Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

8306results about "Towers" patented technology

Movable stand for umbrella and related methods

A stand is for moving an umbrella on a surface. The stand includes a base assembly to receive the umbrella and being over the surface, and arms. Each arm has a proximal end coupled to the base assembly, and a distal end extending outwardly from the base assembly. The stand also includes wheels respectively coupled to the distal ends of the arms, and supports coupled to the base assembly and extending outwardly from the base assembly, each of the supports has a pivot point for a respective one of the arms. The stand includes an actuator assembly coupled to the base assembly and configured to cause the base assembly to switch between a first stationary state and a second movable state.
Owner:ATLEISURE

Anti-shaking type tension cross arm for electric power

The invention discloses an electric anti-shaking tension-resistant cross arm and relates to the technical field of cross arms. The two ends of a double-thread screw are connected with combined rod assemblies, the two ends of a middle rod are welded with inner reinforcing pipes, a drainage hole is formed in the end, close to the middle rod, of a drainage groove, the outer sides of the inner reinforcing pipes are sleeved with glass fiber reinforced plastic outer pipes, and a lead screw is rotationally installed in the middle of a fixed end block in a penetrating mode; according to the invention, when the cable shakes and pulls the end plate, the connecting screw rod shakes in a small amplitude in the displacement hole, the reset spring deforms, and the vibration of the cable is absorbed in cooperation with the glass cement filled between the inner reinforcing pipe and the glass fiber reinforced plastic outer pipe; and the middle rod, the inner reinforcing pipe and the double-thread screw are combined to form a frame structure similar to a # shape, so that the frame structure cannot shake and is kept stable, the situation that the whole cross arm is shaken due to shaking of the cable is prevented, friction loss at the joint of the cross arm and the telegraph pole is reduced, and the service life of the cross arm is prolonged.
Owner:HEBEI ZHUOCHANG ELECTRIC GROUP CO LTD

Drilling and pole erecting comprehensive operation vehicle

The invention provides a drilling and pole erecting comprehensive operation vehicle which comprises a chassis, a vehicle body platform, a pole holding device, a drilling device, a tire walking mechanism and a crawler walking mechanism, the vehicle body platform is arranged on the chassis, and the pole holding device and the drilling device are arranged on the vehicle body platform. The drilling device is used for drilling the ground, and the pole holding device is used for clamping a telegraph pole and then placing the telegraph pole in a telegraph pole hole in the ground. The tire walking mechanism and the crawler walking mechanism are both arranged on the chassis, the tire walking mechanism comprises two swing frames and walking wheels, the two swing frames are used for being connected with the front side and the rear side of the chassis respectively, the walking wheels are arranged on the two swing frames, and a switching oil cylinder is arranged between the chassis and the swing frames. The switching oil cylinder is used for driving the walking wheels to be away from the ground or supported on the ground. According to the electric pole drilling and erecting device, the quality and efficiency of electric pole drilling and erecting operation can be effectively improved.
Owner:XUZHOU HANDLER SPECIAL VEHICLE

Steel plate built-up post, assembly method for steel plate built-up post

PendingJP2024143165ATowersWeld seamPipe
To provide a steel plate built-up post capable of improving workability after assembling it, and an assembly method for the steel plate built-up post.SOLUTION: A steel plate built-up post 100 is built by vertically jointing multiple steel pipes 1, each of which is a right truncated taper-shape cone with its diameter increasing as the level going down. The steel plate built-up post 100 is characterized that: it comprises multiple steel pipes 1, each of which has a weld seam 11 that slants to the circumferential direction f1 as the level goes down; and the weld seam 11D of an upper steel pipe 1D is, in the jointing area R where the pipe is jointed with the lower steel pipe 1E, located in the circumferential direction f1 side of the weld seam 11E of the lower steel pipe 1E. The weld seam 11D of the upper steel pipe 1D may slant at an angle that corresponds to the width of the weld seam 11E of the steel pipe 1E.SELECTED DRAWING: Figure 2
Owner:NIPPON STEEL METAL PROD CO LTD

