Geocells are used in civil engineering for roadway load support, walls and steep slopes, channel protection and erosion control. They are typically made from ultrasonically welded high density polyethylene strips and expanded on-site to form a honeycomb structure which is subsequently filled with sand, gravel, locally available soil, or concrete.

Mine pit steep slope anti-seepage system based on high-molecular polymer mineral anti-seepage material

The invention discloses a mine pit steep slope anti-seepage system based on a high-molecular polymer mineral substance anti-seepage material, which comprises a drainage mechanism, a drainage guide mechanism, an anti-seepage mechanism and an anchoring mechanism which are arranged on a mine pit steep slope, the drainage mechanism comprises a hidden groove arranged on the mine pit steep slope, a prefabricated drainage hidden groove block is arranged in the hidden groove, and the drainage hidden groove block is arranged in the hidden groove. A water pumping assembly is arranged in the prefabricated drainage blind drain block, the drainage guiding mechanism comprises an inner geocell and a drainage pipe which are arranged on the steep slope of the mine pit, the seepage-proofing mechanism comprises an outer geocell arranged on the steep slope of the mine pit, and the anchoring mechanism comprises a T-shaped anchor rod installed on the steep slope of the mine pit. According to the method, the mode that the outer geocell is filled with the high-molecular polymer mineral impermeable material is adopted, complex excavation or backfilling operation does not need to be conducted on the mountain slope, the earthwork amount is reduced, the construction complexity and difficulty are reduced, and therefore the construction cost is remarkably reduced.
Owner:SHANG HAI SHENG YI TECH CO LTD

Ecological support system for side slope

The embodiment of the invention discloses a side slope ecological supporting system, and belongs to the technical field of ecological restoration, the side slope ecological supporting system is composed of a protection slope and a supporting assembly, and the protection slope comprises a slope top turn-up area and a slope surface area; the supporting assembly is arranged on the outer surface of the revetment in a covering mode and comprises a plurality of continuous polygonal geocells and forms a geocell, main anchor rods extending towards the side faces of the geocells are arranged at the intersections of the geocells, the main anchor rods are fixed into the revetment, and a grass planting layer is arranged in the geocell. According to the structure, the structural form of cutting and fixing in the geocell is adopted, the geocell and the fixing piece are integrated into a whole, the whole and the slope form a complete supporting system, the stability of the structure is effectively improved, structural construction is facilitated, meanwhile, the embedded fixing form is adopted, the area of a single geocell can be increased, the material cost is reduced, and the construction efficiency is improved. The scientificity and the stability are realized.
Owner:SICHUAN ZHENMAO NEW MATERIALS CO LTD

Bridge abutment back roadbed structure

The utility model provides a bridge abutment back roadbed structure which comprises a first graded broken stone hardcore, a first earthwork standard room, a first bidirectional geogrid, a foam light soil layer group, a second bidirectional geogrid, a second graded broken stone hardcore, a second earthwork standard room and a concrete layer group, the first graded broken stone hardcore, the first two-way geogrid, the foam light soil layer group, the second two-way geogrid, the second graded broken stone hardcore and the concrete layer group are sequentially arranged from bottom to top, the first geocell is arranged in the first graded broken stone hardcore, and the second geocell is arranged in the second graded broken stone hardcore. And the second geocell is arranged in the second graded broken stone hardcore. According to the abutment back roadbed structure, the settlement characteristic of the roadbed is improved, the overall stability and the bearing capacity of the roadbed are improved, and the dead weight of the roadbed can be effectively reduced, so that post-construction settlement at the bridge joint is reduced, the stability and the bearing capacity of the roadbed are improved, and the safety and the comfort of driving are ensured.
Owner:CHINA RAILWAY CONSTRUCTION ENGINEERING GROUP +1

Ultrahigh reinforced body preloading structure

The utility model provides a superhigh reinforced body preloading structure. The treatment structure comprises a reinforced body working cushion layer, a water separation and drainage reinforced layer and an ultrahigh reinforced body stacking structure layer. The reinforced body working cushion layer comprises machine-made sand and an A-type geocell, the water insulation and drainage reinforced body structure comprises non-woven geotextile, a seepage insulation film and multiple layers of composite drainage grids, the composite drainage grids are adopted to replace a medium-coarse sand drainage layer, a vertical drainage plate is directly connected with the middle layer of composite drainage grids, and the vertical drainage plate is directly connected with the middle layer of composite drainage grids. The ultrahigh reinforced body stacking structure layer comprises non-woven geotextile, construction waste, B-type geocells and mineral powder. The foundation treatment effect is good, the sand consumption is reduced, the manufacturing cost is saved, design and engineering application are facilitated, and the engineering application prospect is very wide.
Owner:WUHAN SURVEYING GEOTECHN RES INST OF MCC

