The invention discloses a
tungsten / steel connection method for a first wall of a fusion reactor cladding, which belongs to the technical field of dissimilar material connection and comprises the following steps: step 1, surface treatment of steel; step 2, fused deposition of
tungsten; and step 3, carrying out post-treatment. According to the
tungsten / steel connection process for the first wall of the fusion reactor cladding, heterogeneous elements are not introduced, dense tungsten is directly grown on the surface of RAFM steel through the additive
manufacturing technology, and tungsten / steel connection is achieved. Through high-efficiency
permeation of elements at a
molten pool, component gradient transition is generated on a tungsten / steel connection interface, existence of a tungsten / steel heterogeneous interface is eliminated, and generation of an intermediate brittle phase is greatly reduced. Different additive manufacturing processes are adopted for achieving tungsten / steel connection according to the surfaces, with different sizes and morphologies, of RAFM steel, namely, the method is suitable for a curved-surface
laser direct energy deposition technology and a planar
electron beam
powder bed cladding technology, partition printing is conducted, and complete connection of tungsten / steel is achieved step by step.