Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

787 results about "Geographic information system" patented technology

A geographic information system (GIS) is a system designed to capture, store, manipulate, analyze, manage, and present spatial or geographic data. GIS applications are tools that allow users to create interactive queries (user-created searches), analyze spatial information, edit data in maps, and present the results of all these operations. GIS (more commonly GIScience) sometimes refers to geographic information science (GIScience), the science underlying geographic concepts, applications, and systems.

Intelligent cable fault accurate positioning and early warning method and system

The invention discloses an intelligent cable fault accurate positioning and early warning method and system, and the method comprises the steps: collecting the temperature gradient, strain distribution and partial discharge signals of the whole length of a cable in real time through a distributed optical fiber sensing network, and generating a multi-dimensional feature matrix of the operation state of the cable; based on the multi-dimensional feature matrix, outputting a preliminary fault positioning coordinate; generating corrected fault coordinates according to the topological structure data of the cable laying environment and the electromagnetic interference distribution diagram; historical fault data, real-time operation parameters and the corrected fault coordinates are fused, and a fault risk thermodynamic diagram in a future preset duration is output; and based on the fault risk thermodynamic diagram and real-time monitoring data, generating fault first-aid repair information by using a dynamic priority algorithm, synchronously triggering an early warning signal, and visually displaying a fault positioning result and a risk area in a three-dimensional geographic information system. According to the embodiment of the invention, rapid positioning, accurate early warning and intelligent disposal of the cable fault can be realized.
Owner:ZHEJIANG WANMA CO LTD

Urban building three-dimensional automatic modeling and visualization method

The invention discloses an urban building three-dimensional automatic modeling and visualization method, and belongs to the technical field of building three-dimensional modeling. The method comprises the steps that point cloud data, high-resolution images and geographic information system data of urban buildings are acquired, data cleaning, registration and alignment are carried out, and preliminary building digital representation is formed; accurately segmenting each building, and identifying the contour and main structural features of the building; based on the data integrity and the building complexity, adaptively selecting a proper reconstruction strategy to carry out three-dimensional reconstruction; in the reconstruction process, the geometric structure is analyzed and optimized in real time, and potential topological problems are repaired; automatically generating missing details based on a predefined architectural style library and a component library, and performing material inference and texture mapping; a graph structure is used for representing the relation between the buildings, and the positions and orientations of the buildings are adjusted through a global optimization algorithm; a rendering engine supporting multi-level detail switching is developed, and smooth visualization and interaction of a large-scale city scene are achieved.
Owner:CHANGZHOU JINTAN DISTRICT LUOSUI TECHNOLOGY CO LTD

Point-shaped landslide and debris flow potential degree self-adaptive monitoring and early warning method

The invention relates to the technical field of geological disaster monitoring, and discloses a point-like landslide and debris flow potential degree adaptive monitoring and early warning method. According to the method, a dot matrix monitoring equipment array is arranged, and displacement data and environmental parameters of multiple monitoring points are collected; analyzing the displacement data timestamp through a timeline analysis module, generating a dynamic timeline, and marking geological event nodes; a geographic information system is combined to carry out spatial mapping on displacement data, and environmental parameters are fused to obtain a preliminary potential degree evaluation result. The pattern recognition engine classifies displacement speed and deformation characteristics in the preliminary result to generate a deformation characteristic spectrum with a space-time label; calculating a dynamic potential degree evaluation map according to the multi-factor weighted evaluation model; and adjusting an early warning threshold according to a user instruction, generating a personalized early warning rule set, and scanning the atlas to output a multi-stage early warning response scheme. On the basis of an early warning feedback iteration updating model and an engine, monitoring data are newly added to trigger and re-analyze in real time, a related scheme is updated in a linkage mode, and different scene requirements are met.
Owner:ZHEJIANG CHENGAN BIG DATA CO LTD +3

