Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

699results about How to "Inhibit deterioration" patented technology

Optimization method for dynamic monitoring of underground water level

The invention relates to an optimization method for dynamic monitoring of an underground water level. Comprising the following steps: uniformly arranging a plurality of sensors in an underground water monitoring area, and monitoring multi-dimensional parameters including water pressure, temperature and humidity; the sensors form a gridding monitoring system through a wireless network; inputting multi-dimensional data acquired by the sensor array into a data fusion module, performing cooperative processing on the data by using a data fusion algorithm, and filtering noise and abnormal values; a unified water level change model is constructed, so that data of different parameters complement each other; dynamically adjusting the weight in the fusion algorithm regularly according to the historical data and the new measurement value; in the monitoring area, based on the dimensions of time and space, a space-time analysis model of underground water level changes is constructed, and the periodicity and regularity of water level fluctuation are excavated; and performing trend analysis on the historical water level data by adopting a time sequence analysis algorithm including ARIMA or LSTM to generate short-term and long-term water level prediction.
Owner:CHINA GEOLOGICAL SURVEY NATURAL RESOURCES COMPREHENSIVE SURVEY COMMAND CENT

Monitoring video transmission method and system based on wireless communication

The invention provides a monitoring video transmission method and system based on wireless communication, and relates to the technical field of monitoring video transmission, and the method comprises the steps: obtaining and preprocessing network state data, the network state data comprising bandwidth, time delay and packet loss rate; establishing a network state prediction model based on the LSTM neural network, and predicting a future network state according to the network state prediction model; based on the future network state, a multi-objective optimization algorithm is adopted to perform transmission path selection; and for the selected transmission path, video coding parameters are adjusted, the coding parameters comprise a code rate, a resolution ratio and a frame rate, and a self-adaptive transmission protocol is adopted to dynamically adjust the transmission rate according to a real-time network state. According to the method, different paths can be dynamically selected, network congestion or degradation is avoided, and the video transmission quality and rate are adaptively and flexibly adjusted according to the current network state, so that stable transmission of the video quality under different network conditions is ensured.
Owner:SHENZHEN FENGFENG COMM TECH CO LTD

Chronic disease patient information management system and method based on intelligent AI

The invention discloses a chronic disease patient information management system and method based on intelligent AI, and relates to the technical field of information management. The information management system comprises a patient information management module, a data acquisition module, a data management module, a data analysis and evaluation module, a risk early warning module, a health management module and a remote medical service module. According to the chronic disease patient information management system and method based on the intelligent AI, learning and analysis are carried out based on comprehensive health data of the patient, so that accurate assessment of the health risk of the patient is realized, the current health data of the patient is integrated, and multi-dimensional information of medical history and living habits of the patient is combined, so that the assessment result is more comprehensive and accurate, and meanwhile, the assessment efficiency is improved. The health risk possibly faced by the patient in the future is predicted, early warning is given out in advance, sufficient time is provided for medical institutions to formulate intervention measures, potential health problems can be found and handled in time, and disease deterioration is prevented.
Owner:XINNENGKANG TECH CO LTD

Dynamic supervision method and system for marine ranching

The invention discloses a dynamic supervision method and system for a marine ranch, and relates to the technical field of marine ranches, and the method comprises the following steps: determining the target, range and index of the dynamic supervision of the marine ranch, collecting the ecological environment data of the marine ranch, and transmitting the ecological environment data to a data management center; wherein the ecological environment data comprises historical data and real-time data, the collected ecological environment data is preprocessed, the preprocessed data is analyzed, environment influence factors are extracted, the environment influence factors comprise a water quality influence factor, a substrate influence factor and a biocenosis influence factor, and the water quality influence factor, the substrate influence factor and the biocenosis influence factor are analyzed; and analyzing the correlation among the water quality influence factor, the substrate influence factor and the biocenosis influence factor. According to the method, the water quality, the substrate and the biocenosis state of the marine ranch are monitored in real time, the ecological environment early warning evaluation coefficient is combined, and the potential ecological risk is quickly identified, so that prevention measures are taken in the first time, and the ecological environment is prevented from deteriorating to an irreversible degree.
Owner:FIRST INSTITUTE OF OCEANOGRAPHY MNR

