Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

1213 results about "Rapid construction" patented technology

"Rapid construction is a systematic approach to deliver of one kind project with complexity in construction due to limited time schedule, contract agreement, approved construction method and meets client satisfaction.” (Yahya, 2009).

Method and system for quickly constructing three-dimensional space model of multi-level building

The invention discloses a rapid construction method and system for a three-dimensional space model of a multi-level building, and relates to the field of building model construction, and the method comprises the following operation steps: S1, constructing a dynamic demand-oriented detail level model; s2, automatic component modeling based on image segmentation; s3, performing multi-version difference judgment and model updating; and S4, cloud collaboration and load optimization. According to the method and the system for quickly constructing the three-dimensional space model of the multilevel building, the region is dynamically divided through the semantic weight, so that the rendering efficiency during model construction can be effectively improved, the memory can be effectively reduced during rendering, the visual fidelity can be optimized, key curvature characteristics can be forcibly reserved for a high semantic weight region, and the construction efficiency is improved. Based on this, deformation distortion caused by simplification can be avoided, a visible area in the model can be automatically identified, an invisible area can be degraded, only the contour line frame of the building is reserved, and the overall memory occupation can be greatly reduced.
Owner:HUZHOU ZHONGHE SURVEY CO LTD

Method and system for quickly constructing national secret encryption channel

The invention discloses a method and system for quickly constructing a national secret encryption channel, and the method comprises the steps: a client and a server respectively generate a client private key and a server private key based on a sensitive data transmission scene, and apply for an SM2 algorithm certificate; based on the private key and the digital certificate, the client and the server perform a handshake process, and the handshake process comprises that the client and the server perform identity verification and negotiation by exchanging certificates, temporary public keys and signature information; based on temporary public key information exchanged between the client and the server, performing key negotiation through an SM2 elliptic curve algorithm to obtain negotiation data; and based on the session key in the negotiation data, encrypting and decrypting the communication data by using a GCM mode of the SM4 algorithm. According to the method, various negotiation parameters are optimized and simplified based on a domestic encryption algorithm, rapid establishment of the secure channel is realized, only one round-trip delay is needed in the whole process, and time and bandwidth are saved on the premise of ensuring communication security.
Owner:NARI INFORMATION & COMM TECH

Perpendicularity control method and platform for tubular pile construction

The invention discloses a perpendicularity control method and platform for tubular pile construction in the technical field of engineering construction tubular pile construction, the platform comprises a reference positioning module and a dynamic adjustment module, the reference positioning module is used for establishing a first coordinate system for an initial vertical reference of a tubular pile; the dynamic adjusting module is used for establishing a second coordinate system with the tubular pile as the reference, monitoring and correcting the perpendicularity deviation of the tubular pile in the construction process in real time and correcting the perpendicularity deviation until the perpendicularity meets the requirement, and the coordinate axis of the second coordinate system and the coordinate axis of the first coordinate system keep the spatial corresponding relation; according to the scheme, through multi-sensor data fusion and closed-loop control, intelligent control over the perpendicularity of the tubular pile is achieved, and the method is suitable for rapid construction of the tubular pile.
Owner:NANTONG ELECTRIC POWER DESIGN INST CO LTD +2

Railway bridge design standard knowledge graph rapid construction method

The invention discloses a rapid construction method for a standard knowledge graph of railway bridge design. The method comprises the steps that S1, data are collected and preprocessed; s2, a BERT pre-training model and a Bi-LSTM model are adopted to convert a text sequence in the processed data into a labeled tag sequence {y1, y2... yn}; s3, identifying and labeling entities, attributes and relationships thereof by using a conditional random field (CRF) and a graph neural network (GNN) technology, forming nodes and edges of the knowledge graph, and obtaining a complete knowledge graph (KG); and S4, adjusting the complete knowledge graph KG structure in real time by using a dynamic topological optimization algorithm. According to the method, the standard data is rapidly integrated and optimally designed, data redundancy is reduced, and newly added and changed data are effectively processed, so that the construction speed and the maintenance efficiency of the knowledge graph are improved.
Owner:CHINA RAILWAY DESIGN GRP CO LTD

