The invention discloses a double-row steel
sheet pile and
soil core combined
cofferdam structure and a construction method. The double-row steel
sheet pile and
soil core combined
cofferdam structure comprises double-row
pile connecting units, steel sheet piles, brackets, steel enclosing purlins, dredger fill and drainage plates. Each double-row
pile connecting unit is formed by
welding an upper connecting plate between two connecting steel sheet piles; the double-row
pile connecting units are inserted into a soil body, and a steel
sheet pile is inserted between every two double-row pile connecting units; corbels are welded to the outer sides of the steel sheet piles, steel enclosing purlins are arranged on the corbels, and the steel enclosing purlins, the steel sheet piles and the corbels are connected in a welded mode; dredger fill is filled between the two rows of steel sheet piles and is compacted by a hammer-attached soil squeezer; a drainage plate is inserted into the dredger fill; earth excavation is conducted on the side, close to water, of the double-row pile
cofferdam to form a foundation pit; when shallow excavation is conducted on the foundation pit, no sand filling
pipe bag is arranged; when the foundation pit is deeply excavated, a slope section is reserved; sand filling
pipe bags are arranged on the outer side of the slope section and stacked on the outer side of the slope section in a staggered mode. The hammer-attached soil squeezing device comprises an attached hammer, a pressing plate, water permeable holes, geotechnical cloth and a
brush.