Welding device and method for metal corrugated pipe production

The invention discloses a welding device and method for metal corrugated pipe production, and relates to the technical field of metal pipe production. A sliding rail is arranged at the top of the base, a collecting box is arranged on one side of the back of the sliding rail, two linkage plates are symmetrically arranged in the sliding rail, an L-shaped plate is arranged at the edge of the top of the base, an annular rail is arranged on the side, close to the axis of the base, of the L-shaped plate, and a welding assembly is arranged in the annular rail. Two deviation prevention devices are symmetrically arranged on the top of the base, and anti-falling devices are arranged on the inner sides of the deviation prevention devices. By means of the inclined plate and the round roller, it is guaranteed that a pipe entering the limiting ring is located in the center of the interior of the limiting ring all the time, the phenomenon of slight deviation in the pipe alignment process is avoided, and workers need to observe the deviated direction with the naked eyes so that manual adjustment can be conducted; and the alignment accuracy between the two pipes is effectively improved, and the welding preparation time is shortened.
Owner:DONGTAI HUITONG MACHINERY ENGINEERING CO LTD

Pollution research and water quality prediction method based on river segmented water environment capacity analysis

The invention discloses a pollution research and water quality prediction method based on river segmented water environment capacity analysis. The method comprises the following steps: accurately dividing a drainage basin into water environment capacity accounting units; obtaining a river water body image through satellite remote sensing; identifying and quantifying the positions and the intensities of point source and non-point source pollution sources in the drainage basin by utilizing the water quality parameters of the river obtained by the remote sensing image; establishing a river water quality prediction model; calculating the water environment capacity of each river reach under different surface water environment quality standards; comparing the estimated pollutant discharge amount with the water environment capacity under each water quality standard, and judging whether the pollutant discharge amount exceeds the capacity or not; and predicting future water quality change by using the model. According to the method, remote sensing, GIS and machine learning technologies are utilized, rapid analysis of the river segmented water environment capacity and accurate prediction of the water quality are achieved, dependence on a large amount of field sampling and complex software simulation is reduced, and the working efficiency is greatly improved.
Owner:南京市市政设计研究院有限责任公司

Intelligent all-in-one machine control method and system

The invention relates to the technical field of equipment control, in particular to an intelligent all-in-one machine control method and system.The intelligent all-in-one machine control method comprises the steps that firstly, collection frequencies are set according to different types of production parameters, original data are collected in real time and preliminarily processed, a unified timestamp is established, and multi-source production parameters are obtained; then, performing fusion analysis on the multi-source production parameters to obtain fusion operation mode information, and identifying a real-time operation mode; constructing a multi-target defect prediction model, and predicting a potential defect condition according to the fused operation mode information and the multi-source production parameters when the real-time operation mode is abnormal; then, an intelligent decision model based on reinforcement learning is introduced, and an optimal production parameter adjustment scheme is generated based on potential defect conditions and multi-source production parameters; and finally, realizing automatic control of the intelligent all-in-one machine based on the optimal production parameter adjustment scheme. According to the invention, the self-adaptive optimization of the production process is realized, and the adaptability of the intelligent all-in-one machine control method to the change of the production process is improved.
Owner:ZHUJI BAOLIPU AUTOMATION EQUIP MFG CO LTD

Intelligent critical patient multi-dimensional management system

The invention provides an intelligent critical patient multi-dimensional management system, and relates to the technical field of intelligent critical patient management. Comprising a data integration and cleaning module, a patient information management module, an algorithm and analysis module, a treatment scheme recommendation module and an early warning and intervention module, patient information can be mainly integrated through the data integration and cleaning module, and therefore previous treatment information of a patient can be rapidly detected. Advanced monitoring equipment and algorithms are integrated, the system can monitor vital signs of a patient in real time, early warning is immediately given out once abnormal data are detected, a quick response opportunity is provided for medical staff, the system not only monitors single vital signs such as the heart rate and the blood pressure, but also can comprehensively analyze multiple physiological parameters, and the medical staff can conveniently and quickly monitor the vital signs. Therefore, the health condition of the patient can be evaluated more comprehensively, and the trend change of data of the patient can be analyzed.
Owner:SHANDONG PROVINCIAL HOSPITAL AFFILIATED TO SHANDONG FIRST MEDICAL UNIVERSITY (SHANDONG PROVINCIAL HOSPITAL)

