Levee top road base structure

Through multi-layer structural design and material combination, construction waste and clay layers were used to solve the strength and settlement problems of the road base structure at the top of the embankment, achieving the effect of efficiently utilizing construction waste and extending the life of the road surface.

CN221822661UActive Publication Date: 2024-10-11SINOHYRDO ENG BUREAU 3 CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323548223.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-25
Publication Date
2024-10-11
Estimated Expiration
2033-12-25

AI Technical Summary

Technical Problem

The existing road base structure on the top of the embankment cannot effectively utilize construction waste, and the structural strength is low, resulting in settlement problems and high maintenance and repair workload.

Method used

Adopting a multi-layer structure design, including base layer, leveling layer, first grid, geocell, sealing layer, second grid and surface layer, using recycled coarse aggregate and clay layer, combined with shotcrete and non-stick wheel emulsification Asphalt waterproof bonding layer increases fatigue resistance and waterproof performance.

Benefits of technology

It improves the overall strength and fatigue resistance of the road structure, effectively utilizes construction waste, extends the service life of the road surface, reduces structural gaps, and reduces costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822661U_ABST
    Figure CN221822661U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field, and particularly relates to an embankment top road base structure which comprises a base layer. A leveling layer is arranged at the top of the base layer, a first grid is arranged at the top of the leveling layer, a geocell is arranged at the top of the first grid, a sealing layer is arranged at the top of the geocell, and a second grid is arranged at the top of the sealing layer; through the structural design of the first grid, the second grid, the leveling layer, the sealing layer and the surface layer, the overall strength of the road structure is improved, meanwhile, building waste can be turned into wealth and reused, the cost is saved, through the structural design of the first grid and the second grid, the anti-fatigue capacity between the leveling layer and the geotechnical inner layer and the anti-fatigue capacity between the sealing layer and the surface layer are improved, and the construction cost is reduced. The damage to the pavement caused by load change can be inhibited, so that the service life of the pavement is prolonged, the clay layer is matched and filled in a gap of the substrate layer, the structure gap is reduced, and the connection tightness is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of embankments, in particular to an embankment top road base structure. Background Art

[0002] Embankment refers to the fill roadbed with the top surface higher than the original ground. It is structurally divided into upper embankment and lower embankment. The upper embankment refers to the fill part within 0.7m below the bottom of the road surface, and the lower embankment refers to the fill part below the upper embankment. The selection of embankment structure roadbed filling material and density control are the most important in roadbed design and construction. Embankment settlement The embankment will produce compaction settlement under its own weight and train load. In addition, under the long-term repeated action of train dynamic loads, cumulative settlement will occur. Excessive settlement of the roadbed will cause roadbed diseases, increase the workload of line maintenance and repair, and affect normal driving. Therefore, how to reduce and control embankment settlement is an important issue to be solved in roadbed engineering, which is mainly solved by controlling the filling material and improving the compaction standard.

[0003] However, the existing base layer structure of the embankment road cannot reduce the cost and cannot make reasonable use of construction waste. At the same time, the existing structure is generally simple and has low structural strength. Therefore, a base layer structure of the embankment road is proposed to address the above problems. Utility Model Content

[0004] The technical problem to be solved by the utility model is that the existing technology has the disadvantages of being unable to reasonably utilize construction waste and having low structural strength. For this reason, we propose a dike top road base structure.

[0005] The technical solution adopted by the utility model to solve its technical problems is: a dike road base structure, including a base layer; a leveling layer is arranged on the top of the base layer, a first grid is arranged on the top of the leveling layer, a geocell is arranged on the top of the first grid, a closed layer is arranged on the top of the geocell, a second grid is arranged on the top of the closed layer, a surface layer is arranged on the top of the second grid, and a greening layer is laid on the surface layer.

[0006] Preferably, the geocell comprises a geotextile inner layer and a geotextile outer layer, wherein the geotextile inner layer is arranged on the top of the first grid, and the geotextile outer layer is arranged between the geotextile inner layer and the sealing layer, the geotextile outer layer is recycled coarse aggregate, the recycled coarse aggregate is made of cement and crushed construction waste, and the geotextile inner layer is sandy soil.

[0007] Preferably, the leveling layer is formed by filling the uneven gaps in the base layer with sprayed concrete, and the sealing layer is a non-stick emulsified asphalt waterproof bonding layer.

[0008] Preferably, the interior of the base layer is filled with a clay layer, and the interior of the clay layer is filled with a plurality of stone balls.

[0009] Preferably, the first grid and the second grid are bidirectional steel-plastic geogrids.

[0010] Preferably, the thickness of the surface layer is 5.5 cm-6.5 cm.

[0011] Preferably, the base layer is emulsified fiber asphalt gravel stabilized soil with a thickness of 0.3m-0.5m.

[0012] The beneficial effects of the utility model are:

[0013] 1. The utility model improves the overall strength of the road structure through the structural design of the first grid, the second grid, the leveling layer, the sealing layer and the surface layer, and can also turn construction waste into treasure, reuse it and save costs;

[0014] 2. The utility model improves the fatigue resistance between the leveling layer and the geotextile inner layer, and between the sealing layer and the surface layer through the structural design of the first grid and the second grid, and can suppress the damage to the road surface caused by load changes, thereby extending the service life of the road surface. Through the cooperation of the clay layer, it fills the gaps in the base layer, reduces the structural gaps, and improves the tightness of the connection. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0017] Figure 2 It is a cross-sectional view of the geocell structure of the utility model;

[0018] Figure 3 It is a cross-sectional view of the base structure of the utility model;

[0019] Figure 4 This is a cross-sectional view of the clay layer structure of the utility model.

