Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

1030 results about "Geotextile" patented technology

Geotextiles are permeable fabrics which, when used in association with soil, have the ability to separate, filter, reinforce, protect, or drain. Typically made from polypropylene or polyester, geotextile fabrics come in three basic forms: woven (resembling mail bag sacking), needle punched (resembling felt), or heat bonded (resembling ironed felt).

Wicking loop cross-plane drainage fabric

A geotextile fabric includes a first weft yarn woven in a weft direction and a first warp yarn and a second warp yarn woven in a warp direction, the first warp yarn being a wicking yarn, and the second warp yarn being a wicking yarn or a non-wicking yarn, the first warp yarn forming a first loop that is woven through and extends from a first face of the woven geosynthetic fabric and across at least two of the first weft yarns to form a first gap between the first loop and first the face of the woven geosynthetic fabric.
Owner:TEN CATE IND ZHUHAI CO LTD

Composite tension sand blocking and silt reducing facility and method

The invention provides a composite tension sand blocking and silt reducing facility and method.The facility is composed of one or more units, each unit comprises a floating body, a composite tension curtain and an anchor point located at the bottom of a water body, one end of the composite tension curtain is connected to the floating body, and the other end of the composite tension curtain is connected to the anchor point; the composite tension curtain forms a sand blocking surface in the water between the bottom of the water body and the floating body by virtue of the buoyancy of the floating body, and the floating body is positioned on the water surface or suspended in the water; the composite tension curtain is formed by sewing two layers of geotechnical cloth together, a plurality of steel cables are inserted between the two layers of geotechnical cloth, a composite tension structure is formed to serve as a sand blocking and silt reducing curtain face, and main water flow force and wave force are borne by the steel cables. The flexible sand blocking curtain structure facility is economical, convenient to construct, suitable for large flow velocity and wave conditions and capable of blocking sand and reducing silt.
Owner:SHANGHAI JIAOTONG UNIV +2

Testing device and testing method for permeability coefficient characteristic curve of wicking geotextile

The invention discloses a testing device and a testing method for a permeability coefficient characteristic curve of wicking geotextile, and belongs to the technical field of permeability coefficient testing. A to-be-tested wicking geotextile and a soil layer are laid between an upper plate body and a lower plate body of a test unit of the test device; the two sealing covers are located at the two ends of the upper plate body and the two ends of the lower plate body respectively. Each of the first hollow column and the second hollow column comprises a hollow column section positioned above the upper plate body and below the lower plate body, the hollow column sections distributed up and down are communicated with a gap between the upper plate body and the lower plate body, and each hollow column section is filled with a soil body and forms a test soil column; the load output end of the load applying unit is used for applying a vertical load to the top of the test soil column and the upper plate body. The test device disclosed by the invention can really simulate the occurrence condition of the wicking geotechnical cloth in the roadbed engineering; the testing method based on the testing device can rapidly test the permeability coefficient of the wicking geotextile, and a characteristic curve of the permeability coefficient of the wicking geotextile is obtained.
Owner:SHANDONG UNIV

Construction method of CRTS III slab ballastless track

The invention provides a construction method of a CRTS III type slab ballastless track, and relates to the technical field of high-speed rail construction, and the construction method comprises the following steps: mounting base plate steel bars, side forms, end templates and limiting groove templates, placing foam plates at expansion joints, and reserving track slab pressing and anchoring holes; base plate concrete is poured, and base plate concrete formwork removal, surface finishing, maintenance and expansion joint construction are carried out after pouring; constructing a geotextile isolation layer and an elastic cushion layer; limiting groove steel bars and self-compacting concrete layer steel bar meshes are installed, and track plates are placed; before and after the track plate and the base plate are fastened by the pressing device, the track plate is finely adjusted by the fine adjustment device; and a self-compacting concrete formwork is installed, self-compacting concrete is poured, and post-pouring treatment and curing are conducted. The track plate and the base plate are fastened through the pressing device, so that the track plate, the base plate and the self-compacting concrete layer are tightly attached in the self-compacting concrete pouring period, and the situation that reworking or track laying is difficult due to the fact that the floating amount of the track plate is too large is avoided.
Owner:ERCHU CO LTD OF CHINA RAILWAY TUNNEL GRP +3