4G sphygmomanometer and blood pressure artificial intelligence analysis system

The invention discloses a 4G sphygmomanometer and a blood pressure artificial intelligence analysis system, and relates to improvement of intelligent medical detection equipment, in particular to improvement of an artificial intelligence sphygmomanometer. The method comprises the following steps of 1, user data acquisition and input, 2, user data storage and management, 3, user data analysis and modeling, 4, user blood pressure data report generation and health suggestion report generation, 5, user interaction and feedback, and 6, model optimization and updating. Measurement results are recorded through a household digital blood pressure measuring instrument, pulse, user mood, motion states, medicine taking conditions and the like are synchronously recorded, daily blood pressure report, weekly blood pressure report, monthly blood pressure report, monthly blood pressure report, annual blood pressure report and the like are formed, and corresponding health reports, health suggestions, medicine taking advice and the like are given through artificial intelligence analysis of a large model. And the blood pressure information of relatives and friends can be published and shared through corresponding software, so that the blood pressure condition care of relatives and friends is realized.
Owner:LONGVON TECH (SHENZHEN) CO LTD

Coordination control method and device for off-grid new energy hydrogen production, electronic equipment and medium

The invention provides a coordination control method and device for off-grid new energy hydrogen production, electronic equipment and a medium, and relates to the technical field of new energy hydrogen production. The coordination control method for off-grid new energy hydrogen production comprises the following steps: performing first coordination control on off-grid new energy hydrogen production based on a steady-state control mode under the condition that the actually measured current frequency of a system is within an adjustment dead zone range; under the condition that the current frequency of the system is not in the adjustment dead zone range, performing second coordination control based on the transient state control mode; after the second coordination control, under the condition that the current frequency of the system is not in the adjustment dead zone range, third coordination control is carried out on off-network new energy hydrogen production based on the emergency control mode; and after the third coordination control, under the condition that the current frequency of the system is not in the adjustment dead zone range, determining a to-be-cut power value of off-grid new energy hydrogen production according to an overcut principle. According to the method, the load adjusting characteristic of the hydrogen production electrolytic cell is considered, source-load interaction is achieved, and the absorption rate of new energy is increased.
Owner:NR ELECTRIC CO LTD +1

Tunnel construction quality evaluation system and method

The invention discloses a tunnel construction quality evaluation system and method. The evaluation system comprises a data acquisition module, a quality evaluation standard system, an early warning and notification module and a data management module. Wherein the data acquisition module is used for acquiring construction vehicle data, construction site sensors and site photographing; the quality evaluation standard system comprises drilling quality evaluation, back break evaluation, primary support thickness evaluation, anchor rod construction quality evaluation, waterproof and drainage pipe quality evaluation, steel bar binding quality evaluation, secondary lining quality evaluation and primary support flatness evaluation; the early warning and notification module integrates early warning signals from all the evaluation modules; and the data management module is responsible for storing data generated by each independent module and executing cross-module data analysis. According to the tunnel construction quality evaluation system, by integrating advanced monitoring equipment, an automatic algorithm and comprehensive data analysis, the quality control effect in the tunnel construction process is remarkably improved.
Owner:CCCC SECOND HIGHWAY ENG CO LTD +1

Flushing control method for ultrafiltration flushing system

The invention relates to the technical field of flushing data processing, in particular to a flushing control method for an ultrafiltration flushing system. The method comprises the following steps: analyzing the distribution condition of data points on a multi-dimensional data curve in each time range to obtain the ultrafiltration membrane pollution degree of each curve in a time period; according to the pollution degree of the ultrafiltration membrane in the real-time curve time period, whether backwashing is carried out at the real-time moment is judged, and according to the pollution degree of the ultrafiltration membrane in the curve time period corresponding to the real-time backwashing, the pollution degree of the ultrafiltration membrane in the next adjacent curve time period corresponding to the previous backwashing and the time distance between the real-time backwashing and the previous backwashing, the backwashing is carried out at the real-time moment. The washing increasing strength of real-time backwashing is obtained; in combination with the initial washing intensity, the washing intensity of real-time backwashing is obtained, and whether chemical washing is carried out in real time or not is judged; and performing flushing control on the ultrafiltration membrane at the real time according to the judgment result. According to the invention, the accurate flushing time is obtained, so that the pollution flushing effect of the ultrafiltration membrane is improved.
Owner:TANGSHAN SHANCHENG TECH CO LTD