Construction progress plan intelligent generation method based on Monte Carlo tree search algorithm

The invention provides a construction progress plan intelligent generation method based on a Monte Carlo tree search algorithm, and particularly relates to a construction progress plan intelligent generation and optimization technology based on a Monte Carlo tree search (MCTS) algorithm. According to the technology, a traditional MCTS algorithm is improved, and rapid generation, real-time dynamic adjustment and resource optimization configuration of a construction progress plan are achieved. Specifically, measures such as dynamic adjustment of an exploration coefficient, nonlinear adjustment of a prior probability and introduction of depth regularization are adopted to improve a traditional upper limit confidence coefficient (UCT) formula. And meanwhile, the total construction period is minimized by combining a dependency relationship between construction steps and constraint conditions of resource finiteness and utilizing a reward function with a negative value of the construction period as a core. Finally, the technology can visually output a construction progress plan in a Gantt chart form, remarkably improves the construction efficiency, reduces the dependence on high-end construction management talents, has a good real-time response capability, and has a wide engineering application prospect.
Owner:CHINA THREE GORGES CORPORATION +1

Deep learning-driven multi-base-station radio map rapid construction method and deep learning-driven multi-base-station radio map rapid construction system

The invention discloses a deep learning-driven multi-base-station radio map rapid construction method and system. The method comprises the steps of generating a radio map original data set of a current environment; processing the radio map original data set to obtain a radio map sample data set; and constructing a neural network model, and training the neural network model according to the radio map sample data set to obtain a radio map construction model. According to the method, the learning ability and generalization performance of the model are enhanced through residual connection and batch normalization by adopting a double-path neural network architecture, so that comprehensive processing of signals of multiple base stations and rapid and high-precision radio map prediction are realized, and the requirements of real-time network planning and optimization are met. Furthermore, by processing the radio map original data set, each pixel data in the image includes path gain information, thereby providing an accurate signal propagation path and improving identification accuracy.
Owner:NANCHANG UNIV

Detection method and device for rapidly constructing dike breach underwater topography based on unmanned aerial vehicle carrying

The invention relates to the technical field of water conservancy surveying and mapping, in particular to a detection method and device for rapidly constructing an underwater terrain of a dike breach based on unmanned aerial vehicle carrying. Aiming at the defects of underwater terrain detection at the current dike breach, the method comprises the following steps of: acquiring water flow speeds, water flow depths, infrared spectrum images and visible light images of a plurality of point clouds by unmanned aerial vehicle carried equipment; processing the water flow depth according to a related algorithm, and processing the infrared spectrum image by using an image processing algorithm to obtain a breach obstacle map; and processing the visible light image by adopting an image processing algorithm to obtain the edge information of the breach, and finally generating a three-dimensional terrain model of the breach in the same coordinate system according to the edge information of the breach, the corrected water flow depth and the breach obstacle map. According to the method, the underwater terrain at the dike breach can be rapidly, accurately and safely detected, and the method is of great significance in improving the plugging engineering efficiency, optimizing the plugging scheme and ensuring the safety and effectiveness of plugging work.
Owner:CCCC YANGTZE CONSTRUCTION & DEVELOPMENT GROUP CO LTD +1

Rapid construction method and system for lower step with inverted arch of horizontal rock stratum large-section tunnel

The invention relates to the technical field of tunnel construction, and discloses a rapid construction method and system for a lower step with an inverted arch of a horizontal rock stratum large-section tunnel, and the method comprises the steps: constructing a three-dimensional geological modeling system to carry out advanced geological forecast on a tunnel construction region; the three-arm drill jumbo is used for conducting self-positioning, geological self-adaptive intelligent hole arrangement, dynamic optimization of drilling parameters and dynamic allocation of drilling tasks through three-arm cooperative control; calculating the vector deviation between the actual excavation contour and the design contour; marking a preferential injection area based on a three-dimensional laser point cloud technology, and dynamically adjusting an injection track and thickness according to back break data; a multifunctional drilling and grouting integrated trolley is adopted for implementing pipe shed supporting, advanced small guide pipe reinforcement, pre-grouting reinforcement and anchor rod reinforcement; the main mechanical arm assists the trolley in drilling and laser scanning acceptance inspection of the feet-lock bolt; re-spraying to the designed thickness by adopting a wet spraying manipulator; the problems that an existing tunnel lower step inverted arch construction method is low in construction efficiency and large in construction risk are solved.
Owner:ERCHU CO LTD OF CHINA RAILWAY TUNNEL GRP +2

