Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

16500results about "Underwater structures" patented technology

Three-layer overlapping assembly type underground station assembling trolley equipment

The invention relates to the technical field of construction trolley equipment, in particular to three-layer overlapping assembly type underground station assembling trolley equipment which comprises a movable pedestal, a movable platform, a movable platform, a movable platform, a movable platform and a movable platform, wherein the movable pedestal is provided with a shear-type lifting platform which ascends and descends in the vertical direction; the fixed frame seat is fixedly mounted on the shear type lifting platform; the side wall assembling assembly comprises a horizontal connecting plate which is horizontally and movably mounted on one side of the fixing frame base and an L-shaped supporting plate which is mounted at the outer end of the horizontal connecting plate; the moving block is horizontally and movably mounted on the other side of the fixing frame base through a driving source, and a longitudinal beam supporting plate and a clamping jaw are mounted on the moving block; the arranged movable pedestal is matched with the fixed frame seat, so that a lifting function and a mounting site are provided, and the device can be suitable for splicing operation of a three-layer overlapping assembly type underground station; the equipment has mobility, the structure is stable and reliable in the construction process, and the requirement for gravity bearing of the prefabricated part can be met; quick positioning and assembling of the assembling position of the prefabricated part can be achieved, then the construction procedure is simplified, and the construction efficiency is improved.
Owner:CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD

Communication pipeline laying system of underground intelligent pipe gallery

The invention discloses a communication pipeline laying system for an underground intelligent pipe gallery, and relates to the technical field of underground intelligent pipe gallery construction, and the system comprises the steps: collecting point cloud data and underground environment parameters through a laser radar and a sensor, and carrying out the synchronous processing; fusing the synchronously processed point cloud data and the underground environment parameters, and constructing a three-dimensional geographic information model; analyzing and planning the three-dimensional geographic model by using artificial intelligence, and optimizing a laying path to obtain an optimal laying path; according to the optimal laying path, automatic pipeline laying is conducted through automatic construction equipment; according to the method, the three-dimensional geographic model is analyzed and planned through artificial intelligence, the laying path is optimized, the optimal laying path is obtained, the risk area under the complex geological condition is effectively avoided, the construction cost is reduced, and the reliability of communication pipeline laying path planning is improved.
Owner:SHANGHAI MINGYUE INFORMATION TECH CO LTD

Settling winged anchor backing plate for construction

The present invention discloses a sunken winged anchor backing plate for construction, which is applied to an anti-corrosion and anti-seepage anchor rod structure for construction. The body of the sunken winged anchor backing plate is in a cylindrical structure, and the body includes a cylinder head part, a cylinder body part, a cylinder tail part, an inner hole part and a plurality of reinforcing wing plates; the cylinder head part is arranged at the uppermost part of the body; the cylinder body part is coaxially connected to the lower part of the cylinder head part; the cylinder tail part is coaxially connected to the lower part of the cylinder body part; wherein the outer dimensions of the cylinder head part, the cylinder body part and the cylinder tail part gradually decrease; the inner hole part is coaxially arranged on the body with the cylinder head part, the cylinder body part and the cylinder tail part; and the plurality of reinforcing wing plates are evenly spaced along the axial direction and are arranged around the outer wall of the cylinder tail part. It can solve the problem of upward seepage of underground foundation water.
Owner:ZHEJIANG ZHONGQIAO PRESTRESSING EQUIP CO LTD

Assembling equipment of fabricated station and construction method

The invention relates to the technical field of subway construction, in particular to assembling equipment and a construction method of an assembly type station, and the assembling equipment comprises a stand column assembling machine which comprises a longitudinal moving mechanism, a transverse moving mechanism and a clamping mechanism, the longitudinal moving mechanism and the transverse moving mechanism are matched, and after the clamping mechanism clamps a stand column to be assembled, transverse moving, longitudinal moving and rotary moving are conducted; the side wall middle plate assembling machine comprises a side wall assembling mechanism and a middle plate assembling mechanism. The middle plate assembling mechanism is used for transversely moving, longitudinally moving, rotating and lifting a middle plate. The side wall assembling mechanism is used for being connected with a reserved structure of a side wall and driving the side wall to be assembled to transversely move, longitudinally move and rotate. The top longitudinal beam assembling machine is used for clamping a top longitudinal beam to be assembled and transversely moving, longitudinally moving and lifting the top longitudinal beam. According to the splicing equipment and the construction method, the split type structural design is adopted, all the splicing machines operate independently and are matched flexibly, and the splicing efficiency is improved; and meanwhile, each split erector maintains respective high-precision assembly, so that the mounting error can be efficiently eliminated.
Owner:CHINA RAILWAY ENG MASCH RES & DESIGN INST CO LTD

