953 results about "Geogrid" patented technology

A geogrid is geosynthetic material used to reinforce soils and similar materials. Geogrids are commonly used to reinforce retaining walls, as well as subbases or subsoils below roads or structures. Soils pull apart under tension. Compared to soil, geogrids are strong in tension. This fact allows them to transfer forces to a larger area of soil than would otherwise be the case.

In-situ reconstruction and extension structure of embankment and construction method thereof

An in-situ reconstruction and extension structure of an embankment and a construction method thereof are provided. The structure includes a stepped slope excavated on an existing side slope. A gradient of the stepped slope is the same as that of an extension side slope, the stepped slope is individually intersected with top and bottom planes of existing side slope; a toe of existing side slope is taken as a toe of the extension side slope, and gradient of the extension side slope is determined according to positions of the toe and an expanded width. An outer side of stepped slope is filled with a geogrid reinforcement layer in a layered manner, a slope protection structure is arranged on an outer side of the geogrid reinforcement layer to form extension equivalent side slope; a drainage system is arranged at a bottom of the extension side slope.
Owner:CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY

Roadbed settlement and frozen soil plasticity prediction system based on intelligent heating geogrid

The invention discloses an intelligent heating geogrid-based roadbed settlement and frozen soil plasticity prediction system, which comprises an intelligent heating geogrid, a data acquisition unit, an intelligent heating control unit, a moisture content calculation unit and an analysis prediction unit, the intelligent heating control unit performs starting control on the heating resistance wire according to a soil body temperature value collected by the optical fiber temperature sensor so as to heat the self-heating steel pipe, the self-heating steel pipe heats the soil body, and the moisture content calculation unit calculates the moisture content of the soil body according to a temperature rise value of the soil body in unit time. And the analysis and prediction unit predicts roadbed settlement and frozen soil plasticity according to the soil moisture content and the grating dependent variable. The self-heating steel pipe is installed on the grating body, the water content of the soil body is monitored in real time while the soil body is heated, the subgrade settlement state and the frozen soil plastic characteristics are accurately predicted according to the collected data, and therefore scientific support is provided for safety evaluation and maintenance of subgrade engineering.
Owner:ZHEJIANG UNIV

Finite difference analysis-based reinforced soil structure design method considering anisotropy of rib material

PendingCN119442419AGet the limit stateHelps to clarify service performanceGeometric CADDesign optimisation/simulationSoil scienceStructural engineering
The invention discloses a reinforced soil structure design method based on finite difference analysis and considering anisotropy of a rib material, which comprises the following steps: establishing a roadbed reinforced soil corner slope three-dimensional model, simulating a roadbed layer by adopting a Duncan-Zhang nonlinear constitutive equation, simulating a foundation layer by adopting an elastic constitutive equation, and simulating a geogrid by adopting a Cable structure unit. A Geogrid structural unit is adopted to simulate the geotechnical cloth; on the basis of a verified model, different mechanical parameters are given to transverse and longitudinal ribs of the bidirectional geogrid to realize self-mechanical behavior anisotropy, the arrangement angle of a Cable unit and the center line of a reinforced soil structure is changed to realize the mechanical behavior anisotropy of a rib-soil interface, and meanwhile, other single or multiple variables can be adjusted, so that the mechanical behavior anisotropy of the rib-soil interface is realized. And testing the influence rule of the key factors on the mechanical properties of the reinforced soil structure. According to the method, the problem that the stress directions of the reinforced soil structure bars are inconsistent or uncertain under the complex geological condition can be solved, and more practical reinforced soil structure design parameters are effectively provided.
Owner:山西省交通科技研发有限公司 +2

Spider-web inspired geogrids

Exemplary geosynthetic apparatus, e.g., geogrid, and designs thereof are disclosed that are configured to restrict displacement of aggregate that mimics biostructures that optimized aperture size, aperture shape and aperture orientation to improve load distribution, improve durability, and / or improve performance in retaining aggregates and other geo materials. The exemplary geosynthetic apparatus as a product is configured as a unit cell in which the center of the unit cell has a primary structure that extend through the center to the edge of the unit cell or one or more intermediate radial position (also referred to as “radial transect boundaries”) therebetween. In embodiments in which the primary structure extends to the transect boundaries through the center of the unit cell, the primary structure are referred to as “radial ribs.”
Owner:GEORGIA TECH RES CORP

