Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

68 results about "Zoning" patented technology

Zoning is the process of dividing land in a municipality into zones (e.g. residential, industrial) in which certain land uses are permitted or prohibited. In addition, the sizes, bulk, and placement of buildings may regulated. The type of zone determines whether planning permission for a given development is granted. Zoning may specify a variety of outright and conditional uses of land. It may also indicate the size and dimensions of land area as well as the form and scale of buildings. These guidelines are set in order to guide urban growth and development.

Urban planning construction land management and control system based on big data

The invention relates to the technical field of urban planning, and particularly discloses an urban planning construction land management and control system based on big data, and the system comprises the steps: obtaining geological environment, landform, engineering construction and human activity data through multi-source data collection; multi-source data fusion analysis is adopted to construct a construction land comprehensive evaluation field including geological stability, engineering suitability and environmental bearing capacity; a development suitability partition is generated based on a density peak value spatial clustering method; updating the development suitability level by dynamically monitoring the verification process; according to the method, accurate analysis and early warning of the three-dimensional deformation field are realized, and scientificity and safety of urban planning in a complex geological environment are improved.
Owner:CHANGAN UNIV

Intelligent anti-seismic structure optimization design method and system for high-rise building

The invention discloses an intelligent anti-seismic structure optimization design method and system for a high-rise building, and relates to the technical field of anti-seismic design of the high-rise building. A working condition database considering multidirectional seismic oscillation and soil-structure interaction is established in combination with seismic oscillation time history and site investigation parameters; constructing a structure model on the BIM platform, and importing frequency characteristics and load to generate a preliminary design; an inter-story displacement angle, a story acceleration, a plastic rotation angle and an energy dissipation ratio index are set in the model, an anti-seismic performance comprehensive function is constructed, constraints are set according to a standard limit value, the structure model is converted into an optimizable problem, and optimal design is achieved by iteratively calling a working condition database and automatically correcting key component parameters and damping arrangement. According to the method disclosed by the invention, the structural optimization design of the high-rise building under the multidirectional earthquake action is realized by establishing an earthquake working condition database and parameterizing structural modeling and performance function constraint.
Owner:THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD

Systems and methods of automated design and spatial allocation of buildings

Disclosed embodiments perform automated design for buildings or portions of buildings and machine-generate architectural design and floor plans. Computer-implemented systems and methods of designing multi-unit buildings and portions of buildings include a set of one or more input requirements, a relationships module, an options placement system, a layout predictor system, and a design plan generator. The input requirements include one or more pre-defined footprints and may include local regulatory requirements such as building code, zoning, accessibility, among others. The design plan generator generates an architectural design plan for the building or portion of a building that can be built on the one or more pre-defined footprints. Disclosed systems and methods substantially reduce the design time and cost while increasing the profitability, sustainability and efficiency of construction projects.
Owner:ARK AUTOMATIC ARCHITECTURE DESIGN LTD

Regional division method and system for screening water and soil conservation of power transmission and transformation project

The invention discloses a zoning method and system for screening water and soil conservation of a power transmission and transformation project, and relates to the technical field of water and soil loss analysis of the power transmission and transformation project. Identifying each space unit in a boundary band in the primary partition planning map to judge whether the space unit is used as a dynamic change region point or not, judging a boundary membership degree of the boundary band, and forming a dynamic partition planning map; respectively simulating the evolution conditions of dynamic change area points of the current construction stage and the future construction stage based on the dynamic partition planning map, judging the boundary membership degree of the boundary zone, and forming a prediction partition planning map; and integrating the prediction zoning planning map and the primary zoning planning map to obtain a water and soil conservation zoning map. The characteristics of natural geographic element changes are considered on the basis of water and soil conservation static zoning, a dynamic boundary zone is reserved, membership analysis is carried out on the boundary zone again according to construction disturbance, and a final water and soil conservation zoning map is made not to be a static rigid zoning map but keeps the characteristics of dynamic prediction.
Owner:QUZHOU GUANGMING ELECTRIC POWER DESIGN CO LTD

Tunnel face surrounding rock partition blasting blasthole parameter optimization method and system