Anti-sliding structure for greening slope support

PendingCN119083461AEfficient and convenient disassembly and assembly operationsFast clamping and fixingClimate change adaptationExcavationsSoil scienceGeocells
The anti-sliding structure comprises a plurality of earthwork standard rooms and a plurality of anti-sliding piles, the lower ends of the anti-sliding piles are buried in a roadbed below a side slope, the anti-sliding piles are arranged at intervals in the extension direction of a slope toe line of the side slope, the earthwork standard rooms are buried in the portion, between every two adjacent anti-sliding piles, of the side slope, and the anti-sliding piles are arranged at intervals in the extension direction of the slope toe line of the side slope. A vegetation hanging net is laid on the slope surface of the side slope; one end of each geocell is fixedly installed at the corresponding position of the slope surface of the side slope, and the other end of each geocell extends in the direction away from the slope surface of the side slope and is fixedly installed in the side slope through a positioning device. And the installation is stable and reliable.
Owner:ANHUI TRANSPORT CONSULTING & DESIGN INST

Load shedding structure used under goaf high-fill embankment and construction method

ActiveCN119287721ASettlement controlsimple facilitiesGround-workRoadwaysSoil scienceGeocells
The invention provides a load shedding structure used under a goaf high-fill embankment and a construction method. The load shedding structure comprises an arch-shaped base body structure and multiple layers of arc-shaped earthwork standard rooms arranged on the outer side of the arch-shaped base body structure. The arch-shaped base body structure comprises multiple layers of tamped soil formed by filling layer by layer in sequence from bottom to top, and the width of each layer of tamped soil is gradually decreased layer by layer from bottom to top. Geocells are laid on the top face and the two side faces of each layer of tamped soil; a porous box culvert is arranged in the middle of the tamped soil on the lowest layer; the space between every two adjacent layers of arc-shaped geocells and the space between the arc-shaped geocell on the innermost layer and the arc-shaped base body structure are filled with arc-shaped filling soil; filling is conducted on the outer side of the arc-shaped earthwork standard room on the outermost layer to form roadbed filling soil; an expressway roadbed is paved on the top surface of the roadbed filling soil; and a plurality of layers of horizontal geocells are laid in the roadbed filling soil close to the highway roadbed.
Owner:GUIZHOU UNIV +2

Earthwork standard room

The utility model relates to the technical field of civil engineering, in particular to an earthwork standard room which comprises a plurality of strips arranged in parallel, a plurality of nodes are arranged on adjacent strips, the strips at the nodes are arranged at intervals, injection molding structures are jointly wrapped on the strips at the nodes, and the adjacent strips are connected through the injection molding structures. The geocell has the advantages that the intervals are arranged between the two strips at the joints of the geocell, the adjacent strips can be wrapped through the hot melting injection molding structures, firmness at the joints can be improved, the problem that the strips are prone to sliding or cracking due to gapless connection of the strips is solved, and the service life of the geocell is prolonged. Meanwhile, the whole performance of the strip is prevented from being damaged due to the fact that the strip is punched and fixed; meanwhile, the reinforcing piece is further arranged, the firmness performance of the injection molding structure is further improved, and the tensile strength of the geocell is improved.
Owner:SHANDONG DONGKAI ENG MATERIAL

Geocell with fastener joints

The utility model relates to the technical field of geocells, in particular to a geocell with fastener joints. Specifically, for any belt body of the geocell, a plurality of clamping parts which are evenly distributed in the length direction of the belt body are arranged on the belt body, and each clamping part is composed of a plurality of parallel kerfs; for any node of the geocell, two fasteners and a locking piece are arranged at the node; the fastener comprises a base body, and a plurality of limiting units are fixedly arranged above the base body; under the condition that the two fasteners are fastened oppositely, the limiting unit of one fastener is embedded with the limiting unit of the other fastener; the clamping parts of the two belt bodies at the node are overlapped, and the overlapped clamping parts are clamped between the limiting unit of one fastener and the limiting unit of the other fastener by the two fasteners; and the locking piece is used for locking the two fasteners which are oppositely fastened at the node. The joints of the geocell are excellent in mechanical property, and the geocell further has the advantages of being high in safety and low in cost.
Owner:CHENGDU LUBAO ENG MATERIALS CO LTD