Oxygen gradient self-coupling granular sludge partition reactor

The invention belongs to the technical field of sewage treatment, and particularly relates to an oxygen gradient self-coupling granular sludge partition reactor which comprises a reactor body, the reactor body is of a vertically-arranged tower structure, and an aeration system, a water distribution system, a partition assembly, a three-phase separator, a gas collection assembly, a water outlet assembly and a sludge discharge port are arranged in the reactor body. Wherein at least one layer of separation assembly is arranged, and the separation assembly divides an inner cavity of the reactor body into a first reaction function area and a second reaction function area which are connected in series up and down; the separation assembly comprises PET geotechnical cloth, and grating supporting plates are arranged on the upper side and the lower side of the PET geotechnical cloth. The functions of aeration, reaction, separation, water outlet and the like are integrated through a vertical tower type structure, high efficiency and energy conservation in the sewage treatment process are achieved, nitrification and denitrification reactions are synchronously completed in a single reactor by utilizing an oxygen gradient self-coupling mechanism in aerobic granular sludge, a traditional nitrification liquid internal reflux and sludge reflux system is not needed, and the cost is reduced. And the energy consumption and the operation cost are obviously reduced.
Owner:BEIJING MUNICIPAL RES INST OF ENVIRONMENT PROTECTION

Mould bag sand cofferdam MPM simulation method and system based on artificial intelligence

The invention belongs to the technical field of crossing of artificial intelligence and computational mechanics, and particularly relates to an artificial intelligence-based MPM simulation method and system for a mold bag sand cofferdam, a three-dimensional simulation system of the mold bag sand cofferdam is constructed in combination with an MPM method, and the penetration state of sand and geotechnical cloth is detected in an accelerated manner by utilizing a penetration tracking algorithm and spatial Hash. An artificial intelligence algorithm is introduced, a reward function is designed with minimum penetration depth and penetration times as targets, penetration prediction of MPM particles is driven, the speed and stress of the MPM particles are further dynamically regulated and controlled on the basis of a predicted contact model and the artificial intelligence algorithm, penetration is prevented, numerical stability is ensured, and the prediction accuracy of the MPM particles is improved. The calculation precision is improved by adopting implicit integration and gradient descent methods; and bidirectional coupling of the sand and the geotechnical cloth is realized through a visualization module. The problems that in a traditional method, coupling simulation of sandy soil and a flexible structure is low in efficiency, easy to penetrate, unstable in numerical value and the like are solved, and the accuracy and reliability of simulation analysis of the mold bag sand cofferdam structure under the complex working condition are remarkably improved.
Owner:GUANGZHOU MUNICIPAL ENG DESIGN & RES INST CO LTD

Phase change-moisture absorption and drainage composite roadbed structure in seasonal frozen region and intelligent regulation and control method

The invention provides a phase change-moisture absorption and drainage composite roadbed structure in a seasonal frozen region and an intelligent regulation and control method, and relates to the technical field of roadbed design and renovation. The roadbed structure is characterized in that a plurality of gradient phase change material layers are arranged on the top surface of a roadbed surface layer; the multi-layer gradient phase change material layer, the high moisture absorption and drainage geotextile layer and the drainage pipe system are arranged from top to bottom; the phase change temperature intervals and the phase change latent heat of the phase change layers in the multiple gradient phase change material layers are different; the high moisture absorption and drainage geotextile layer is used for guiding water in the soil body into the drainage pipe system; the drainage pipe system is of a porous structure with the inclination angle within the set angle range and is used for guiding water in the soil into the drainage ditch. And the intelligent regulation and control system is used for dynamically regulating the thermal resistance of each phase change layer and the opening degree of the drainage pipe. According to the invention, the time of the roadbed in a relatively stable physical state can be prolonged, so that the purpose of preventing and treating winter frost heaving, frost boiling and mud rising in a spring melting period and other diseases caused by temperature change of the roadbed in severe cold areas is achieved.
Owner:SHIJIAZHUANG TIEDAO UNIV