The invention belongs to the technical field of tunnel engineering, and particularly relates to a tunnel face surrounding rock partition blasting blasthole parameter optimization method and system. According to the scheme, the surface morphological characteristic, the joint density characteristic, the resistivity characteristic and the rebound strength characteristic of a tunnel face are integrated, all-around perception of the surface and internal characteristics of the tunnel face is achieved, and the tunnel face surrounding rock partition blasting blasthole parameter optimization method and system are provided. The problem of inaccurate partitioning caused by dependence on experience or single-dimension data in a traditional scheme is eliminated, and the accuracy of parameter optimization is effectively improved while the accuracy of partitioning is improved; historical blasting data are introduced in the partitioning process and the parameter optimization process, the historical blasting data are used for effectively guiding the model, and the accuracy of parameter optimization is further improved. Meanwhile, the blasting effect is fed back to the parameter optimization model, the loss function of the parameter optimization model is dynamically adjusted, an incremental training technology is combined, a self-adaptive optimization closed loop of blasting parameter optimization is formed, and the adaptive capacity of the blasting parameter optimization model is improved.
Owner:CHINA RAILWAY 14TH CONSTR BUREAU GRP 4TH ENG

Wharf demolition backfill settlement control construction method based on real-time monitoring

The invention discloses a wharf dismantling and backfilling settlement control construction method based on real-time monitoring, and belongs to the technical field of wharf engineering construction and settlement control. Existing wharf dismantling and backfilling construction lacks a systematic settlement control process and does not depend on real-time monitoring to realize dynamic feedback, so that the construction quality and the settlement control effect are poor. According to the method, partition division, threshold value determination and monitoring point position setting are prepared before construction, partition and segmented dismantling, layered backfill compaction, settlement dynamic adjustment and circulating construction are conducted, settlement and horizontal displacement data are collected through real-time monitoring in the whole process and transmitted to a data processing end, and construction parameters are adjusted and areas exceeding the threshold value are processed according to the data. The method is mainly used for accurately controlling settlement in wharf dismantling and backfilling construction, guaranteeing construction quality and safety of surrounding buildings and underground pipelines, and improving construction orderliness and safety.
Owner:CHINA HARBOUR ENGINEERING

The first zoning planning method based on gap identification

This application discloses the first zoning planning method based on gap identification, which includes: a robot walking along a wall and identifying target gaps to complete at least one closed-loop path, and forming the first zoning by enclosing at least one ring of walls with at least one target gap, so that the robot can enter the unmapped area from the first zoning after passing through the identified target gap.
Owner:AMICRO SEMICONDUCTOR CO LTD

Elevator layout scheduling collaborative optimization method based on SLP and simulation

The invention relates to the field of building vertical traffic system optimization, in particular to an elevator layout scheduling collaborative optimization method based on SLP and simulation, and the method comprises the steps: firstly obtaining elevator operation data, determining the unique uplink dominant characteristics of a hospital through flow mode analysis, and modeling a passenger arrival mode through Weibull distribution; then, building an inter-floor relation strength matrix by using an SLP method, and carrying out floor layout optimization based on a total movement distance minimization objective function; an elevator system discrete event simulation model is further constructed, multiple partitioning strategies are designed and evaluated, and the effect of a requirement-based cross region partitioning scheme is optimal; finally, layout and scheduling collaborative optimization is achieved through an SLP-simulation two-way data exchange mechanism, implementation can be achieved without replacing equipment, and the method is suitable for elevator system optimization of various high-rise hospitals and other public buildings.
Owner:GUANGDONG CONSTR VOCATIONAL TECH INST

Planning zoning-land use conduction effectiveness evaluation method and device

The application provides a planning partition-land conduction effectiveness evaluation method and device, which has the following characteristics: step S1, constructing a planning partition-land function attribute conduction matrix; step S2, obtaining a plurality of planning land vector graph patches of the planning partition; step S3, obtaining a dominant land type; step S4, aggregating the planning land vector graph patches to obtain land aggregation graph patches; step S5, obtaining coordinate values of each vertex of the planning partition and the land aggregation graph patches; step S6, calculating a characteristic vector; step S7, calculating a characteristic vector; step S8, calculating a conduction deviation coefficient; and step S9, obtaining a conduction effectiveness evaluation result according to the conduction deviation coefficient. In summary, the method can obtain the conduction effectiveness evaluation result.
Owner:SHANGHAI TONGJI URBAN PLANNING & DESIGN INST

Geographic information system (GIS)-based rural and town territorial space planning partition collaborative optimization method