Earthwork standard room structure

The utility model provides a geocell structure, which relates to the technical field of geocells and comprises a geocell body, a steel wire fixing frame is arranged in the geocell body, a plurality of first limiting rings are symmetrically arranged at two ends of the steel wire fixing frame, and first ground anchors are inserted into the inner sides of the first limiting rings. The geocell body can be divided into a plurality of modules with the same size through the steel wire fixing frames, manual grass planting work of workers is facilitated, meanwhile, the overall strength of the geocell body is enhanced, and the geocell body is prevented from being deformed and damaged due to treading of the workers; the steel wire fixing frame is arranged on the side wave soil layer, the tip end of the steel wire fixing frame is inserted into the side wave soil layer, and then the steel wire fixing frame is tightened and prevented from loosening, so that the strength and stability of the geocell body are improved, meanwhile, potential safety hazards possibly existing when workers plant grass manually are avoided, and the actual use requirement is met.
Owner:ROAD & BRIDGE INT CO LTD +2

High-strength polymer alloy geocell and preparation method thereof

The invention relates to the field of waste plastic bottle recycling, and discloses a high-strength polymer alloy geocell and a preparation method thereof.The high-strength polymer alloy geocell is prepared from, by weight, 80-120 parts of polyester (PET), 65-105 parts of polypropylene (PP) and 80-90 parts of polypropylene-grafted maleic anhydride (PP-g-MAH). According to the high-strength polymer alloy geocell and the preparation method thereof, better strength and durability can be obtained, and through mixing, stirring and extrusion at multiple specific temperatures, the high-strength polymer alloy geocell can be obtained; the defect that the PET geocell is not resistant to alkali can be overcome, the overall service life is further prolonged, follow-up use is guaranteed, material production can be carried out in a centralized mode, the occupied area of whole production equipment is reduced, the overall production cost is reduced, and the production efficiency is improved through multiple modes of mixed cutting and matched heating and drying. The overall working efficiency is further improved, the production cost is reduced, the labor intensity of workers is relieved, and the device is suitable for production.
Owner:INST OF ROCK & SOIL MECHANICS CHINESE ACAD OF SCI +1

Earthwork standard room with node protection structure

The utility model relates to the technical field of geocells, in particular to a geocell with a node protection structure. The geocell comprises a belt body and a node connecting piece, wherein the node connecting piece comprises an inserting rod; a plurality of mutually parallel kerfs are formed in the belt body at the nodes, the length direction of the kerfs is parallel to the length direction of the belt body, and the kerfs penetrate through the belt body in the thickness direction of the belt body; at the node, the insertion rods are inserted into the front and back surfaces of the belt body in a staggered manner through the kerfs; the node protection structure is located outside the node and wraps the belt body at the node, and the kerf on the belt body at the node is located inside the node protection structure. According to the design of the geocell, the belt body at the joint of the geocell can be protected; in addition, workers can be prevented from being scratched by the joint structure of the geocell.
Owner:CHENGDU LUBAO ENG MATERIALS CO LTD

High-strength geocell

The utility model discloses a high-strength geocell, which relates to the technical field of geocells, and comprises a first geocell body and a second geocell body, one side of the first geocell body and one side of the second geocell body are respectively provided with a strength installation assembly, and the other side of the first geocell body is provided with a splicing assembly assembly; the strength installation assembly comprises a reinforcing column, and the reinforcing column is arranged in the middle of one side of the first earthwork standard room body and the middle of one side of the second earthwork standard room body in a clamped mode. The reinforcing columns are sleeved with the fixing cylinders, the fixing cylinders are clamped outside the reinforcing columns for the second time, the U-shaped rods drive the clamping blocks to be clamped with the clamping grooves, the U-shaped rods, the reinforcing columns and the fixing cylinders are reinforced, the structure of the geocell sheets and the structure of the geocell plates are prevented from being damaged, and when the geocell is stressed, the use strength is improved.
Owner:GUIZHOU ZHONGCHI ENVIRONMENTAL PROTECTION TECH DEV CO LTD

