Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

197 results about "Zoning" patented technology

Zoning is the process of dividing land in a municipality into zones (e.g. residential, industrial) in which certain land uses are permitted or prohibited. In addition, the sizes, bulk, and placement of buildings may regulated. The type of zone determines whether planning permission for a given development is granted. Zoning may specify a variety of outright and conditional uses of land. It may also indicate the size and dimensions of land area as well as the form and scale of buildings. These guidelines are set in order to guide urban growth and development.

System and method for standardizing and tracking land use utility

Property records and parcel boundaries form the basis for much of the backbone used in the real estate industry for a myriad of activities from property search, analysis, evaluations for lending etc. However, these records do not include accurate and consistent data for fields related to a property's zoning or possible future land use. This invention targets transforming disparate data sources needed to express a property's land use utility and standardizes the multiple records into a standardized land use utility with an element for time that allows tracking and measuring changes in standardized land use utility at the parcel level for one or more locations. Improvements in this invention are directed to an improvement in computer-related technology.
Owner:BEYOND VALUE INC

County power distribution network partition autonomous optimization method and system based on dynamic partition strategy

The invention discloses a county power distribution network partition autonomous optimization method and system based on a dynamic partition strategy. The method comprises the steps of collecting power distribution network data, evaluating the comprehensive adjustment capability of various adjustable resources of a power distribution network, and constructing a dynamic partition index system. And under the zoning framework of the county power distribution network, constructing an autonomous zoning optimization model with the minimization of the network loss as an optimization target. And solving the model by adopting an improved genetic algorithm to realize minimization of the loss of the county power distribution network. And a dynamic updating mechanism of the partition structure is designed, and continuous optimization of a partition result is realized. According to the county power distribution network partition autonomous optimization method and system based on the dynamic partition strategy, evaluation and optimization of the comprehensive adjustment capability are achieved, and the operation efficiency and stability of the power distribution network are remarkably improved. The method has the remarkable advantages in the aspects of dealing with voltage fluctuation, power fluctuation and resource adjusting capacity, and the problems which cannot be dealt with in the prior art are solved.
Owner:GUIZHOU POWER GRID CO LTD

Urban planning construction land management and control system based on big data

The invention relates to the technical field of urban planning, and particularly discloses an urban planning construction land management and control system based on big data, and the system comprises the steps: obtaining geological environment, landform, engineering construction and human activity data through multi-source data collection; multi-source data fusion analysis is adopted to construct a construction land comprehensive evaluation field including geological stability, engineering suitability and environmental bearing capacity; a development suitability partition is generated based on a density peak value spatial clustering method; updating the development suitability level by dynamically monitoring the verification process; according to the method, accurate analysis and early warning of the three-dimensional deformation field are realized, and scientificity and safety of urban planning in a complex geological environment are improved.
Owner:CHANGAN UNIV

Power distribution network dynamic partitioning method, system and equipment considering new energy output fluctuation, and medium

The invention discloses a power distribution network dynamic partitioning method, system and device considering new energy output fluctuation and a medium, and relates to the technical field of power distribution network partitioning, and the method comprises the steps: building a measurement matrix based on a power transmission relation quantification means in a new energy output stable state, and selecting a main power supply node according to the node correlation reflected by the measurement matrix, load nodes are classified according to the electrical correlation degree and the spatial proximity principle to form a preliminary partition framework, new energy output time sequence prediction information is introduced, a partition quality evaluation function is constructed, a partition optimization model is established, the preliminary partition framework is dynamically adjusted and corrected, and new energy output is obtained; and solving the partition optimization model by adopting an optimization solving method, and outputting a dynamic partition scheme adapted to new energy fluctuation. According to the method, comprehensive optimization of the power distribution network dynamic partitioning method considering the new energy output fluctuation is realized, and the operation economy, safety and reliability of the power distribution network in a high-proportion new energy access environment are remarkably improved.
Owner:GUIZHOU POWER GRID CO LTD

Field drip irrigation automatic zoning method and system based on improved k-means algorithm

