The invention relates to a construction method for a roadbed penetrating through a V-shaped valley area, and belongs to the technical field of
foundation engineering and foundation treatment. The problems of low foundation drainage efficiency, filling side slope
instability and differential settlement control in V-shaped valley roadbed construction are solved. According to the technical scheme, a groove is dug along the bottom of a valley, a gravel drainage blind
ditch wrapped by permeable
geotextile is laid, and a foundation drainage
system is formed; during layered filling, a vibratory roller with a
piezoelectric sensor embedded into a steel wheel is adopted; after every two
layers are filled, one-way geogrids are laid along the slope and vertically anchored into the compaction layer through U-shaped anchoring parts; a transverse drainage
pipe is pre-buried when filling is conducted to a foundation
bearing capacity sudden change point threshold value; and after filling is completed, a settlement monitoring array is arranged. According to the method, through
system integration of foundation drainage structure optimization, filling body intelligent compaction and differential settlement dynamic treatment, the bearing stability of the fill roadbed under the complex
terrain is remarkably improved, and the method is suitable for foundation construction and disaster prevention and control of the V-shaped
canyon section of the mountain road.