Ecological slope protection structure and construction method thereof

The invention provides an ecological slope protection structure and a construction method thereof, and relates to the field of slope engineering, the ecological slope protection structure comprises a geocell arranged in a shallow soil body of a slope surface, and plants are planted in the geocell; the precast concrete beam is arranged on the upper surface of the geocell and is arranged along the inclination direction of the slope slope surface; the cast-in-place concrete beams are arranged on the slope top, the slope middle and the slope toe respectively, the cast-in-place concrete beam located on the slope top is connected with the top of the prefabricated concrete beam, the cast-in-place concrete beam located on the slope toe is connected with the bottom of the prefabricated concrete beam, and the cast-in-place concrete beam located on the slope middle presses the prefabricated concrete beam on the slope face of the slope. The method has the effect of improving the overall stability of the slope.
Owner:WUHAN UNIV

Expansive soil core-filled roadbed structure

The utility model relates to a subgrade structure with an expansive soil filling core. The subgrade structure sequentially comprises a foundation, a broken stone hardcore, a non-woven geotextile inverted filter layer and the expansive soil filling core. The slope surfaces on the two sides of the expansive soil filling core are each sequentially provided with an edge sealing clay layer, a side slope anti-seepage geomembrane and a concrete slope protection building block from inside to outside; an asphalt concrete waterproof layer and a capping clay layer are sequentially arranged at the top of the expansive soil filling core from top to bottom; the top of the expansive soil filling core is provided with a first layer of anti-expansion geocell; a second layer of anti-expansion geocell is arranged below the first layer of anti-expansion geocell in parallel; a permeable hose penetrating into the expansive soil filling core is arranged on the concrete slope protection building block. According to the utility model, the influence on roadbed stability and driving safety caused by embankment slope instability and roadbed surface arching due to water absorption expansion of the expansive soil filling core of the embankment in the plum rain climate region can be avoided, and the long-term stability of the expansive soil filling core embankment in the plum rain climate region is improved.
Owner:CHINA RAILWAY 16TH BUREAU GRP RAIL TRANSPORT ENG CO LTD

Node reinforced type earthwork standard room

The utility model relates to the technical field of earthwork standard rooms, in particular to a node reinforced earthwork standard room, and aims to solve the problems that the earthwork standard room is insufficient in connection strength, and the earthwork standard rooms are easy to fall off or deform after being used for a long time. Comprising a plurality of geocell zones, and a plurality of ribs are formed on the geocell zones; the connecting pieces are used for penetrating through the ribs of the two adjacent geocell belts; an annular groove is formed in the baffle ring; the fixing pieces are arranged on the connecting pieces in a sleeving manner; wherein the connecting piece is used for penetrating the ribs into the annular groove, the baffle ring limits and fixes the connecting piece through the annular groove, and the adjacent fixing pieces are mutually connected and fix the ribs and the connecting piece. The fixing pieces are arranged on the connecting pieces in a sleeving mode, the connecting pieces are arranged on the ribs of the geocell belt in a sleeving mode, finally the baffle rings are arranged at the tail ends of the connecting pieces in a sleeving mode, the connecting pieces are fixed, the exposed connecting pieces are flattened and limited, and the connecting strength of the geocell belt is improved.
Owner:CHENGDU LUBAO ENG MATERIALS CO LTD

Cold and arid area roadbed structure with foam light soil combined with geocell reinforcement and construction method

The invention relates to the technical field of roadbed construction, in particular to a cold and arid region roadbed structure with foam light soil combined with geocell reinforcement and a construction method, and provides the following scheme aiming at the problems that in the prior art, a cold and arid region roadbed structure is unstable and fiber doping is uneven during raw material mixing. The geocell and the foam light soil are laid on the top face of the cold and dry roadbed, the geocell is filled with the foam light soil, so that a foam fiber light soil layer is formed on the top face of the cold and dry roadbed, the foam light soil comprises salinized soil, an anti-freezing agent, a water reducing agent, an accelerator, fibers, a foaming agent and cement, the mixing amount of the salinized soil does not exceed 40%, and the mixing amount of the foam light soil is not more than 40%. The anti-freezing agent and the water reducing agent account for 0.1% of the gel material, the accelerator accounts for 5% of the gel material, the fiber doping amount is 0.6-0.1%, and the water-to-material ratio is 0.45-0.55. The porous structure of the foam light soil is utilized, so that the foam light soil has good heat preservation and heat insulation properties, and the integral strength of the light soil is improved by doping the fibers.
Owner:INST OF ROCK & SOIL MECHANICS CHINESE ACAD OF SCI +1