Basement roof lawn vegetation construction method under complex working conditions

A basement roof lawn vegetation construction method under complex working conditions comprises the steps of implementing complex basement roof modeling and implementing lawn vegetation above a basement roof. The complex basement top plate modeling method comprises the steps of a flat site large-area backfill construction method, a step-shaped basement top plate backfill construction method and a basement top plate large-gradient inclined plate earthwork backfill construction method. The step of implementing the lawn vegetation above the basement top plate comprises the steps of cross construction, backfilling and excavation, slope toe construction and solid soil area construction. According to the technology, the problem of construction of greening in a complex shape on the basement roof of a project is solved, particularly the problem that more slope roofs in a mountaintop shape or roofs in a stepped rice field shape exist is solved, the problem that backfill soil construction is difficult after the basement roof is complex in shape is solved, the stability of backfill soil after backfill soil is improved, and the construction period is shortened. And the concept of green building is practiced.
Owner:SHANGHAI BAOYE GRP CORP +1

Large deep foundation pit inner supporting system with safety system

The invention relates to the technical field of foundation pit supporting, and discloses a large deep foundation pit inner supporting system with a safety system.The large deep foundation pit inner supporting system comprises a telescopic rod, a supporting rod, a connecting plate and a soil retaining plate, one end of the telescopic rod is rotationally connected with a connecting block through a pin, the connecting block is movably provided with an elastic assembly, and the elastic assembly is connected with one side of the supporting rod; the elastic assembly reserves an elastic telescopic space between the supporting rod and the telescopic rod and is used for detecting displacement generated when the supporting rod and the soil retaining plate support the foundation pit, clamping grooves are formed in the two opposite sides of the soil retaining plate, and an assembling structure is arranged on one side of the supporting rod. According to the large-scale deep foundation pit inner supporting system with the safety system, prestress can be effectively applied to the side wall of the foundation pit, so that the periphery of the pit wall has certain supporting force, the deformation condition of the side wall of the foundation pit can be monitored, meanwhile, underground water seepage of a soil layer of the foundation pit can be eliminated in time, and the safety coefficient during foundation pit supporting is improved.
Owner:YANCHENG INST OF TECH

Construction method of inclined bare rock drilling platform under high condition of jerky waves

The invention relates to a construction method of an inclined bare rock drilling platform under the condition of high jerky waves, and belongs to the technical field of drilling platform construction.The construction method comprises the steps that firstly, a guide frame and anchors are prefabricated, four groups of anchors are thrown in the sea, a rock anchor is arranged on the shore side, the machined guide frame is transported to the designed position through a barge, and then accurate positioning is conducted through the anchors; steel pipe piles are inserted and driven through the guide frames, a construction platform is installed on the guide frames, anchor pile construction is completed, the construction platform is dismantled, then construction of the four sets of guide frames is completed through the method, a temporary construction platform is erected through the completed guide frames, and the remaining anchor piles are constructed on the temporary construction platform; and after the anchor piles are completed, the upper structure of the drilling platform is installed, the drilling platform is erected, and the problems that in the prior art, when the steel pipe piles are anchored in the rock stratum through the anchor piles in the inclined bare rock zone for anchor pile construction, due to the influence of the inclined bare rock geology, the construction difficulty is large, and the construction period is long are solved.
Owner:CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP CO LTD

Crack-resistant ultra-high performance concrete for underground engineering in water-rich strata, preparation method, and application thereof