The invention relates to the technical field of territorial space planning, and discloses a GIS-based rural and town territorial space planning partition collaborative optimization method, which comprises the steps of collecting territorial space planning, village planning, industrial development planning, ecological environment management and control planning and related evaluation data, and constructing a multi-source planning basic database; performing coordinate unified registration and format conversion on the multi-source data to form a standardized fusion database; on the basis, rigid constraint conditions and elastic development conditions are extracted, partition conflicts are recognized through spatial overlay analysis, and first-level planning partitions are formed; on the basis of the map spot unit, generating a secondary planning partition candidate scheme, and verifying and screening through a rigid constraint condition to obtain a final planning partition scheme; and finally, outputting a planning partition result. According to the method, the multi-source data processing flow based on the GIS is constructed, the planning data of different sources and different formats are subjected to format conversion processing, and the uncertainty caused by non-uniform coordinate references is reduced.
Owner:LUOYANG URBAN PLANNING & ARCHITECTURE DESIGN RES INST CO LTD

Construction area vibration zoning control method based on multi-sound source identification

This invention discloses a construction area vibration zoning control method based on multi-source sound identification, relating to the field of engineering construction control. The method includes: acquiring the coordinate positions of the target construction area and the railway track, and determining the upper limit of vibration intensity in the target construction area; determining the target set of construction equipment, and based on the construction movement line, determining the fixed positions of the foundation construction equipment set within the target construction area to form a foundation equipment layout scheme, and generating a foundation construction vibration distribution through multi-source sound identification analysis; performing vibration zoning on the foundation construction vibration distribution, and based on the vibration zoning results and the upper limit of vibration intensity, optimizing the equipment layout of the movable construction equipment set based on the foundation equipment layout scheme to generate a target equipment layout scheme. This solves the technical problem in existing technologies where regional vibration load imbalance prevents the optimal allocation of vibration energy in the construction area, leading to both low construction efficiency and potential safety risks.
Owner:CHINA RAILWAY GUANGZHOU BUREAU GROUP CO LTD CHANGSHA ENGINEERING CONSTRUCTION HEADQUARTERS +2

An ecological management and control partitioning method and system based on static and dynamic supply and demand matching

This invention discloses an ecological management zoning method and system based on static and dynamic supply and demand matching, belonging to the field of ecological management technology. The invention constructs a node feature matrix by calculating a comprehensive static supply and demand matching index and a comprehensive dynamic change trend index, then generates a dynamic spatiotemporal adjacency matrix to construct a spatiotemporal physical connectivity graph. This graph is then input into a spatiotemporal graph neural network for processing, outputting predicted static supply and demand matching indices and predicted dynamic change trend indices. Based on the zero-value boundaries of these indices, the study area is divided into initial four-level basic management zones. A Markov decision process is then constructed, and a Pareto optimal solution set is obtained through reinforcement learning algorithms to fine-tune the spatial boundaries of the initial four-level basic management zones. The resulting refined ecological management zoning map and management priority sequence are output, making the zoning results more targeted for management. This solves the problem that existing ecological management zoning results lag behind actual changes and are difficult to effectively support adaptive management.
Owner:LANZHOU UNIV

Urban noise space perception and partition management and control system based on Internet of Things

The invention discloses an urban noise space perception and zoning management and control system based on the Internet of Things, relates to the technical field of urban noise monitoring and management and control, and aims to solve the problems that in an urban multi-section construction scene, a noise source is difficult to accurately position, management and control thresholds are rigid and unmatched, multi-section noise responsibilities are difficult to divide, and the construction efficiency is high. The system comprises a multi-dimensional sensing module which is used for collecting noise data, equipment working condition data, environment parameters and sensitive area associated data of a construction area, and transmitting the collected data to a noise source positioning and classifying module; and the noise source positioning and classifying module is used for carrying out fusion processing on the received data. The method has the advantages that the noise source of the construction area is accurately positioned, the differentiated control threshold is generated in combination with the scene, meanwhile, the multi-section noise contribution degree is quantified, and the construction safety progress and sensitive area environment guarantee are efficiently balanced.
Owner:SOUTH CHINA INST OF ENVIRONMENTAL SCI MEP

A photovoltaic power station distributed construction management method and system based on load analysis