Bridge abutment back roadbed structure

The utility model provides a bridge abutment back roadbed structure which comprises a first graded broken stone hardcore, a first earthwork standard room, a first bidirectional geogrid, a foam light soil layer group, a second bidirectional geogrid, a second graded broken stone hardcore, a second earthwork standard room and a concrete layer group, the first graded broken stone hardcore, the first two-way geogrid, the foam light soil layer group, the second two-way geogrid, the second graded broken stone hardcore and the concrete layer group are sequentially arranged from bottom to top, the first geocell is arranged in the first graded broken stone hardcore, and the second geocell is arranged in the second graded broken stone hardcore. And the second geocell is arranged in the second graded broken stone hardcore. According to the abutment back roadbed structure, the settlement characteristic of the roadbed is improved, the overall stability and the bearing capacity of the roadbed are improved, and the dead weight of the roadbed can be effectively reduced, so that post-construction settlement at the bridge joint is reduced, the stability and the bearing capacity of the roadbed are improved, and the safety and the comfort of driving are ensured.
Owner:CHINA RAILWAY CONSTRUCTION ENGINEERING GROUP +1

Soft foundation levee slope reinforcing structure based on timber piles and geogrids

The utility model provides a soft foundation levee slope reinforcing structure based on timber piles and geogrids. The soft foundation levee slope reinforcing structure comprises a soil levee body, a reinforcing levee slope, a soft soil levee foundation, the timber piles, a gravel soil backfilling layer, a ballast platform and the geogrids. An embankment top road is arranged at the upper part of the earth embankment body, and the side surface is an original embankment slope; the reinforced levee slope is located outside the original levee slope; the soft soil embankment foundation is located on the lower side of the soil embankment body. The lower ends of the timber piles are vertically inserted into the soft soil embankment foundation, and steel wire meshes are arranged at the tops; the gravel soil backfill layer is laid on the timber piles; the ballast platform is located on the upper side of the original levee slope and connected with the reinforced levee slope. The geogrids are located between the gravel soil backfill layer and the ballast platform and laid layer by layer along with filling of the ballast platform. The timber piles are used as the slide-resistant piles, so that the bearing capacity of the soft soil embankment foundation is improved; the stability and integrity of the levee slope are enhanced by adopting the ballast platform and the geogrid, the instability of the levee slope is prevented, the safety of the levee slope in the construction period and the operation period is guaranteed, and the engineering effect is good.
Owner:CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD

Rapid reinforcement construction method for deep ultra-soft foundation

The invention belongs to the technical field of foundation treatment construction, and particularly relates to a rapid reinforcement construction method for a deep ultra-soft foundation. Comprising the following steps: step 1, in-situ sludge solidification; 2, leveling and partitioning are carried out; 3, construction of the cutoff wall; 4, well point dewatering; 5, high-pressure jet grouting reinforcement is conducted; 6, a geogrid reinforced broken stone hardcore is laid; and 7, leveling and rolling. According to the method, the three key steps of sludge in-situ solidification, well-point dewatering and high-pressure jet grouting pile construction are combined, the construction period is effectively shortened, the construction cost is reduced, the environmental protection property is good, the bearing capacity of the foundation can be remarkably improved, the stability and safety of a building are ensured, and an innovative solution is provided for reinforcement treatment of the ultra-soft soil foundation.
Owner:CCCC FIRST HARBOR ENGINEERING CO LTD +1