Power distribution network fault differentiation operation and maintenance first-aid repair decision recommendation method, system and equipment based on knowledge graph, and medium

The invention discloses a power distribution network fault differentiation operation and maintenance first-aid repair decision recommendation method, system and device based on a knowledge graph and a medium, and belongs to the technical field of operation and maintenance recommendation, and the method comprises the steps: obtaining the real-time monitoring data of a power distribution network, and constructing a fault feature data set; based on the fault feature data set, combining with a power distribution network knowledge graph to identify a historical fault entity; extracting a corresponding operation and maintenance first-aid repair strategy from the historical fault entity, presetting an evaluation index, and calculating a strategy effect score; evaluating a fault processing priority; and sorting the candidate first-aid repair strategies according to the strategy effect score and the fault processing priority, and screening and outputting a target operation and maintenance strategy suitable for the current fault and matters needing attention of the target operation and maintenance strategy. According to the method, the geographic information system is used for positioning the fault, the distance between the fault and the first-aid repair personnel is evaluated, the processing priority is determined in combination with the emergency degree of the fault, resource allocation is effectively optimized, and response efficiency is improved.
Owner:GUIZHOU POWER GRID CO LTD

Method and system for automatically identifying plants based on neural network model

The invention provides an automatic plant identification method and system based on a neural network model, and relates to the technical field of intelligent agriculture, and the method comprises the steps: inputting a composite feature map into a compressed and optimized lightweight convolutional neural network model, and outputting a plant type identification result and a confidence value in real time; dynamically binding a plant type identification result with a geographic information system (GIS) coordinate, generating an endangered plant space distribution thermodynamic diagram and triggering a real-time alarm; images are automatically collected and marked based on newly-added plant sample positions marked in the spatial distribution thermodynamic diagram, and weight parameters of the lightweight convolutional neural network model are periodically updated. The plant identification and protection capability is comprehensively improved through the links of data acquisition diversification and standardization, image processing high efficiency and scientificity, feature extraction and identification accuracy, endangered plant protection and dynamic monitoring, model continuous optimization and adaptability and the like.
Owner:路利龙

Automatic address governance method and device based on intelligent agent and medium

The invention relates to the field of geographic information systems, and discloses an agent-based automatic address governance method and device and a medium, and the method comprises the steps: obtaining a to-be-governed address through a data perception and preprocessing agent; inputting the address to be governed into a master control agent; the main control agent analyzes the address to be governed and gives an analysis result; according to the analysis result, selecting a tool execution agent to process the address to be treated; and outputting the governed address, and storing all data by adopting a memory and interaction agent. According to the method, the analysis accuracy, the semantic understanding depth and the robustness of the LLM in processing complex and non-standard addresses containing confusion information are greatly improved, meanwhile, the requirement for manual intervention is greatly reduced, the efficiency of processing mass address data is remarkably improved, and the real-time response speed is remarkably increased.
Owner:WUDA GEOINFORMATICS CO LTD

Video GIS intelligent analysis method based on deep learning

The invention relates to the technical field of artificial intelligence, in particular to a video GIS intelligent analysis method based on deep learning, and the method comprises the steps: detecting a target in a video in real time through a predefined target detection model, and generating a space-time mark which comprises a bounding box and category information; thirdly, associating target tracks of different cameras by using a dynamic graph model and a dynamic graph neural network to form a space-time ID and a track chain; then, combining a visual inertial odometer and a geographic information system to calibrate a homography matrix, and mapping the trajectory chain to a geographic coordinate system to obtain space-time trajectory data; then, constructing a neural network model and a trajectory generation model, and respectively predicting crowd density distribution and pedestrian motion trajectories; and finally, carrying out real-time alarm according to the track and the multi-level geo-fencing rule. According to the invention, intelligent analysis of video data is realized, target tracking and alarm capabilities are improved, and the method is widely applicable to the fields of crowd management and safety monitoring.
Owner:MAPUNI TECH CO LTD