Reinforced soil roadbed beneficial to pipeline maintenance

The invention discloses a reinforced soil roadbed beneficial to pipeline maintenance, belongs to the technical field of roadbeds, and solves the problem that in the prior art, when pipelines are buried during roadbed maintenance, reinforced materials are damaged, and the overall safety of the reinforced roadbed is affected. In the reinforced soil roadbed, a two-way stretching geogrid is detachably connected with a geocell through a connecting assembly; the two-way stretching geogrids are hung on the short rods, and the connecting anchoring rods penetrate through the two-way stretching geogrids, the through holes and the geocells; the multiple spherical protrusions are arranged on the side walls of different grids of the two-way stretching geogrid in the transverse direction of the reinforced soil roadbed, one ends of the elastic pieces are fixedly connected with the short rods, the other ends of the elastic pieces are suspended, the space between the two elastic pieces is a containing space, and the containing space is divided into a necking-down section and a containing section in the direction gradually close to the short rods. The width of one end, close to the accommodating section, of the necking section is smaller than the diameter of the spherical bulge. The device can facilitate pipeline maintenance.
Owner:SHIJIAZHUANG TIEDAO UNIV +1

Levee top road base structure

The utility model belongs to the technical field, and particularly relates to an embankment top road base structure which comprises a base layer. A leveling layer is arranged at the top of the base layer, a first grid is arranged at the top of the leveling layer, a geocell is arranged at the top of the first grid, a sealing layer is arranged at the top of the geocell, and a second grid is arranged at the top of the sealing layer; through the structural design of the first grid, the second grid, the leveling layer, the sealing layer and the surface layer, the overall strength of the road structure is improved, meanwhile, building waste can be turned into wealth and reused, the cost is saved, through the structural design of the first grid and the second grid, the anti-fatigue capacity between the leveling layer and the geotechnical inner layer and the anti-fatigue capacity between the sealing layer and the surface layer are improved, and the construction cost is reduced. The damage to the pavement caused by load change can be inhibited, so that the service life of the pavement is prolonged, the clay layer is matched and filled in a gap of the substrate layer, the structure gap is reduced, and the connection tightness is improved.
Owner:SINOHYRDO ENG BUREAU 3 CO LTD

Road structure suitable for valley terrain

The utility model discloses a road structure suitable for a valley terrain. The road structure comprises an original foundation excavation step, a cement concrete pile, a sand cushion layer, a cement concrete plate, a pipe culvert, waterproof geotechnical cloth, a cement concrete wall, a hard geocell, a pavement structure and an EPS (Expandable Polystyrene) filling block. The pile foundation structure and the cement concrete plate are arranged at the bottom of the road structure, the cement concrete wall pairs divide the EPS filling area into a plurality of units and make direct contact with the exposed part of the pipe culvert to fix the pipe culvert, the hard geocell is laid on the cement concrete-EPS composite roadbed, and the pavement structure is laid on the geocell which is backfilled with plain soil. Through the combined arrangement of the pipe culvert and the sand cushion layer, smooth drainage of the valley terrain is guaranteed, the waterproof effect of the EPS roadbed is guaranteed through the arrangement of the reinforced concrete pouring structure and the waterproof structure layer, the pile foundation can transmit loads to a deeper soil layer with higher bearing capacity, construction is convenient, noise is avoided, and differential settlement of the roadbed is effectively reduced.
Owner:HEBEI UNIV OF TECH

Roadbed filler and earthwork standard room setting optimization analysis method

The invention relates to the field of electrical digital data processing, and provides a roadbed filler and geocell setting optimization analysis method, which comprises the following steps: S1, carrying out joint simulation analysis on three factors to obtain different settlement displacement values under the joint action of the three factors; s2, the settlement displacement value is substituted into response analysis software, and a Box-Behnken response optimization method is used for analysis; s3, analyzing the primary and secondary effect relationship of the influence of the three factors on roadbed settlement according to a settlement regression analysis result obtained through response analysis; and S4, according to the regression equation model, analyzing the response curved surface diagram and the contour map, determining the influence of three factors of experimental design on roadbed settlement, and taking a settlement minimum value as an optimization analysis target to obtain an optimal prediction scheme. According to the method, a test design method based on three levels is designed through a Box-Behnken response optimization method, and through reasonable arrangement of test points, a plurality of factors and the interaction of the factors can be evaluated under the condition that the number of test times is small.
Owner:CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +1