Weaving method of high-strength three-dimensional composite geogrid

The weaving method of the high-strength three-dimensional composite geogrid comprises the steps of primary processing of the grid net, secondary processing of the grid net and winding of a finished product, the geogrid processed through the weaving method is of a double-layer structure, the double-layer grid net can be stored by a winding unit in an attached mode, and the double-layer grid net can be stored by the winding unit in an attached mode. Reeds of the adjusting parts can be inserted into meshes of the grating nets during storage, winding of the finished geogrid is not affected by arrangement of the adjusting parts, when the geogrid is used, only one-time laying is needed, the lower-layer grating net is fixed, and the upper-layer grating net is lifted to enable the upper connecting parts to be elastically clamped into clamping grooves in the outer sides of the two reeds, so that the geogrid is convenient to use. The supporting work of the double-layer grid net can be completed through the adjusting piece, so that the laying work of the geogrid can be simpler and quicker, and the soil fixation and slope protection effects of the geogrid are guaranteed.
Owner:FEICHENG SANHE ENG MATERIALS CO LTD

Geogrid strain gauge auxiliary pasting device

The utility model discloses an auxiliary pasting device for a geogrid strain gauge. The auxiliary pasting device comprises a bottom plate, a clamping plate, an operation cover top, two spherical strong magnets, a dropping bottle fixing device, a sharp-nose dropping bottle and a spotlight, an operation groove is formed in the middle of the bottom plate; the clamping plate is arranged above the bottom plate, the clamping plate is detachably connected with the bottom plate, and a vertically-through operation opening is formed in the middle of the clamping plate; a geogrid is clamped between the bottom plate and the clamping plate; the operation cover top covers the periphery of the operation opening; the two spherical strong magnets are respectively positioned above and below the transparent cover plate and are in magnetic attraction connection; the top of the dropping bottle fixing device is connected with a spherical strong magnet positioned below the transparent cover plate, and the dropping bottle fixing device is vertically suspended; the sharp-nose dropping bottle is detachably mounted at the bottom of the dropping bottle fixing device; and the spotlight is rotationally connected to the side wall of the dropping bottle fixing device. According to the device, the operation of pasting the strain gauges on the geogrids of various different specifications becomes convenient and accurate, and the precision of measuring the strain values of the geogrids is improved.
Owner:YANCHENG TRANSPORTATION INVESTMENT & CONSTRUCTION HOLDING GROUP CO LTD

Reinforced geogrid

The utility model belongs to the technical field of geogrids, and particularly relates to a reinforced geogrid which comprises first grid strips and second grid strips. A plurality of first grating strips are arranged in parallel at intervals; a plurality of second grid strips are arranged in parallel at intervals in the length direction of the first grid strips; the first grid strips and the second grid strips are perpendicularly staggered to form a plurality of grid chambers, reinforcing parts are arranged at the intersections of the first grid strips and the second grid strips, the thickness of the reinforcing parts is larger than that of the first grid strips and that of the second grid strips, and ground gripping structures and anti-skid structures are arranged on the upper faces and the lower faces of the reinforcing parts correspondingly. The ground gripping structure is used for increasing the ground gripping force of the bottom of the geogrid, and the anti-skid structure is used for increasing the friction force between the top of the geogrid and soil. The strength of the geogrid can be enhanced through the thickened reinforcing part, the geogrid is resistant to tear and deformation, the ground gripping structure and the anti-skid structure can enhance the connecting force between soil on the surface of the geogrid and the geogrid, and the overall stability of a slope can be improved through the geogrid.
Owner:QUZHOU XINHONG GEOGRID CO LTD

Reinforcing structure of soft soil foundation road and construction method thereof

The invention belongs to the technical field of soft soil foundation treatment, and discloses a soft soil foundation road reinforcing structure and a construction method thereof.The reinforcing structure comprises a plurality of cement soil mixing piles arranged in a soft soil foundation in an array mode; the multiple core piles are used for being inserted into the cement-soil mixing pile before initial setting of the cement-soil mixing pile, the multiple core piles and the multiple cement-soil mixing piles are arranged in a one-to-one correspondence mode, and each core pile comprises a pipe pile and a reinforcing piece which is filled and fixed in the pipe pile; the geogrid layer is laid on the top of the soft soil foundation and located above the multiple core pile areas, and a plurality of meshes are formed in the geogrid layer; a mattress layer; and a filler. The integrality, water stability and certain strength of the road soft soil foundation can be effectively improved, the bearing capacity and shear strength of the road subgrade are remarkably improved, meanwhile, differential settlement of the road subgrade can be effectively controlled by reinforcing the soft soil layer, and the construction quality is improved.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