Quick blocking system for dike breach

The invention discloses a quick blocking system for a dike breach, which belongs to the field of hydraulic engineering equipment and comprises a pushing support fixed on a dike through a positioning anchor rod and a fixed arm slidably arranged along the length direction of the dike, and the pushing support is connected with the fixed arm through hydraulic pushing translation equipment. One end of each fixed arm extends to the position above the dike breach, the two fixed arms are parallel to each other, a longitudinal supporting arm is arranged at the end, away from the pushing support, of each fixed arm, the longitudinal supporting arms are arranged between the two fixed arms, and positioning guide seats are arranged on the longitudinal supporting arms and the fixed arms correspondingly; the positioning guide seats are used for positioning the blocking anchor rods, the blocking anchor rods are downwards anchored into a foundation of the embankment breach along the positioning guide seats, and the breach is blocked by throwing geotechnical cloth sandbags or large stones or steel mesh gabions into an area formed by the blocking anchor rods. The problem that when a blocking medium is directly fed into the breach, the blocking medium is not stable under the impact of water flow and is directly washed away is solved.
Owner:GUANGDONG ELECTRIC POWER PLANNING SURVEY & DESIGN INST

Three-dimensional visual monitoring system for geotextile laying ship

The invention discloses a three-dimensional visual monitoring system for a geotextile laying ship, and the system comprises a data transmission module which is used for collecting and storing the monitoring data of the geotextile laying ship in real time through a sensor; the somatosensory module is used for capturing limb actions of the user through various hardware devices and recognizing user voice; the virtual environment generation module is used for receiving the transmission data of the data transmission module and the somatosensory module and constructing a virtual arrangement environment highly similar to the operation site of the arrangement ship; the user interaction monitoring module is used for enabling monitoring personnel to control the virtual arrangement environment, check all angles and details of the arrangement ship, judge whether the arrangement ship is abnormal or not and record the abnormality on the basis of the virtual environment generation module; and the exception handling module is used for recording and reporting exception information when the user interaction monitoring module inspects the exception. According to the invention, visual, efficient and safe three-dimensional visual monitoring experience is provided for arrangement construction.
Owner:CCCC SHANGHAI DREDGING CO LTD +1

River and lake sludge dewatering and curing ecological bank protection process

The invention discloses a river and lake sludge dewatering and curing ecological bank protection process. Ecological bank protection construction is achieved through in-situ resourceful treatment of sludge. The process comprises the following steps: firstly, pressing natural wood piles into the bottom of a bank slope to form a comb-shaped anti-sliding bent frame, and paving high-strength permeable geotextile pipe bags between the piles and the bank slope; bottom mud is extracted by adopting mud suction equipment, is modified by a flocculating agent and then is injected into a tubular bag in a layered manner, and gravity dehydration is completed by utilizing the permeable characteristic of tubular bag fabric; the tops of the pipe bags are backfilled with stacking materials for graded stacking, and solidification is accelerated through external pressurization to form a stable bank protection filling body; and finally, the surface layer is covered with planting soil, moisture-proof plants are planted, and the composite revetment with the permeation drainage function and the ecological function is constructed. Compared with a traditional technology, the technology effectively solves the problems of bottom mud outward transportation pollution and resource waste through triple synergy of geotextile tube bag gravity dehydration, natural timber pile stability enhancement, building body strength improvement through graded stacking and loading and the like, and the formed revetment has ecological restoration and landscape functions. The method is suitable for ecological restoration of rivers and lakes, wetland reconstruction and waterfront environment treatment, and has the comprehensive advantages of convenience in construction, environmental friendliness, economy and high efficiency.
Owner:NANJING COMM INST OF TECH +1

Efficient dehydration treatment device for waste engineering slurry and dehydration method of efficient dehydration treatment device

The invention discloses an efficient dehydration treatment device for waste engineering slurry and a dehydration method of the efficient dehydration treatment device. Relates to the technical field of rapid dehydration of high-water-content waste slurry. The dehydration treatment device comprises a waste slurry pipeline conveying module, a precise dosing module, a multi-stage pipeline mixing and dissolving module and a geotextile tube bag dehydration module which are connected in sequence. Accurate dosing can be achieved according to the water content of the slurry in the slurry sedimentation tank, negative effects on the flocculation effect of the slurry due to too much or too little flocculants are avoided, use of flocculant materials is reduced, the material cost is greatly reduced, meanwhile, the flocculants are arranged, the cationic flocculant YAPAM is adopted as the flocculants, and the flocculation effect of the slurry sedimentation tank is improved. The flocculant has the advantages of small dosage, good flocculation effect, environmental protection and the like. In the flocculating settling process of the slurry, soil particles in the slurry can be rapidly gathered and precipitated through the effects of electric neutralization and adsorption bridging, and the formed floc is stable in structure, large in size and not prone to being broken.
Owner:江苏瑞沃建设集团有限公司 +2