Lightweight knowledge graph rapid construction method and system based on NLP technology

The invention discloses a lightweight knowledge graph rapid construction method and system based on an NLP technology. The method comprises the steps of preprocessing an unstructured text and segmenting the unstructured text into semantic segments; unsupervised clustering is combined with the contour coefficient to determine the optimal clustering number, and a semantic association fragment cluster is obtained; performing word segmentation, part-of-speech tagging, NER and entity linking on the fragment cluster, extracting an entity and initial relationship, and fusing semantic similarity, TF-IDF word frequency collaboration degree and co-occurrence frequency to calculate a relationship edge weight; constructing a lightweight knowledge graph; in the question and answer stage, questions are disassembled through a process engine, related sub-graphs are retrieved, and answers with reasoning links are generated. The system correspondingly comprises a text preprocessing module, a clustering module, an entity relation processing module, a graph construction module, a question and answer reasoning module and a storage module. According to the method, the construction cost is reduced, the interpretability and the module coupling degree are improved, multiple scenes such as government and enterprise public opinions and medical assistance are adapted, and the problems of weak generalization, poor real-time performance and'black box 'in the traditional technology are solved.
Owner:XIAMEN MEIYA PICO INFORMATION CO LTD +1

Digital twin terrain rapid construction method based on oblique photography

The invention discloses a digital twin terrain rapid construction method based on oblique photography, and relates to the technical field of geographic model image processing, and the method comprises the steps: data collection based on oblique photography: employing an oblique photography mode to collect bidirectional terrain image data at two sides of a path in a cross manner; image processing: performing preprocessing, feature extraction and classification on the terrain image data acquired in the two directions to generate training data; model training: constructing and training a deep learning model, and identifying and classifying topographic features in the bidirectional topographic image data; digital twinborn modeling: constructing a digital elevation model and a digital surface model, and obtaining digital three-dimensional terrains on the two sides of the flight path; and result verification: combining the digital three-dimensional terrains on the two sides of the path, and verifying with an actual site. According to the method, the deep learning model is constructed and trained, and digital twin modeling is performed according to the training result, so that the construction speed and precision of the terrain model can be greatly improved.
Owner:ZHEJIANG EXPRESSWAY INFO ENG TECH CO LTD

Full-length expanded-head anchor cable rotary jet grouting reaming rapid construction process

The invention discloses a full-length expanded-head anchor cable jet grouting reaming rapid construction process, which comprises the following steps: firstly, equipment is fully prepared and has strong pertinence, and a drill rod, a steel bearing body, a hydraulic extrusion sleeve and other parts act synergistically to ensure stable drilling of an anchor cable; secondly, surveying and setting-out are accurate, and accurate arrangement of anchor cable hole positions and real-time deviation correction of a drilling track are achieved by utilizing equipment such as a total station and a level gauge in combination with a drill rod inclination angle adjusting formula and a directional drilling track design formula; and finally, the staged drilling process is scientific and reasonable, primary drilling and secondary drilling are combined, a reaming method is flexibly selected according to different geological conditions, a hard stratum and a complex space environment are effectively dealt with, the hole forming quality is guaranteed, all links are tightly connected from equipment disassembly to high-pressure rotary guniting fluid back pulling to anchor cable tensioning and locking, and the drilling efficiency is greatly improved. And finally, stable anchoring of the anchor cable under complex geological conditions is achieved, and reliable prestress guarantee is provided for slope or foundation pit supporting.
Owner:CHINA CONSTR FOURTH ENG DIV CORP LTD +1

Mineral reserve estimation modeling method, system and equipment for optimizing block division

