The invention relates to the technical field of telegraph pole preparation, and discloses energy-saving
processing equipment for a prefabricated
cement telegraph pole, which comprises a curing chamber. The baffle and the partition plate are matched to form the curing cavity and the preheating cavity, the mold in the preheating cavity is preheated through
heat transfer of the mold in the curing cavity, the
temperature difference between high-temperature steam and a cold mold is greatly reduced, the steam
liquefaction amount is reduced from the source, it is avoided that a condensate water film hinders
heat transfer, and the temperature of the mold and concrete is increased more intensively through steam heat; the heat waste is reduced; the alternate switching of the reciprocating swing frequency of the mold ensures the
moisture cleaning effect, reduces ineffective
energy consumption, remarkably improves the energy utilization efficiency and achieves
energy conservation and consumption reduction, the preheating cavity enables the mold to have a certain temperature before entering the curing cavity, the time of
steam heating to the target temperature is shortened, the mold swings in a reciprocating mode to efficiently clean
surface moisture, and
heat transfer is prevented from being affected. And through cooperation of the two, the maintenance period of the single telegraph pole is shortened, and the overall production efficiency is improved.