The invention discloses a construction method for a
coal mining
subsidence land
sponge field, and belongs to the technical field of
sponge field construction. The high-strength
geogrid is laid at the bottom of the backfill layer, the
gangue filling layer bonded by
Portland cement is combined, a rigid framework and flexible reinforced composite foundation structure is formed, differential settlement of a
subsidence area is restrained, the
gangue filling layer consolidated by
cement prevents secondary collapse, the permeable material layer is arranged under the
earth surface, and the water-permeable material layer is arranged under the
earth surface. The water-permeable layer is formed by mixing modified
coal gangue loaded compound
fertilizer, broken stone and gravel, the water-permeable layer intercepts nutrients through the
ion exchange effect of the modified
coal gangue, graded pores of the broken stone and the gravel promote rapid infiltration of rainwater, waterlogging is avoided, and the
surface layer is covered with a mixture of the modified
coal gangue loaded compound
fertilizer and local soil. A
water retention-ventilation-
fertilizer supply microenvironment is formed, the pore structure of the
coal gangue improves the air permeability of the soil, the graft
copolymer can retain water, slowly release and reduce water
evaporation, and deep-
root crops penetrate through roots to consolidate the soil and improve the
erosion resistance.