The present invention discloses a crack-resistant ultra-high performance concrete (UHPC) for underground engineering in water-rich strata, preparation method, and application thereof, belonging to the technical field of building materials. The concrete is prepared from the following raw materials in parts by weight: 550-650 parts of cement, 140-180 parts of fly ash, 120-150 parts of silica fume, 200-300 parts of calcined shield tunnel slag, 30-50 parts of micron-scale magnesium oxide, 30-50 parts of nano-scale magnesium oxide, 30-50 parts of rheology-modifying material, 800-1000 parts of lightweight aggregate, 4-8 parts of water reducer, and 50-200 parts of water. The rheology-modifying material has a fluidity ratio of 106%. The present invention incorporates calcined shield tunnel slag, micron / nano-scale magnesium oxide, and lightweight aggregate into the UHPC, which effectively suppresses shrinkage and reduces crack formation.
Owner:SHANDONG UNIV

Ultra-deep buoyancy type double-wall steel hanging box design and construction method based on sea-crossing bridge bearing platform with strong tide reciprocating flow

The invention discloses a construction method of an ultra-deep buoyancy type double-wall steel hanging box based on a strong tide reciprocating flow sea-crossing bridge bearing platform. The construction method comprises the five process steps of preparation before construction of the steel hanging box, hoisting and lowering of the steel hanging box, preparation before pouring of bottom sealing concrete, pouring of the bottom sealing concrete and construction of the bearing platform. According to the design and construction method for the ultra-deep buoyancy type double-wall steel hanging box based on the strong tide reciprocating flow sea-crossing bridge bearing platform, the buoyancy cabin is arranged for the double-wall steel hanging box of the strong tide rapid flow ultra-large water head to ingeniously solve the problem that the self weight of the steel hanging box is large, four pile casing post-cast strips are reserved to serve as stabilizing measures for resisting reciprocating flow impact in the bearing platform construction period, and the construction efficiency is improved. The construction technology is ingenious, a foundation is laid for smoothly achieving the construction period target of the Hangzhou bay cross-sea railway bridge, and good economical efficiency, practicability and application and popularization value are achieved.
Owner:CCCC SECOND HARBOR ENGINEERING CO LTD +1

Splicing construction method for three-layer overlapping assembly type station

The invention relates to the technical field of station construction, in particular to a three-layer overlapping assembly type station assembling construction method, and an overlapping assembly type station comprises a bottom plate, prefabricated side walls, cast-in-place side walls, middle stand columns, middle longitudinal beams, middle plates, top longitudinal beams, a prefabricated top plate and a cast-in-place top plate. The construction method specifically comprises the steps that concrete is poured in situ to form the bottom plate, then the prefabricated side walls are assembled, the cast-in-place side walls are poured, then the middle stand columns and the middle longitudinal beams are assembled, connecting joint concrete is poured, the middle plate is erected, the concrete is symmetrically poured at the two ends of the middle plate for forming, and single-layer construction is completed. When the station is constructed to the top sealing of the uppermost layer, the middle plate serves as the foundation, the cast-in-place side walls, the prefabricated side walls, the middle stand columns and the top longitudinal beams are spliced and poured in sequence, the prefabricated top plate is erected, and the cast-in-place top plate is poured to complete top sealing; the method is easy to control, the accuracy of structure construction is guaranteed, the construction period is short, the construction quality is stable and reliable, and the construction efficiency can be obviously improved.
Owner:CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD

Cavern type data center based on underground river construction and construction method and operation method thereof

The invention discloses a cave depot type data center based on underground river construction and a construction method and an operation method thereof, and belongs to the technical field of cave depot type data center construction. The data center comprises a mountain body, an underground river is developed in the mountain body, the underground river flows through a karst cave in the mountain body, a plurality of equipment storage tunnels are arranged on one side or two sides of the underground river in the mountain body, and the equipment storage tunnels are communicated with the karst cave through slope connecting tunnels. An equipment cabinet and a liquid heat exchanger are arranged in the equipment storage tunnel, a river water conveying assembly is connected to the liquid heat exchanger, and the end, away from the liquid heat exchanger, of the river water conveying assembly penetrates through the slope connection tunnel and extends into the underground river. The liquid cooling mode is adopted for cooling and heat dissipation of the equipment cabinet, the direct temperature control mode remarkably improves the heat dissipation and cooling effects of the IT equipment cabinet, meanwhile, the heat exchange efficiency is high, and the operation energy consumption of a data center can be reduced.
Owner:GUIZHOU TRANSPORTATION PLANNING SURVEY & DESIGN ACADEME