Production process regulation and control method of glass fiber geogrid based on machine learning

The invention relates to the technical field of regulation and control, in particular to a glass fiber geogrid production process regulation and control method based on machine learning. The method comprises the following steps: acquiring a yield stage variation characterization value and a strengthening stage variation characterization value of a test sample; according to the yield stage variation characterization value and the strengthening stage variation characterization value of the test sample, a stress-strain curve mutation characterization value corresponding to the test sample is obtained, and according to the stress-strain curve mutation characterization value, the direction for regulating and controlling the production process of the glass fiber geogrid is obtained. And the production process of the glass fiber geogrid is regulated and controlled according to the regulation and control direction. According to the method, the regulation and control direction can be accurately and reliably determined, and the production process of the glass fiber geogrid can be reliably and efficiently regulated and controlled subsequently according to the determined regulation and control direction.
Owner:SHANDONG DAGENG PROJECT MATERIAL CO

Distributed roadbed slope catastrophe whole-process intelligent monitoring device and method

The invention discloses a whole-process intelligent monitoring device and method for distributed roadbed slope catastrophe, and relates to the technical field of monitoring devices for civil engineering. The roadbed slope deformation sensing material unit comprises a geotechnical reinforced belt layer, a flexible conductive polymer film layer and a stretchable flexible circuit film layer which are sequentially arranged in the protective shell; a plurality of roadbed slope deformation sensing material units are woven into a net to form the intelligent roadbed slope deformation sensing geogrid; according to the invention, distributed deformation monitoring of the whole process of collapse catastrophe in roadbed and slope engineering can be realized, and meanwhile, pavement cracking can be prevented and roadbed stability can be improved. The method not only can play a role in the field of slump catastrophe monitoring in roadbed and slope engineering, but also has application potential in the fields of pavement cracking monitoring, ground subsidence monitoring, reconstruction and extension road differential deformation monitoring and the like.
Owner:SHANDONG UNIV +4

Reservoir box dam filling and compacting construction method

PendingCN118958265AGuarantee quality requirementsAdjust working parametersEarth-fill damsIn situ soil foundationSoil scienceControl system
The invention provides a reservoir box dam filling and compacting construction method, which relates to the field of geotechnical engineering and comprises the following steps: S1, monitoring the water content of filling soil materials in real time, determining an excavation area according to the water content of the filling soil materials, and taking soil and transporting the soil to a box dam filling area; s2, soil materials are filled for paving; s3, after paving of the filling soil material is completed, an intelligent rolling machine is used for rolling, the compaction rate, the water content and the compaction path of the filling soil material are monitored in real time in the rolling process, and the working state of the intelligent rolling machine is adjusted in real time according to the monitoring condition; s4, geogrids are laid on the compacted filling soil materials; and S5, repeating the steps S2-S4 until filling and forming, and then carrying out subsequent work. According to the construction method, the water content and the compactness are monitored through the PLC control system, the influence of human factors on the construction quality is reduced, and the overall bearing capacity and stability of the dam are improved through the geogrids.
Owner:POWERCHINA MUNICIPAL CONSTR GRP CO LTD

Geocell with fastener joints

The utility model relates to the technical field of geocells, in particular to a geocell with fastener joints. Specifically, for any belt body of the geocell, a plurality of clamping parts which are evenly distributed in the length direction of the belt body are arranged on the belt body, and each clamping part is composed of a plurality of parallel kerfs; for any node of the geocell, two fasteners and a locking piece are arranged at the node; the fastener comprises a base body, and a plurality of limiting units are fixedly arranged above the base body; under the condition that the two fasteners are fastened oppositely, the limiting unit of one fastener is embedded with the limiting unit of the other fastener; the clamping parts of the two belt bodies at the node are overlapped, and the overlapped clamping parts are clamped between the limiting unit of one fastener and the limiting unit of the other fastener by the two fasteners; and the locking piece is used for locking the two fasteners which are oppositely fastened at the node. The joints of the geocell are excellent in mechanical property, and the geocell further has the advantages of being high in safety and low in cost.
Owner:CHENGDU LUBAO ENG MATERIALS CO LTD

