The invention belongs to the technical field of road and bridge construction application, and particularly relates to a bridgehead transition slab anti-
sedimentation jacking device and a construction method thereof. Comprising a bridge
abutment and a roadbed arranged on one side of the bridge
abutment, lapping plates are arranged on the top face of the bridge
abutment and the top face of the roadbed on the back of the bridge abutment, a pressure
barrel is pre-buried in the roadbed on the back of the bridge abutment, a vertically-arranged
piston pipe is arranged at the bottom of the pressure
barrel, a
piston is sleeved with the
piston pipe, and a pressure disc is arranged at the end, extending out of the piston
pipe, of the piston. The pressure disc is arranged in the pressure
barrel in a lifting mode, the piston pipe penetrates through the bottom of the pressure barrel, an
oil tank is arranged at the end, away from the pressure barrel, of the piston pipe, an output pipe is arranged on the
oil tank, and a jacking oil cylinder is connected to the end, away from the
oil tank, of the output pipe. According to the device provided by the invention, extra monitoring is not needed, and the jacking oil cylinder is promoted to move only by utilizing pressure change generated by natural
sedimentation, so that the
tower plate is supported.