparation, assembly of the light type cable carrying crane, the positioning and debugging of the light type cable carrying crane, the positioning of a ship carrying steelbeams, the lifting of the steel beams up to the hoisting point, the descent of a lifting device, the bolting connection of the lifting device and the steel beams, the first stage lifting of the steelbeams, the 30-percent load detection, the 70-percent load detection, the 100-percent load detection, the horizontal adjustment of the steel beams, the second stage lifting of the steel beams, the positioning of the steel beams and boiling connection of a lifting rod, the assembly of a security device, the lifting of the light type cable carrying crane, the movement positioning of the light type cable carrying crane; and the special light type cable carrying crane consists of a load-bearing mechanism, a load-lifting mechanism, a traveling mechanism, an anchoring mechanism and a weight-balancing beam. The process method and the special light type cable carrying crane have the advantages of light weight, simple structure, easy processing, convenient assembly and disassembly, no waterway occupation, big free space brought to transport barges and waterway traffic, high flexibility and maneuverability, high lifting speed, low construction cost, low labor intensity of workers and the suitability for the construction of the suspension bridge.
Owner:CHINA FIRST METALLURGICAL GROUP

Dual-machine loading-and-walking type hydraulic numerical control deck erection gantry and control system and control method

The invention provides a dual-machine loading-and-walking type hydraulic numerical control deck erection gantry, which comprises two sets of loading-and-walking type hydraulic numerical control deck erection gantries and a control system, wherein each set of the loading-and-walking type hydraulic numerical control deck erection gantries comprises the following four parts: a transverse truss girder, two sets of walking type loading-and-walking devices arranged at two ends of the transverse truss girder, a hydraulic lifting device and a carrying pole of a hanger; each set of the walking type loading-and-walking devices consists of a guideway, a walking mechanism steel framework, m traction jacks, 4n load conversion jacks, a supporting pull rod, a walking roller bracket and P guideway walking jacks; all the components are connected with one another by pin shafts; and the control system of the deck erection gantry is a distributed computer network control system which consists of a main control station, Y field controllers, Y pump stations, Y pump station starting boxes, a data acquisition system, and a plurality of data wires and communication wires. The deck erection gantry has the advantages of great lifting force and high work efficiency and stability; and when the deck erection gantry walks with load, the control system of the deck erection gantry can effectively and synchronously control every jack.
Owner:LIUZHOU OVM MASCH CO LTD

Steering cable saddle for large-tonnage cable crane

The invention discloses a steering cable saddle for a large-tonnage cable crane. The steering cable saddle aims at solving the problems that existing movable type cable saddle towers are equipped with a plurality of front and back wind cables along bridge directions and high in cost, and service lives of bearing cable axle assemblies, hoisting cable axle assemblies, traction cable axle assemblies, bearing cables, hoisting cables and traction cables are short. The steering cable saddle comprises cable saddle base distribution beams and a cable saddle base connecting cross beam, wherein each cable saddle base distribution beam is provided with a bearing cable axle assembly, a bearing cable steering device, a hoisting cable steering device, a traction cable axle assembly, a traction cable steering device and a sliding axle assembly; the cable saddle base connecting cross beam is provided with a hoisting cable axle assembly; and the cable saddle base distribution beams are positioned on left and right sides of the cable saddle base connecting cross beam. By means of the steering cable saddle for the large-tonnage cable crane, service lives of the bearing cable axle assemblies, the hoisting cable axle assembly, the traction cable axle assemblies, bearing cables, hoisting cables and traction cables are prolonged.
Owner:HUNAN CONSTR ENG GRP COR +1

Deck unit erection gantry

InactiveCN101559905AReasonable load-bearing structureSimple load-bearing structureBridge erection/assemblyCable carsEngineeringGravity center
The invention discloses a deck unit erection gantry. The gantry comprises two towers, a winding engine, a lifting pulley and track ropes, wherein the winding engine is arranged on tops of the towers; the track ropes are connected with the tops of the two towers; the winding engine slides along two parallel track ropes through driving the lifting pulley by a hauling cable; the lifting pulley consists of two end girders, a load bearing cross beam, a fixed pulley and a movable pulley; the fixed pulley is arranged on the load bearing cross beam; lifting ropes are wound on the fixed pulley and the movable pulley. The deck unit erection gantry is characterized in that each upper surface of the two end girders is provided with a hinge base; two ends of the load bearing cross beam are connected with hinges of the end girders through the hinge bases; the movable pulley and a carrying-pole beam are connected and have a connection point positioned on the gravity center of the carrying-pole beam. The deck unit erection gantry has reasonable stress of bearing structure, simple structure, convenient operation, low cost and safe construction, and is particularly convenient for lifting and mounting a large steel box girder prefabricated structural element of a suspension bridge.
Owner:GUANGDONG PROVINCIAL CHANGDA HIGHWAY ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products