Implementation method of holographic traffic at intersection

The invention discloses a method for realizing holographic traffic at an intersection. The method comprises the following steps: acquiring a real-time video stream at the intersection; motor vehicles, non-motor vehicles and pedestrians in the video are identified based on a deep learning target detection algorithm, a continuous motion track of each target is generated through a multi-target tracking algorithm, identity association is carried out on cross-camera targets in combination with a re-identification algorithm, and structured traffic data including target types, real-time speeds and motion directions are output; obtaining coordinate points of each lane of the intersection based on a geographic information system, and constructing a lane network topological relation; combining with the structured traffic data to generate target trajectory data; and constructing an intersection three-dimensional model based on an unreal engine, generating a virtual target in the three-dimensional model according to the target trajectory data, and driving the virtual target to move in real time. According to the method, a holographic traffic implementation scheme is provided for a business scene which is free of radar and only monitored by a video.
Owner:SHANGHAI JIEXUAN ELECTRONIC TECH CO LTD

Region address standardization method based on knowledge graph enhanced retrieval

The invention belongs to the technical field of natural language processing and geographic information systems, and particularly relates to a region address standardization method based on knowledge graph enhanced retrieval. Cleaning and preprocessing the original address text input by the user; utilizing a fine-tuned large language model to identify a geographic entity and performing standardized expansion on variant expression to generate a query candidate set; entity linking and context retrieval are carried out based on the knowledge graph, and attributes, hierarchy and spatial topology information of associated entities are obtained; in combination with the original input and the map context, an enhanced retrieval query text is generated through large language model reconstruction; vectorized semantic retrieval is carried out through the fine-tuned embedding model, and a preliminary candidate address set is obtained; carrying out multi-dimensional refined sorting by adopting a resorting model; and generating a structured standard address by using a large language model, and outputting the structured standard address after multi-level verification. According to the method, the problems of ambiguity resolution, alias recognition and context understanding in address processing are solved, and the accuracy and robustness of address standardization are improved.
Owner:SHENYANG ZHANYAN TECH CO LTD

Wave energy array development site selection method

The invention discloses a wave energy array development site selection method, which belongs to the field of wave energy development and utilization, and comprises the following steps of: 1) processing geographical distribution data by utilizing a GIS (Geographic Information System) spatial analysis method to obtain a limited development area graph layer; and 2) constructing an evaluation index system of wave energy array development site selection, and carrying out standardization processing to obtain a comprehensive evaluation result. And 3) calculating an offshore distance, and generating a refined developable range layer. And 4) carrying out wave direction statistical analysis in the developable range to obtain an array development range. And 5) on the basis of determining the array development range of the target sea area, determining a potential development site. 6, quantitative analysis and trend analysis of the array development capability are carried out with the potential development site as the center point, and the key development site is determined.According to the method, multi-dimensional evaluation indexes such as environment compatibility, resource endowment, technical feasibility and economic rationality are integrated, and a scientific basis is provided for array development site selection of the wave power station.
Owner:OCEAN UNIV OF CHINA

Trade whole industry chain data intelligent matching and resource docking method

The invention provides a trade whole industry chain data intelligent matching and resource docking method, and relates to the technical field of international trade data analysis and geographic information systems.The method comprises the steps that customs declaration data, logistics tracking data, enterprise supply chain data and market public opinion data are collected in real time through a standardized interface; constructing a multi-source heterogeneous data fusion system of block chain evidence storage; dynamically modeling a whole industry chain relation network based on the knowledge graph, and quantifying the supply chain dependency, the trade flow direction and the policy influence weight; calculating an industrial chain correlation index ICRI and a resource matching priority coefficient RMPC, optimizing a logistics path in combination with a geographic space analysis algorithm, and avoiding a policy restriction area in real time; and rendering a matching result through a three-dimensional visualization platform, and iteratively updating model parameters based on user interaction feedback. According to the method, the limitation of a traditional data island is broken through, dynamic quantitative analysis and accurate resource matching are realized, and the trade data integration efficiency is remarkably improved through intelligent path planning and interactive decision support.
Owner:ZHEJIANG SCI-TECH UNIV