The invention relates to the technical field of geological three-dimensional modeling, and discloses a mineral reserve estimation modeling method, system and equipment for optimizing block division. The method comprises the following steps: delineating an ore body according to imported drilling data, and establishing an entity model for estimating the ore body; block division is carried out on the entity model based on earth grid division or space grid division; converting the drilling data into block data according to the size of block division, and carrying out statistics on the block data to obtain a data distribution characteristic graph; calculating a variation function based on the data distribution characteristic graph and performing cross validation; and estimating according to the variation function and the block data, and outputting a resource reserve estimation report. Earth grid division is introduced, and during block division, longitude and latitude reference earth grid division and space grid division adopting a digital storage octree index can be selected, so that the storage speed is increased, the memory space is saved, the method adapts to multi-scale index transformation, data integration sharing and hierarchical management are facilitated, and the efficiency is improved. And rapid construction of the ore body and block subdivision storage are realized.
Owner:武汉智博创享科技股份有限公司

Building waterproof roll construction method

The invention provides a building waterproof roll construction method. The building waterproof roll construction method comprises the following steps that pre-paving waterproof construction is conducted on a base layer; performing waterproof construction on the basement side wall; and performing waterproof construction on the basement roof. The building waterproof roll construction method has the beneficial effects that roll waterproof construction can be conducted on a base layer, a basement side wall and a top plate, the construction process is reasonable, waterproof roll lap joints can be treated, the good waterproof effect can be achieved, waste of waterproof rolls is avoided, and in addition, the construction cost is reduced. The construction method strictly meets the requirements of construction specifications, rapid construction can be achieved, the construction efficiency is improved, the safety of constructors can be protected, and practicability is high.
Owner:中电建路桥集团有限公司

Modular integrated bathroom suitable for rapid construction

The invention relates to the technical field of integrated bathrooms, and particularly discloses a modular integrated bathroom suitable for rapid construction, which comprises a bearing unit, a butt joint unit and a mounting unit, the bearing unit is used for being matched with a wall, the butt joint unit is used for corner parts where the bearing units are oppositely spliced, the butt joint unit is detachably connected to the bearing unit, the mounting unit is used for being matched with a water pipe, a valve and a water heater hanging piece, and the mounting unit is detachably arranged on the bearing unit. The length and the height of the wall body can be cut and adjusted according to actual space requirements to adapt to bathroom spaces of different sizes, the position of the bearing seat can be adjusted in a sliding mode, equipment such as a water pipe, a shower head and a water heater can be conveniently installed, extra cutting, punching or grooving is not needed, the construction difficulty is reduced, right-angle corner butt joint is achieved through the butt joint unit, and the construction efficiency is improved. The device adapts to different layouts and shapes of bathroom inner walls.
Owner:RUNFA HOUSING IND (CHANGZHOU) CO LTD

Method and equipment for automatically constructing circuit of building electromechanical system

The invention provides an automatic construction method and equipment for a building electromechanical system circuit, and the method achieves the quick construction of a building electromechanical system and the efficient retrieval of key paths of equipment through abstracting the equipment attributes and the connection relation into a directed graph and automatically generating the connection relation between the equipment through a link prediction graph neural network model. The method can be used for automatically generating the mutual connection relation between the devices according to given device attributes, so that rapid construction of a building electromechanical system and efficient retrieval of key paths of the devices are achieved, and basic data are provided for the functions of device fault positioning, abnormal energy consumption analysis and the like in the building operation and maintenance stage. According to the method, the efficiency and accuracy of electromechanical system design are improved, reliable basic data support is provided for the functions of equipment fault positioning, abnormal energy consumption analysis and the like in the building operation and maintenance stage, meanwhile, a data link of electromechanical system design, construction and operation and maintenance is broken through, and technical support is provided for digital and intelligent transformation of the building industry.
Owner:SHANGHAI CONSTRUCTION FOURTH CONSTRUCTION GROUP CO LTD

