Full-automatic mining comprehensive protector testing system

A technology of comprehensive protector and test system, applied in the direction of instrument, measuring power, measuring device, etc., can solve the problems of large test error, low test efficiency, delay of underground production, etc., to reduce work intensity operation, avoid untimely test, The effect of improving test accuracy
CN102393492AInactive Publication Date: 2012-03-28ZHONGBEI UNIV

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
ZHONGBEI UNIV
Publication Date
2012-03-28
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention discloses a full-automatic mining comprehensive protector testing system, which comprises a hardware and a software, and is characterized in that: the hardware comprises a voltage stabilizer, a testing table and a special box which corresponds to the model of the comprehensive protector one to one; the testing table comprises a programmable control signal generator and a control computer; the programmable control signal generator is connected with a relay; the generator and the relay are connected with the voltage, current measuring block, a switch input output module and a timing module; the three modules are connected with the control computer through RS485 bus, and are used for controlling the computer to connect a printer simultaneously; the software is mainly portioned into user interface module, system maintenance module, task management module and comprehensive testing module. The full automatic mine comprehensive protector testing system has the characteristics of capability of reducing work intensity of testing personnel, increasing testing accuracy and error operation, so that the problem of influence on production and safety caused by untimely and inaccurate testing of comprehensive protector is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical field

[0001] The invention relates to a test system, in particular to a fully automatic mine-used comprehensive protector test system. Background technique

[0002] Comprehensive mine protector, referred to as comprehensive protection, is to protect electrical equipment including power supply and electricity consumption in coal mines. It has overcurrent protection, phase failure protection, three-phase unbalance (phase sensitive) protection, overvoltage and undervoltage protection, and insulation Relay protection devices with functions such as monitoring protection, leakage protection and lockout protection are often plugged into the switch as parts of the electrical switch, so they are generally called plug-ins on site.

[0003] The coal mine comprehensive protector is mainly used to protect various electrical faults that may occur in various electrical equipment in the mine, prevent equipment damage and personal injury accidents, and avoid coal mine gas explosion accide...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More