The application discloses a photovoltaic power station distributed construction management method and system based on load analysis, and the method comprises the following steps: outputting a dynamic load intensity thermal map according to the terrain elevation data, meteorological historical data and component mechanical parameters of a photovoltaic power station planning area; generating a wind pressure-resistant optimized construction zoning scheme based on the dynamic load intensity thermal map; outputting a conflict-free construction resource allocation matrix according to the construction zoning scheme; dynamically correcting construction parameters by using a self-adaptive particle swarm optimization algorithm based on the construction resource allocation matrix, and generating a deformation-resistant construction instruction set; driving a construction machine to execute an operation according to the deformation-resistant construction instruction set, and iteratively updating a global load distribution atlas by using a reinforcement learning model, so that a closed-loop construction management link is formed. By using the embodiment of the application, the balance between construction precision and efficiency under a complex environment can be realized by fusing multi-source data, optimizing zoning planning, intelligently scheduling equipment and closed-loop quality control.
Owner:ZHEJIANG ZHONGJIA ELECTRIC POWER TECHNOLOGY CO LTD

Building general layout parameterized design method, system and electronic equipment based on shortest parking path

The application provides a building general layout parameterized design method and system based on the shortest parking path, and electronic equipment. The method comprises the following steps: importing a general layout range and a building base range in a parameterized design platform; dividing a remaining area into random parking areas and setting a main building entrance; calculating the shortest path of the geometric center of each parking area from a candidate entrance to the main building entrance, determining an optimal entrance, and calculating a total distance estimate and an area variance; taking the shortest total distance and the smallest area variance as double targets, optimizing the parking area division by using a genetic algorithm, and obtaining a Pareto optimal solution set; manually selecting a final scheme and determining a second entrance; and dividing roads and green areas according to preset parameters to complete the general layout design. The system comprises corresponding function modules. The application automatically generates a building general layout scheme with the shortest parking path and balanced partition through parameterized design and multi-objective optimization.
Owner:ARCHITECTURAL DESIGN & RES INST OF TSINGHUA UNIV

New energy power market price limit optimization method and system based on dynamic partition

The invention provides a new energy power market price limit optimization method and system based on dynamic partitioning, and relates to the field of power markets, and the method comprises the steps: carrying out the dynamic partitioning of a given power grid region based on new energy clustering and physical constraint fusion; constructing a dynamic partition price limit model by taking the upper and lower limits of the price limit of each partition in different time periods as decision variables; constructing a feature vector for predicting time-phased new energy output of the region, and solving an electricity price prediction probability distribution function of each region through LSTM-Transform based on the feature vector; and solving the dynamic partition price limit model by using the electricity price prediction probability distribution function of each partition to obtain the upper limit and the lower limit of the price limit of each partition in different time periods. The invention designs a power market dynamic partitioning method, and provides a differential price limit generation and optimization method for dynamic partitioning so as to realize full connection of a market mechanism and regional difference and improve the resource allocation efficiency of the market.
Owner:RES INST OF ECONOMICS & TECH STATE GRID SHANDONG ELECTRIC POWER

A method for zoning design of high embankment slopes and a server

This invention discloses a method and server for zoning design of high embankment slopes. The method includes the following steps: S1: Establishing a finite element model of the high embankment and setting a coordinate system; S2: Setting monitoring sections at intervals and extracting the settlement elevation of the monitoring sections; S3: Setting the endpoint of the horizontal segment on the observation curve as the theoretical zoning boundary and dividing the slope according to the theoretical zoning boundary; S4: Designing the slope of settlement control zone I according to the highway subgrade design specifications; S5: Calculating the overall stability of the slope in strength control zone II, obtaining the stability coefficient and the design slope line; S6: Using the design slope line as the zoning land-saving design slope line. In this invention, by reducing the settlement control zone from the entire slope to settlement control zone I, it ensures that pavement settlement control is not affected, saves construction compaction costs, and shortens the subgrade filling construction period; at the same time, by carrying out land-saving design for the lower strength control zone II of the high embankment slope, the construction land for the high embankment slope can be saved.
Owner:CCCC FOURTH HARBOR ENG INST CO LTD +1