Crack detection and grouting repair device for underwater concrete

The invention discloses a crack detection and grouting repair system for underwater concrete, which comprises a visual operation system and an underwater robot controlled by the visual operation system, the underwater robot comprises a bearing plate, a multifunctional converter arranged below the edge of the bearing plate, and a power assembly, a camera shooting assembly, a detection assembly, a crack repairing assembly and a control circuit which are arranged in corresponding areas of the bearing plate. The detection assembly comprises an ink jet head arranged on the multifunctional converter, the ink jet head is used for carrying out ink jet treatment on the suspected crack area, and the ink jet head is connected with a corresponding ink storage box; the crack repairing assembly comprises a high polymer spray head arranged on the multifunctional converter and a pinhole grouting head arranged below the base, the high polymer spray head and the pinhole grouting head are communicated with a micro grouting machine, the high polymer spray head is used for narrow crack grouting repairing, and the pinhole grouting head is used for wide crack grouting repairing. The invention aims to realize crack detection and repair of underwater concrete.
Owner:ZHENGZHOU UNIV

Connecting device for deformation joint at civil engineering structural plate and using method of connecting device

The invention relates to the technical field of civil engineering structure plate deformation joint connection, and discloses a civil engineering structure plate deformation joint connecting device and a using method thereof.The civil engineering structure plate deformation joint connecting device comprises at least two adjacent concrete plates, and a deformation joint is arranged between the concrete plates; the elastic rubber belt is arranged in the deformation joint, and the elastic rubber belt is arranged in the length direction of the deformation joint and used for connecting the adjacent concrete slabs and providing telescopic connection to adapt to thermal expansion and cold contraction or other deformation of the concrete slabs; the supporting structures are located on the two sides of the elastic rubber belt, and each supporting structure comprises a first supporting plate and a second supporting plate. The elastic rubber belts are arranged in the length direction of the deformation joint, flexible connection can be provided between the concrete slabs, thermal expansion and cold contraction or other displacement deformation of the concrete slabs caused by temperature changes and foundation settlement are effectively absorbed through the design, and therefore the situation that the concrete slabs crack or are unstable in structure is avoided.
Owner:POWERCHINA JIANGXI ELECTRIC POWER ENGINEERING CO LTD

Intelligent box culvert jacking posture control method and system based on digital twinning

The invention provides a box culvert jacking attitude intelligent control method and system based on digital twinning, and relates to the technical field of attitude control. Structural parameters of a box culvert entity, parameters of a construction environment, and elevation change data and axis offset data in a jacking process are obtained, and the two kinds of data are integrated to obtain a box culvert jacking attitude intelligent control system; generating a box culvert jacking attitude data frame sequence; according to box culvert entity reference information in the model and the updated box culvert real-time state information, combining the box culvert jacking attitude data frame sequence to determine box culvert actual attitude parameters, comparing the box culvert actual attitude parameters with box culvert design attitude parameters, determining attitude deviation types and attitude deviation values corresponding to the box culvert axis direction and the box culvert height direction respectively, and calculating the box culvert jacking attitude data frame sequence according to the attitude deviation types and the attitude deviation values. According to the method, the attitude adjustment control instruction is generated according to the attitude of the box culvert, so that the equipment drives the jack to adjust the jacking attitude of the box culvert according to the instruction, dynamic synchronization and accurate mapping of the structural state in the jacking process of the box culvert are realized, and the real-time performance, the accuracy and the control robustness of attitude adjustment are improved.
Owner:SHIJIAZHUANG TIEDAO UNIV +1