Pipeline looseness detection method and system for rail train

The invention provides a pipeline looseness detection method and system for a rail train, and the method comprises the steps: obtaining a pipeline image: obtaining a pipeline image collected by a visual camera; a tie abnormity analysis step: judging whether tie characteristics can be extracted from the pipeline image and judging whether the current tie is normal or abnormal according to the shape after the tie characteristics are extracted; a pipeline looseness calculation step: when the current ribbon is abnormal, according to the continuous pipeline images, through shooting frequency analysis and pipeline relative position analysis in the pipeline images, obtaining pipeline vibration frequency and pipeline vibration amplitude, and through calculation with the fluid data set and the train running speed, obtaining a pipeline looseness rate through a looseness rate equation; a loosening upper limit feedback step: recording the duration under the pipeline loosening rate, comparing the duration with a time consumption upper limit threshold, and outputting a pipeline interface leakage instruction or a pipeline interface crisis instruction according to a comparison result; the method has the advantages that the looseness condition of the pipeline during train running can be judged, and the leakage moment of the pipeline connector can be estimated.
Owner:CRRC HANGZHOU DIGITAL TECH CO LTD

Visual real-time monitoring method and system for digital floating disc of storage tank

The invention relates to the technical field of storage tank safety monitoring, in particular to a visual real-time monitoring method and system for a digital floating disc of a storage tank. The method comprises the following steps: carrying out real-time floating disc signal acquisition on a full liquid receiving floating disc to obtain real-time floating disc sensing signal data, and carrying out data filtering preprocessing on the real-time floating disc sensing signal data to obtain floating disc sensing signal data; performing Kalman filtering data fusion on the floating disc sensing signal data to obtain real-time floating disc sensing fusion data; performing floating disc abnormal state detection on the real-time floating disc sensing fusion data to obtain floating disc abnormal detection data; floating disc early warning information integration is carried out according to the floating disc anomaly detection data, so that an abnormal floating disc alarm strategy is obtained; data of the full-liquid-receiving floating disc auxiliary mechanism is obtained, prevention and control strategy analysis is carried out, an abnormal floating disc prevention and control strategy is obtained, and the abnormal floating disc prevention and control strategy is uploaded to a controller to execute a floating disc prevention and control task. The safety of the storage tank can be improved.
Owner:HUNAN SHANGCHI ENVIRONMENTAL PROTECTION TECH CO LTD

Regulation and control method and system suitable for wastewater multi-stage purification of green factory and terminal

The invention relates to a regulation and control method and system suitable for wastewater multistage purification of a green factory and a terminal, and belongs to the technical field of factory wastewater treatment.The regulation and control method comprises the steps that according to historical wastewater discharge data of the factory, the predicted total discharge amount of wastewater discharge of the day is predicted; generating a first expected water inflow of the wastewater multi-stage purification system according to the predicted total discharge amount; periodically acquiring the actual buffer capacity of the stored sewage discharged into the flow buffer pool by the factory on the same day; whether the actual buffering capacity exceeds one time of the first expected water inflow or not is judged; and if yes, controlling the sewage in the flow buffer pool to enter the wastewater multi-stage purification system at the first expected water inflow. The wastewater multi-stage purification system has the beneficial effects that the treatment capacity of the wastewater multi-stage purification system adapts to the discharge amount of sewage, so that the wastewater treatment effect of the wastewater multi-stage purification system is improved.
Owner:SHANDONG CHEN LU CONSTR ENG CO LTD

Water environment safety early warning method and system based on Internet of Things