Bridge static load experiment simulation pressurization experiment equipment

The invention discloses bridge static load experiment simulation pressurization experiment equipment, and relates to the field of bridge experiments, the bridge static load experiment simulation pressurization experiment equipment comprises main body supporting rods, a cross beam plate and pressurization transverse plates, the cross beam plate is located between the front main body supporting rod and the rear main body supporting rod, and the multiple pressurization transverse plates are located between the main body supporting rods on the two sides; and a lifting supporting structure is fixedly mounted at the top of the main body supporting rod. According to the bridge static load experiment simulation pressurization experiment equipment, the pressurization angles of the pressurization jack and the pressurization attaching plate are adjusted, the left-right pressurization positions of the pressurization jack and the pressurization attaching plate are adjusted, and the front-back pressurization positions of the pressurization jack and the pressurization attaching plate are adjusted; according to the bridge static load test device, the number of the pressurizing transverse plates and the number of the pressurizing jacks can be automatically increased and decreased according to the size of a bridge, the pressurizing heights of the pressurizing jacks and the pressurizing attaching plates are adjusted, and height adjustment and use in a bridge static load test are more convenient.
Owner:LANZHOU INST OF TECH

Step-by-step layered excavation construction method for slope with dangerous terrain and poor self-stability

The invention discloses a construction method for excavating and protecting a slope with a dangerous terrain and poor self-stability by utilizing a step-by-step layering method, which comprises the following steps of: excavating each stage of slope according to a design drawing in a layered manner according to protection, excavating and protecting from top to bottom, and taking the excavated bottom surface of each layer as a protection construction platform, so as to realize full-mechanical construction; erecting of a scaffold and a down-the-hole drill platform is omitted, and a crawler-type down-the-hole drill is adopted for drilling to avoid aloft work; and in the drilling process, lower-layer redundant soil and stone cleaning, anchor cable manufacturing, anchor cable mounting, frame beam pouring, grouting and other construction operations are synchronously carried out. According to the step-by-step layered excavation mode, the actual unprotected height of slope excavation is reduced, one layer of slope excavation is protected one layer of slope excavation, rapid construction is achieved, economy is achieved, and safety is guaranteed.
Owner:SICHUAN ROAD & BRIDGE CONSTRUCTION GROUP CO LTD +1

Railway station structural engineering demand parameter matrix rapid construction method and system

The invention discloses a method and a system for quickly constructing a railway station structure engineering demand parameter matrix, which are characterized in that a time-history load function, a time-history load working condition and a ground acceleration of a railway station structure model are automatically created and set through a Python programming language on the basis of an application programming interface (API) opened by MIDAS Gen design software, and the time-history load function, the time-history load working condition and the ground acceleration of the railway station structure model are automatically established and set through a Python programming language. The method comprises the following steps of: firstly, carrying out time-history analysis on a plurality of key components, then carrying out elastic-plastic time-history analysis in batches, extracting a corner of a non-elastic hinge of the key components and interlayer acceleration of the floors, and finally, automatically assembling and forming an engineering demand parameter (EDP) matrix, so that the convenience and feasibility of shock resistance toughness evaluation of the railway station are remarkably improved.
Owner:CHINA RAILWAY FIRST SURVEY & DESIGN INST GRP

Dam back seepage monitoring drainage structure capable of being rapidly constructed

The utility model discloses a dam back seepage monitoring drainage structure capable of being quickly constructed, which relates to the field of hydropower and hydraulic engineering, and comprises a channel, a dam, a dam drainage body and a pressure slope body, and further comprises a concrete connector, an impermeable layer, a measuring weir retaining wall and a permeable drainage channel, the lower portion of the permeable drainage channel penetrates into the relative impervious layer, the impervious layer is laid from the top of the dam drainage body slope to the downstream along the channel, the downstream is embedded into the measuring weir retaining wall, the two sides are embedded into the concrete connecting body, the permeable drainage channel is arranged below the impervious layer and arranged along the bottom of the channel, the upstream of the permeable drainage channel is connected with the dam drainage body, and the downstream of the permeable drainage channel reaches the front of the measuring weir retaining wall. The pressure slope body is filled above the impermeable layer and is filled along the channel, the upstream of the pressure slope body leans on the back of the dam, and the downstream slope toe reaches the front of the retaining wall of the measuring weir. A relatively closed anti-seepage structure is defined by combining the anti-seepage layer, the concrete connecting body and the relatively impervious layer, dam seepage and pressure slope seepage are separated, and the seepage flow of the dam can be accurately monitored; the measuring weir retaining wall structure can respectively monitor seepage of the pressure slope body and seepage of the dam, and the stability of the pressure slope body and the stability of the dam can be respectively evaluated.
Owner:POWERCHINA HUADONG ENG CORP LTD +1