The invention provides a field drip irrigation automatic zoning method and system based on an improved k-means algorithm. The method comprises the following steps: acquiring state data of each land parcel in a field area; inputting the state data of each land parcel into a pre-trained random forest model, and obtaining N initial clustering centers output by the random forest model, N being a clustering number of a k-means algorithm; n optimal clustering centers are obtained according to a preset angle exid optimization algorithm, the state data of each land parcel and the N initial clustering centers; according to the state data of each land parcel and the N optimal clustering centers, each land parcel is clustered, a clustering result of each land parcel is obtained, and the clustering result of each land parcel represents an irrigation type to which the land parcel belongs; and determining a drip irrigation scheme of each land parcel according to the clustering result of each land parcel. By applying the method provided by the invention, an accurate plot clustering result can be obtained, so that the drip irrigation effect can be effectively improved.
Owner:INST OF AGRI MECHANIZATION XINJIANG AGRI INST

Volume partition early warning method and system for urban stock land planning

The invention discloses a volume partition early warning method and system for urban stock land planning, and relates to the technical field of urban land planning management, and the method comprises the steps: interactively obtaining urban stock land planning, carrying out the volume calculation and division, and building a target urban stock land; acquiring land current situation data, and generating a dynamic partitioning result; calculating a redevelopment coefficient according to land use planning, and mapping a planning volume; obtaining a partition identifier, matching the partition identifier with a basic threshold value, performing volume influence analysis, and establishing a first influence coefficient; and in combination with strategy development prediction, generating a second influence coefficient, correcting a basic threshold, and then carrying out early warning identification. The technical problem that in the existing stock land redevelopment process, due to regional difference, too high or too low development volume can affect reasonable planning of the region and urban bearing capacity is solved, and the technical effects of optimizing the stock land development planning and ensuring balance of volume reasonability and regional bearing capacity in planning implementation are achieved.
Owner:SHENZHEN URBAN PLANNING & LAND RES CENT

Land space planning stock land management and control early warning system based on multi-dimensional analysis

The invention discloses a territorial space planning stock land management and control early warning system based on multi-dimensional analysis, and relates to the related field of territorial space management, and the system comprises a data association module which is used for collecting territorial space planning constraint data and regional multi-dimensional land data of a target region, and carrying out the spatial association superposition, and forming a stock land database; the partition development module is used for carrying out stock unit identification and regional aggregation analysis to obtain a partition development stock land; the multi-dimensional constraint analysis module is used for constructing a multi-dimensional constraint system, performing multi-dimensional constraint analysis on the partition development stock land, and determining a partition stock land volume threshold value; and the land use management and control early warning module is used for monitoring and obtaining stock land use development planning volume data according to a partition stock land use volume threshold value, and performing land use management and control early warning based on a grading early warning mechanism. The technical problem that existing stock land management and control early warning is insufficient in accuracy and timeliness is solved, and the technical effect of improving the stock land management and control early warning accuracy and timeliness is achieved.
Owner:SHENZHEN URBAN PLANNING & LAND RES CENT

Urban engineering construction suitability evaluation method and application thereof

The invention discloses an urban engineering construction suitability evaluation method and application thereof. The method comprises the following steps: S1, collecting nine types of influence factor data influencing urban engineering construction; s2, 45 specific evaluation factors are screened for each element, and an evaluation index system is constructed; s3, performing unified quantitative assignment on the evaluation factors to form a set of evaluation scoring standards; s4, according to the specific conditions of different evaluation areas, evaluation indexes are selected according to the step S2, a hierarchical structure model is established, a judgment matrix is constructed, and the corresponding weight of each evaluation factor is calculated in combination with an expert scoring method; and S5, on the basis of a CreateFishnet module of ArcGIS and a comprehensive index method, combining the calculated suitability evaluation comprehensive score of each unit grid, and finally obtaining an urban engineering construction suitability evaluation zoning result. According to the method and the application thereof, the evaluation and analysis efficiency and accuracy of the suitability of urban engineering construction are improved, urban construction planning can be better guided, and relevant government departments can make scientific and effective decisions and management.
Owner:YUNNAN GEOLOGICAL & MINERAL ENG SURVEY GRP CO LTD