Farmland improvement zoning method and system

PendingCN121961132Astatistically significantavoid subjective assumptionsOffice automationEnvironmental resource managementEnvironmental engineering
The invention relates to the technical field of farmland improvement, in particular to a farmland improvement zoning method and system, and the method comprises the following steps: 1, zoning factor selection and weight calculation; 2, processing partition basic data; 3, partition factor calculation and statistics; 4, performing partition data standardization calculation; and 5, constructing an accurate zoning model for farmland improvement. According to the method, farmland improvement suitability zoning can be accurately carried out, and a scientific and reasonable basis is provided for farmland improvement project planning and design.
Owner:SICHUAN LAND DEVELOPMENT GROUP CO LTD +1

Support demand evaluation method considering deep tunnel strain type rockburst space partition

The invention provides a support demand evaluation method considering deep tunnel strain type rockburst space partition, and is used for designing a set of strain type rockburst energy numerical calculation framework considering fractured rock geometric dimensions for a research target of a block model representing an engineering scale rock evolutionary process from a continuous medium to a discontinuous medium evolutionary process. A broken block model based on a finite element-discrete element coupling numerical method is specifically configured, so that the rock evolution process in the hard rock excavation process is accurately represented from the physical mechanism, the law of conservation of energy is considered theoretically, and deep tunnel strain type rockburst partition support demand evaluation is achieved.
Owner:INST OF ROCK & SOIL MECHANICS CHINESE ACAD OF SCI +1

Blasting zoning method based on geophysical exploration technology

The invention relates to the technical field of geophysical exploration, in particular to a blasting zoning method based on the geophysical exploration technology. The method comprises the following steps: synchronously acquiring multi-source data such as seismic waves, resistivity and induced polarization, and generating a high-precision static rock physical parameter three-dimensional model through cross gradient joint inversion; obtaining three-dimensional distribution of dynamic damage factors through calibration blasting and full-waveform inversion; fusing the static and dynamic parameters, and constructing a three-dimensional geomechanical model containing mechanical parameters by means of a machine learning model; intelligent blasting partitioning is realized based on a multi-index fusion rule, and a customized blasting design scheme is automatically generated; and finally, self-evolution of the model is driven through blasting effect feedback. The defects that a traditional method is single in data, disjointed in dynamic and static, dependent on experience and the like are overcome, and precision, intellectualization and self-adaptive optimization of blasting partition are achieved.
Owner:UNIV OF SCI & TECH LIAONING

Method for collaborative optimization of elevator layout scheduling based on slp and simulation

The present application relates to the field of building vertical transportation system optimization, in particular to an elevator layout and dispatching co-optimization method based on SLP and simulation, which first acquires elevator operation data, determines the uplink dominant characteristics specific to the hospital through flow pattern analysis, and models passenger arrival pattern using Weibull distribution; then constructs the inter-floor relationship strength matrix using SLP method, and optimizes the floor layout based on the total travel distance minimization objective function; further constructs the discrete event simulation model of the elevator system, designs and evaluates multiple zoning strategies, among which the demand-based cross-zone zoning scheme is the best; finally, the layout and dispatching co-optimization is realized through the SLP-simulation bidirectional data exchange mechanism, which can be implemented without replacing equipment, and is suitable for elevator system optimization of various high-rise hospitals and other public buildings.
Owner:GUANGDONG CONSTR VOCATIONAL TECH INST

Intelligent planning surveying and mapping method and system for municipal building

The invention provides an intelligent planning surveying and mapping method and system for a municipal building, and the method comprises the steps: obtaining a municipal building function list and demand attributes, inputting the same to an FCA processing module, generating a hard constraint set, a soft constraint set and a concept partition proposal, obtaining municipal building layout parameters, and carrying out the calculation of the layout parameters; municipal building layout parameters are input into a multi-modal optimization generation module to obtain an initial layout scheme set, a planning fitness score of each initial layout scheme is obtained, a screening layout scheme is obtained through the planning fitness scores, the screening layout scheme is reversely mapped to an FCA processing module, and an optimization FCA processing module is obtained. And the optimization FCA processing module is input to the multi-modal optimization generation module for iterative optimization to obtain an optimized layout scheme, intelligent planning layout is performed on the municipal building through the optimized layout scheme, and the rationality and practicability of the municipal building layout are improved through the intelligent planning surveying and mapping method of structural analysis, multi-modal optimization and dynamic feedback.
Owner:SHANDONG QIANSHENG URBAN & RURAL PLANNING SURVEYING & MAPPING CO LTD