Beach sunshade canopy

ActiveUS12264491B1Tents/canopiesTowers
This application relates to beach sunshades, particularly a beach sunshade canopy. It addresses prior issues where canopies were unstable in sand, prone to tilting, and difficult to secure and retract, resulting in a poor user experience. The solution includes a support pillar with a spiral fixing base at the bottom. A through hole on the side of the pillar contains a rotating shaft, to which an installation rod is fixed. The rod connects to a first arc-shaped plate at the bottom and a second arc-shaped plate at the top. Two opposing slots are provided at both ends of the through hole. This design ensures the canopy remains stable, preventing tilting and allowing for easy securing and retraction, enhancing the user experience.
Owner:ZENG XIANRUI

Anti-freezing electric transmission line tower supporting foundation suitable for frozen earth area

The invention discloses an anti-freezing power transmission line tower supporting foundation suitable for a frozen soil area, relates to the technical field of power transmission line tower supporting, and aims to solve the problem that an existing power transmission line tower supporting foundation cannot resist freezing and cannot keep supporting efficiency under season replacement. Comprising a pile foundation cylinder, a pile foundation cylinder inner supporting column, an arc-shaped heat conduction pipe and a frost heaving piercing mechanism. A pile foundation cylinder top seat and a power transmission line tower connecting frame are mounted at the top of the pile foundation cylinder; the pile foundation cylinder inner supporting column is embedded in the pile foundation cylinder, circulating flow channels are designed between the pile foundation cylinder inner supporting column and the pile foundation cylinder and between the pile foundation cylinder inner supporting column and the arc-shaped heat conduction pipe, and an equipment mounting inner cavity is formed in the top of the pile foundation cylinder inner supporting column. When the soil body is subjected to frost heaving, the transverse anchor rods can pierce into the surrounding soil body, so that the pile foundation cylinder and the surrounding soil body are anchored together, and the frost heaving is further resisted.
Owner:HEILONGJIANG ELECTRIC POWER SCIENCE RESEARCH INSTITUTE +4

Steel plate built-up post, assembly method for steel plate built-up post

To provide a steel plate built-up post capable of securely improving rigidity of the steel plate built-up post, and an assembly method for the steel plate built-up post.SOLUTION: A steel plate built-up post 100 is built by vertically jointing multiple steel pipes 1, each of which is a right truncated taper-shape cone with its diameter increasing as the level going down. The steel plate built-up post 100 is characterized by comprising: an upper first steel pipe 10; and a lower second steel pipe 20 that is jointed to the bottom of the upper first steel pipe 10 having its diameter increased in a taper rate higher than that of the upper first steel pipe 10. The taper rate of the lower second steel pipe 20 is greater than the taper rate of the upper first steel pipe 10 by 0% plus to 7%. To be assembled, the first steel pipe 10 and the second steel pipe 20 are fist made contact each other by the second steel pipe 20 being inserted into the bottom part of the first steel pipe 10, then the first steel pipe 10 is pushed downward for the jointing.SELECTED DRAWING: Figure 2
Owner:NIPPON STEEL METAL PROD CO LTD

Method for constructing a ribbed foundation for wind turbines and ribbed foundation obtained

Disclosed is a method comprising: placing a central steel ferrule (2) on a central reinforcement mesh (1); installing around the central ferrule (2) a central assembly (3) and prefabricated pieces (4, 5) comprising a concrete beam (4) and a steel strut (5); assembling (61) sections between the bases (43) of the beams (4), and filling in (62) the central assembly (3); installing formwork (71, 72, 73) around the central assembly (3), the infill (62) and the outer perimeter; and obtaining, by means of simultaneous concreting, a monolithic concrete foundation (10) in which the ends of the struts are embedded, thus forming the ribbed foundation.
Owner:INGECID INVESTIGACION Y DESARROLLO DE PROYECTOS SL