Remote sensing image change detection method based on deep learning and GIS

The invention discloses a remote sensing image change detection method based on deep learning and a GIS, and relates to the technical field of image processing and geographic information system application. Comprising the steps of 1, carrying out data preparation and preprocessing, 2, constructing a deep learning network model, carrying out feature extraction on preprocessed remote sensing image data by adopting a multi-layer convolution layer and a pooling layer, and aiming at obtained GIS data, carrying out feature extraction on the remote sensing image data by adopting different feature extraction methods according to data types, 3, performing feature fusion: fusing the remote sensing image feature vector and the GIS feature vector in a deep learning network model by using a feature fusion layer to obtain a fused feature vector; and step 5, performing change detection and result output: applying the trained deep learning network model to the preprocessed to-be-detected remote sensing image data and GIS data, outputting a change probability value of each pixel point through forward propagation calculation of the model to obtain a change probability graph, and performing post-processing operation on an obtained binary change detection result to obtain a change probability graph. And finally, outputting a clear and accurate remote sensing image data change detection result, and displaying the position, range and type information of a change area in the form of image or vector data.
Owner:INSPUR SOFTWARE TECH CO LTD

Regional planting pattern matching method, system, equipment and medium

The invention discloses a matching method, system, equipment and medium for a regional breeding pattern, and relates to the technical field of crossing of agricultural resource management and geographic information systems, and the method comprises the steps: obtaining soil fertility data, crop types and areas, regional breeding manure nutrient supply and nitrogen and phosphorus demand per unit area; according to crop types and areas in the planting and breeding area, nitrogen and phosphorus demand per unit area and soil fertility data, the matching degree of regional breeding manure nutrient supply and planting industry demand is quantified, and a planting and breeding balance index is obtained; obtaining a critical distance when the economic value of the manure transportation cost is equal to that of the manure transportation cost instead of the chemical fertilizer transportation cost, and screening out a resource allocation path with the lowest cost and the highest efficiency; and dynamically adjusting the planting structure according to the planting and breeding balance index and the resource allocation path, and screening out the optimal pattern configuration. According to the method, the problem of uneven distribution of nutrients among regions is solved, the resource utilization efficiency is improved, and global optimization of economic, ecological and social benefits is realized.
Owner:NORTHWEST A & F UNIV

Urban water supply pipe network satellite leakage detection method based on multi-source data fusion

The invention discloses an urban water supply network satellite leakage detection method based on multi-source data fusion, and the method comprises the steps: S1, obtaining multi-source data, including a satellite remote sensing image, DMA partition measurement data, and Internet of Things sensor data; s2, preprocessing the multi-source data, including data cleaning, feature extraction and space-time registration; s3, constructing a multi-modal data fusion model, and carrying out feature fusion and leakage point recognition on the preprocessed data through a deep convolutional neural network; s4, performing leakage risk assessment in combination with a geographic information system and a dynamic hydraulic model, and generating a suspected leakage point list with priority ranking; and S5, performing iterative optimization on the model based on a ground checking result to form a closed-loop feedback mechanism.
Owner:GUIYANG BEIKONG WATER CO LTD

GIS basin-type insulator defect detection method, electronic equipment and storage medium