Connecting mechanism for geocell and geocell assembly

The utility model relates to the field of earthwork standard room construction, in particular to a connecting mechanism for earthwork standard rooms and an earthwork standard room assembly, the connecting mechanism clamps the side walls of the earthwork standard rooms, so that the adjacent earthwork standard rooms are mutually connected, and the assembly of the earthwork standard room assembly is realized; the arc-shaped connecting section provides elastic force, and it is guaranteed that self-locking can be achieved after the first connecting part and the second connecting part are connected; the first connecting part and the second connecting part are detachably connected, so that the connecting mechanism can be quickly mounted and dismounted on the geocell, and the assembly and adjustment of the geocell assembly are facilitated; the side walls of the adjacent earthwork standard rooms are stacked and then clamped and fixed between the first connecting rod and the second connecting rod, so that the adjacent earthwork standard rooms are connected with each other; according to the earthwork standard room assembly, the adjacent earthwork standard rooms can be rapidly connected or disassembled through the connecting mechanisms, operators can conveniently adjust the earthwork standard rooms, the construction operation efficiency of the earthwork standard rooms is improved, and the construction difficulty is reduced.
Owner:CHINA RAILWAY NO 2 ENG GROUP CO LTD +1

Soil fixation method suitable for sandy soil geological conditions

The invention discloses a soil fixation method suitable for sandy soil geological conditions, and belongs to the technical field of soil conservation. Comprising the steps that S1, natural gullies formed by sandy soil are classified according to the depth, and the natural gullies are divided into three types with the depth smaller than or equal to 0.1 m, the depth larger than 0.1 m and smaller than or equal to 0.5 m and the depth larger than 0.5 m; s2, for the gully with the depth larger than 0.5 m, a drainage channel is formed through excavation, a plurality of sand blocking structures are installed in the drainage channel, the depth of the sand blocking structures is lower than that of the drainage channel, bottom plates are installed on the upstream and the downstream of the sand blocking structures, meanwhile, side walls are installed on the vertical walls on the two sides of the drainage channel, and the depth of the side walls is lower than that of the drainage channel. Through the modes of arranging the sand blocking structure, arranging the bottom plate, the geotechnical cloth and the geocell, backfilling the backfill soil and the like, a drainage channel of an original gully is reserved, the soil is kept at the original position, the situation that a new gully is formed due to repeated flushing is avoided, a stable and effective drainage system is formed, and further expansion of the gully is effectively controlled.
Owner:POWERCHINA HUADONG ENG CORP LTD +1

Earthwork standard room with three-dimensional bayonet lock

The utility model discloses an earthwork standard room with three-dimensional bayonet locks. The earthwork standard room comprises a bottom plate, an inserting rod is arranged on one side of the bottom plate, and a side baffle is arranged on one side of the inserting rod; wherein a positioning block is arranged on one side of the side baffle, and a U-shaped block is arranged on one side of the positioning block; wherein a plug pin is arranged on the other side of the positioning block, an extension rod is arranged on one side of the plug pin, and the situation that the earthwork standard room is separated when the earthwork standard room is unfolded is avoided through insertion connection of an insertion rod and an insertion groove, insertion connection of the positioning block and a groove and insertion connection of a U-shaped block and a U-shaped groove, so that the device is more stable during use; and by arranging the extension rod on one side of the plug pin, the position between the positioning blocks can be conveniently limited through the plug pin, the geocell and the ground can be conveniently and rapidly positioned and connected, and therefore the practicability of the geocell is higher.
Owner:ANHUI ZHONGLU ENG MATERIAL CO LTD