Prestress reinforcing device for newly-built concrete pole

The invention relates to a newly-built concrete electric pole prestress reinforcing device, and belongs to the technical field of power transmission line engineering, the newly-built concrete electric pole prestress reinforcing device comprises an electric pole body, a prestress assembly is installed on the electric pole body, the prestress assembly comprises a connecting hoop and an adjusting assembly, and the connecting hoop is installed at the top end of the adjusting assembly; the adjusting assembly comprises four hinge rods which are sequentially connected end to end to form a parallelogram structure and arranged outside the electric pole body in a sleeving mode, a hinge piece is installed at the connecting position of any two connected hinge rods, and the ends of the hinge rods and the hinge pieces are installed in a hinged mode. A pair of pulleys installed on the electric pole body is further arranged between the connecting hoop and the adjusting assembly, the two U-shaped connecting blocks are both connected with steel twisted ropes, and the free ends of the steel twisted ropes penetrate through the through holes, bypass the pulleys and then are fixedly connected with the connecting hoop. Tensioning and applying of prestress can be achieved, the strength and the anti-overturning capacity of the concrete electric pole are effectively improved, and the service life of the concrete electric pole is effectively prolonged.
Owner:STATE GRID FUJIAN POWER ELECTRIC CO ECONOMIC RESEARCH INSTITUTE +1

Expanding foundation system and method

A foundation system for supporting a structure may include a main post, a racking post, and a barb assembly. The main post may include an upper section and a lower section below the upper section. The racking post may be telescopically connected to the upper section of the main post. The barb assembly may be connected to the lower section of the main post. The barb assembly may be configured to move from an unexpanded state to an expanded state, thereby forming a wedge shape at a lower section of the main post.
Owner:APA SOLAR LLC

Method for replacing web members of steel towers and device for replacing web members

To provide a method for replacing web members of steel towers and a device for replacing web members of steel towers that can reinforce the range of web member replacement and replace the web members even when the work for replacing web members of steel towers takes several days or the stress borne by reinforcement materials is large.SOLUTION: A device for replacing web members of steel towers comprises upper and lower horizontal reinforcement members that are attached between main pillar members near above and below the range of web member replacement; and temporary reinforcement members that are attached to be inclined from a fixing point of the upper horizontal reinforcement member of one main pillar member to a fixing point of the lower horizontal reinforcement member of the other main pillar member, the temporary reinforcement member is divided into first and second temporary members, the first and second temporary members are arranged with flange joints provided at one end facing each other with a predetermined gap, and the flange joints are connected with connecting bolts to introduce a predetermined axial stress into the first and second temporary members according to the amount of fastening, and an adjustment plate is inserted between the flange joints and fixed with fastening parts.SELECTED DRAWING: Figure 1
Owner:DENRO CORP

UHPC-based wind turbine tower with ground anchor strands, and construction method therefor

Disclosed in the present invention is a UHPC-based wind turbine tower with ground anchor strands. The wind turbine tower comprises a plurality of layers of UHPC tower column sections, which are stacked one on top of another, wherein upper and lower adjacent UHPC tower column sections are connected to each other by means of a tower column transition section; each UHPC tower column section comprises a plurality of UHPC tower column units; the tower column transition section comprises a plurality of UHPC transition sections and a plurality of transverse linkage members; and upper and lower adjacent UHPC tower column units are connected by means of each UHPC transition section. The wind turbine tower further comprises a plurality of prestressed ground anchor strands. Further provided in the present invention is a construction method for the wind turbine tower with ground anchor strands. In a wind turbine tower structure in the present invention, under the action of the ground anchor strands, a UHPC tower column is in a relatively high pressure stress state, such that the advantage of high compressive strength of UHPC can be exploited to the full, thereby improving the performance of the UHPC tower column under stress. A frame-type tower column structure using the UHPC as a main body material has higher rigidity and wind-resistant stability, a low dead weight, a possibly greater height, and good fatigue resistance and durability.
Owner:HUNAN UNIV