The invention relates to a GIS (Geographic Information System) basin-type insulator defect detection method, electronic equipment and a storage medium, belongs to the technical field of intelligent image identification and processing of power equipment, and solves the problem of how to improve the accuracy of GIS basin-type insulator defect detection. The method effectively improves the resolution and information integrity of defect images, constructs a MobileNetV2 and YOLOv11n lightweight network structure for the technical bottlenecks of large FMC data volume and complex imaging calculation, achieves the intelligent closed-loop process from defect identification, positioning and classification to segmentation evaluation, achieves the automatic identification and geometric quantity extraction of defect areas, and improves the accuracy of the detection result. A data support is provided for subsequent early warning judgment and decision making; according to the method, the ultrasonic detection identification precision and the imaging quality are effectively improved.
Owner:HEFEI UNIV OF TECH

Environment perception and command control intelligent deduction platform based on bionic unmanned equipment

The invention discloses an environment perception and command control intelligent deduction platform based on bionic unmanned equipment, and relates to the field of intelligent deduction, and the platform comprises the steps: collecting environment data through a multi-mode sensor, encrypting the environment data through an anti-interference communication relay module, and transmitting the encrypted environment data to a central control platform; the data fusion preprocessing module is used for processing multi-source data and outputting a structured data stream, and the environment intelligent modeling module is combined with a geographic information system to construct a three-dimensional dynamic environment model; an intelligent deduction module carries out multi-scene deduction based on the model, and a self-adaptive control strategy generation module converts a decision tree into an anti-disturbance control sequence; and the man-machine collaborative decision-making module fuses operator intervention to generate a final instruction, and the instruction distribution and equipment collaborative control module issues the instruction to the bionic unmanned equipment to realize intelligent collaborative control. The method has the advantages that bionic perception, anti-interference communication and intelligent deduction are integrated, efficient cooperation and adaptive control of unmanned equipment in a complex environment are achieved, and the intelligence and robustness of task execution are remarkably improved.
Owner:TIANZE SMART TECH (CHENGDU) CO LTD

Coastal wetland ecological corridor identification and optimization method and system

The invention provides a coastal wetland ecological corridor identification and optimization method and system, and relates to the technical field of ecological environment monitoring. The method comprises the following steps: integrating optical, radar, terrain, night light and road data on an earth engine cloud platform, and unifying time and space references to form an initial data set; extracting a normalized vegetation index and a vegetation coverage degree, and combining with a water body frequency to identify an ecological source land; generating a comprehensive resistance surface according to the land utilization and coverage type and the road distance; and performing minimum cost path and circuit connectivity analysis in a geographic information system to obtain potential galleries, key nodes and barrier regions, and outputting gallery grades and optimization suggestions in a grading manner according to a cost threshold, thereby realizing high-precision identification and optimization of the coastal wetland ecological network.
Owner:NORTHEAST INST OF GEOGRAPHY & AGRIECOLOGY C A S

GIS insulation defect evaluation method and device and electronic equipment

The invention provides a GIS insulation defect evaluation method and device and electronic equipment, and relates to the field of data processing. According to the method, a cross-modal synchronous data stream formed by an ultrahigh frequency sensor and a mechanical vibration sensor on a GIS (Geographic Information System) is obtained, event slicing is firstly carried out, multi-dimensional features are extracted, and candidate events are screened in combination with a sparse labeling library; and generating a propagation time delay window and a path priority table by using a three-dimensional geometric model, completing cross-modal pairing and time registration, outputting a registration result, performing array manifold sparse reconstruction separation, and eliminating multipath interference to obtain purification components. And constructing a cross-modal event chain graph based on the purification components, executing spatial positioning and physical quantity inversion under the constraint of the chain graph, and finally generating a defect evaluation report in combination with a historical labeling result, thereby realizing high-precision detection and evaluation of GIS insulation defects. By implementing the technical scheme provided by the invention, the accuracy of insulation defect evaluation can be improved.
Owner:WUHAN LANDPOWER CO LTD