Supporting slope for highway subgrade

The utility model discloses a supporting side slope for a highway subgrade, and relates to the technical field of side slope supporting structures. The device comprises a soil slope, a geogrid is fixedly mounted at the top of the soil slope, and a drainage mechanism and a water storage mechanism are arranged on the soil slope; the drainage mechanism comprises a first drainage assembly, a plurality of planting assemblies and a second drainage assembly, the first drainage assembly comprises a body fixedly installed at the top of the geogrid, a plurality of first drainage channels are fixedly installed at the top of the body, and a retaining wall is fixedly installed on the front face of the soil slope. A plurality of first drainage pipes are fixedly mounted on the front face of the retaining wall, penetrate through the retaining wall and are fixedly connected with the retaining wall. According to the utility model, the drainage mechanism and the water storage mechanism are arranged; when the rainfall is large, rainwater can be drained in time.
Owner:NEIMENGGU LIANSHOUCHUANGYE ROAD&BRIDGE CO LTD

Construction method for roadbed penetrating through V-shaped valley area

The invention relates to a construction method for a roadbed penetrating through a V-shaped valley area, and belongs to the technical field of foundation engineering and foundation treatment. The problems of low foundation drainage efficiency, filling side slope instability and differential settlement control in V-shaped valley roadbed construction are solved. According to the technical scheme, a groove is dug along the bottom of a valley, a gravel drainage blind ditch wrapped by permeable geotextile is laid, and a foundation drainage system is formed; during layered filling, a vibratory roller with a piezoelectric sensor embedded into a steel wheel is adopted; after every two layers are filled, one-way geogrids are laid along the slope and vertically anchored into the compaction layer through U-shaped anchoring parts; a transverse drainage pipe is pre-buried when filling is conducted to a foundation bearing capacity sudden change point threshold value; and after filling is completed, a settlement monitoring array is arranged. According to the method, through system integration of foundation drainage structure optimization, filling body intelligent compaction and differential settlement dynamic treatment, the bearing stability of the fill roadbed under the complex terrain is remarkably improved, and the method is suitable for foundation construction and disaster prevention and control of the V-shaped canyon section of the mountain road.
Owner:XINGTAI ROAD & BRIDGE CONSTR GENERAL

Test device and test method for soft soil roadbed reinforcement

The invention relates to the technical field of geotechnical engineering, in particular to a test device and a test method for soft soil roadbed reinforcement. Comprising a roadbed simulation body, the roadbed simulation body comprises a simulation box with an opening in the upper end, a consolidation soil layer, a soft soil roadbed and an upper structure layer are arranged in the simulation box from bottom to top, a pressurization mechanism is arranged above the upper structure layer, and a data acquisition unit used for acquiring internal data of the upper structure layer is arranged on the upper structure layer. The test device designed by the invention can simulate the soft soil roadbed of a to-be-constructed road section and multiple modes for reinforcing the soft soil roadbed, and fully considers the influence of the laying layer number of the geogrid and the laying position of the geogrid on the reinforcement of the soft soil roadbed; according to the influence of the height of the gabion net on the reinforcement of the soft soil roadbed and the influence of the combination of the gabion net, the geogrid and the geomembrane on the reinforcement of the soft soil roadbed, the optimal reinforcement scheme corresponding to the soft soil roadbed can be determined through the test device designed by the invention.
Owner:PETROCHINA CO LTD

Hole slag back pressure backfilling and roadbed structure integrated construction process

The invention discloses a hole slag back pressure backfilling and roadbed structure integrated construction technology, and belongs to the technical field of road construction. Comprising the following steps: grading and screening the tunnel hole slag into large / medium / fine three-level aggregate, and then crushing and recombining to form graded improved aggregate; constructing a multi-layer backfill structure of a base layer, a transition layer and a reinforcing layer; interface shear strength is achieved through the gravel-geogrid composite transition layer; adopting a vibratory roller to implement a static pressure and vibratory rolling combined process with adaptive levels; a coarse / fine-particle-size two-stage cement stabilized macadam layer is laid on the top to form a permeation drainage channel, and a transverse drainage blind pipe system is arranged to achieve three-dimensional drainage. According to the technology, the problems that in traditional hole slag backfilling, aggregate grading discreteness is large, shear failure is likely to be caused by sudden change of interlayer modulus, interlayer combination weakening is caused by uneven layered rolling energy transfer, and structure instability is caused by pore water pressure accumulation are solved, and hole slag resource utilization and roadbed structure performance collaborative improvement are achieved.
Owner:CHINA ROAD & BRIDGE

