The invention discloses a multi-parameter
coupling-based
soil material field collaborative partitioning method and
system and a medium. The method comprises the following steps of: obtaining topographic and geomorphic development characteristics of a
soil material field; carrying out exploration sampling on the
soil material field and carrying out a
physical property test to obtain a soil material
mass partition index; carrying out
zoning by adopting a different soil field
zoning method to obtain different preliminary
zoning results; according to the soil
material quality zoning indexes, based on an
analytic hierarchy process, constructing a judgment matrix, determining a
weight coefficient of each soil
material quality zoning index, and respectively endowing each soil material field zoning method with an intermediate
score; and on the basis of different preliminary partitioning results, the weight coefficients and the intermediate scores, constructing a soil material field multi-parameter
coupling collaborative partitioning model, and calculating a soil material comprehensive partitioning result. According to the method, fine material source management and mining of the earth material field of the core-wall rockfill dam are achieved through comprehensive parameter partitioning, the earth material
utilization rate can be remarkably increased, the invalid
material handling capacity is reduced, meanwhile, the mining path and the mining sequence are optimized according to partitioning, the construction cost is reduced, and the construction period is shortened.