Biological self-repairing geotechnical cloth suitable for soil slope and construction method

The invention discloses biological self-repairing geotechnical cloth suitable for a soil slope and a construction method.The biological self-repairing geotechnical cloth is fixed to the soil slope surface through anchor rods and comprises two layers of biological composite fiber geotechnical cloth arranged up and down and a layer of polypropylene fiber geotechnical cloth arranged between the two layers of biological composite fiber geotechnical cloth; the biological self-repairing geotextile is formed by connecting biological composite fiber geotextile, polypropylene fiber geotextile and biological composite fiber geotextile from top to bottom in sequence through needling. According to the invention, the biological composite fiber geotextile, the polypropylene fiber geotextile and the biological composite fiber geotextile are connected into the biological self-repairing geotextile by adopting a needling technology; batch production of the biological self-repairing composite geotextile can be realized, the production cost is reduced, and the production efficiency is improved; and the biological self-repairing geotechnical cloth is fixed on the soil slope surface in a step shape, so that the soil slope in the application environment can be prevented from sliding and eroding.
Owner:ZHEJIANG COMM CONSTR GRP CO LTD +3

Ecological reinforcing structure of river channel grouted rubble retaining wall revetment

The invention provides an ecological reinforcing structure of a river channel grouted rubble retaining wall revetment, the ecological reinforcing structure takes double-row pile foundations and a planting platform as a core design concept, the first pile foundation is located at the foot of an existing grouted rubble retaining wall, the top of the pile foundation is provided with a reinforced concrete guide beam, and the second pile foundation is located at the foot of the existing grouted rubble retaining wall; the newly-built guide beam is connected with an existing grouted rubble retaining wall base into a whole through embedded steel bars, the integrity and the anti-sliding capacity of the retaining wall are remarkably enhanced, and base emptying and wall body deformation are effectively restrained. The second pile foundation structure is a planting pile and backfill soil behind the planting pile to construct an aquatic plant planting platform, geotechnical cloth is laid between the planting pile and the backfill soil, soil particle loss can be prevented, water is allowed to freely permeate, and normal exchange between water and soil is maintained. The stability of an existing retaining wall is guaranteed, an aquatic plant planting platform is constructed, the whole reinforcing system is hidden under the normal water level, the natural form of a river channel is maintained, and deep integration of ecology and safety is achieved.
Owner:SHANGHAI INVESTIGATION DESIGN & RES INST CO LTD

Anti-fouling curtain structure for water dredging engineering

The invention discloses an anti-fouling curtain structure for water dredging engineering, and belongs to the technical field of environment protection of dredging engineering, the anti-fouling curtain structure for water dredging engineering comprises a floating body, an anti-fouling curtain and a vertical body, the floating body is arranged at the top end of the anti-fouling curtain, the vertical body is arranged at the bottom end of the anti-fouling curtain, and the anti-fouling curtain is geotechnical cloth; the geotechnical cloth is prepared from the following components in parts by weight: 100 to 150 parts of polyester, 20 to 50 parts of copolyester and 5 to 30 parts of inorganic filler, the copolyester is a copolymer of terephthalic acid, 5-sulfoisophthalic acid sodium salt, ethylene glycol and dihydroxyl-terminated polyvinyl imidazole, and the geotechnical cloth is further prepared by a post-treatment step. According to the invention, the copolyester composed of terephthalic acid, sodium 5-sulfoisophthalic acid, ethylene glycol and dihydroxyl-terminated polyvinyl imidazole and the inorganic filler are added into the polyester fiber, and the polyester fiber is modified through a post-treatment step, so that the alkali resistance and the antifouling property of the antifouling curtain are improved.
Owner:CCCC FOURTH HARBOR ENG CO LTD +1

Dredged mud upper and lower part double-face combined vacuum consolidation drainage method