Load management operation method for comprehensive energy optimization configuration

The invention discloses a load management operation method for comprehensive energy optimal configuration, and relates to the technical field of energy management, and the method comprises the following specific steps: microclimate partition division: carrying out the comprehensive field exploration of a target region, collecting the landform, building layout and vegetation coverage data, analyzing the influence of each factor on the microclimate formation, and carrying out the calculation of the microclimate; according to the method, a partition division basis is determined according to the difference between airflow and heat caused by topographic relief, the influence of a building on sunlight and ventilation and local microclimate characteristics of vegetation construction, and a linkage model comprehensively considering the relationship among a microclimate partition state, a building adjustment behavior and an energy load is established; the complex relation among microclimate parameter changes, building adjustment action changes and energy load changes is accurately reflected, meanwhile, according to state changes after building adjustment, the energy management system can dynamically optimize an energy configuration scheme, unnecessary energy transmission and conversion links are reduced, and the energy utilization rate is improved. And deep optimization configuration of comprehensive energy of the whole area from generation, transportation to use is realized.
Owner:STATE GRID ZHEJIANG ELECTRIC POWER CO LTD SONGYANG COUNTY POWER SUPPLY CO +1

Urban noise complaint spatial distribution feature and partition management and control system

The invention discloses an urban noise complaint spatial distribution characteristic and partition management and control system, relates to the technical field of data processing, and aims to solve the problems that current urban noise partition management and control research is insufficient, quantitative analysis on noise complaint spatial distribution characteristics is less, and the efficiency is high. The system comprises a noise monitoring module, a data processing module, a noise complaint module, an analysis module, a data storage module, a noise partition management and control unit and a display module, and the noise monitoring module is used for monitoring different functional areas of a city. And the noise complaint module is used for establishing a noise complaint threshold value and automatically making a noise complaint for the monitored noise. According to the method, deep mining and analysis of urban noise complaint data are realized through multi-module collaborative operation and in combination with a multi-source information fusion technology, and the problem of insufficient resident complaint analysis in urban noise management and control is effectively solved.
Owner:SOUTH CHINA INST OF ENVIRONMENTAL SCI MEP

Urban planning construction land partition management and control system based on big data

The invention relates to the technical field of big data, and provides a big-data-based urban planning and construction land zoning management and control system, which comprises a data acquisition module used for acquiring multi-dimensional data of urban planning and construction lands in real time; the feature extraction module is used for extracting key features from the multi-dimensional data; the dynamic partitioning module is used for constructing a dynamic land use partitioning model according to the key features and determining a dynamic partitioning index of each region based on the dynamic land use partitioning model; the conflict potential module is used for determining a conflict potential index between every two regions according to the dynamic partition indexes corresponding to every two regions of different land use types; the application optimization module is used for obtaining the optimized urban land; the zoning management and control module is used for zoning and managing and controlling the urban land again according to the new purpose corresponding to the optimized urban land; according to the invention, the accuracy, adaptability and sustainability of urban planning construction land zoning management and control can be improved.
Owner:西安高新技术产业开发区管理委员会

System and method for standardizing single family home use only as derived from zoning and deed restrictions

Single family homes may be perceived as a widely accepted use by local zoning codes, however, it isn't just local zoning codes that determine the use.This invention extends the notion of standardization using machine learning by including deed restrictions as part of its standardization for model building using disparate data sets. These are directed to an improvement in computer-related technology.
Owner:BEYOND VALUE INC

Dynamic partition refrigeration regulation and control system based on floor height

