Garden system and construction method thereof
Through the combination of prefabricated pile plates and steel cages, the problems of long construction cycle and construction quality of existing garden systems are solved, and rapid and stable pool construction and efficient waterproofing performance are achieved.
Patent Information
- Application Number
- CN202411264222.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-11-08
AI Technical Summary
The construction of landscape pools in the existing garden system requires the excavation of the base, slope protection, reinforcement mesh binding, formwork installation, concrete pouring and other steps, resulting in a long construction cycle and a lot of interference from external factors such as weather, which affects the construction quality, especially when the construction period is tight. Construction quality is difficult to guarantee.
Prefabricated rectangular flat-panel pile plates are used as the positioning piles for the pool, and the soil layer is pressed into the static press, combined with the side plate and the bottom plate to form a continuous pool wall, a waterproof layer and a sewage pump are installed, and concrete is poured with steel cages to avoid large excavation solutions. , improve construction efficiency and waterproof performance.
Accelerate the construction progress through prefabricated pile plates, reduce assembly costs, improve construction quality and waterproof performance, ensure the stability and use performance of the pool structure, reduce water leakage, and facilitate cleaning.
Smart Images

Figure CN118911268A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of garden construction, in particular to a garden system and a construction method thereof. Background Art
[0002] In the landscape design of the garden system, the pool landscape is still the most important part of the landscape design. On the one hand, the pool landscape can improve the climate conditions in a small area, regulate temperature and humidity, etc. On the other hand, it can liven up the space atmosphere and add interest to the space. Water can reduce dust in the air, increase air humidity, and reduce air temperature. The introduction of water, no matter what form, has a cooling effect both physiologically and psychologically.
[0003] When constructing landscape pools in existing garden systems, most of them are built on-site after the design drawings are completed. They must go through steps such as base excavation, slope protection, steel mesh binding, formwork installation, concrete pouring, and earth backfilling. Not only is the construction period long, but it is also affected by many external factors such as weather. When the construction period is very strict, once the construction period is tight, traditional technology will be greatly restricted, affecting the construction quality. Summary of the invention
[0004] In order to overcome the technical defects of the prior art, the present invention provides a garden system and a construction method thereof to solve the problem that the landscape pool of the existing garden system needs to be built on site, and must go through the steps of base excavation, slope protection, steel mesh binding, formwork installation, concrete pouring, earth backfilling, etc., which not only has a long construction period, but is also subject to many interferences from external factors such as weather. When the construction period is very strict, once the construction period is tight, the traditional process will be greatly restricted, affecting the construction quality.
[0005] The technical solution adopted by the present invention is: a garden system, including vegetation, roads and a pool, the pool including a plurality of pile plates, side plates and a bottom plate connected to each other, the pile plate is a prefabricated rectangular flat plate, the bottom end of the pile plate is a conical structure and the length is greater than the side plate, the pile plate and the side plate are cross-arranged, and the side plate and the bottom plate are both cast-in-place plates; a first groove is opened in the center of the length direction on both sides of the pile plate, a first steel bar and a second steel bar are arranged on the pile plate, and the first steel bar is located inside the first groove.
[0006] Preferably, a waterproof layer is provided on one side of the pile plate, the side plate and the bottom plate, and the bottom plate is a funnel-shaped structure inclined toward the middle with a slope of 2%.
[0007] Preferably, a sewage pump is installed in the middle of the inner bottom wall of the bottom plate, and the output end of the sewage pump is fixedly connected to a sewage pipe, and the other end of the sewage pipe is located outside the pool.
[0008] Preferably, a reinforcing rib is fixedly connected to the outer side of the pile plate, and the number of the reinforcing ribs is two and the reinforcing ribs are integrally formed with the pile plate.
[0009] Preferably, the pile plates at the four corners of the pool are of a 45° structure, and two adjacent pile plates fit each other.
[0010] Preferably, the length of the pile plate is 1.5-.18 times the depth of the pool, and the pile plate is a reinforced concrete structure.