Synchronous and rapid construction system for offshore wind power steel pipe composite pile foundation

The utility model relates to the technical field of pile foundation engineering, in particular to an offshore wind power steel pipe composite pile foundation synchronous and rapid construction system which comprises a self-elevating platform, the self-elevating platform comprises a supporting column and a platform, the bottom of the supporting column is arranged on the seabed, and the platform is supported by the supporting column. A plurality of steel pipe composite pile construction hole sites are formed in the platform, a rack with a rotary power head is arranged at each steel pipe composite pile construction hole site, and the racks are connected with steel pipes of steel pipe composite piles. The utility model has the advantages that: a plurality of steel pipe piles are adopted, stirring sinking is carried out simultaneously, the construction speed is high, steel pipe sinking, concrete pouring in the steel pipes, bearing platform construction and truss construction can be carried out in stages in a plurality of wind power foundations, and the overall construction efficiency is improved.
Owner:CHINA RAILWAY SHANGHAI DESIGN INST GRP CO LTD

Composite curtain wall system with wing type decorative grating and construction method

The invention discloses a composite curtain wall system with a wing type decorative grating and a construction method, and relates to the technical field of decorative composite curtain walls. The method comprises the following steps of construction scheme compilation and demonstration, scheme disclosure, construction preparation, civil engineering transfer, civil engineering structure error check, surveying and setting out, post-repair embedded part installation, post-repair embedded part pull-out test, connecting part installation, keel installation and curtain wall fire prevention. Installation of a lightning protection system, hidden acceptance, installation of glass plates, installation of aluminum single plates, installation of aluminum composite plates, installation of decorative grids, and ash removal and gluing. According to the invention, in a decoration project with short construction period, accurate and rapid construction and high-quality adjustment of each unit module of the composite curtain wall are effectively realized, each component is assembled and mounted in the whole course, secondary processing procedures on site are reduced, the construction is convenient and fast, the construction efficiency of decoration, brightening and drainage projects is improved, and the construction cost is reduced. And meanwhile, secondary damage to each system component by a construction site is also avoided, and the loss rate is reduced.
Owner:CHINA MCC5 GROUP CORP LTD

Cluster type medicine building rapid construction BIM model construction method and system

The invention relates to a method and a system for constructing a BIM model for quickly constructing a clustered medical building, and the method comprises the steps: constructing a thinking tree with multiple attributes based on design demands, carrying out the pruning in combination with a medical prototype library and compliance constraints, generating a DAG according to a leaf node task of the thinking tree after pruning, and carrying out the construction of the BIM model. The method comprises the following steps of: establishing a DAG (Distributed Acyclic Graph), endowing a DAG edge with an interdependent key level based on cluster linkage between tasks, forming a weighted DAG, determining task priority and resource allocation by a planning agent according to the weighted DAG, generating an execution sequence, processing the tasks by a BIM code generation agent according to the sequence, and generating a component code by adopting a thinking chain process of grading confidence coefficient scoring; at the end of each stage, calculating a confidence coefficient according to node attributes and medical geometric rules; and if the threshold value is lower than the threshold value dynamically adjusted based on the complexity of the cluster unit, adjusting and restarting the thinking chain. When the confidence coefficient is continuously too low or the key task cluster is completed, the check and correction agent intervenes, and the generated code is checked and corrected; and collecting the corrected codes to construct a BIM model.
Owner:中建五局第四建设有限公司