The invention belongs to the technical field of building refrigeration, and discloses a dynamic partition refrigeration regulation and control system based on floor height, regulation and control areas are divided in real time according to the floor height, heat flux density and the like through a dynamic density clustering partition algorithm, and the influence of high-altitude air pressure on the sensible temperature is corrected in combination with a height compensation module; an adaptation strategy is generated based on a'height-load 'bivariate model; the high-layer area fits the air convection characteristic through a linear function, and the low-layer area reflects the soil thermal buffer effect through an exponential function, so that refrigeration parameters are accurately matched with actual requirements of all floors, and overheating or insufficient refrigeration caused by traditional unified parameter regulation and control is avoided; data are collected in real time through a space-air-ground three-in-one sensing network; when the personnel density in a region is suddenly increased or functions are switched, the system can complete temporary partition merging and regulation and control parameter adjustment in a short time, and the intelligent operation and maintenance requirements of scenes such as a campus and a hospital for real-time monitoring and rapid optimization are met.
Owner:ZHONGNENG BENYUAN (TIANJIN) NEW ENERGY TECHNOLOGY DEVELOPMENT CO LTD

Pipeline gap bridge zoning and layering planning method and device, computer equipment and medium

PendingCN119047041AReal-time monitoring of operating parametersbest configurationGeometric CADBiological modelsArchitectural engineeringConstruction plan
The invention relates to the technical field of bridge construction and pipeline layout technologies. The invention relates to a pipeline bridge crossing zoning and layering planning method and device, computer equipment and a medium, and the method comprises the steps: obtaining bridge structure information, planning a pipeline according to the bridge structure information, obtaining the layout position and trend information of the pipeline, and adjusting the layout position and trend information of the pipeline in real time through an intelligent optimization algorithm. The method comprises the following steps: generating a pipeline layout scheme, performing safety simulation on the pipeline layout scheme to obtain an optimized pipeline layout scheme, and formulating a construction plan according to the optimized pipeline layout scheme. The method and the device have the effect of realizing efficient layout of the pipelines.
Owner:SHENZHEN YUANXING ELECTROMECHANICAL CO LTD

Method for operating a robot arm using a zoning model

The invention relates to a method (400) for operating a robot arm (10) for an automation system (1). The method comprises the steps of: mounting (420) a gripper (100), at which a plurality of suction elements (110, 120) are arrangeable in an array (150), for gripping an object (21); providing (430) a control module comprising a matrix for mapping the array (150) of the plurality of suction elements (110, 120) being arranged at the gripper (100) and a zoning model; dividing (440), by means of the zoning model, the matrix and the array (150) of the plurality of suctions elements (110, 120) into a plurality of zones (115, 125); determining (450) a group of zones to be activated out of the plurality of zones (115, 125) for gripping the object (21) by means of the zoning model of the control module; and activating (460) a group of suction elements out of the plurality of suction elements (110, 120), which are arranged in the group of zones to be activated, to grip the object (21) by means of an actuating unit (500).
Owner:ABB (SCHWEIZ) AG

Disaster prevention and control refined zoning method based on map data

The invention discloses a disaster prevention and control refined division method based on map data. The method comprises the following steps: step S10, subdividing an evaluation unit based on map data, landform data and administrative division; step S20, comprehensively selecting prevention and treatment alternative areas through risk assessment, vulnerability assessment and disaster assessment; step S30, constructing an index system from three dimensions of dangerousness, exposure and vulnerability; s40, performing index quantification based on the map data and the investigation and survey data, and calculating the weight of each index in combination with the information entropy; step S50, calculating a comprehensive index of each evaluation unit by adopting a Jenks natural fracture method; and step S60, finely delimiting disaster prevention and control key areas in combination with actual management department experience and comprehensive indexes. The method is convenient for later-period management, avoids a large amount of repeated work, and has relatively high objectivity and reference value.
Owner:SHANGHAI WATER ENG DESIGN & RES INST

Intelligent anti-seismic structure optimization design method and system for high-rise building

