The invention discloses a production scheduling strategy adjustment
system and method, and belongs to the technical field of production management, and the method comprises the steps: constructing a multi-source heterogeneous
database, setting a
semantic association method, generating a demand
knowledge graph, setting a prediction and
correction method, constructing an order prediction model, generating order quantity fluctuation matrixes with different confidence degrees, and providing quantitative parameters for
risk assessment. Constructing a
risk assessment basic
data set, setting a
risk assessment method, dynamically adjusting a
risk threshold value to realize adaptive early warning, constructing a
risk probability model, and generating a production decision result based on a formulated production decision judgment rule; calculating a factory quantity deviation rate, setting
causal analysis, detecting deviation by using a threshold value, triggering an alarm, integrating production data to construct a causal graph, and generating a causal effect report; and calculating a deviation rate of deviation detection, setting a self-optimization method, obtaining an optimal hyper-parameter combination, and optimizing an input
feature vector so as to improve the production scheduling prediction accuracy.