The invention discloses a boom-luffing
tower crane and a method for determining the positions of a first fixed
pulley and a third fixed
pulley. The boom-luffing
tower crane comprises: a supporting seat; a balancing arm; a lifting arm; a support rod, the bottom of which is connected to the supporting seat through a first connecting point; a pulling rod; a luffing mechanism, comprising a luffing fixed
pulley and a luffing
rope arranged at the top of the support rod, the luffing
rope is unwound from a luffing
winch, and is connected to the lifting arm after passing through the luffing fixed pulley, and the luffing mechanism is used to make the lifting arm luffing and rotating relative to the supporting seat; a lifting mechanism, comprising a lifting
winch arranged on the balancing arm, a lifting
rope, a first fixed pulley arranged at the top of the support rod, a second fixed pulley located at the bottom of the support rod, a third fixed pulley arranged on the support rod and located between the first fixed pulley and the second fixed pulley, and a fourth fixed pulley arranged at the lifting end, when lifting a heavy object, the lifting rope is unwound from the lifting
winch, and is connected to the heavy object after passing through the first fixed pulley, the second fixed pulley, the third fixed pulley and the fourth fixed pulley in sequence.