Anti-cracking and anti-seepage concrete cement pole and preparation method thereof

The invention discloses an anti-cracking and anti-seepage concrete electric pole and a preparation method of the anti-cracking and anti-seepage concrete electric pole, and belongs to the technical field of concrete electric poles. Comprising 300 to 350 parts of Portland cement, 100 to 120 parts of fine sand, 40 to 60 parts of fly ash, 100 to 150 parts of slag powder, 150 to 200 parts of coarse aggregate, 100 to 150 parts of water, 30 to 50 parts of multi-substance modified basalt fiber, 10 to 40 parts of carbon fiber, 10 to 40 parts of polypropylene fiber and 5 to 8 parts of a water reducing agent. The basalt fiber is subjected to alkali treatment, so that the surface of the basalt fiber is rough, the 1, 6-fructose diphosphate trisodium salt and the graphene oxide are favorably adsorbed, the durability and the crack resistance of the concrete are improved, the interface bonding strength and the material compactness are enhanced, and the compression resistance and the impermeability are improved. 4-sulfonic acid calixarene and 6, 6 '-iminodi-1-hexanol are combined and then coupled with basalt fibers, the structure of the calixarene endows the basalt fibers with stability, the structural strength is improved, moisture permeation channels are reduced, fiber agglomeration is reduced, the bonding strength with concrete is enhanced, and the anti-cracking and anti-seepage performance is provided.
Owner:BAOTOU MENGLU POWER EQUIP CO LTD

Cooling tower with steel pipe-steel plate-concrete prefabricated assembly structure and construction method thereof

The invention relates to a steel pipe-steel plate-concrete prefabricated assembly structure cooling tower and a construction method thereof. The steel pipe-steel plate-concrete prefabricated assembly structure cooling tower comprises outer side steel plates, inner side steel plates, steel pipes, welding stud connecting pieces and filling concrete. The outer side steel plate and the inner side steel plate enclose circumferences with different radiuses to form the outer side and the inner side of the tower wall of the cooling tower, a plurality of welding stud connecting pieces are arranged in a gap between the outer side steel plate and the inner side steel plate, and the filling concrete fills the residual gap part. Compared with the prior art, steel pipes and steel plate elements are prefabricated in a factory and assembled into a stiff steel framework on site, the structural mechanical property is enhanced, meanwhile, the stiff steel framework serves as a formwork for pouring concrete, the construction period is shortened, the construction complexity is reduced, the construction quality is improved, and the construction safety risk is reduced.
Owner:TONGJI UNIV

Beach Accessory Anchoring Device

The present invention relates to a pole-mounted anchoring device. The anchoring device is equipped with various adjustable components to insure a stable foundation. The device has a cone-shaped, threaded base component of plastic or metal that screws the device into the ground. The device also has a set of bags that hangs from the device to add weight to the overall unit. The number of weighted bags, amount of sand, or other material in the bags can be altered depending on the weather conditions and size of the item to be supported. Further, the device may be disassembled and transported via a carrying bag.
Owner:THOMAS AMY

Access device for a passageway

The invention relates to an access device for a passageway, in particular for an entrance system of a self-service store, with at least one support element on which at least one locking element is pivotably arranged and which can be moved between a position closing a passageway and a position releasing the passageway, wherein the access device comprises a mounting foot that can be mounted on a floor and which forms a mounting plane over which it can be placed on the floor, characterized in that the mounting foot and the support element are two separate components and that the support element can be detachably fixed to the mounting foot, wherein the mounting foot has at least one connecting element extending perpendicular to the mounting plane onto which the support element can be slid.and wherein the support element fixed to the mounting base completely conceals it at least in one viewing direction along a longitudinal extension direction of the support element.
Owner:KESSEBOHMER HLDG KG