The invention discloses a dredged mud upper and lower part double-face combined vacuum consolidation drainage method, which comprises the following specific implementation processes: laying a horizontal sand bag containing a PVC (Polyvinyl Chloride) pipe and a vertical drainage pipe at the bottom of a cofferdam foundation pit to serve as a bottom drainage system, blowing and filling dredged mud in a layered manner, controlling the thickness and the water content of each layer, and when the water content of a soil body is lower than twice liquid limit, stopping drainage; starting the bottom vacuum water pumping device to perform preliminary water drainage, inserting straw bundles into the soil body through hollow pipes with bottom covers to form a vertical water drainage structure after the strength of the soil body meets the requirement, sequentially laying geotechnical cloth, a straw woven blanket, a PVC water drainage pipe network and a sealing film on the top to construct a top vacuum system, and finally synchronously starting the top vacuum water pumping device and the bottom vacuum water pumping device. The vacuum difference is controlled by adjusting the ventilation device, and upper and lower double-face combined vacuum consolidation drainage is achieved. The drainage consolidation of the dredged mud is effectively accelerated, the treatment efficiency is improved, and the drainage effect is enhanced through precise control over the vacuum degree and application of materials such as straw.
Owner:ZHEJIANG UNIV OF TECH +1

Shoreline Sand Protection System and Method

A system suitable for protecting shoreline or other target area / zone includes a geotextile sheet having an upper edge and a lower edge, the upper edge including a first channel through which a first draw cord is threaded, and the lower edge including a second channel through which a second draw cord is threaded. A flap has a lower portion affixed to the geotextile sheet proximal to its lower edge. The flap can further include un upper portion affixed to the geotextile sheet proximal to its upper edge, where the flap and the geotextile sheet form an enclosure.
Owner:SOX LLC

Permafrost thawing prevention via a cooling geotextile

PendingUS20250361690A1GeotextilesSoil preservationBiodegradable coatingMiddle infrared
Permafrost thawing prevention may involve deploying a cooling geotextile onto a permafrost soil. The geotextile may include a biomass scaffold comprising natural plant-based fibers. The geotextile may further include a cellulose layer comprising cellulose fibers laminated onto the biomass scaffold such that the cellulose fibers are physically entangled with the plant-based fibers. The geotextile may further include a hydrophobic and biodegradable coating which defines at least one surface of the geotextile. The geotextile may be optically opaque, exhibits high solar reflectivity, and maintains high mid-infrared emissivity to enable passive radiative cooling.
Owner:PURDUE RES FOUND

Efficient maintenance method for cement stabilized macadam base

The invention discloses an efficient maintenance method for a cement stabilized macadam base, and relates to the technical field of buildings. According to the efficient maintenance method for the cement stabilized macadam base, the water-retaining property of the covering device is guaranteed through the geotechnical cloth water-retaining layer, so that the covering object is better kept wet in the maintenance process; the cement stabilized macadam base is well prevented from being influenced by water shortage during maintenance due to the toughness and the water conveying capacity of the polyethylene water distribution pipe; the reserved connecting port of the water distribution pipe has the effects of connecting a water supply pipe and connecting a plurality of covering device units, sufficient water maintenance of a cement stabilized macadam base layer in a covering area is guaranteed as far as possible, and meanwhile, the performance of convenient disassembly and assembly provides the effects of being suitable for maintenance of areas with any area and recycling of the device during maintenance of the cement stabilized macadam. Due to the water sealing performance of the polyethylene water sealing layer and the water supplementing holes formed in the water distribution pipe, only a small amount of water in the cement stabilized macadam base is evaporated.
Owner:CHINA MCC17 GRP CO LTD

An anti-cracking and durable long-life asphalt pavement structure and its construction method

The present invention discloses a crack-resistant and durable long-life asphalt pavement structure and its construction method, which relates to the technical field of asphalt pavement construction. It includes an asphalt surface layer, a reinforcement mesh, positioning piles, and fixing rings. A geotextile stress absorption layer is provided under the asphalt surface layer, and a prime coat is provided under the geotextile stress absorption layer. The prime coat is SBS modified emulsified asphalt. By using polypropylene geotextiles to reinforce the pavement structure and form a composite structure with road materials, it has strong interfacial effects and reinforcement functions, forms a good whole with the surface layer and the base layer, effectively prevents or delays the cracking of asphalt pavements, improves the service life of the asphalt surface layer. After the polypropylene geotextiles are combined with the prime coat oil, it has excellent waterproof effects, prevents surface water from seeping into the pavement structure and eroding the roadbed, and extends the service life of the pavement.
Owner:CCCC FIRST HIGHWAY CONSULTANTS CO LTD

Ground surface settlement prevention and control method based on mold bag grouting

