This invention relates to the technical field of landfill seepage prevention and diversion
engineering, and discloses a method for layered protection excavation construction of landfill seepage walls, including: S1, pre-construction pretreatment; S2, layered
dewatering operation; S3, layered and segmented excavation; S4, reinforcement cage installation and filter layer filling; S5, drainage
system connection; S6, backfilling and sealing treatment; S7, full-process monitoring. This invention achieves safe and efficient construction of seepage walls through an integrated process of pre-treatment, layered and segmented excavation, dynamic protection, and simultaneous molding. It adopts a layered construction mode of upper-layer sloping excavation and lower-layer trenching using a long-arm
excavator, combined with reinforcement cage
geogrid wall protection, real-time
gas monitoring, and dynamic
dewatering technology. Furthermore, through modular installation of the reinforcement cage and layered
filter material filling process, it ensures the
structural integrity and drainage effectiveness of the seepage wall. The construction process is standardized, safe, and controllable, and is suitable for the construction of seepage walls in various types of landfills.