Road subgrade settlement prediction method and system based on multi-source data

The invention relates to the technical field of civil engineering, and discloses a road subgrade settlement prediction method and system based on multi-source data. The method comprises the following steps: acquiring and correcting a precipitation sequence and roadbed soil moisture distribution data; analyzing rainfall accumulation characteristics and carrying out penetration risk classification, thereby extracting a penetration depth estimation value, and utilizing finite element analysis to simulate a soil body saturation state change trend; quantifying a soil body supporting capacity reduction range, constructing and calibrating a settlement initiation probability calculation model, and obtaining settlement probability distribution; identifying a high-risk evolution area, integrating path weights and accumulated influence factors, and generating a settlement prediction interval subjected to multi-dimensional verification; and fusing the prediction interval and actual roadbed structure data through a geographic information system to generate a comprehensive evaluation report. According to the method, the whole-process accurate evaluation of the roadbed settlement risk from multi-source perception, mechanism simulation to space prediction is realized, and the accuracy and timeliness of the roadbed settlement risk prediction and the pertinence of engineering maintenance are improved.
Owner:ZHENGZHOU MUNICIPAL ENG SURVEY DESIGN&RES INST

Mutually generative artificial intelligence system based on multi-dimensional spatiotemporal information vector graphics

Disclosed is a mutually generative artificial intelligence system based on multi-dimensional spatiotemporal information vector graphics, relating to the field of artificial intelligence and engineering applications. Based on a geographic information system (GIS) or a computer-aided design (CAD) platform and a data source, a multi-dimensional vector spatiotemporal large model terminal, a multi-dimensional spatiotemporal information processing agent terminal, and an intelligent information system application terminal are constructed. For multi-dimensional spatiotemporal data such as two-dimensional and three-dimensional vectors and temporal states, a multimodal spatiotemporal large model having an understanding capacity for an engineering professional knowledge system, a data processing flow, multi-dimensional vector graphics, and thematic graphics-text documents is pre-trained to achieve the mutual expression and generation of engineering multi-dimensional vector graphics and thematic graphics-text documents and to form an intelligent engineering graphic data processing application.
Owner:BEIJING LONGRUAN TECHNOLOGIES INC +1

Lightweight method and system for highway engineering three-dimensional live-action model and medium

The invention discloses a lightweight method and system for a highway engineering three-dimensional live-action model and a medium, and relates to the technical field of three-dimensional live-action modeling. The method comprises the following steps: firstly, carrying out engineering semantic segmentation on an input three-dimensional grid model, and extracting design parameters in a BIM / GIS (Basic Information Model / Geographic Information System); then, constructing a multi-level constraint model fusing semantic constraints, engineering precision constraints and design parameter constraints; and finally, carrying out iterative simplification under the guidance and limitation of the multi-level constraint model by adopting an improved quadratic error measurement algorithm. The method solves the problems of semantic information loss, out-of-control local precision and disjunction with design intention when a traditional pure geometric simplification method is applied to highway engineering, and can intelligently reserve key engineering characteristics, control geometric errors and fit a design form while ensuring that the data size of the model is greatly reduced. And a high-quality lightweight model suitable for professional analysis and application is generated.
Owner:SICHUAN HIGHWAY PLANNING SURVEY DESIGN AND RESEARCH INSTITUTE LTD

Fault signal detection system and analysis positioning method

The invention provides a fault signal detection system and an analysis positioning method, and relates to the technical field of signal detection. An injection module is used for periodically applying narrowband acoustic disturbance capable of adaptively selecting frequency and power to an optical cable sheath; the passive wireless label nodes arranged along the line collect multi-dimensional data such as arrival timestamps, amplitudes, frequencies, phases, local temperatures and the like in real time, and upload the data through near-field coupling. And the convergence module completes node identification association and batch aggregation, the analysis and construction module constructs an acoustic propagation path map, and after temperature difference segmentation compensation, an actual laying path is dynamically recovered by adopting a map search algorithm. And the projection and identification module maps the map to a geographic information system coordinate system and outputs a fault space position, thereby realizing real-time and accurate optical cable fault positioning under a topology-free prior condition, remarkably reducing manual inspection and misjudgment rates, and being suitable for a multi-branch and multi-repair long-distance communication or power optical cable scene.
Owner:HANGZHOU DAZHI INTERNET COMM TECH CO LTD