Geogrid laying structure

The utility model discloses a geogrid laying structure which comprises a plurality of transverse grid strips and vertical grid strips, a plurality of positioning assemblies are evenly fixed to each transverse grid strip at equal intervals, the vertical grid strips can be embedded into the positioning assemblies respectively, the vertical grid strips and the transverse grid strips are arranged in an interlaced mode, and the transverse grid strips and the vertical grid strips are arranged in an interlaced mode. The positioning assemblies are arranged on the transverse grating bars, so that the vertical grating bars can be positioned at the interlacing joints of the transverse grating bars and the vertical grating bars, the vertical grating bars can be interlaced on the transverse grating bars conveniently, deviation in the laying process is prevented, and the uniformity of laying density is ensured.
Owner:INNER MONGOLIA JIAOKE ROAD & BRIDGE CONSTR CO LTD

Pile-supported embankment structure with tie beams and construction method of pile-supported embankment structure

The invention relates to the technical field of pile-supported embankments, and provides a pile-supported embankment structure with tie beams and a construction method thereof.The pile-supported embankment structure with the tie beams sequentially comprises a rigid pile layer, a connecting layer, a cushion layer, a geogrid layer and an embankment layer from bottom to top; the rigid pile layer comprises a plurality of rigid piles perpendicularly arranged relative to the ground, and grouting holes and grouting pipes communicating with the grouting holes are arranged at the ends, away from the ground, of the rigid piles. The connecting layer comprises a pile cap and a straining beam which are arranged on the upper layer of the rigid pile, and a grouting pipe main pipe and a grouting pipe branch pipe are arranged in the pile cap and the straining beam; the cushion layer comprises a broken stone cushion layer and a soil pressure sensor arranged in the broken stone cushion layer.
Owner:WUHAN UNIV

Soft soil foundation embankment heightening and widening structure and construction method

The invention discloses a soft soil foundation embankment heightening and widening structure and a construction method, and belongs to the field of water conservancy projects. In order to solve the problems of uneven settlement, landslide instability and overlarge occupied area easily occurring when the soft soil foundation embankment is heightened and widened, the structure comprises precast concrete piles (top beams and ripraps are arranged on the tops of the piles) densely arranged at the slope toe outside the embankment, an inner side cantilever retaining wall (with drainage holes and a gravel inverted filter), geogrids laid in backfill soil in a layered mode, and CFG piles arranged on the lower portion in a plum blossom shape. The guardrail base and the flower bed are integrally poured with the retaining wall. The construction method comprises the steps of slide-resistant pile construction, earthwork excavation, CFG pile construction, retaining wall pouring, embankment body backfilling and embankment top road construction. Bidirectional control over settlement and horizontal displacement is achieved through cooperation of multiple structures, variable-stiffness leveling can be achieved by adjusting parameters of the CFG piles, and the variable-stiffness leveling structure has the advantages of skid resistance, stability, landscape optimization and land occupation saving and is suitable for soft soil foundation embankment upgrading and reinforcing projects.
Owner:CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD

Embankment widening construction method based on biomineralization and reinforcement cooperation

The invention relates to the technical field of embankment reinforcing and widening, and provides an embankment widening construction method based on biomineralization and reinforcement cooperation. The microcosmic cementation effect of calcium carbonate precipitation in the inclusion is induced by the enzyme and is combined with the macroscopic constraint of the geogrid, so that a friction-cementation composite interface is formed, and the shear resistance and impermeability of the new and old roadbed combined surface are greatly improved. Meanwhile, the synergistic enhancement transition area serves as a rigidity coordination layer, loads can be effectively homogenized, differential deformation can be effectively absorbed, and therefore differential settlement is restrained, and reflection cracks are prevented. According to the method, the microcosmic cementation strengthening capacity of enzyme-induced calcium carbonate precipitation and the macroscopic reinforcement restraining capacity of the geotechnical reinforcement material are subjected to space coupling and function cooperation, the weak area of the widened embankment is fundamentally improved, and the integrity and long-term stability of the widened embankment are remarkably improved.
Owner:HUNAN INSTITUTE OF ENGINEERING