The invention discloses a water environment safety early warning method and system based on the Internet of Things, and relates to the technical field of water environment monitoring and safety alarming, and the main scheme is as follows: firstly, collecting water quality physical and chemical parameters and water quantity parameters of a current detection period, then respectively calculating each subentry index, and calculating the water quality index; comprising temperature, turbidity, conductivity index and the like obtained by physical parameters, dissolved oxygen, pH value, lead content index and the like obtained by chemical parameters, and water quantity index, so as to obtain water quality physical index, chemical index and water environment safety index, and then judge whether to trigger safety real-time alarm or not; and acquiring data of a previous cycle to calculate a historical water environment safety index and an index growth rate, and comparing with corresponding threshold values to judge whether to give a delayed alarm. According to the method, multi-parameter and multi-cycle data are integrated, a comprehensive and accurate judgment basis is provided for water environment safety monitoring, the monitoring accuracy and reliability are effectively improved, and the water environment safety is guaranteed.
Owner:NORTHEAST AGRICULTURAL UNIVERSITY

Infrared screening automatic separator suitable for feed opening

The invention discloses an infrared screening automatic separator suitable for a discharging port, and relates to the technical field of material screening, the infrared screening automatic separator comprises a discharging inlet, a vibrating screen plate is connected to the upper end of the discharging inlet in an up-down sliding mode, and a screen hole abnormity detection mechanism is arranged between the vibrating screen plate and the discharging inlet; the screen hole anomaly detection mechanism is used for detecting the indentation degree of screen holes in the surface of the vibrating screen plate, the screen hole anomaly detection mechanism is provided with the movement limiting mechanism, the movement limiting mechanism is used for changing the screen hole detection track, and the real-time monitoring function reduces the screening efficiency reduction or the product quality problem caused by the screen hole problem of the vibrating screen plate; according to the sieve plate, the stability and reliability of the production process are ensured, the problems of the sieve holes can be found in time and repaired, further expansion and deterioration of the problems can be avoided, the complexity and cost of maintenance work are reduced, in addition, through regular monitoring and preventive maintenance, the service life of the sieve plate can be prolonged, and the overall maintenance cost can be reduced.
Owner:中科宝溢视觉科技(江苏)有限公司

Interior inspection robot for blades of wind generating set

The invention provides a wind generating set blade interior inspection robot, and relates to the technical field of wind power generation, the wind generating set blade interior inspection robot comprises a robot body, the robot body is composed of a Mecanum wheel chassis, a robot tower bottom cabinet and a robot cabin cabinet, and the robot tower bottom cabinet is arranged at the top end of the Mecanum wheel chassis; a robot cabin cabinet is arranged at the top end of the robot tower bottom cabinet, and a monitoring sensing device is arranged on the outer side of the robot cabin cabinet. According to the invention, the monitoring sensing device is arranged, and the interior of the cabin of the generator set is effectively monitored by monitoring the operation of a sensor, so that the problems that the existing wind turbine generator inspection robot is mainly an unmanned aerial vehicle, and the appearance and blades of the wind turbine generator are monitored in the prior art are effectively improved; the problems that the interiors of the wind turbine generator blades cannot be continuously monitored in real time, and meanwhile, the interiors and important positions of the wind turbine generator blades cannot be monitored and daily maintenance requirements cannot be met are solved.
Owner:HUANENG HAMI WIND POWER CO LTD

Shield forming tunnel form data processing system and method

The invention discloses a shield forming tunnel form data processing system and method, and relates to the technical field of tunnel data processing. The shield forming tunnel form data processing method specifically comprises the following steps: S1, collecting and preprocessing data of a plurality of sections in a shield forming tunnel; s2, calculating the offset of the center of each segment; s3, continuously measuring and analyzing a deformation trend; s4, predicting offset change by using a linear regression model; s5, predicting the final offset of the duct piece by using the trained model; the removed abnormal values are recorded and analyzed, so that abnormal factors of segments in the tunnel can be screened, potential problems can be found and solved in time, further deterioration of the problems is prevented, and safety and stability of the tunnel are ensured; the deformation is calculated and the deformation trend is analyzed by using a time sequence, so that the deformation trend can be found in time, a subsequent detection plan can be formulated, the deformation problem can be found and processed in time through continuous monitoring, and the stability and the safety of the tunnel are ensured.
Owner:CHINA RAILWAY SEVENTH BUREAU GRP XIAN RAILWAY ENG CO LTD +2