[0011] A method for constructing a garden system, the method comprising the following steps: Step 1: Design: Design the overall outline and depth of the pool as required, and design the number and length of the pile boards according to the overall outline and depth of the pool. Then prefabricate the pile boards in the factory and transport them to the construction site. Step 2: Pile pressing: Level the site of the construction site, locate and lay out the lines according to the overall outline, and then use a static press to press multiple pile plates into the soil layer, using multiple pile plates as positioning piles; Step 3: Excavation: excavate the soil in multiple pile boards, and after excavating to the second steel bar of the pile board, slope the bottom, and then remove the soil between the two pile boards. After supporting the formwork, pour concrete at one time to form the side plates and bottom plates to obtain a continuous pool wall; Step 4: Waterproofing: a leveling layer is arranged on the bottom plate, and then at least one layer of waterproofing membrane is arranged on the leveling layer, pile plate and side plate to obtain a waterproof pool.
[0012] Preferably, when pressing the piles, the pile plates at the four corners of the pool are pressed first, and then the pile plates at the four sides of the pool are pressed in sequence, so that the exposed lengths of multiple pile plates are the same, and the distance between two adjacent pile plates is 20-30 cm.
[0013] Preferably, after the soil is excavated, the accumulated water inside the foundation pit is pumped out and discharged, and the bottom layer is compacted with clay to perform leakage treatment.
[0014] Preferably, after the soil between the two pile plates is removed, it is rinsed clean to expose the first steel bars, the first steel bars on adjacent pile plates are butt-jointed, and then the second steel bars on multiple pile plates are butt-jointed, at this time a continuous steel cage is formed, and then a casting formwork is set, and then concrete is poured into the steel cage, and conventional maintenance is carried out, and after the poured concrete solidifies, the casting formwork is removed.
[0015] The beneficial effects of the present invention are: In the above scheme, prefabricated pile plates are used as positioning piles for the water pool. After being pressed into the ground, they not only serve as the inner wall of the water pool, but also support the excavated pit. Only the soil inside the positioning piles needs to be excavated to avoid the large excavation scheme of traditional construction, which can speed up the construction progress. In addition, the prefabricated pile plates are flat structures with strong versatility, easy to standardize and modularize production, and lower assembly costs. At the same time, during construction, steel cages are used to cast the bottom plate and two adjacent pile plates into a whole. Not only is the construction convenient, reliable and stable, but it can also achieve the same effect as cast-in-place, with better waterproof performance and improved construction quality.
[0016] In the above scheme, by reasonably designing the pile plate of the pool wall and setting a waterproof layer inside, the strength and anti-seepage performance of the connection positions of the pile plate, side plate and bottom plate can be guaranteed, and the performance of the pool structure can be guaranteed. By setting the length of the pile plate to be greater than that of the side plate, the pile plate will not only serve as the inner wall of the pool after being pressed into the ground, but also a part of the bottom of the pile plate will be located inside the soil after the soil inside the pile plate is excavated, which can provide stable supporting force and better support the excavated pit.
[0017] In the above scheme, the accumulated water in the foundation pit is pumped out and discharged after excavating the soil, and the bottom layer is compacted with clay and treated for leakage. This not only increases the waterproof performance, but also ensures better support for the bottom layer and reduces water leakage in the pool. By giving a 2% slope in the middle of the bottom plate, it is convenient to clean the bottom of the pool. When there is a lot of sludge at the bottom of the pool, the sewage pump is turned on. At this time, the sewage pump pumps the sludge out of the sewage pipe, which makes it easy to clean the pool and ensure the cleanliness of the water. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 A three-dimensional structural diagram of a pool of a garden system and a construction method thereof; Figure 2 A schematic diagram of the top view of a pool of a garden system and a construction method thereof; Figure 3 A schematic diagram of the structure of a pile board for a garden system and a construction method thereof; Figure 4 A schematic diagram of the cross-sectional structure of a pool of a garden system and a construction method thereof; Figure 5 For the garden system and its construction method Figure 3 Schematic diagram of the enlarged structure at point A in the middle.