Self-repairing flow state solidified soil reinforced retaining wall for slope toe reinforcement and construction method

The invention relates to a self-repairing flow state solidified soil reinforced retaining wall for slope toe reinforcement and a construction method, and the retaining wall comprises a wall body which is formed by self-repairing flow state solidified soil in a cast-in-place mode and is provided with extension sections on the two sides, and drainage holes are formed in the extension sections; the foundation is arranged on the foundation and used for supporting the wall body; the reinforcement system is composed of multiple layers of geogrids and embedded in the wall body in a layered mode, one end of each layer of geogrid is anchored in the wall body, and the other end of each layer of geogrid extends backwards and is anchored in the backfill area; when the retaining wall has micro-cracks due to uneven settlement of a soft foundation, the high-alkali environment at the cracks can immediately trigger the alkali-sensitive self-repairing microcapsules to be broken, the released repairing material can generate gel in situ to seal the cracks, the mechanism converts traditional passive damage into active repairing, crack development is effectively restrained, an erosion channel is blocked, and the service life of the retaining wall is prolonged. Therefore, the long-term durability of the retaining wall is obviously improved.
Owner:CHINA CONSTR EIGHTH ENG DIV CORP LTD ZHEJIANG CONSTR CO LTD +2

Thermal-insulation waterproof frost heaving-prevention structure for existing railway roadbed in deep seasonal frozen soil region and construction method of thermal-insulation waterproof frost heaving-prevention structure

The invention relates to the technical field of railroad bed structures, and discloses a deep season frozen soil area existing railroad bed heat preservation, water insulation and frost heaving prevention structure and a construction method of the deep season frozen soil area existing railroad bed heat preservation, water insulation and frost heaving prevention structure. The invention relates to a heat-insulating waterproof frost heaving-preventing structure for an existing railroad bed in a deep seasonal frozen soil region. The overall cross section of the existing railroad bed is of an axial symmetry structure along the center line of the railroad bed; the existing railway subgrade foundation bed is sequentially provided with a first gravel cushion layer, a waterproof geotechnical cloth layer, a second gravel cushion layer, a geogrid layer and a closed railway ballast layer from bottom to top. Polyurethane heat preservation layers are arranged on side slopes on the two sides of the existing railroad bed. A polyurethane heat preservation layer and a waterproof geotechnical cloth layer are sequentially arranged on the road shoulders on the two sides of the existing railroad bed from bottom to top. A drainage channel is arranged at the slope toe of the existing railroad bed; a polyurethane heat preservation layer is arranged on the connecting section of the slope toe of the existing railroad bed and the drainage channel. The thermal-insulation waterproof frost heaving prevention structure for the existing railroad bed in the deep seasonal frozen soil region can be suitable for treatment and maintenance of frost heaving disasters of the existing railroad bed in the deep seasonal frozen soil region, and has a good engineering application prospect.
Owner:LANZHOU JIAOTONG UNIV +1

Multilayer integral geogrids having a cellular layer structure, and methods of making and using same

A multilayer integral geogrid, including one or more cellular layers, has a plurality of oriented multilayer strands interconnected by partially oriented multilayer junctions with an array of openings therein. The multilayer integral geogrid having one or more cellular layers is produced from a coextruded or laminated multilayer polymer starting sheet. The integral geogrid has a multilayer construction, with at least one outer layer thereof having the cellular structure. By virtue of the cellular layer structure, the multilayer integral geogrid provides for increased layer vertical compressibility under load, resulting in enhanced material properties that provide performance benefits to use of the multilayer integral geogrid to stabilize and strengthen soil, aggregates, or other particulate materials.
Owner:TENSAR INTERNATIONAL CORP

Soft covering protection structure for outdoor earthen site in humid environment and construction method