Ultra-long concrete post-cast strip structure and manufacturing method

The invention relates to the technical field of concrete structure construction, and discloses a super-long concrete post-cast strip structure and a manufacturing method.The structure comprises an interface treatment layer, a fiber grid layer, a micro-expansion concrete layer and a steel fiber protection layer which are sequentially arranged from bottom to top, and the interface treatment layer is used for providing combination transition of new concrete and old concrete; the fiber grid layer is used for achieving deformation constraint and stress transfer, the micro-expansion concrete layer is used for forming an autonomous compensation deformation area, and the steel fiber protection layer is used for providing final structure protection and load distribution. The interface treatment layer is a concrete base surface treated by high-pressure water jet, and is coated with a silane-based interface treatment agent. The bonding strength of new concrete and old concrete is enhanced through the interface treatment layer, the fiber grid layer provides effective deformation constraint, the micro-expansion layer achieves automatic shrinkage compensation, the steel fiber layer controls crack development, the layers are matched with one another to form a complete anti-crack system, the problem that the anti-crack performance of a traditional post-cast strip is insufficient is solved, and the overall anti-crack performance is improved.
Owner:FUJIAN ZHUOYUE CONSTR ENG DEV CO LTD

Comprehensive pipe gallery underground diaphragm wall deformation risk early warning system

The invention, which relates to the technical field of the underground diaphragm wall, discloses a comprehensive pipe gallery underground diaphragm wall deformation risk early warning system comprising a data acquisition module, a data analysis module, a risk early warning module, an external environment monitoring module and a real-time monitoring module. The data analysis module is used for analyzing the continuous wall data collected by the data acquisition module, and the data analysis module comprises a deformation prediction unit, a soil stress detection unit and a deformation comprehensive evaluation unit. The soil stress detection unit is combined with the soil pressure and the internal stress of the wall body to perform quantitative analysis on the mechanical property of the underground diaphragm wall, so that the interaction between the soil and the underground structure can be quantified, finally, the deformation comprehensive evaluation unit is used for performing comprehensive evaluation, and different risk levels are set for the result. The early warning effect is achieved, the deformation risk early warning quality is improved, and potential safety hazards are reduced.
Owner:ZHEJIANG KEJIA ENG TECH RES CO LTD

Construction method of protection system suitable for corrosive silt silt coast

The invention relates to the field of silt silt coast restoration, in particular to a protection system construction method suitable for an erosive silt silt coast, which adopts engineering measures such as a water-permeable offshore submerged embankment and a riprap protection bank on the seaside of a vegetation restoration area to dissipate waves, and adopts the riprap protection bank to prevent a high beach from being further eroded. By reserving the tide passageway, the vegetation restoration area is kept to be communicated with a water system of an open sea, more suitable conditions are provided for vegetation restoration, and the survival rate of plants for vegetation restoration on an erosive beach is increased. The degraded wetland habitat of an erosive beach is recovered, the structural integrity and the functional stability of a coastal zone ecological system are improved, the capability of resisting marine disasters is improved, and the regional ecological safety is guaranteed.
Owner:CHINA DESIGN GROUP CO LTD

Fabricated subway station main body structure construction method based on cover-excavation top-down construction method

The invention discloses an assembly type subway station main body structure construction method based on a cover-excavation top-down construction method. Comprising the steps of underground diaphragm wall construction, upper covering soil excavation and pile position drilling, prefabricated pile construction, prefabricated top beam lifting and placing, prefabricated top plate lifting and placing, top beam plate-column joint post-pouring, top plate-side wall joint post-pouring, upper covering soil backfilling, negative first layer earthwork excavation, prefabricated middle beam lifting and placing, prefabricated middle plate lifting and placing, middle beam plate-column joint post-pouring and middle plate-side wall joint post-pouring. Excavating a negative second layer earthwork, pouring a bottom plate cushion layer, prefabricating a bottom beam in place and suspending, binding bottom plate steel bars, post-pouring a bottom plate, and post-pouring a bottom beam column node. A bottom plate is cast in place, a top beam, a top plate, a longitudinal beam and a floor slab are fully prefabricated, and an underground continuous wall and a prefabricated pile serve as temporary enclosure components and also serve as permanent vertical supporting components; and only a simple template needs to be erected, and after the top plate is mounted, the covering soil is backfilled to restore the road surface, so that the construction period is greatly shortened, and the influence of construction on urban traffic and environment is reduced to the minimum.
Owner:EAST CHINA JIAOTONG UNIVERSITY

Hybrid fiber reinforced ultrahigh-performance geopolymer concrete as well as preparation method and application thereof