[0019] Explanation of the accompanying drawings: 1. Pile plate; 2. Side plate; 3. Bottom plate; 4. First groove; 5. First steel bar; 6. Second steel bar; 7. Sewage pump; 8. Sewage pipe; 9. Reinforcing rib. DETAILED DESCRIPTION
[0020] The present invention will be further described below in conjunction with the accompanying drawings: like Figure 1-5 As shown, this embodiment provides a garden system, including vegetation, roads and pools. The pool includes a plurality of pile plates 1, side plates 2 and bottom plates 3 connected to each other. The pile plate 1 is a prefabricated rectangular flat plate. The bottom end of the pile plate 1 is a conical structure and is longer than the side plate 2. Since the prefabricated pile plate 1 is a flat plate structure, it has strong versatility, is convenient for standardized and modular production, and has lower assembly costs. The pile plate 1 and the side plate 2 are cross-arranged, and the side plate 2 and the bottom plate 3 are both cast-in-place plates. A first groove 4 is provided in the center of the length direction on both sides of the pile plate 1. A first steel bar 5 and a second steel bar 6 are provided on the pile plate 1. The first steel bar 5 is located inside the first groove 4. In this way, the bottom plate 3 and the two adjacent pile plates 1 can be cast into a whole. Not only is the construction convenient, reliable and stable, but it can also achieve the same effect as cast-in-place and has better waterproof performance.
[0021] like Figure 1 and Figure 4 As shown, in this embodiment, a waterproof layer is provided on one side of the pile plate 1, the side plate 2 and the bottom plate 3, and the bottom plate 3 is a funnel-shaped structure inclined toward the middle with a slope of 2%.
[0022] This arrangement can ensure the anti-seepage performance between the pile plate 1, the side plate 2 and the bottom plate 3, and ensure the reliability of the water pool structure. The middle part of the bottom plate 3 is sloped by 2%, which is convenient for cleaning the bottom of the water pool.
[0023] like Figure 1 and Figure 4 As shown, in this embodiment, a sewage pump 7 is installed in the middle of the inner bottom wall of the bottom plate 3, and the output end of the sewage pump 7 is fixedly connected to a sewage pipe 8, and the other end of the sewage pipe 8 is located outside the pool.
[0024] In this way, when there is a lot of sludge at the bottom of the pool, the sewage pump 7 is turned on, and the sewage pump 7 draws the sludge out of the sewage pipe 8, so that the pool can be cleaned easily and the water body can be kept clean.
[0025] like Figure 3 and Figure 5 As shown, in this embodiment, a reinforcing rib 9 is fixedly connected to the outer side of the pile plate 1 . The number of the reinforcing ribs 9 is two and they are integrally formed with the pile plate 1 .
[0026] The pile plate 1 is set as a positioning pile of the water pool. After being pressed into the ground, it not only serves as the inner wall of the water pool, but the reinforcing ribs 9 on the pile plate 1 can increase the friction between the pile plate 1 and the soil to prevent movement. At the same time, the reinforcing ribs 9 improve the overall strength and can better support the excavated pit.
[0027] like Figure 1 and Figure 2As shown, in this embodiment, the pile plates 1 at the four corners of the pool are of a 45° structure, and two adjacent pile plates 1 fit each other.
[0028] In this way, the prefabricated pile plates 1 are used as positioning piles for the pool, and the pile plates 1 at the four corners fit together to provide better support.
[0029] like Figure 1 and Figure 3 As shown, in this embodiment, the length of the pile plate 1 is 1.5-1.8 times the depth of the pool, and the pile plate 1 is a reinforced concrete structure.
[0030] After the pile plate 1 is pressed into the ground in this way, it not only serves as the inner wall of the pool, but also a part of the bottom of the pile plate 1 will be located inside the soil after the soil inside the pile plate 1 is excavated. It can not only provide stable supporting force, but also the positioning of the pile plate 1 will not affect the excavation of the soil.