The invention discloses a soft covering protection structure for an open earthen site in a humid environment and a construction method. The protection structure comprises a three-dimensional net-shaped geogrid overburden layer and a herbaceous plant layer. The three-dimensional net-shaped geogrid overburden layer is laid on the surface of the ruin body, and the herbaceous plant layer is located on the outer side of the three-dimensional net-shaped geogrid overburden layer. The three-dimensional net-shaped geogrid overburden layer comprises an inner-layer geogrid and an outer-layer geogrid, the space between the inner-layer geogrid and the outer-layer geogrid is filled with loose soil, and the loose soil, the inner-layer geogrid and the outer-layer geogrid are tamped together to form a rammed earth layer; the herbaceous plant layer comprises a planting soil layer laid on the outer geogrid, and herbaceous plants are planted on the planting soil layer. The slope protection device is used for protection of the abrupt slope under the heavy rainfall condition, and the purposes of controlling slope body shallow layer landslide and slowing down slope surface scouring erosion are achieved.
Owner:SICHUAN PROVINCIAL INST OF CULTURAL RELICS & ARCHAEOLOGY (SANXINGDUI INST SICHUAN GROTTO TEMPLE CONSERVATION INST) +1

Tubular pile type deep reinforcement treatment anti-settlement construction framework for highway bridgehead soft foundation

The utility model discloses a tubular pile type deep reinforcement treatment anti-sedimentation construction framework for a highway bridgehead soft foundation, and relates to the technical field of highway engineering bridgehead paddy field section soft foundation treatment construction. Comprising a prefabricated pipe pile which is internally and fixedly filled with core filling concrete; the concrete pile cap body is fixedly connected with the prefabricated pipe pile and the filling core concrete; the geogrid is laid and fixedly arranged at the top of the concrete pile cap body; and the mattress layer is laid and fixedly arranged at the top of the geogrid. The problem that in the prior art, soft foundation engineering quality is difficult to achieve an ideal effect after soft foundation road sections such as highway bridgehead paddy fields and post-construction settlement strict control road sections are treated through a traditional construction framework is solved.
Owner:ROAD & BRIDGE INT CO LTD +1

Passable pipe bag hydraulic reclamation cofferdam structure

The utility model provides a passable pipe bag hydraulic reclamation cofferdam structure, which belongs to the technical field of cofferdam construction and comprises a geogrid layer fixedly arranged at the bottom of a river, a through bag layer laid on the geogrid layer, a lower cofferdam layer and an upper cofferdam layer. The cofferdam lower layer comprises a first left side pipe bag and a first right side pipe bag which are laid on the through bag layer, an inverted-T-shaped center area is formed between the first left side pipe bag and the first right side pipe bag, and the inverted-T-shaped center area is filled with a first layer of sand soil structure in a blowing mode. The problem that existing cofferdam construction is insufficient in stability and traffic capacity is solved, and the method has the advantages of being simple, easy to implement, high in operability, efficient and reliable and can be widely applied to cofferdam field construction.
Owner:SINOHYDRO BUREAU 6 CO LTD

Geogrid laying device for building construction

The invention provides a geogrid laying device for building construction, which belongs to the technical field of constructional engineering and comprises a laying seat, a pulling handle is arranged at one end of the laying seat, two mounting seats are arranged at the other end of the laying seat, an unwinding roller is arranged between the two mounting seats, and a penetration mechanism for inserting positioning steel nails into the ground is further arranged on the laying seat. The penetration mechanism is located on the side, away from the pulling handle, of the unwinding roller, and a containing mechanism used for containing the positioning steel nails and guiding the positioning steel nails into the penetration mechanism is arranged at the top of the laying base; the penetration mechanism comprises a first supporting seat and a second supporting seat which are erected between the two mounting seats, conveying pipes are arranged on the two sides of the first supporting seat, a pressing part is arranged on the second supporting seat, and notches allowing the pressing part to be inserted in are formed in the conveying pipes. The positioning steel nails can be conveniently and quickly inserted into the ground to position the geogrid, so that the laying efficiency is improved while the labor intensity of workers is reduced.
Owner:CHINA RAILWAY NO 10 ENG GRP CO LTD