The invention discloses a ground surface settlement prevention and control method based on mold bag grouting. The ground surface settlement prevention and control method comprises the following steps that geological investigation is conducted, and pile positions are arranged; drilling at the pile position to form a pile hole; the method further comprises the following steps that the main grouting pipe and the geotextile bag on the main grouting pipe are placed into the pile hole together, and backfilling is conducted between the pile hole and the main grouting pipe; pressure grouting is conducted in the main grouting pipe, the grout in the main grouting pipe rises gradually, meanwhile, the grout in the main grouting pipe is pressed into the geotextile mold bag through the secondary grouting pipe, and the geotextile mold bag expands gradually in the radial direction and extrudes the surrounding soil body; and grouting is stopped, and after the grout in the main grouting pipe and the soil engineering mold bag is hardened, the main grouting pipe and the soil engineering mold bag jointly form a mold bag pile body. The construction method has the beneficial effects that the grouting pipes are arranged underground, the expandable mold bags are installed at the preset positions of the grouting pipes, after grout is injected, the mold bags expand directionally and evenly extrude the surrounding soil body, and therefore active compaction of the soil body is achieved, and the rigidity and integrity of a foundation are remarkably improved.
Owner:CHINA RAILWAY NO 8 ENG GRP CO LTD +2

Bundling and drafting device for geotextile spinning and geotextile production line

The utility model discloses a bundling and drafting device for geotextile spinning and a geotextile production line, the bundling and drafting device comprises a bundling and drafting box, and a first drafting roller unit, a second drafting roller unit and a third drafting roller unit which are arranged in the bundling and drafting box, and the drafting speeds of the three drafting roller units are sequentially increased; each drawing roller unit comprises a plurality of drawing rollers which are parallel to one another, and the three drawing roller units sequentially draw a fiber bundle which is formed by a plurality of fibers and enters the bundling drawing box; therefore, the fiber bundles are mechanically bundled and drafted through the three drafting roller units with the drafting speeds sequentially increased, the fiber drafting process in the spinning process is optimized, in addition, the geotechnical cloth production line provided with the bundling and drafting device can adapt to polyester raw materials with higher viscosity, the tensile strength of the prepared polyester geotechnical cloth is improved, and the production efficiency is improved. And the drafting speed of the polypropylene fibers can be increased, so that the tensile strength of the prepared polypropylene geotextile is improved.
Owner:SHAOXING LIDA NON WOVEN FABRIC CO LTD

Degradable slope protection vegetation geotextile and preparation method thereof

The invention discloses degradable slope protection vegetation geotextile and a preparation method. The degradable slope protection vegetation geotextile comprises two layers of double-sided degradable biological geotextile and concrete arranged between the two layers of double-sided degradable biological geotextile; the double-sided degradable biological geotechnical cloth comprises two layers of polylactic acid biopolymer geotechnical cloth and jute fiber bundles, and the jute fiber bundles penetrate through the two layers of polylactic acid biopolymer geotechnical cloth from top to bottom and are bound to form the double-sided degradable biological geotechnical cloth. The double-sided degradable biological geotextile forms a carrier, a better growth environment is provided for plants in the biochar vegetation concrete, the blended biochar vegetation concrete is uniformly poured in the middle of the double-sided degradable geotextile, and the purpose of uniformly reinforcing the side slope is achieved.
Owner:FUJIAN TRANSPORTATION PLANNING & DESIGN INST CO LTD +3

Anti-seepage water collection and drainage system for deep-ground super-large-span storage tank chamber

The invention relates to the technical field of storage tank chambers, in particular to a deep-ground ultra-large-span storage tank chamber anti-seepage water collection and drainage system which comprises a chamber outer side waterproof and water collection and drainage system, a chamber inner side water collection and drainage system, a chamber channel outer side waterproof and water collection and drainage system and a chamber channel inner side water collection and drainage system. The waterproof plate and the waterproof geotechnical cloth are arranged on the outer sides of the chamber and the chamber channel; wherein the chamber outside waterproof and catchment drainage system, the chamber inside catchment drainage system and the chamber channel outside waterproof and catchment drainage system are all communicated with the chamber channel inside catchment drainage system. According to the anti-seepage water collection and drainage system for the deep-ground ultra-large-span storage tank chamber, water seepage around the storage tank chamber is considered, the measures of water prevention, water collection and drainage are taken, and the anti-seepage problem of the ultra-large-span storage tank chamber in the deep underground space is effectively solved.
Owner:CCCC FIRST HIGHWAY CONSULTANTS CO LTD