[0031] A method for constructing a garden system, the method comprising the following steps: Step 1, design: design the overall outline and depth of the pool as required, and design the number and length of the pile plates 1 according to the overall outline and depth of the pool, then prefabricate the pile plates 1 in the factory and transport them to the construction site; Step 2: Pile pressing: Level the site of the construction site, position and lay out the lines according to the overall outline, and then use a static press to press multiple pile plates 1 into the soil layer, using the multiple pile plates 1 as positioning piles; Step 3, excavation: excavate the soil in the multiple pile boards 1, and after excavating to the second steel bar 6 of the pile board 1, slope the bottom, and then remove the soil between the two pile boards 1. After supporting the formwork, cast the concrete once to form the side board 2 and the bottom board 3 to obtain a continuous pool wall; Step 4: Waterproofing: a leveling layer is arranged on the bottom plate 3, and then at least one layer of waterproofing membrane is arranged on the leveling layer, the pile plate 1 and the side plate 2 to obtain a waterproof pool.
[0032] In this way, the prefabricated pile plate 1 is used as the positioning pile of the water pool. After being pressed into the ground, it not only serves as the inner wall of the water pool, but also supports the excavated pit. Only the soil inside the positioning pile needs to be excavated, avoiding the large excavation plan of traditional construction. In addition, there is no need to backfill after the formwork concrete is poured, which can speed up the construction progress.
[0033] like Figure 1 and Figure 2 As shown, in this embodiment, when pressing the piles, the pile plates 1 at the four corners of the pool are first pressed, and then the pile plates 1 at the four sides of the pool are pressed in turn, so that the exposed lengths of multiple pile plates are the same, and the distance between two adjacent pile plates 1 is 20-30 cm.
[0034] This arrangement ensures that the second steel bars 6 on the pile plates 1 are located on the same horizontal plane. The distance between the two pile plates 1 is 20-30 cm, which will not cause soil collapse. The distance between the two pile plates 1 can be increased or shortened according to the supporting force of the soil.
[0035] In this embodiment, after excavating the soil, the accumulated water inside the foundation pit is pumped out and discharged, and the bottom layer is compacted with clay to treat leakage.
[0036] This arrangement increases the waterproofing properties of the compacted clay, while also ensuring better support for the bottom layer and reducing water leakage from the pool.
[0037] like Figure 1 and Figure 3 As shown, in this embodiment, the soil between the two pile plates 1 is removed and rinsed to expose the first steel bars 5, the first steel bars 5 on adjacent pile plates 1 are connected, and then the second steel bars 6 on multiple pile plates 1 are connected. At this time, a continuous steel cage is formed, and then a casting template is set, and then concrete is poured into the steel cage, and conventional maintenance is carried out. After the poured concrete solidifies, the casting template is removed.
[0038] Setting the soil as part of the formwork is not only convenient, reliable and stable in construction, but also uses a steel cage to cast the bottom plate 3 and two adjacent pile plates 1 into a whole during construction, which can achieve the same effect as cast-in-place and has better waterproof performance.
[0039] The technical solution provided by the present invention uses the prefabricated pile plate 1 as the positioning pile of the water pool. After being pressed into the ground, it not only serves as the inner wall of the water pool, but also supports the excavated earth pit. Only the soil inside the positioning pile needs to be excavated, avoiding the large excavation scheme of traditional construction, which can speed up the construction progress. The prefabricated pile plate 1 is a flat plate structure with strong versatility, convenient for standardized and modular production, and lower assembly cost. At the same time, a steel cage is used during construction to cast the bottom plate 3 and two adjacent pile plates 1 into a whole, which is not only convenient to construct, reliable and stable, but also can achieve the same effect as cast-in-place concrete. The effect is achieved, the waterproof performance is better, and the construction quality is improved. By reasonably designing the pile plate 1 of the pool wall and arranging a waterproof layer inside, the strength and anti-seepage performance of the connection position of the pile plate 1, the side plate 2 and the bottom plate 3 can be guaranteed, and the performance of the pool structure can be guaranteed. By setting the pile plate 1 to be longer than the side plate 2, the pile plate 1 is pressed into the ground and not only serves as the inner wall of the pool, but also a part of the bottom of the pile plate 1 will be located inside the soil after the soil inside the pile plate 1 is excavated, which can provide stable supporting force and better support the excavated pit.