The invention relates to hybrid fiber reinforced ultrahigh-performance geopolymer concrete as well as a preparation method and application thereof. Slag, metakaolin and silica fume are used as precursor materials of geopolymer concrete, a sodium hydroxide-water glass solution is adopted to compound an alkali activator, and steel fibers, polyvinyl alcohol fibers and modified glass chopped fibers of different sizes are mixed and doped, so that the brittleness of the geopolymer concrete is remarkably improved, and the service life of the geopolymer concrete is prolonged. The early strength and the high temperature resistance are improved. The hybrid fiber reinforced ultrahigh-performance geopolymer concrete has the characteristics of low carbon emission, ultrahigh strength, high temperature resistance, high durability and the like, and can meet the use of the geopolymer concrete in actual engineering. According to the ultrahigh-performance geopolymer concrete, solid waste resources are utilized at the same time, carbon emission in the concrete production process is reduced, and the ultrahigh-performance geopolymer concrete is environmentally friendly, low in carbon, ultrahigh in strength, easy to prepare and capable of being suitable for complex environmental engineering structures such as tunnels, bridges and high-rise buildings.
Owner:TONGJI UNIV

Advanced water stop post-cast strip structure of underground building bottom plate and construction method of advanced water stop post-cast strip structure

The invention discloses an underground building bottom plate advanced water stop post-cast strip structure which comprises a cushion layer concrete layer, other waterproof layers are arranged on the cushion layer concrete layer, and waterproof layer protection layers are arranged on the other waterproof layers. An earthwork groove is formed in the cushion layer concrete layer, same-bottom-plate steel bar layers are arranged on the two sides of the earthwork groove, and a waterproof assembly used for preventing water is arranged between the same-bottom-plate steel bar layers. A bottom plate bottom layer steel bar layer is arranged at the upper end of the same bottom plate steel bar layer, and two mud blocking assemblies are installed on the bottom plate bottom layer steel bar layer. A post-cast strip groove is formed between the two lower fast-easy closing-in nets and the two upper fast-easy closing-in nets, and a supporting part used for supporting is arranged in the post-cast strip groove. The lower fast and easy closing-in net and the upper fast and easy closing-in net can be supported, the stability of the lower fast and easy closing-in net and the stability of the upper fast and easy closing-in net can be improved during bottom plate concrete pouring, and then the stability of the overall structure is improved.
Owner:CHINA MCC17 GRP CO LTD

Lifting sliding type shock insulation groove cover plate structure and using method thereof

The invention discloses a lifting sliding type shock insulation groove cover plate structure and a using method thereof.In an earthquake, a shock insulation device impacts the lower end of a first rod body and the front end of an optical axis, the lower end of the first rod body is pushed, and the first rod body and the optical axis synchronously move in the direction of a circular through hole of a fixed linear bearing and a circular through hole of a fixed frame; an X-shaped frame of the cross lifting mechanism is gradually changed into a small angle from a large angle, and drives an upper cover plate to be lifted upwards without being separated from an optical axis, so that the required displacement space of the seismic isolation device under the action of seismic force is realized; a displacement space is provided, and meanwhile, the cover plate is ensured not to fall into the shock isolation groove, so that the normal function of the shock isolation device is not influenced; according to the earthquake isolation groove, the use requirement of daily bearing can be met, the structure can be kept intact and not damaged after an earthquake occurs, repeated use is achieved after the earthquake isolation groove is reset manually, and the risk that the earthquake isolation groove falls into the earthquake isolation groove is avoided.
Owner:CHINA AVIATION PLANNING AND DESIGN INSTITUTE (GROUP) CO LTD

Gallery-cabin connection and design method of pipe gallery type seabed data center

The invention provides a gallery-cabin connection and design method of a pipe gallery type seabed data center, and is suitable for the field of underwater data center construction. The gallery-cabin connection comprises an underwater suspension pipe gallery and a seabed data cabin, an airtight door is arranged on the side face of the underwater suspension pipe gallery, a section of connecting channel extends out of the airtight door, and the connecting channel is provided with a drainage channel and an air pressure balance channel to be connected with the underwater suspension pipe gallery. The channel is connected with the seabed data cabin through a rubber waterstop, and a humidity sensor is arranged in the channel; through a back-and-forth channel communicated between the underwater suspension pipe gallery and the seabed data cabin, the convenience requirements of personnel entering the seabed data cabin through the underwater suspension pipe gallery for overhauling, replacement, maintenance and capacity expansion can be met; through a pressure balance valve and a humidity sensor, the safety of personnel and a server in the opening process of the cabin door of the seabed data cabin is ensured; and meanwhile, through a detachable connection mode, the characteristic that the seabed data cabin integrated module can be subjected to structural maintenance after being detached is reserved.
Owner:CCCC FOURTH HARBOR ENG INST CO LTD +1