Comprehensive land improvement acceptance assessment and analysis method

The invention belongs to the technical field of land renovation acceptance assessment, and particularly relates to a land comprehensive renovation acceptance assessment analysis method, which comprises the following steps of: firstly, acquiring height distribution characteristics and vegetation distribution characteristics through image recognition, dividing land areas and determining a renovation priority weight; analyzing according to the land monitoring report of each remediation stage to obtain a soil index improvement rate, a vegetation coverage improvement rate and a soil flatness improvement rate, calculating the soil quality improvement degree of each region, and combining the soil quality improvement degree with the remediation priority weight to obtain the comprehensive remediation improvement degree of the target land. And finally, generating and feeding back a comprehensive land improvement acceptance assessment report based on the improvement degree, realizing reasonable allocation of improvement resources through accurate partition and differential weight setting, improving the improvement efficiency and the assessment accuracy, ensuring strong binding of an acceptance result and an actual land commissioning demand, and improving the land comprehensive improvement acceptance assessment report. The method is suitable for various land reclamation acceptance scenes such as agricultural land.
Owner:SHANDONG GUANGHE IND DEVELOPMENT GROUP CO LTD

Environment zoning method for freeze-thaw damage of concrete structure

The invention discloses an environment zoning method for freeze-thaw damage of a concrete structure, and belongs to the technical field of durability evaluation of the concrete structure, and the method comprises the following steps: obtaining material characteristic data of the concrete structure and historical meteorological data of a corresponding region; wherein the historical meteorological data comprises atmospheric temperature, solar radiation and wind speed; on the basis of a Holt-Winters method, meteorological data in a concrete structure design reference period are obtained according to historical meteorological prediction; dividing the map layout into grid points of 0.25 latitude * 0.25 longitude based on the spatial-temporal resolution of ERA5; randomly selecting any grid point as a target point, calculating to obtain a concrete surface temperature field of a target point daily scale according to the meteorological data, and calculating temperature field change along the depth direction of the concrete structure; obtaining the equivalent freezing and thawing times of the target point concrete structure at different depths according to the temperature field change, and calculating the overall equivalent freezing and thawing times of the daily-scale concrete structure; obtaining the overall equivalent freeze-thaw damage of the target point concrete structure in the design reference period according to the overall equivalent freeze-thaw times of the daily scale; and repeating the steps, and generating an environment zoning map of the freeze-thaw damage of the concrete structure according to the obtained overall equivalent freeze-thaw damage of all the grid points.
Owner:TONGJI UNIV

Generating code for building compliance verification using artificial intelligence

Methods, systems, and apparatus, including computer programs encoded on computer-storage media, for generation of computer-executable code for automated zoning compliance. Zoning, building, planning, and other regulations for a jurisdiction are provided to a trained artificial intelligence model which provides computer-executable code that is configured, when executed, to provide output that indicates whether an input candidate building plan complies with the regulations for the jurisdiction. The computer-executable code generated by the trained artificial intelligence model is deployed in an application. The application receives, in a request, a candidate building plan. The application generates and provides a compliance report for the candidate building plan that includes compliance results for the candidate building plan with respect to the regulations for the jurisdiction.
Owner:X DEVELOPMENT LLC

A high-rise building-oriented intelligent anti-seismic structure optimization design method and system

The application discloses a kind of intelligent anti-seismic structure optimization design method and system for high-rise building, it is related to high-rise building anti-seismic design technical field, including taking seismic intensity zoning, site category and fault distribution information, establish the working condition database considering multi-directional ground motion and soil-structure interaction in combination with ground motion time history and site survey parameters;Structure model is constructed in BIM platform and is imported frequency characteristics and load to generate preliminary design;Inter-story drift angle, floor acceleration, plastic rotation and energy dissipation ratio index are set in the model, construct seismic performance comprehensive function, set constraint according to specification limit, convert structure model into optimization problem, realize optimization design by iteratively calling working condition database and automatically correcting key component parameters and damping arrangement.The method described in the application realizes the structure optimization design of high-rise building under multi-directional seismic action by establishing seismic working condition database, parameterized structure modeling and performance function constraint.
Owner:THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD

Urban land utilization planning aided decision-making method and system based on big data