The invention discloses an intelligent anti-seismic structure optimization design method and system for a high-rise building, and relates to the technical field of anti-seismic design of the high-rise building. A working condition database considering multidirectional seismic oscillation and soil-structure interaction is established in combination with seismic oscillation time history and site investigation parameters; constructing a structure model on the BIM platform, and importing frequency characteristics and load to generate a preliminary design; an inter-story displacement angle, a story acceleration, a plastic rotation angle and an energy dissipation ratio index are set in the model, an anti-seismic performance comprehensive function is constructed, constraints are set according to a standard limit value, the structure model is converted into an optimizable problem, and optimal design is achieved by iteratively calling a working condition database and automatically correcting key component parameters and damping arrangement. According to the method disclosed by the invention, the structural optimization design of the high-rise building under the multidirectional earthquake action is realized by establishing an earthquake working condition database and parameterizing structural modeling and performance function constraint.
Owner:THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD

Soil body excavation and ballasting method based on numerical simulation optimization

The invention discloses a soil body excavation and ballasting method based on numerical simulation optimization, and relates to the technical field of excavation construction. The soil excavation and ballasting method based on numerical simulation optimization comprises the method steps of foundation pit zoning, excavation scheme determining, field monitoring scheme determining, field excavation construction, dynamic monitoring and real-time adjusting and underground structure construction, zoning is conducted in the horizontal direction, zoning is also conducted in the vertical direction, and the underground structure is constructed. And interval excavation is conducted by adopting a method that multiple interval areas are propelled at the same time. And in the excavation construction process, according to the real-time numerical simulation result, the excavation scheme is dynamically adjusted, and the excavation construction efficiency is improved to the maximum extent. And in the aspect of deformation control, according to a field deformation monitoring result, a pre-arranged plan of adding ballast to an area with large deformation is added, and the deformation control effect in the excavation process is ensured. The method has good deformation control over the excavation process, the safety of the underlying operation subway tunnel is enhanced, and the construction efficiency is improved.
Owner:SINOHYDRO BUREAU 5

Ecological restoration partition classification system and method, terminal and storage medium

The invention discloses an ecological restoration partition classification system and method, a terminal and a storage medium, and the system comprises an importance evaluation module, a comprehensive damage evaluation module, a service evaluation module and a partition module. The partitioning module is connected with the importance evaluation module, the comprehensive damage evaluation module and the service evaluation module; corresponding evaluation results are obtained through the importance evaluation module, the comprehensive damage evaluation module and the service evaluation module, all the evaluation results are processed through the partitioning module, and a final evaluation result is obtained and partitioned. According to the method, the multiple evaluation results are combined for corresponding partitioning, so that the partitioned results are more accurate, and ecological restoration can be better realized.
Owner:Shenzhen Longgang District Planning and Land Development Research Center

Systems and methods of automated design and spatial allocation of buildings

Disclosed embodiments perform automated design for buildings or portions of buildings and machine-generate architectural design and floor plans. Computer-implemented systems and methods of designing multi-unit buildings and portions of buildings include a set of one or more input requirements, a relationships module, an options placement system, a layout predictor system, and a design plan generator. The input requirements include one or more pre-defined footprints and may include local regulatory requirements such as building code, zoning, accessibility, among others. The design plan generator generates an architectural design plan for the building or portion of a building that can be built on the one or more pre-defined footprints. Disclosed systems and methods substantially reduce the design time and cost while increasing the profitability, sustainability and efficiency of construction projects.
Owner:ARK AUTOMATIC ARCHITECTURE DESIGN LTD

Regional division method and system for screening water and soil conservation of power transmission and transformation project

The invention discloses a zoning method and system for screening water and soil conservation of a power transmission and transformation project, and relates to the technical field of water and soil loss analysis of the power transmission and transformation project. Identifying each space unit in a boundary band in the primary partition planning map to judge whether the space unit is used as a dynamic change region point or not, judging a boundary membership degree of the boundary band, and forming a dynamic partition planning map; respectively simulating the evolution conditions of dynamic change area points of the current construction stage and the future construction stage based on the dynamic partition planning map, judging the boundary membership degree of the boundary zone, and forming a prediction partition planning map; and integrating the prediction zoning planning map and the primary zoning planning map to obtain a water and soil conservation zoning map. The characteristics of natural geographic element changes are considered on the basis of water and soil conservation static zoning, a dynamic boundary zone is reserved, membership analysis is carried out on the boundary zone again according to construction disturbance, and a final water and soil conservation zoning map is made not to be a static rigid zoning map but keeps the characteristics of dynamic prediction.
Owner:QUZHOU GUANGMING ELECTRIC POWER DESIGN CO LTD