Rapid construction device for exhibition

The utility model discloses a quick building device for exhibition, which relates to the technical field of exhibition and comprises a building device, the building device comprises a main body mechanism, an upper baffle is mounted at the top end of the main body mechanism and connected with the main body mechanism through hexagonal fixing screws, and a clamping groove is formed in the top end of the main body mechanism. The device has the advantages that the mounting and dismounting efficiency of the device is remarkably improved, the building process is more convenient and faster, meanwhile, due to the design of the clamping groove formed in the top end of the main body mechanism, due to the design of the clamping groove formed in the top end of the main body mechanism, the mounting and dismounting efficiency of the device is improved, and the mounting and dismounting efficiency of the device is improved. The upper baffle can be firmly clamped to the top end of the main body mechanism, the stability and safety of the device are greatly improved, in addition, the upper baffle is installed at the top end of the connecting and fixing block through the supporting mechanism, the connecting stability of the whole mechanism is further improved, and the device is safer and more reliable in actual use.
Owner:HEILONGJIANG SHENGYU CULTURE COMMUNICATION CO LTD

Deep foundation pit for synchronously removing deeply-buried large abandoned raft plates in sensitive environment and construction method

The invention relates to a synchronous removal deep foundation pit for deeply burying large waste rafts in a sensitive environment and a construction method. Comprising a prefabricated assembly type trestle plate step-by-step reinforced concrete supporting trestle technical system, a steel casing and rapid prefabricated assembly type water collecting pit setting technical system, a waste bottom plate block-by-block breaking-first-cutting-crushing-dismantling technical system and a reserved pile filling hole position segment-by-segment block-by-layer backfilling technical system. The construction method has the beneficial effects that rapid construction of the reinforced concrete supporting trestle is achieved, the structural stability is guaranteed, and the construction efficiency is improved; high efficiency and quality control of construction of the stand column pile are achieved, meanwhile, the concrete over-filling amount is reduced, and the construction economical efficiency is improved; rapid setting and automatic management of the sump are realized, and the construction efficiency and the reliability of a drainage system are effectively improved; safe and efficient dismantling of the waste bottom plate is achieved, the construction precision is guaranteed, and the operation efficiency is improved.
Owner:HANGZHOU JIANGRUN TECH LIMITED +1

Deep marine soft soil super-long steel pipe pile steel trestle and construction method

The invention relates to a deep marine soft soil super-long steel pipe pile steel trestle and a construction method. The construction method comprises the following steps of setting angle steel sliding rail construction, qualitative steel pipe pile guide frame installation, hanging type safety operation platform installation, transverse connection welding, panel track laying and next section construction. The method has the beneficial effects that the qualitative steel pipe pile guide frame is adopted, accurate positioning of the position of the steel pipe pile can be achieved, and high efficiency and safety in the construction process are ensured; the shaped angle steel sliding rails and the panel rails are ingenious in design and have higher multifunctionality and practical value; the sleeve arranged at the end part of the crawler crane can ensure that the steel pipe pile can be accurately positioned, so that the construction error is reduced, and the safety and the construction efficiency in the driving process are favorably improved; the hanging type safe operation platform can be rapidly installed, the height can be adjusted, and the safety of constructors is guaranteed; the bailey beam combined limiting piece is simple in structure and convenient to construct quickly.
Owner:ZHEJIANG COMM CONSTR GRP CO LTD

Rapid construction method for assembling and cast-in-place mixing of water delivery canal

The invention provides a water delivery canal assembly and cast-in-place mixed rapid construction method which comprises the following steps that S01, a slope of a canal is excavated, and the width of the slope is larger than that of the canal; s02, an assembly type bottom channel is prefabricated, the assembly type bottom channel comprises a bottom plate, inclined webs are arranged on the two sides of the bottom plate, and the height of the webs is larger than that of accumulated water in the original water channel; s03, a cushion layer is laid at the bottom of the excavated water channel; s04, the assembly type bottom channel is hoisted; s05, the hoisting assembly type bottom channel of each section is subjected to sectional type continuous tensioning; s06, after construction of the fabricated bottom channel is completed, the side plates are constructed; s07, after construction of the water channel is completed, backfilling the outer side of the water channel, filling backfilling soil between the outer side of the water channel and the side slope, and compacting the backfilling soil; the rapid construction of the water channel is completed through the steps. By the adoption of the construction method of the assembly type bottom channel and the cast-in-place type side plates, construction can be conducted in accumulated water, the construction period cannot be affected in the rainy season, the side plates are constructed in the water-free state, and the balance between the construction efficiency and the cost is achieved.
Owner:YANGTZE ECOLOGY & ENVIRONMENT CO LTD

