The invention discloses a
slurry shield short screw and rear
crusher collaborative deslagging working parameter optimization method based on CFD-DEM
coupling modeling, and relates to the technical field of
civil engineering and
tunnel engineering.The
slurry shield short screw and rear
crusher collaborative deslagging working parameter optimization method comprises the steps that rheological behaviors of
slurry are simulated through a rheological model; establishing a three-dimensional calculation model, and optimizing short spiral rotating speed setting; based on a
coupling technology, establishing a crushing cabin three-dimensional
coupling model; performing coupling
simulation; the working parameters of the
crusher are optimized; obtaining the crushing
mass per second of rock
slag particles under each group of
simulation and the
mass flow rate of
slag discharged from an outlet of the crushing cabin; and optimizing each decision variable by using a multi-objective
particle swarm optimization algorithm, and determining an optimal solution by using an approximation
ideal solution. The method can quickly and accurately calculate the
optimal combination of the working parameters of the short screw and the working parameters of the crusher at different
shield tunneling speeds, alleviates the difficult problem of stagnant
discharge of the actual
engineering muddy water cabin, and has the advantages of low cost, wide applicability, high practicability and high popularization value.