Coal mine dust concentration real-time monitoring method based on big data analysis

The invention discloses a coal mine dust concentration real-time monitoring method based on big data analysis, and relates to the technical field of coal mine dust concentration monitoring, and the method comprises the following steps: obtaining various parameter information generated in the data fusion process of a big data system in real time, including transient response information and time synchronization information, and analyzing and processing the obtained transient response information and the time synchronization information. According to the method, the transient deviation index and the phase error index are introduced, the data fusion process is intelligently evaluated in combination with the machine learning model, the error problem caused by the sensor response time difference is solved, and multi-level intelligent sensing is achieved. The system accurately judges the risk level, reduces false alarm and missing alarm, takes maintenance, adjustment or emergency intervention measures corresponding to different risks through a grading early warning mechanism, remarkably improves the coal mine monitoring safety, and reduces the accident risk.
Owner:HUATING COAL GRP CO LTD +1

Road surface quality real-time evaluation and optimization system

The invention discloses a road surface quality real-time evaluation and optimization system, and relates to the technical field of signal processing, and the system comprises a road surface penetration radar signal transmitting and collecting part, a signal processing part, a signal analysis part and a road surface quality evaluation and optimization part. The road surface penetration radar signal transmitting and collecting part is used for using a multi-spectrum ground penetration radar system and then collecting reflection signals of penetration radar signals; the signal processing part is used for carrying out high-order frequency domain deconvolution on the reflected signals to improve the resolution ratio and finally extracting signal features; the signal analysis part is used for calculating the water content and density of the pavement according to the extracted signal features; and the road surface quality evaluation and optimization part is used for calculating a quality evaluation index of the road surface. The pavement quality real-time evaluation and optimization system provided by the invention is efficient, accurate and intelligent.
Owner:LIAOCHENG TRANSPORTATION DEV CO LTD

Glass, glass plate, and method for producing glass plate

Provided is a glass having a low dielectric loss tangent in a high-frequency region and excellent chemical resistance and moisture resistance. A glass having, in mol% on the basis of oxides, 68% or more of SiO2, 0.1-8% of Al2O3, 88% or more of [SiO2] + [B2O3], 27% or less of [B2O3]-([RO] + [R2O]-[Al2O3]), a relative dielectric constant of 4.5 or less at 25 DEG C and a frequency of 10 GHz, a dielectric loss tangent of 0.005 or less at 25 DEG C and a frequency of 10 GHz, [Delta] Abs-OH of 4.0 or less, 0.1-4% of SrO, a total content (RO) of MgO, CaO, SrO and BaO of more than 0% and 6% or less, and a total content (R2O) of Li2O, Na2O and K2O of 0-1%, [Al2O3]-[RO] is-3% or more and less than 8%, [Al2O3] * [RO] is greater than 0 and 30 or less, [MgO] + [CaO] is 0.1-5.9%, and [MgO] / ([MgO] + [Al2O3]) is 0-0.45.
Owner:AGC INC

Preparation method of immunomodulatory recombinant macrophage vesicles

The invention belongs to the technical field of biomedical treatment, and discloses a preparation method of immunomodulatory recombinant macrophage vesicles, and the preparation method specifically comprises the following steps: step 1, clinical sequencing of gingival tumor tissues and pathogenic microbiota data analysis; hybridizing and fusing a macrophage membrane infected by the porphyromonas gingivalis and an exosome membrane; and 3, constructing a piezoelectric driven ROS (reactive oxygen species) to generate the immunoregulation vesicles. The invention provides an innovative nano vesicle technology, and the technology shows double advantages in tumor treatment: firstly, accurate targeting and efficient killing of key porphyromonas gingivalis in a tumor environment are realized by constructing recombinant macrophage vesicles, and meanwhile, the stability of normal flora is kept, and tumor deterioration is prevented; and secondly, the anti-tumor immune response is obviously activated by utilizing the immunoregulation capability of the bacteria-induced macrophages and exosome vesicles thereof, including converting immunosuppressed M2 type macrophages into anti-tumor M1 type macrophages, so that the growth of solid tumors is effectively inhibited.
Owner:TIANJIN MEDICAL UNIVERSITY GENERAL HOSPITAL