[0040] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for illustrating the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which shall fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A garden system, characterized in that: The invention comprises vegetation, a road and a pool, wherein the pool comprises a plurality of pile plates (1), side plates (2) and a bottom plate (3) which are connected to each other, wherein the pile plate (1) is a prefabricated rectangular flat plate, the bottom end of the pile plate (1) is a conical structure and is longer than the side plate (2), the pile plate (1) and the side plate (2) are arranged crosswise, and the side plate (2) and the bottom plate (3) are both cast-in-place plates; Both sides of the pile plate (1) are provided with a first groove (4) centered along the length direction. The pile plate (1) is provided with a first steel bar (5) and a second steel bar (6). The first steel bar (5) is located inside the first groove (4).
2. The garden system according to claim 1, characterized in that: A waterproof layer is provided on one side of the pile plate (1), the side plate (2) and the bottom plate (3); the bottom plate (3) is a funnel-shaped structure inclined toward the middle with a slope of 2%.
3. The garden system according to claim 2, characterized in that: A sewage pump (7) is installed in the middle of the inner bottom wall of the bottom plate (3); the output end of the sewage pump (7) is fixedly connected to a sewage pipe (8); the other end of the sewage pipe (8) is located outside the pool.
4. The garden system according to claim 3, characterized in that: The outer side of the pile plate (1) is fixedly connected with a reinforcing rib (9), and the number of the reinforcing ribs (9) is two and they are integrally formed with the pile plate (1).
5. The garden system according to claim 4, characterized in that: The pile plates (1) at the four corners of the pool are of a 45° structure, and two adjacent pile plates (1) fit each other.
6. The garden system according to claim 5, characterized in that: The length of the pile plate (1) is 1.5-1.8 times the depth of the pool, and the pile plate (1) is a reinforced concrete structure.
7. A method for constructing a garden system according to any one of claims 1 to 6, characterized in that: The construction method comprises the following steps: Step 1, design: design the overall profile and depth of the pool as required, and design the number and length of the pile plates (1) according to the overall profile and depth of the pool, then prefabricate the pile plates (1) in a factory and transport them to the construction site; Step 2: Pile pressing: the site of the construction site is leveled, and the positioning is carried out according to the overall contour, and then a static press is used to press a plurality of pile plates (1) into the soil layer, and the plurality of pile plates (1) are used as positioning piles; Step 3, excavation: excavating soil within the plurality of pile plates (1), and after excavating to the second steel bar (6) of the pile plate (1), the bottom is sloped, and then the soil between the two pile plates (1) is removed, and after supporting the formwork, the side plates (2) and the bottom plate (3) are cast in one step by concrete to obtain a continuous pool wall; Step 4: Waterproofing: a leveling layer is provided on the bottom plate (3), and then at least one layer of waterproofing membrane is provided on the leveling layer, the pile plate (1) and the side plate (2) to obtain a waterproof pool.
8. The method for constructing a garden system according to claim 7, characterized in that: When pressing the piles, the pile plates (1) at the four corners of the pool are first pressed in, and then the pile plates (1) at the four sides of the pool are pressed in sequence, so that the exposed lengths of the multiple pile plates are the same, and the distance between two adjacent pile plates (1) is 20-30 cm.
9. The method for constructing a garden system according to claim 7, characterized in that: After the soil is excavated, the accumulated water inside the foundation pit is pumped out and discharged, and the bottom layer is compacted with clay to treat leakage.
10. The method for constructing a garden system according to claim 7, characterized in that: After the soil between the two pile plates (1) is removed, it is rinsed clean to expose the first steel bars (5), the first steel bars (5) on adjacent pile plates (1) are butt-jointed, and then the second steel bars (6) on a plurality of pile plates (1) are butt-jointed, thereby forming a continuous steel cage. A casting template is then set, and concrete is then cast into the steel cage. Conventional curing is performed, and after the cast concrete solidifies, the casting template is removed.
Citation Information
Cited By
Intelligent anti-seepage plate capable of being monitored for long time and intelligent anti-seepage wall
CN119877517A
Intelligent anti-seepage plate and intelligent anti-seepage wall capable of long-term monitoring
CN119877517B
Construction method of dam composite flexible diaphragm wall
CN119877616A
Construction method of composite flexible anti-seepage wall of embankment
CN119877616B