Initial support structure for rapid support in tunnel excavation and construction method

The invention discloses a tunnel excavation rapid support preliminary bracing structure and a construction method, the tunnel excavation rapid support preliminary bracing structure comprises an inner layer, an outer layer and anchor rods, the inner layer is formed by splicing preliminary bracing segments, and the segments are made of steel plates and used for forming a framework of a preliminary bracing system; the pipe pieces also serve as inner formworks for concrete pouring, and the adjacent pipe pieces are welded or bolted; the outer layer is composed of mould bag concrete, geotextile is adopted to manufacture a geotextile mould bag, the concrete is poured into the mould bag through a high-pressure pump, and after solidification, an integral concrete plate is formed and serves as a main supporting structure of primary support. The shape and the size of the geotextile mold bag can be adjusted to cope with different excavation conditions, the primary support inner layer can adopt temporary support or permanent support or combination of the temporary support and the permanent support, the primary support inner layer can be used for placing construction facilities through expansion, and the mold bag can keep certain pressure to actively support surrounding rock before concrete is solidified when concrete is poured. According to the method, the excavation efficiency can be greatly improved, supporting is more timely and effective, the operation safety is improved, the tunnel face environment is improved, convenience is provided for construction operation, construction is convenient and fast, practicability is high, and the method is worthy of popularization.
Owner:SICHUAN ROAD & BRIDGE CONSTRUCTION GROUP CO LTD

Composite temperature control drainage geotextile

The invention discloses a composite temperature-control drainage geotextile, and relates to the technical field of geosynthetic materials. The geotextile comprises a drainage layer which is of a three-dimensional water guide structure formed by biaxial warp knitting of special-shaped section wicking fiber bundles and polypropylene reinforced fiber bundles and used for efficient drainage; the reinforcing layer is of a grid structure which is formed by hot melting and bonding ultra-high molecular weight polyethylene fibers and has high tensile strength, and provides mechanical support; the heating layer is composed of carbon fiber heating wires which are arranged in parallel in a snakelike mode and electrically connected in series, and the heating layer is embedded in a quilting seam channel between the drainage layer and the reinforcing layer and can achieve active heating of soil; the temperature control module comprises a temperature sensor in the enhancement layer and a temperature control device connected with the heating layer in series, and the heating power can be dynamically adjusted according to a preset temperature threshold value. By means of the multi-layer composite structure and the intelligent temperature control system, effective integration of drainage, enhancement and active anti-freezing functions is achieved, and the engineering application performance of the geotechnical cloth in the cold environment is remarkably improved.
Owner:SOUTHWEST PETROLEUM UNIV

Steel slag base pavement structure and construction method thereof

The invention discloses a steel slag base pavement structure and a construction method thereof. The pavement structure comprises a soil base compaction layer, a gravel functional layer, a cement stabilized steel slag layer, prime coat oil, a stress absorption layer, tack coat oil, waterproof geotechnical cloth, an asphalt concrete lower surface layer and an asphalt concrete upper surface layer which are sequentially laid from bottom to top. The cement-stabilized steel slag layer is formed by mixing cement and steel slag according to the weight ratio of (4-5%): (95-96%), the crushing value of the steel slag is smaller than or equal to 35%, the soaking expansion rate is smaller than or equal to 2%, the iron content is smaller than or equal to 2%, the free calcium oxide content is smaller than 3%, and the maximum particle size is smaller than or equal to 37.5 mm. The invention relates to the technical field of road engineering, in particular to a steel slag base pavement structure and a construction method thereof.
Owner:BAOTOU STEEL GRP DESIGN & RES INST

Assembled plastic steel sheet pile structure for dam piping treatment and using method of assembled plastic steel sheet pile structure