Intelligent operation management method and system for ultrafiltration membrane pool of water plant and storage medium

The invention relates to the technical field of sewage treatment, in particular to an intelligent operation management method and system for a water plant ultrafiltration membrane pool and a storage medium. The method comprises the steps that membrane pool operation parameters are obtained, multiple regression analysis is conducted on the membrane pool operation parameters, and transmembrane pressure differences corresponding to the membrane pool operation parameters are determined; the operating parameters of the membrane tank comprise inlet water quality, outlet water quality, water temperature and filtering pressure; when the transmembrane pressure difference is higher than the preset standard pressure difference, whether the current moment is in a preset emptying period or not is judged; if yes, carrying out cleaning operation based on the membrane pool operation parameters; and if not, obtaining a transmembrane pressure difference increase value in the first preset time period, and determining a coping intervention type based on the transmembrane pressure difference increase value, the coping intervention type including preventive intervention and immediate intervention. According to the invention, the balance between the cleaning and maintenance of the ultrafiltration membrane is conveniently improved, so that the continuous, efficient and stable operation of the water treatment process is ensured.
Owner:HEBEI HUATONG INNOVATION TECH

Flash spinning fiber containing organic pigment as well as preparation method and application of flash spinning fiber

The invention discloses an organic pigment-containing flash spinning fiber and a preparation method and application thereof, and relates to the technical field of spinning. The organic pigment is subjected to polyarylsulfone wrapping treatment in advance to form the heat-resistant layer, and then is subjected to high-temperature heat treatment, so that the crystallinity and orientation degree of the polymer heat-resistant layer can be improved to the maximum extent, and the high-temperature resistance and rigidity of the polymer heat-resistant layer are further enhanced; the solvent-resistant effect of the modified pigment can be improved, the polyarylsulfone heat-resistant layer is prevented from being dissolved and broken due to the influence of a spinning solvent in a long-time high-temperature and high-pressure environment, the degradation degree of the modified pigment is low after long-time high-temperature flash spinning production, and a finally prepared fiber product is relatively high in strength and toughness; the color fastness to light, friction and soaping can all reach grade 4 or above, and color fading or discoloration is not prone to occurring.
Owner:XIAMEN DANGSHENG NEW MATERIAL CO LTD

Construction method and system based on encephalopathy nursing knowledge base

The invention relates to the technical field of database construction, in particular to a construction method and system based on an encephalopathy nursing knowledge base. The method comprises the following steps: acquiring multi-source encephalopathy data; performing structured data screening on the multi-source encephalopathy data to generate structured encephalopathy data and unstructured encephalopathy data; performing multi-modal data structured layering on the unstructured encephalopathy data to generate multi-modal structured layered data; performing data preprocessing on the multi-modal structured hierarchical data and the structured encephalopathy data to generate a standard structured encephalopathy data set; performing context analysis on the standard structured encephalopathy data set to generate an encephalopathy information semantic vector set; and performing redundant relation pruning processing on the encephalopathy information semantic vector set to generate spatial semantic optimization data. According to the method, by integrating multi-source data, structured and unstructured information, real-time dynamic mapping nursing requirements and system feedback evaluation, the construction quality and practicability of the encephalopathy nursing knowledge base are improved.
Owner:XIAN TRADITIONAL CHINESE MEDICINE ENCEPHALOPATHY HOSPITAL CO LTD

Fuming furnace smelting process control method and system, terminal and readable storage medium