Jamming deviation rectifying structure of tower anti-falling guide rail, robot and jamming deviation rectifying method

The invention belongs to the field of electric power anti-falling guide rail inspection, and provides a jamming correction structure, a robot and a jamming correction method for a tower anti-falling guide rail. The jamming deviation rectifying structure of the tower anti-falling guide rail comprises a driving wheel, a holding wheel, a floating assembly and a guide wheel assembly. The driving wheel is connected with the floating assembly. The lower portion of the driving wheel is attached to the upper surface of the guide rail. The upper end of the floating component is connected with the fixed bracket; the guide wheel assembly comprises a supporting plate, a guide wheel seat, a compression spring and a guide wheel; the supporting plate is connected to the fixing support, the guide wheel seat is installed on the supporting plate, the guide wheel is fixed to the guide wheel seat through the guide wheel shaft, and the compression spring is installed between the supporting plate and the guide wheel seat. The guide wheel assemblies are installed on the two sides of the fixing support and used for tightly holding the side edges of the guide rails and guiding movement. The enclasping wheels are mounted on the supporting plate and attached to the two sides of the lower surface of the guide rail, and the enclasping wheels are matched with the driving wheels to jointly clamp the guide rail; buffering slopes are arranged on the guide wheel seat and the supporting plate in the direction of the guide rail so as to correct the deflection angle of the guide rail.
Owner:STATE GRID INTELLIGENCE TECHNOLOGY CO LTD

Perpendicularity adjusting and temporary supporting device for concrete pole tower

The invention belongs to the technical field of electric power auxiliary equipment, and particularly relates to a concrete pole and tower perpendicularity adjusting and temporary supporting device which comprises a concrete pole and tower. The sag infrared monitoring mechanisms are connected to the outer side of the upper portion of the concrete tower in a sleeving mode through fixing rings; the plurality of clamping sleeves are fixedly connected to the outer side of the upper part of the concrete tower, and the plurality of clamping sleeves are arranged corresponding to the sag infrared monitoring mechanism; the supporting end of the temporary supporting mechanism is connected with the outer side of the upper portion of the clamping sleeve in a clamped mode, the other end of the temporary supporting mechanism is placed on the ground, and the temporary supporting mechanism is used for supporting and adjusting the concrete pole tower which deviates; and the pressure sensor is arranged between the supporting end of the temporary supporting mechanism and the clamping sleeve and used for monitoring whether deviation correction of the concrete pole tower is completed or not. According to the invention, the concrete pole tower is monitored and rectified mainly from four aspects of normal state monitoring, offset detection, signal feedback and adjustment and state recovery, and efficient and autonomous management of pole tower offset is realized.
Owner:NORTHEAST DIANLI UNIVERSITY

Lattice tower prestressed cable penetrating method

The invention belongs to the field of lattice tower prestressed cable construction, and particularly relates to a lattice tower prestressed cable penetrating method which is characterized in that an anchorage device support is arranged on a construction platform at the top of a lattice tower, an anchor ring, a backing ring and a steering wheel are sequentially arranged on the anchorage device support from top to bottom, and through holes in one-to-one correspondence with cable penetrating holes in the anchor ring are formed in the steering wheel; the through hole is a variable-diameter hole with the two ends large in hole diameter and the middle small in hole diameter, the inner hole wall of the through hole smoothly extends in the hole core direction, the first steel wire rope is restrained at the tower top and slowly droops, and a worker at the tower top pulls the first steel wire rope to control the steering wheel to move downwards to the corner position of the latticed column in a pipe cavity of the latticed column. The steel strand is matched with the hole wall or the hole edge of the through hole in the steering wheel in a surface contact mode, the situation that protruding radial shear force point positions exist due to point contact or line contact between the steel strand and the steering wheel is effectively avoided, and the steel strand is prevented from being fractured due to the influence of radial shear force.
Owner:HEFEI VSL ENG CORP ON LIM