Method for repairing and reconstructing incomplete road network based on AI (Artificial Intelligence) identification

The invention relates to the technical field of geographic information systems, in particular to an incomplete road network repairing and reconstructing method based on AI recognition. Comprising the following steps: S1, road surface data geometric restoration and road width calculation; s2, reconstructing a target road network topology; s3, road attribute matching; and S4, topology simplification and output. According to the method, through the dynamic distance threshold value and topology verification, broken roads are intelligently connected, the disconnection phenomenon is eliminated, a topology connected road network is constructed, and a reliable data basis is provided for path planning. The width is calculated through correlation between the road surface and the center line, and the external road network attributes are fused, so that the output road network has key information such as the road width and grade, and the trafficability evaluation requirement in mechanical construction is met.
Owner:四川电力设计咨询有限责任公司

InSAR building deformation risk assessment method considering stress strain

The invention belongs to the technical field of geographic information systems and PS-InSAR, and discloses a stress-strain-considered InSAR building deformation risk assessment method, which comprises the following steps: carrying out PS-InSAR processing on time sequence SAR image data to obtain a time sequence deformation result and carrying out precision verification; adopting a PS point correction method based on a self-adaptive building contour to screen out PS points of the building; selecting five indexes of building strain, building cumulative inclination amount, building cumulative settlement amount, building age and building structure material type; building risk assessment modeling is carried out by applying an analytic hierarchy process, consistency check and weight calculation are carried out, and the maximum characteristic value of a judgment matrix established by the five risk assessment indexes is calculated; grading the indexes of the model, performing risk assessment on each index, and drawing; and verifying a building risk assessment result in combination with actual dangerous house data. According to the invention, accurate evaluation of the deformation risk level of the building is realized.
Owner:CENT SOUTH UNIV

Steep cliff three-dimensional modeling method and system based on structural plane constraint

The invention discloses a steep cliff three-dimensional modeling method and system based on structural plane constraint, and relates to the technical field of three-dimensional geographic information system.The steep cliff three-dimensional modeling method comprises the steps that steep cliff area geological data including steep cliff multi-view images and steep cliff surface dense point cloud data are collected, and a geological prior knowledge base is constructed; an image recognition technology is used for processing a steep cliff multi-view image, point cloud geometric analysis is combined, and the structural plane spatial orientation including a rock stratum interface and a joint plane is recognized. According to the method, geological priori knowledge is fused, the geometric distortion problem of a traditional digital elevation model in a cliff area is effectively solved, the spatial orientation of a rock stratum interface and a joint surface is extracted by using an image recognition technology, and the spatial orientation is used as a hard constraint condition to construct a control triangulation network framework; the problems of forced smoothing errors of a regular grid DEM and a suspended surface of a triangular irregular network are avoided, and the rock stratum structure, the crack distribution and the dangerous rock body form of the cliff can be precisely restored through the self-adaptive triangulation algorithm.
Owner:INST OF GEOGRAPHICAL SCI & NATURAL RESOURCE RES CAS

Planning permission data processing method, device and equipment based on geographic information system

The invention discloses a planning permission data processing method, device and equipment based on a geographic information system, relates to the technical field of graphic data processing, and aims to solve the problem of relatively low processing and analysis efficiency of planning permission data. The method comprises the following steps: converting a planning range line and a building contour line in a computer-aided design (CAD) drawing into topologically closed geographic information system (GIS) surface data, extracting planning design layer information with a spatial association relationship from the GIS surface data, and constructing a structured planning database; based on an analysis engine of a GIS, determining an overlapping surface domain of planning data and permission data in the structured planning database, and dynamically segmenting and recombining the overlapping surface domain through a topological cracking-clustering algorithm to obtain at least one planning region; determining the planning type of each planning area according to a preset priority sequence, and generating a visual layer with a real-time conflict mark; and calculating a permission compliance index and generating an analysis report based on the spatial topological relation and the visual layer.
Owner:SHANXI ARCHITECTURAL DESIGN & RES INST