Method, structure and construction device for supporting chamber based on ultraviolet curing resin

The invention discloses a chamber supporting method and structure based on ultraviolet curing resin and a construction device. The construction method comprises the steps that a flexible ultraviolet light curing resin fiber belt is positioned at the bottom of one side of the inner wall of the chamber, and a fixing anchor rod is driven into the flexible ultraviolet light curing resin fiber belt for fixing; an arch-shaped support is installed, and a telescopic supporting mechanism is installed on the arch-shaped support in a sliding mode; the flexible ultraviolet light curing resin fiber belt is tightly attached to the inner wall of the chamber and is annularly unfolded along the inner wall of the chamber, and telescopic supporting mechanisms are adopted for supporting the flexible ultraviolet light curing resin fiber belt at certain intervals; tearing off a light-proof film on the flexible ultraviolet light curing resin fiber band, and irradiating the flexible ultraviolet light curing resin fiber band with ultraviolet light; and after the flexible ultraviolet light curing resin fiber belt is completely cured, the telescopic supporting mechanism is contracted, the arched support is removed, and construction of the chamber supporting structure is completed. The method has space adaptability, deformation coordination and rapid construction capacity, and efficient and stable supporting of the chamber is achieved.
Owner:POWERCHINA ZHONGNAN ENG +2

Transformer substation modeling method and system based on point cloud data

The invention provides a transformer substation modeling method and system based on point cloud data, and the method comprises the steps: constructing a transformer substation equipment model library according to the point cloud data of all equipment in a transformer substation; converting the point cloud data of each device into a two-dimensional planar bounding box topological structure of each device; geometric shape detection is carried out on the two-dimensional planar bounding box topological structure of each device, and a minimum repetitive structure unit is extracted; performing shape retrieval and template fitting on the minimum repetitive structure unit and a substation equipment model library to obtain a three-dimensional point cloud model of the minimum repetitive structure unit, and completing rapid construction of a substation model; according to the method, geometrical shape detection is performed on the two-dimensional planar bounding box topological structure of each device, and the accuracy of extracting the minimum repetitive structure unit can be improved on the basis of the determined geometrical shape, so that the accurate minimum repetitive structure unit can be rapidly extracted on the basis of the clear geometrical shape, and the accuracy of extracting the minimum repetitive structure unit is improved. And completing rapid construction of a subsequent transformer substation model.
Owner:BEIJING GUODIANTONG NETWORK TECH CO LTD +1

Digital twinborn scene rapid construction method based on cross-modal generation

The invention relates to a digital twinborn scene rapid construction method based on cross-modal generation. The method is composed of a cross-modal data generation framework and a digital twinning construction framework. The cross-modal data generation framework comprises a character generation module, an image generation module and a model reconstruction module; the digital twinning construction framework comprises a digital twinning model construction method, a digital twinning model assembly method, a digital twinning model fusion method and a digital twinning model verification and calibration method. According to the method, a rapid virtual modeling strategy in a low-sample application scene is defined, a basis is provided for virtual experiments and virtual-real symbiosis, the construction efficiency of a twinborn scene is improved, and a new possibility is provided for datamation of the scene in a resource-constrained environment.
Owner:SOUTHEAST UNIV

Three-step multi-working-face short-circulation weak-blasting step-pitch-control rapid construction method

The invention provides a three-step multi-working-face short-circulation weak-blasting step-pitch-control rapid construction method, which comprises the following steps of: dividing the section of a thin-layer schist tunnel into four parts, namely an upper step, a middle step, a lower step and an inverted arch, and carrying out excavation and support construction on the upper step, the middle step, the lower step and the inverted arch; by means of reducing the height of an upper step, jointly constructing short-step excavation, loose blasting and mechanical excavation, dynamically adjusting the combination of construction working faces and the like, it is guaranteed that thin-layer schist tunnel construction achieves the purposes of rapidly closing and forming a ring, reducing surrounding rock disturbance and improving construction safety and efficiency.
Owner:CHINA RAILWAY 11TH BUREAU GRP CORP LTD +1