FRP (Fiber Reinforced Plastic)-concrete-steel combined tower drum of mixed tower wind turbine generator and construction method of FRP-concrete-steel combined tower drum

The invention discloses a mixed tower wind turbine generator FRP-concrete-steel combined tower drum and a construction method.The tower drum comprises a steel tower section and a mixed tower section, the steel tower section is installed on the upper portion of the mixed tower section, the mixed tower section is composed of a plurality of tower drum sections which are sequentially connected from top to bottom, and each tower drum section is formed by combining a plurality of arc-shaped tower drum ring pieces in a surrounding mode; the tower drum ring pieces in the same tower drum section are fixedly connected, vertical joints between the vertically adjacent tower drum sections are installed in a staggered mode, and each tower drum ring piece comprises a reinforced concrete main body part, an inner steel pipe part and a CFRP cloth wrapping section arranged on the outer side of the reinforced concrete main body part. And the reinforced concrete main body parts and the inner steel pipe parts of the upper and lower adjacent tower drum sections are respectively connected, so that the adjacent tower drum sections are mutually fixed. The compressive strength and ductility of the wind power tower cylinder concrete can be improved, larger deformation is generated before the structure is damaged, more energy is absorbed, brittle failure is avoided, complex steel bar configuration is avoided, and the construction difficulty is reduced.
Owner:HUADIAN JILIN ENERGY CO LTD +2

Mailbox post protector with internal toolless interlock

A post protector is disclosed that provides protection for the lower portion of a mailbox post. Protection is provided against string trimmers and edgers and other impacting implements in a landscape environment. A shielded chamber receives latches that allow simple and concealed assembly without the need for fasteners or tools. In one embodiment, the post protector may be stacked for creating a unique visual effect and added protection. In another embodiment, perimeter flanges for pinning to a soil surface are provided. The structure provides an aesthetic complement to downspout protectors having a similar profile.
Owner:YARD ARMOR LLC

Power transmission tower

The utility model discloses a power transmission tower which comprises a tower body and a composite cross arm arranged on the tower body, the composite cross arm comprises at least one post insulator, the low-voltage end of the post insulator is connected with the tower body, the high-voltage end of the post insulator is provided with an end fitting, and the end fitting is provided with a wire hanging point used for hanging a phase wire. The number of the composite cross arms is twelve, so that twelve wire hanging points are formed and used for hanging four-loop wires. The power transmission tower can reduce the line corridor width, reduce the tower height, improve the transmission capacity of the tower body and enhance the line reliability.
Owner:SHANGHAI SHEMAR POWER ENG CO LTD

High-strength waterproof concrete pole

The invention discloses a high-strength waterproof concrete pole, and belongs to the technical field of concrete materials, the high-strength waterproof concrete pole comprises high-strength waterproof concrete, a reinforcement cage and a waterproof coating coated on the surface of the pole, the high-strength waterproof concrete comprises the following components in proportion: 750-850kg / m < 3 > of cement, 130-170kg / m < 3 > of silica fume, 1000-1300kg / m < 3 > of sand, 150-250kg / m < 3 > of steel fiber, 10-15kg / m < 3 > of water reducing agent, 170-190kg / m < 3 > of water and 0.5-1.5 kg / m < 3 > of defoaming agent; the waterproof coating and the defoaming agent with the multi-arm star-shaped polymer as the main component are adopted, and the internal and external common waterproof effect is achieved; the defoaming agent disclosed by the invention has good dispersity and defoaming performance in concrete, and can also fill part of micropores of the concrete to a certain extent.
Owner:GUANGDONG FENGYE POWER EQUIP CO LTD

Insulated concrete composite electric pole, and electric power product quality tracing and tracking management method based on big data

