The invention discloses a stable high-water-content
sludge roadbed filling construction device and method. According to the device, a movable frame serves as a carrier, a foam manufacturing and conveying device, a high-water-content
sludge storage and conveying device and a
cement mixing and conveying device are integrated, and foam,
cement paste and
sludge are supplied to a
mixing tank of a vehicle-mounted stirring device through respective independent pipelines; the stirring device adopts a low-speed multi-blade
impeller to carry out low-shear mixing so as to protect a foam structure, the mixture is uniformly sprayed on a roadbed by the spraying device, and then the mixture is leveled by the height-adjustable transverse slicking device. The method comprises the steps of device in-place, foam preparation, sludge and
cement paste conveying, low-speed mixing, spraying, scraping and the like. Compared with the prior art, on-site integrated and continuous construction is achieved, the foam structure can be effectively protected, the material proportion and the construction
rhythm can be accurately controlled, the construction efficiency, the
engineering quality and the high-water-content sludge
resource utilization rate are improved, and the energy-saving, environment-friendly and
engineering popularization value is remarkable.