Rapid construction and analysis method for power-grid topology relation
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- ELECTRIC POWER RES INST OF GUANGDONG POWER GRID
- Publication Date
- 2014-03-19
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1 Figure 2
Abstract
Description
technical field
[0001] This patent belongs to the field of power grid management and application. Using the related technologies of geographic information system (GIS), combined with the geographical location information of the power grid, quickly construct the topology model of the power grid, and can check, update and modify the topology relationship in real time, as well as perform conventional power grid topology analysis. Background technique
[0002] In power application and management systems, network structure description and topology analysis play an important role, even the cornerstone of many business applications. Early network topology analysis was based on a specific data structure, and its common disadvantages are low efficiency and Poor scalability. When a new device is added to the network or a certain electrical component has new topology characteristics, it cannot automatically adapt well, and a large number of modifications may be required. From the persp...