PCT designated stage expiredWO2024212852A1Shaping reinforcementsTowersFiberFiberglass mesh
An insulated concrete composite electric pole, which belongs to the technical field of power transmission apparatuses. The insulated concrete composite electric pole consists of a main body part (100) and an insulating part (200), wherein the main body part (100) is circled by the insulating part (200); and the main body part (100) is prepared from a composite concrete material (110), a plurality of insulating fiber-reinforced plastic main bars (120), and a plurality of layers of insulating fiberglass mesh (130) winding round the main bars. An electric power product quality tracing and tracking management method based on big data is used in a preparation process for the insulated concrete composite electric pole. By means of the electric power product quality tracing and tracking management method based on big data, each insulated concrete composite electric pole is provided with a unique code, and the quality is tracked according to the unique code. The insulating part (200) circles the main body part (100), thereby realizing the technical effects of insulating an electric pole, preventing electric shocks, and ensuring the product quality and the traceability of the product quality.
Owner:GUANGDONG GUANGZE IND CO LTD

Storage system

A storage system includes a storage grid structure and multiple remotely operated storage bin handling vehicles. The storage grid structure includes vertical storage column profiles defining multiple storage columns in which storage bins can be stored one on top of another in vertical stacks. Each of the storage column profiles have an upper end and a lower end and the storage column profiles are interconnected at their upper ends by rails forming a horizontal rail grid upon which the bin handling vehicles may move in two perpendicular directions. The storage grid structure features grid supports include multiple base angle brackets. Each base angle bracket includes a vertical flange and a horizontal flange. The vertical flange is connected to a storage column profile. The horizontal flange is connected by bolts to a floor upon which the storage grid is arranged and a web interconnecting the flanges. Each of the flanges has a first end and a second end. The first end is arranged closer than the second end to the lower end of the storage column profile to which the vertical flange is connected. The web has a recess arranged between the first ends of the flanges.
Owner:AUTOSTORE TECH AS

Parallelogram Articulated Lattice Mast for Passive (Self) Deployment

A self-deployable mast, typically for supporting a payload. The mast has top longerons, bottom longerons, and hinge linkages that form a series of moveable parallelograms operable to fold and unfold. The mast further has springs and trusses, with at least one spring and one truss associated with each of the parallelograms. The springs are operable to deploy the mast from a folded position to a deployed position. Each truss is operable to become in tension diagonally across its associated parallelogram once the mast is deployed into a final position. In other embodiments, motors may be used instead of springs.
Owner:SOUTHWEST RES INST

Power grid frame for power distribution network

The invention discloses a power grid frame for a power distribution network, and relates to the technical field of power grid frames, the power grid frame comprises a main body mechanism, the top of the main body mechanism is fixedly provided with a bird repelling mechanism, and the top of the bird repelling mechanism is fixedly provided with an adjusting mechanism. According to the cable cleaning device, after the second motor is started, ice and snow on the surface of a cable can be effectively removed through cooperation of the rotating wheel and the scraping plate, manual cable shaking is not needed, the cable cleaning efficiency and stability are improved, the service life of the cable is prolonged, and the cable maintenance and replacement cost is reduced; the power grid frame can automatically skip obstacles and prevent cables or scrapers from being damaged, the power grid frame allows accurate adjustment of cable spacing through driving of the air cylinder and a parallelogram telescopic structure of the spacing adjusting assembly according to the conditions of thickness, length, internal electric quantity and the like of the cables, and the problems of space waste and heat dissipation caused by improper spacing are avoided.
Owner:HEFEI LANXIANGFANGHUI DECORATION ENGINEERING CO LTD

Tower for a wind turbine

A tower for a wind turbine extending axially along a longitudinal axis of the wind turbine includes a rail attached to an external surface of the tower, the rail providing a guide to which a service trolley is attachable in order to be movable along the rail. The tower includes: a plurality of axially adjacent tower segments, each tower segment extending axially between two axial ends, a respective flange being provided at one or both of the axial ends for connecting the respective tower segment to another tower segment. The rail is provided at the flange.
Owner:GAMESA INNOVATION & TECH SL