The invention discloses an urban land utilization planning aided decision-making method and system based on big data, and the method comprises the steps: collecting land data and monitoring data of a plurality of preset cities, carrying out the semantic segmentation of a high-resolution remote sensing image of the land data according to deep learning, and obtaining a current land use type; setting initial weights of the partitions by adopting a multi-objective optimization algorithm; performing dynamic planning analysis according to the monitoring data to obtain a land utilization planning index, and when the land utilization planning index is greater than an index threshold value, introducing a dynamic weight adjustment mechanism to adjust the initial weight and refine partitions to obtain a grid region marked with the dynamic weight; step-by-step mask fuzzy C-means clustering is adopted to carry out secondary clustering on the grid region to obtain a local fine weight region, and a satisfactory decision-making mechanism is constructed according to the local fine weight region and urban development planning; and according to the satisfaction decision-making mechanism, constructing an urban land utilization planning auxiliary decision-making model, and carrying out multi-objective optimization on the urban land utilization planning auxiliary decision-making model.
Owner:CHINA NAT INST OF STANDARDIZATION

Space zone control method and system for air dust removal equipment

The invention relates to the technical field of air dust removal, and provides a space partition control method and system for air dust removal equipment. The method comprises the following steps: scanning a target area, and setting dust removal subareas; acquiring equipment information, introducing a dust removal point location, and determining a dust removal radius interval; adding dust removal beacons, guide waves and monitoring data to an edge processor; acquiring a control instance, and generating a control scene in combination with the radius interval; building a three-dimensional simulation space on the basis of the control scene and the regional spatial features; and receiving a dust removal request, carrying out optimal configuration by taking dust removal efficiency maximization and energy consumption minimization as targets, updating dust removal point locations, responding to the request, and carrying out multi-point cooperative control. The technical problems of low dust removal efficiency and high energy consumption caused by the fact that a traditional air dust removal method cannot effectively cover a target space area are solved, and the effects of improving the dust removal efficiency and reducing the energy loss by setting the dust removal control subareas and the dust removal point positions are achieved.
Owner:NANTONG JINGANG ENVIRONMENTAL PROTECTION TECHNOLOGY CO LTD

An ecological green core construction project access intelligent auditing method and system

The application relates to an ecological green core construction project access intelligent auditing method and system, relates to the field of text examination and approval, and comprises the following steps: extracting project red line vector data and construction content from a declaration data packet; superimposing and analyzing the red line data and a preset control factor layer set to obtain a space compliance detection conclusion and construct a space compliance characteristic parameter; selecting a rule subset from a hierarchical rule library according to a partition category and a superimposed area, assigning values to a judgment threshold according to a first difference value between a scale proportion of urban and rural construction land and a control upper limit and a second difference value between a scale proportion of residential land and the control upper limit, and obtaining a parameterized rule subset; comparing the construction content according to the parameterized rule subset, and outputting a list compliance conclusion; merging the space compliance detection conclusion and the list compliance conclusion to generate an access level conclusion, and triggering a corresponding examination and approval path and a compulsory examination and approval node. By implementing the method, the deviation between a list compliance auditing conclusion and the actual situation of land index control in a region where a project is located can be reduced.
Owner:HUNAN PROVINCIAL INSTITUTE OF LAND & RESOURCE PLANNING (HUNAN PROVINCIAL INSTITUTE OF GEOLOGICAL SCIENCES HUNAN PROVINCIAL MINERAL RESOURCE RESERVES EVALUATION CENTER)

Geographic information application multi-zoning system management and application method

The application discloses a kind of geographic information application multi-zone system management and application method, belong to multi-zone system management and application field, user defines the metadata information of multiple sets of zoning system through system interface;According to the metadata information of multiple zoning system, generate dictionary data table and graphic data table;Import the graphic database file of zoning system to space graphic data table;According to the graphic data table record of zoning system, generate dictionary data table record synchronously;To each zoning system graphic data is extracted and is rarefied, generates cache;Each zoning system space data is generated map mask data;Establish the association of business application and multiple zoning system;Based on the association of business application and multiple zoning system, establish the mapping relationship of user and multiple zoning system;Based on the mapping relationship of user and multiple zoning system, carry out attribute data access control, carry out map mask access control.Multiple annual, multiple service zoning data unified management is realized, user can carry out query, analysis and show.
Owner:BEIJING FORESTAR TECH CO LTD