[0020] In the figure: 1, base layer; 2, leveling layer; 3, first grid; 4, geocell; 41, geotextile inner layer; 42, geotextile outer layer; 5, sealing layer; 6, second grid; 7, surface layer; 8, greening layer; 9, clay layer; 10, stone balls. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] The following is combined with Figure 1-4 To further explain this application in detail,

[0023] The present application embodiment discloses a dike top road base structure. Figure 1 and Figure 2 A base structure for a dike road comprises a base layer 1; a leveling layer 2 is arranged on the top of the base layer 1, a first grid 3 is arranged on the top of the leveling layer 2, a geocell 4 is arranged on the top of the first grid 3, a sealing layer 5 is arranged on the top of the geocell 4, a second grid 6 is arranged on the top of the sealing layer 5, a surface layer 7 is arranged on the top of the second grid 6, and a greening layer 8 is laid on the surface layer 7; the greening layer 8 plays a role in preventing soil and water loss.

[0024] Reference Figure 1 and Figure 2 The geocell 4 includes a geotextile inner layer 41 and a geotextile outer layer 42. The geotextile inner layer 41 is arranged on the top of the first grid 3, and the geotextile outer layer 42 is arranged between the geotextile inner layer 41 and the sealing layer 5. The geotextile outer layer 42 is recycled coarse aggregate, which is made of cement and crushed construction waste. The geotextile inner layer 41 is sandy soil. It can turn construction waste into treasure, reuse it, and save costs.

[0025] Reference Figure 1 The leveling layer 2 is a layer of sprayed concrete that fills the uneven gaps in the base layer 1. The sealing layer 5 is a non-stick emulsified asphalt waterproof bonding layer. The leveling layer 2 levels the upper part of the base layer 1 to facilitate laying the first grid 3 thereon. The sealing layer 5 can play a non-stick wheel role during construction and has an excellent waterproof effect after hardening.

[0026] Reference Figure 3 and Figure 4 The interior of the base layer 1 is filled with a clay layer 9, and the interior of the clay layer 9 is filled with a number of stone balls 10; the gaps in the base layer 1 are filled to reduce the structural gaps and improve the tightness of the connection.

[0027] Reference Figure 1 The first grid 3 and the second grid 6 are bidirectional steel-plastic geogrids, which improve the fatigue resistance between the leveling layer 2 and the geotextile inner layer 41, and between the sealing layer 5 and the surface layer 7.

[0028] Reference Figure 1The thickness of the surface layer 7 is 5.5cm-6.5cm.

[0029] Reference Figure 1 The base layer 1 is emulsified fiber asphalt crushed stone stabilized soil with a thickness of 0.3m-0.5m; it is made by mixing and rolling emulsified asphalt, plastic fiber, crushed stone and cement mixture, and has high density, water resistance, crack resistance and high strength.

[0030] Working principle: A leveling layer 2 is laid on the top of the base layer 1 to level the upper part of the base layer 1, so as to facilitate laying of the first grid 3 thereon. An inner geotextile layer 41 and an outer geotextile layer 42 are laid on the top of the first grid 3 to play a supporting and filling role. The user then lays a closed sealing layer 5 on the outer geotextile layer 42, which plays a non-stick wheel role during construction and has an excellent waterproof effect after hardening. A surface layer 7 and a greening layer 8 are then laid on the closed layer 5.

[0031] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, and these changes and improvements fall within the scope of the utility model to be protected.

Claims

1. A dike road base structure, characterized in that: The invention comprises a base layer (1); a leveling layer (2) is arranged on the top of the base layer (1); a first grid (3) is arranged on the top of the leveling layer (2); a geocell (4) is arranged on the top of the first grid (3); a sealing layer (5) is arranged on the top of the geocell (4); a second grid (6) is arranged on the top of the sealing layer (5); a surface layer (7) is arranged on the top of the second grid (6); and a greening layer (8) is laid on the surface layer (7).

2. The embankment road base structure according to claim 1, characterized in that: The geocell (4) comprises a geotextile inner layer (41) and a geotextile outer layer (42), wherein the geotextile inner layer (41) is arranged on the top of the first grid (3), and the geotextile outer layer (42) is arranged between the geotextile inner layer (41) and the sealing layer (5), wherein the geotextile outer layer (42) is recycled coarse aggregate, which is made of cement and crushed building waste, and the geotextile inner layer (41) is sandy soil.

3. The embankment road base structure according to claim 1, characterized in that: The leveling layer (2) is formed by spraying concrete to fill the gaps in the uneven base layer (1), and the sealing layer (5) is a non-stick emulsified asphalt waterproof bonding layer.

4. The embankment road base structure according to claim 1, characterized in that: The interior of the base layer (1) is filled with a clay layer (9), and the interior of the clay layer (9) is filled with a plurality of stone balls (10).

5. The embankment road base structure according to claim 1, characterized in that: The first grid (3) and the second grid (6) are bidirectional steel-plastic geogrids.

6. The embankment road base structure according to claim 1, characterized in that: The thickness of the surface layer (7) is 5.5 cm-6.5 cm.

7. The embankment road base structure according to claim 1, characterized in that: The base layer (1) is emulsified fiber asphalt gravel stabilized soil with a thickness of 0.3m-0.5m.