Construction method of anti-typhoon sea wave sea-crossing steel trestle and platform adjacent to residential building

The invention relates to a construction method of an anti-typhoon sea wave sea-crossing steel trestle and platform adjacent to a residential building. The construction method comprises the steps that firstly, deep fusion application of BIM and VR is conducted; step 2, surveying and setting out; step 3, embedding steel bars and pouring strip-shaped concrete; fourthly, the steel pipe piles are transported and lengthened; fifthly, steel pipe piles are driven; sixthly, parallel connection and diagonal bridging construction is conducted; seventhly, bearing beams are installed; eighthly, longitudinal beams are installed; ninthly, the distribution beams are installed; tenthly, bridge deck slabs and guardrails are installed; and 11, an intelligent monitoring and early warning system.
Owner:SHANGHAI BAOYE GRP CORP

A cave-type data center built based on an underground river, and its construction method and operation method

The present invention discloses a cave-type data center constructed based on an underground river, as well as its construction method and operation method, belonging to the technical field of cave-type data center construction. The data center includes a mountain body, in which an underground river is developed, and the underground river flows through a karst cave in the mountain body. On one side or both sides of the underground river in the mountain body, a number of equipment storage tunnels are provided. The number of the equipment storage tunnels are respectively connected to the karst cave through a slope connecting tunnel. An equipment cabinet and a liquid heat exchanger are arranged in the equipment storage tunnel. A river water conveying assembly is connected to the liquid heat exchanger. One end of the river water conveying assembly far away from the liquid heat exchanger passes through the slope connecting tunnel and extends into the underground river. The liquid cooling method is used to cool and dissipate heat from the equipment cabinet. This direct temperature control method significantly improves the heat dissipation and cooling effect on the IT equipment cabinet. At the same time, the heat exchange efficiency is high, and the operation energy consumption of the data center can be reduced.
Owner:GUIZHOU TRANSPORTATION PLANNING SURVEY & DESIGN ACADEME

Deviation rectification construction method for large press-in type rectangular open caisson structure

The invention belongs to the technical field of open caisson construction, and particularly discloses a large press-in type rectangular open caisson structure deviation rectifying construction method which comprises the steps that a plurality of monitoring points are arranged on the two long side portions of a rectangular open caisson; the rectangular open caisson continuously sinks into the side sinking channel; acquiring an elevation value between each monitoring point and the port of the side sinking channel in real time; whether the rectangular open caisson needs to be rectified at the current moment or not is judged according to the difference value of the elevation values between the monitoring points; respectively drawing elevation curves of the two long side parts according to the elevation value at the current moment; according to the elevation curve, determining the adjustment amount required for correcting the rectangular open caisson, adjusting the postures of the two long side parts through the adjustment amount, and updating the elevation curve in real time; the method has the following advantages that accurate control over the rectangular open caisson is achieved through real-time monitoring and deviation rectification in the sinking process, the method adapts to complex projects such as underground stations and pipe galleries, the construction efficiency is improved, manual dependence is reduced, meanwhile, the urban environment is effectively protected, and surrounding influences are relieved.
Owner:SHANGHAI URBAN CONSTRUCTION DESIGN & RESEARCH INSTITUTE (GROUP) CO LTD

Immersed tube tunnel underwater slope protection silting prevention system and construction method thereof