The invention discloses a fuming furnace smelting process control method and system, a terminal and a readable storage medium. The method comprises the following steps: constructing a normal association relationship among initial multi-source data in a stable operation state of a fuming furnace; collecting current multi-source data of the fuming furnace in a current operation state; identifying association deviation according to the normal association relationship and the current multi-source data; identifying an abnormal state according to the correlation deviation; and according to the abnormal state, the smelting area is finely controlled. According to the control method and system for the smelting process of the fuming furnace, the normal incidence relation among the multi-source data is constructed, the abnormal state can be recognized more accurately, then the smelting area is finely controlled, and therefore the control accuracy of the smelting process can be improved, unnecessary energy consumption and process fluctuation can be reduced, and the smelting process can be controlled more accurately. And meanwhile, local abnormity can be rapidly and effectively eliminated, further deterioration of the local abnormity is prevented, and automatic control over the smelting process of the fuming furnace can be achieved.
Owner:JIANGXI COPPER TECHNOLOGY RESEARCH INSTITUTE CO LTD +1

Neodymium-iron-boron magnet and preparation method and application thereof

The invention provides a neodymium-iron-boron magnet and a preparation method and application thereof, and the preparation method comprises the following steps: preparing a neodymium-iron-boron melt-spun sheet from a magnet raw material, and then carrying out hydrogen demolishing treatment on the neodymium-iron-boron melt-spun sheet to obtain coarse powder; the hydrogen decrepitation treatment comprises a hydrogen absorption step and a dehydrogenation step which are carried out in sequence, and the dehydrogenation temperature is 250-350 DEG C; coating the coarse powder with an organic additive to obtain a coating material; and carrying out grinding, molding, sintering treatment and aging treatment on the coating material to obtain the neodymium-iron-boron magnet. According to the preparation method, the content of hydrogen in the coarse powder is controlled through an incomplete dehydrogenation process, so that the content of impurity elements in the magnet is reduced, degradation of the impurity elements on the magnetic performance is avoided, meanwhile, the problem that cracks are formed in the magnet in the sintering process due to the incomplete dehydrogenation process is avoided in cooperation with a multi-stage sintering process, and the quality of the magnet is improved. And a coating process is matched to protect the magnet, so that the problem that the magnet adsorbs impurities again in a subsequent treatment process is avoided.
Owner:NINGBO KONIT IND +4

Pre-examination triage method and equipment for child emergency treatment and medium

The embodiment of the invention discloses a pre-examination triage method and equipment for child emergency treatment and a medium, and relates to the technical field of emergency treatment triage, the method comprises the following steps: obtaining multi-source treatment data of each emergency treatment child patient, so as to construct a current pre-examination triage data set corresponding to each emergency treatment child patient, and according to demographic information of the emergency treatment child patient, establishing a current pre-examination triage data set corresponding to each emergency treatment child patient; matching is carried out in a pre-constructed model library, and an age pre-examination intelligent triage model corresponding to each emergency treatment child patient is determined to generate initial triage grading information of each emergency treatment child patient; when the initial triage classification information is a non-endangered level, determining an affiliated emergency treatment area of each emergency treatment child patient, and collecting real-time waiting queue information; based on the real-time waiting queue information, determining predicted grading change trend information of each emergency treatment child patient; and by predicting the grading change trend information, the treatment area and the treatment sequence are adjusted in real time, and the real-time triage information of each emergency treatment child patient is determined.
Owner:AFFILIATED CHILDRENS HOSPITAL OF CAPITAL INST OF PEDIATRICS

Key gene prediction method based on network information entropy

InactiveCN119028429AAchieve volatility quantificationaccurate diagnosisProteomicsGenomicsReference sampleNetwork structure
The invention provides a key gene prediction method based on a network information entropy, and the method specifically comprises the following steps: S1, constructing a background network, S2, constructing a reference sample network, S3, constructing a disturbance sample network, S4, calculating a network information entropy and a difference network information entropy, S5, calculating a global difference network information entropy by using the difference network information entropy, and S5, predicting a key gene based on the global difference network information entropy. And selecting a key local difference network information entropy to predict a key gene. On the basis of basic theories such as dynamic network biomarkers, a sample specific network and information entropy, the volatility of a complex biological system is accurately monitored under a dynamic background, a brand new method is provided, potential correlation information between nodes is disclosed by analyzing network connection, namely, taking edges as minimum analysis units, and the fluctuation of the complex biological system is accurately monitored. And a key network structure causing significant fluctuation is identified, so that early warning of specific genes and identification of key pathogenic gene groups are facilitated.
Owner:HANGZHOU INST FOR ADVANCED STUDY UCAS