The invention relates to the technical field of dam piping treatment, in particular to an assembled plastic steel sheet pile structure and a using method. The structure comprises at least one group of plastic steel sheet piles which are arranged in an embankment foundation on the backwater side of an embankment body, and the first group of plastic steel sheet piles are located between a piping outlet and the embankment body to cut off a piping channel. The plastic steel plate piles are assembled through mortise and tenon structures, tenons and tenon buckles are connected in a matched mode, and supporting bases with inserting plates are arranged to assist in vertical installation. The surface of the embankment foundation is covered with a permeable filter layer and an inverted filter layer, the permeable filter layer is made of geotechnical cloth, and the inverted filter layer is composed of a fine gravel layer and an overlying coarse gravel layer. The using method comprises the steps that an original piping outlet is positioned, and the first set of sheet piles are inserted; according to water seepage and sand carrying conditions, inserting subsequent sheet piles between the first group of sheet piles and the dike body in a progressive increase manner; if a new outlet appears, the insertion direction and depth of the sheet pile are adjusted according to the outlet position. The seepage path is prolonged by inserting the sheet piles with different depths in a graded mode, the filtering layer is matched for intercepting gravel, and the problem that traditional treatment efficiency is low is solved.
Owner:HOHAI UNIV

Geogrid with drainage function and manufacturing device and method thereof

The invention belongs to the technical field of geogrids, and discloses a geogrid with a drainage function and a manufacturing device and method.The geogrid comprises a plurality of grid strips, the grid strips are divided into drainage strips and common strips, each drainage strip comprises a groove-shaped strip body, a drainage groove is formed in the groove-shaped strip body in the length direction of the groove-shaped strip body, and the common strips are arranged in the drainage groove. Geotextile is arranged on the groove-shaped strip body and located on the notch side of the drainage groove, the common strip comprises a rectangular strip body and a groove-shaped strip body, a plurality of fiber tows are arranged in the rectangular strip body at intervals, drainage strips are adopted as the longitudinal grid strips, and drainage strips or common strips are adopted as the transverse grid strips. The design of the longitudinal drainage strips is adopted, the drainage channel penetrating in the longitudinal direction is formed, free water in the soil body can be rapidly collected and directionally drained out of an engineering area, the soil body saturation degree is effectively reduced, the residence time of water in the soil body is shortened, and the problems that due to water accumulation, the dead weight of the soil body is increased, and the bearing capacity is reduced are solved.
Owner:LUZHOU SHENGYANG NEW MATERIAL CO LTD +1

Geological disaster control project drainage channel structure and construction method thereof

The invention provides a drainage channel structure of a geological disaster control project and a construction method of the drainage channel structure, and relates to the technical field of drainage channels. The drainage channel structure of the geological disaster control project comprises an excavated U-shaped drainage channel body, a channel body supporting structure is arranged in the drainage channel body, and the channel body supporting structure comprises a first supporting layer and a second supporting layer arranged on the inner side of the first supporting layer; the first supporting layer comprises U-shaped supporting walls and a U-shaped concrete platform which are matched with the U-shaped drainage channel body, the U-shaped supporting walls are embedded in supporting wall setting cavities so as to form the first supporting layer with the U-shaped concrete platform, and the U-shaped supporting walls are formed by filling stone cages with broken stones; the second supporting layer is a concrete layer, and waterproof geotechnical cloth is arranged between the second supporting layer and the first supporting layer. The concrete layer of the second layer is not prone to cracking or damage, the canal body supporting structure is more stable, and the service life is longer.
Owner:CHINA 19TH METALLURGICAL CORP

Socket prefabricated chute and prefabricating and assembling method

The invention discloses a socket prefabricated chute and a prefabricating and assembling method, and belongs to the technical field of road drainage facilities. The torrent groove comprises a top section, a plurality of middle sections and a bottom section which are in lap joint with one another, and main bodies of all the sections are groove bodies of U-shaped structures, are in lap joint through U-shaped clamping grooves and U-shaped bosses and are connected through U-shaped connecting steel bars. The top section, the middle section and the bottom section are made of C25 concrete precast blocks, two-cloth-one-film anti-seepage geotechnical cloth is laid at the bottom, cement mortar is adopted for caulking at the splicing position, a slope toe foundation is arranged below the bottom section, and an anti-skid table is further arranged according to the filling height of a roadbed. The prefabrication method comprises the steps of formwork preparation, bolt hole forming part pre-burying, concrete pouring and demolding forming. The assembling method comprises the steps of foundation treatment, installation of all sections, steel bar connection, joint treatment, auxiliary treatment, anti-skid table arrangement and the like. The construction method has the advantages of being high in construction efficiency, easy to guarantee construction quality, good in anti-seepage performance, high in structural stability and the like, and is suitable for various road drainage projects.
Owner:HENAN JIAOTONG DESIGN CONSULTING CO LTD +1