High-strength geocell with embossed surface

The utility model discloses a high-strength geocell with embossed surfaces, and relates to the technical field of geocells. The high-strength geocell with the embossed surface comprises ground strips with embossed grooves formed in the surfaces, the adjacent ground strips are connected through connecting areas, the high-strength geocell further comprises connecting pieces with connecting cavities, the connecting pieces are arranged on the connecting areas and used for fixing the connecting areas, and the front ends and the rear ends of the connecting pieces are connected through connecting assemblies; the rivet ground head is fixedly connected to the connecting piece; second open grooves are formed in the two ends of the restraint strap; according to the utility model, the restraint strap is connected to the connecting piece, so that the restraint strap can be connected to the connecting piece in a pre-mounting manner, and then the mounting of the restraint strap can be quickly completed after the connecting piece wraps and is locked in the connecting area of the ground strip, and the connecting assembly of the connecting piece for connection has various implementation modes; and quick connection of connecting pieces can be facilitated.
Owner:SHANDONG LIANXIANG NEW MATERIALS GROUP CO LTD

Earthwork standard room, node structure of earthwork standard room, manufacturing method of earthwork standard room and pouring mold

The invention provides an earthwork standard room and a node structure thereof, a manufacturing method of the earthwork standard room and a pouring mould, the earthwork standard room comprises a first strip and a second strip, a connecting node is arranged between the first strip and the second strip, the node is formed by attaching strips with preset length, and the first strip and the second strip are arranged along the length direction of the strips. Each node is provided with a first connection area and a second connection area which are distributed at the two ends of the length, and a strip between the first connection area and the second connection area is divided into multiple layers through separation seams and stretches out in a staggered mode in the thickness direction to form a cavity channel. And the nodes are wrapped by colloid. The colloid is poured into the cavity channel in the filling process and wraps the first connecting area, the second connecting area and the periphery of the cavity channel, and the joints and the colloid form a multi-layer connecting structure, so that the earthwork standard room obtains higher connecting strength at the joint positions, the first strip and the second strip are not prone to stripping at the joint positions, and therefore the connecting strength of the earthwork standard room is improved. And the tensile capacity and the shearing strength of the geocell are greatly improved.
Owner:ANHUI HUIFENG NEW SYNTHETIC MATERIALS CO LTD

Slope protection profiles (geocell sheet units)

1. The name of the product of this design: slope protection profile (geocell sheet unit). 2. Purpose of this design product: slope protection profile to prevent soil erosion. 3. The design key point of this appearance design product lies in the shape. 4. The picture or photo that best illustrates the design points: three-dimensional picture.
Owner:GUANGZHOU WENYING GREENING MATERIALS CO LTD

Rock mass - soil - plant - microorganism slope ecological restoration system and construction method

The present invention provides a rock mass - soil - plant - microorganism slope ecological restoration system and a construction method. It is characterized in that multi - level slope - cutting platforms are arranged on the rock mass slope for unloading, and longitudinal drainage ditches are arranged at the platforms to guide the collected water, reducing the flushing of the nutrient soil in the geocells and reducing the load weight of the geocells; by driving grouting anchor rods, the geocells are tightened and fixed by the anchor rods - tie bars - cross - shaped tie bars, and adjacent geocells are connected by U - shaped steel nails; the surface of the geocells is sprayed with an integrated matrix of soil - plant - microorganism, and the interaction between plants and microorganisms is utilized to improve the survival rate and growth rate of plants, and quickly restore the original plant community structure and ecosystem function.
Owner:ZHEJIANG SHIRUN JIANCHUANG TECH DEV CO LTD +1

A solid waste-based geocell filler, its preparation method and application

The present invention discloses a solid waste-based geocell filler, its preparation method and application. The solid waste-based geocell filler comprises, by mass parts, 100-200 parts of air-dried silt soil, 50-100 parts of solid waste-based curing agent, 10-20 parts of water and 0.1-2 parts of functional material; the solid waste-based curing agent comprises, by mass percentage, 10%-30% of cement, 15%-25% of slag, 5%-15% of fly ash, 20%-30% of steel slag, 10%-20% of carbide slag, 5%-10% of red mud, 10%-20% of rice husk ash and 5%-10% of desulfurized gypsum; the functional material is waste tire fragments with a particle size of 1-20 mm. The present invention innovatively adds tire fragments. After adding the tire fragments, the gel filled in the internal pores of the mixture composed of the curing agent and the silt is wrapped and entangled by the tire fragments, forming a stable three-dimensional network structure inside the soil particles, further restricting the rolling and movement of the soil particles, and improving the internal stability and overall strength of the solidified silt soil.
Owner:中国水利水电第七工程局有限公司 +1