Marine ecological environment problem identification method based on multi-source data

The invention discloses a marine ecological environment problem identification method based on multi-source data, and relates to the technical field of marine ecological evaluation, marine ecological environment data is collected from a plurality of data sources of a research area, and is preprocessed to form a marine environment data set; constructing a multi-level ecological environment partitioning system based on the marine environment data set, wherein the multi-level ecological environment partitioning system comprises preliminary partitioning and refined partitioning; and determining the boundary of each hierarchical partition by utilizing a GIS (Geographic Information System) technology and combining ocean topography and landform, hydrodynamic characteristics and ecological function differences. By integrating satellite remote sensing, ocean buoy, subsurface buoy observation, ship investigation, port and coastal monitoring stations and other multi-source data, various aspects of the ocean ecological environment can be comprehensively covered, rich information sources and multi-dimensional and multi-level data sets are provided, information insufficiency or deviation possibly existing in a single data source is effectively made up, and the method has the advantages of being simple in structure, convenient to operate and high in practicability. And the precision and comprehensiveness of marine ecological environment problem identification are obviously improved.
Owner:MARINE DISASTER MITIGATION CENT OF THE MINISTRY OF NATURAL RESOURCES

Comprehensive development and utilization method for underground space

The invention provides an underground space comprehensive development and utilization method, which relates to the technical field of underground space utilization and comprises three steps of data acquisition, construction of a development and utilization identification model and decision making of underground space comprehensive development and utilization. According to the method, meteorological, hydrological and social statistical data are supplemented, the geological conditions, environmental suitability and functional requirements of an underground space development area are structurally and comprehensively evaluated by using a geographic information system, so that the overall evaluation precision is improved, and the evaluation accuracy is improved by combining with a convolutional neural network. Decision support is provided for the purpose of comprehensive development and utilization of the underground space, subjectivity and deviation in traditional manual analysis are reduced, and the effect of improving decision efficiency is achieved.
Owner:BAODING WANSHENG LONCIN CONSTR ENG CO LTD

Distributed MIMO clutter echo simulation method based on GIS information

The invention provides a distributed MIMO clutter echo simulation method based on GIS information, and the method comprises the steps: obtaining the GIS information of a geographic information system, and dividing a surface scatterer irradiated by an MIMO radar into a plurality of basic scattering units based on the GIS information; calculating slope distances, Doppler frequencies, terrain elevation values and land cover types of the plurality of basic scattering units to form a scene model element set; mapping a plurality of basic scattering units to a radar resolution unit by combining a backscattering coefficient empirical model and a resolution adaptive grid mapping method according to the scene model element set; dividing the radar resolution unit into a permanent scattering area and a dynamic scattering area according to GIS information; performing clutter statistical characteristic simulation processing on the permanent scattering region and the dynamic scattering region to obtain a clutter amplitude sequence; and performing echo analysis processing on the clutter amplitude sequence in a time-frequency domain to obtain clutter echo simulation data. And the simulation precision of clutter echo simulation data is integrally improved.
Owner:XIDIAN UNIV

Shared geographic information system for creation, change management and delivery of 3D structure models

A new generation 3D modeling system is described for the management of the 3D characteristics of man-made structures in a shared geographic information system (GIS) platform. The system accommodates the conversion of 2D GIS topology to 3D real-world topology, originate and perpetually maintain 3D models and non-graphical attribute data through time managed by a community of users based on a series of permissions and user roles. The system integrates 3D model data with attribute data and may be supplemented with published map or attribute data and / or data made available by users of the system.
Owner:GEOSPAN CORP