The utility model provides a converter
station concrete
mass foundation crack prevention device relates to the
electric power civil engineering technical field, include:
mass foundation, the
mass foundation top is equipped with the
pile foundation, and the mass foundation is equipped with the foundation main
muscle inside, and the foundation main
muscle is divided into longitudinal reinforcement and cross
muscle, and the longitudinal reinforcement and cross muscle cross distribution, and the
pile foundation is equipped with the vertical muscle inside, and the vertical muscle below inserts into the mass foundation inside, and the vertical muscle of
pile foundation inside is provided with the inside
stirrup, the utility model not only can through the
stirrup tight hoop, prevent because the external temperature change and other factors lead to the pile foundation
cracking, still can through the cooling
water flow in the mass foundation inside and take away the mass foundation internal heat, prevent the mass foundation because the internal overheating leads to the
cracking, solved the prior art cannot prevent the problem that the concrete cracks because of the mass internal foundation heating.