Tunnel face surrounding rock partition blasting blasthole parameter optimization method and system

The invention belongs to the technical field of tunnel engineering, and particularly relates to a tunnel face surrounding rock partition blasting blasthole parameter optimization method and system. According to the scheme, the surface morphological characteristic, the joint density characteristic, the resistivity characteristic and the rebound strength characteristic of a tunnel face are integrated, all-around perception of the surface and internal characteristics of the tunnel face is achieved, and the tunnel face surrounding rock partition blasting blasthole parameter optimization method and system are provided. The problem of inaccurate partitioning caused by dependence on experience or single-dimension data in a traditional scheme is eliminated, and the accuracy of parameter optimization is effectively improved while the accuracy of partitioning is improved; historical blasting data are introduced in the partitioning process and the parameter optimization process, the historical blasting data are used for effectively guiding the model, and the accuracy of parameter optimization is further improved. Meanwhile, the blasting effect is fed back to the parameter optimization model, the loss function of the parameter optimization model is dynamically adjusted, an incremental training technology is combined, a self-adaptive optimization closed loop of blasting parameter optimization is formed, and the adaptive capacity of the blasting parameter optimization model is improved.
Owner:CHINA RAILWAY 14TH CONSTR BUREAU GRP 4TH ENG

Method of presenting structured digitized zoning data via an application programming interface to generative architecture model software

A method presents structured digitized zoning data, by a server including a processor and a memory, via an application programming interface (API) to a client computer for displaying three-dimensional (3D) representations of geospatial data generated by generative architecture model software on a graphical user interface (GUI) on the client computer. The method includes extracting from a zoning data record, by the processor, as a function of the zoning restriction request and as a function of a default and / or a conditional zoning use class, the zoning restriction attributes associated with the zone and the zoning restriction parameters for the zoning restriction attributes by retrieving, from the zoning data record, the zoning restriction attributes associated with the zone in the zoning data record and each zoning restriction parameter for the default and / or conditional zoning use class associated with the zoning restriction attributes in the zoning data record; packaging, by the processor, the extracted zoning restriction attributes and zoning restriction parameters into a data object in a predefined data exchange format associated with the API; and transmitting, by the processor, the data object, as an API response, to the generative architecture model software to generate a visual representation of the extracted zoning restriction parameters on the GUI on the client computer.
Owner:ZONEOMICS INC

Parking zoning method and system based on interaction relationship between land use and traffic

The invention discloses a parking zoning method based on an interaction relationship between land use and traffic. The parking zoning method comprises the following steps: S1, acquiring and cleaning GIS space zoning data, land use data and traffic facility data; s2, based on the land use data and the traffic facility data obtained in the step S1, carrying out fusion calculation on traffic and land use characteristics of a minimum space unit to obtain a traffic index and a land use characteristic index; and S3, carrying out clustering analysis on the traffic indexes and the land use characteristic indexes according to a clustering algorithm to obtain a plurality of characteristic clustering partitions, extracting parking partition influence factors from an interaction relationship between traffic and land use by coupling land use space and traffic characteristics, and constructing a parking planning partition index system with interaction between traffic and land use and qualitative and quantitative combination. The parking zoning method and system based on the land and traffic interaction relationship have the effects of guiding scientific parking zoning and promoting fine parking management.
Owner:WUHAN URBAN PLANNING & DESIGN INST

Wharf demolition backfill settlement control construction method based on real-time monitoring