The invention provides an immersed tube tunnel underwater slope protection silting prevention system and a construction method thereof.The immersed tube tunnel underwater slope protection silting prevention system comprises a foundation trench, a side slope is arranged in the foundation trench, the immersed tube tunnel underwater slope protection silting prevention system comprises a plurality of blocking units, each blocking unit comprises a silting prevention plate and a plurality of limiting pipes, and the limiting pipes are arranged on the side slope. The silt prevention plate is laid on the side slope, a plurality of accumulation channels penetrating in the vertical direction are formed in the silt prevention plate, and the accumulation channels are used for collecting silt; the multiple limiting pipes are inserted into the side slope in the vertical direction and connected with the silt prevention plate. According to the immersed tube tunnel underwater slope protection siltation prevention system, silt in water flow is intercepted through the accumulation channel on the siltation prevention plate, when the silt falls onto the siltation prevention plate, the silt can be deposited in the accumulation channel, the deposited silt and a soil body embedded in the accumulation channel are fused into a whole, the siltation prevention plate can be reversely fixed, the stability of a side slope is protected, and the service life of the side slope is prolonged. The sludge utilization rate is improved.
Owner:CHINA RAILWAY TUNNEL GROUP CO LTD +3

Retaining wall systems

A retaining wall system includes at least one wall block, at least one ground-stabilizing base body supporting the at least one wall block, a fastening body under the at least one ground-stabilizing base body, and at least one tension link attached to the at least one wall block and to the fastening body.
Owner:MCINTOSH ROBERT GORDON

Interlocking ecological frame retaining wall and construction method

The invention discloses a chain ecological sash retaining wall and a construction method, the chain ecological sash retaining wall comprises a wall body with an inner cavity, the two sides of the wall body are provided with a first concave structure and a second concave structure, the middle of the first concave structure is provided with a first connecting lug which is horizontally arranged, and the middle of the second concave structure is provided with a second connecting lug which is horizontally arranged; vertical connecting holes are formed in the middle of the first connecting lug and the middle of the second connecting lug, connecting rod bodies are installed in the vertical connecting holes, a plant growing groove is formed in the front side of the wall body, and the plant growing groove is communicated with the interior of the wall body. Gridding cloth is arranged on the inner wall of the plant growth groove. The side portions of the wall bodies are arranged in an inward-concave mode, the connecting lugs are matched with the inward-concave structures, the two adjacent wall bodies are connected and fixed through the connecting rod pieces, the wall bodies can be filled with broken stones, meanwhile, the plant growing grooves are formed in the bottoms of the wall bodies, and green plant growing platforms are provided through the plant growing grooves.
Owner:CHINA MCC17 GRP CO LTD

Comprehensive pipe gallery monitoring and early warning analysis method based on multimode sensing fusion reasoning

The invention discloses a comprehensive pipe gallery monitoring and early warning analysis method based on multimode sensing fusion reasoning, relates to the technical field of comprehensive pipe gallery monitoring and early warning, and solves the technical problem that in the prior art, only the risk at the current moment is processed, the potential chain reaction of the risk is ignored, and the risk is spread. According to the method, risk event evolution chains are constructed through development nodes of risk events, and a comprehensive pipe gallery risk evolution network is constructed according to overlapped nodes and index description sets of the risk event evolution chains; the early warning state score of the comprehensive pipe gallery is analyzed; analyzing an early warning consequence score of the comprehensive pipe gallery according to the consequence score of the risk event corresponding to the alarm node; based on the early warning state score and the early warning consequence score, the early warning grade of the comprehensive pipe gallery is analyzed; according to the invention, through the comprehensive pipe gallery risk evolution network, potential risk chain reactions are predicted in advance, and early warning is carried out in time.
Owner:HEFEI ZEZHONG CITY INTELLIGENT TECH CO LTD

Mechanically Stabilized Earth (MSE) Retaining Wall Employing Reinforcement Rods

Disclosed are embodiments of a mechanically stabilized earth (MSE) retaining wall that employs one or more reinforcement rods, such as rebar, and that can be produced with inexpensive, widely available parts. A concrete panel is provided. A steel embed is provided with an embed loop and with first and second outwardly extending stems having aligned embed apertures. The loop is secured within the concrete panel. A steel reinforcement rod is provided with a generally cylindrical elongated body with first and second ends. The first end resides within backfill soil, and the second end has a rod loop, preferably created by reshaping the end of the reinforcement rod. A steel fastener extends through the embed apertures and the rod loop to thereby secure together the reinforcement rod and the embed.
Owner:EARTH WALL PRODUCTS LLC