The invention discloses a wharf dismantling and backfilling settlement control construction method based on real-time monitoring, and belongs to the technical field of wharf engineering construction and settlement control. Existing wharf dismantling and backfilling construction lacks a systematic settlement control process and does not depend on real-time monitoring to realize dynamic feedback, so that the construction quality and the settlement control effect are poor. According to the method, partition division, threshold value determination and monitoring point position setting are prepared before construction, partition and segmented dismantling, layered backfill compaction, settlement dynamic adjustment and circulating construction are conducted, settlement and horizontal displacement data are collected through real-time monitoring in the whole process and transmitted to a data processing end, and construction parameters are adjusted and areas exceeding the threshold value are processed according to the data. The method is mainly used for accurately controlling settlement in wharf dismantling and backfilling construction, guaranteeing construction quality and safety of surrounding buildings and underground pipelines, and improving construction orderliness and safety.
Owner:CHINA HARBOUR ENGINEERING

The first zoning planning method based on gap identification

This application discloses the first zoning planning method based on gap identification, which includes: a robot walking along a wall and identifying target gaps to complete at least one closed-loop path, and forming the first zoning by enclosing at least one ring of walls with at least one target gap, so that the robot can enter the unmapped area from the first zoning after passing through the identified target gap.
Owner:AMICRO SEMICONDUCTOR CO LTD

Carbon neutralization partition simulation method, system and device based on smart city

The invention provides a carbon neutralization zoning simulation method, system and device based on a smart city, and relates to the technical field of carbon neutralization simulation, and the method mainly comprises the steps: carrying out the planning zoning of a map of a tested city; calculating the carbon emission of each partition and carrying out visualization processing to obtain geographic space data; calculating the carbon sink amount of each partition; collecting output value basic data of each industry of the detected partition and marking the output value basic data in geographic space data; carbon emission basic data, carbon sink basic data and output value basic data which are regularly acquired by a smart city system are stored in a smart city database based on a time sequence; predicting the future carbon emission, carbon sink and output value of the measured subarea; constructing a time sequence dynamic optimization model, and solving an industrial area layout scheme through a parallelization genetic algorithm; and generating suggestion information. According to the scheme, a quantifiable and adjustable carbon management tool is provided for overall planning of urban territorial space, and the scheme is particularly suitable for low-carbon planning and treatment of high-density coastal cities.
Owner:TIANJIN UNIV

A progressively reconfigurable water supply network zoning method

The present invention discloses a progressively reconfigurable water supply network zoning method, comprising the following steps: 1. establishing a hydraulic model of the entire network and obtaining hydraulic parameters; 2. selecting a set of closable valves and, based on the hydraulic characteristic parameters, selecting valves with the least impact on the network; 3. partitioning the network, setting the number of zones, and installing metering equipment along the main water supply path to form independent zones; 4. reconstructing the zones, calculating the leakage index of the zones, and separating and merging the zones according to the target index values ​​through dynamic valve control; 5. progressively partitioning the zones step by step, selecting areas with high leakage indexes, setting the minimum size of the zones, and repeating steps 3 and 4 to complete the zoning. The present invention proposes a method for reconstructing zones through dynamic valve control between zones, identifying high leakage areas, and gradually refining the zones to reduce the leakage range. The present invention is a water supply network zoning method that reduces costs and ensures water quality. The present invention has application in the field of urban water supply.
Owner:SHANGHAI MUNICIPAL ENG DESIGN INST (GRP) CO LTD

Elevator layout scheduling collaborative optimization method based on SLP and simulation

The invention relates to the field of building vertical traffic system optimization, in particular to an elevator layout scheduling collaborative optimization method based on SLP and simulation, and the method comprises the steps: firstly obtaining elevator operation data, determining the unique uplink dominant characteristics of a hospital through flow mode analysis, and modeling a passenger arrival mode through Weibull distribution; then, building an inter-floor relation strength matrix by using an SLP method, and carrying out floor layout optimization based on a total movement distance minimization objective function; an elevator system discrete event simulation model is further constructed, multiple partitioning strategies are designed and evaluated, and the effect of a requirement-based cross region partitioning scheme is optimal; finally, layout and scheduling collaborative optimization is achieved through an SLP-simulation two-way data exchange mechanism, implementation can be achieved without replacing equipment, and the method is suitable for elevator system optimization of various high-rise hospitals and other public buildings.
Owner:GUANGDONG CONSTR VOCATIONAL TECH INST