Mine pit steep slope anti-seepage system based on high-molecular polymer mineral anti-seepage material
By using polymer polymer mineral anti-seepage materials and combined drainage, drainage and anchoring mechanisms on the steep slope of the mine pit, the problems of high construction difficulty and poor stability of the anti-seepage layer in the existing technology are solved, and the cost reduction and improvement of prevention are achieved. The effect of the penetration effect.
Patent Information
- Application Number
- CN202411113707.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-11-12
AI Technical Summary
The existing technology has problems such as difficult construction, high cost, and easy settlement deformation or local instability in the anti-seepage treatment of steep slopes of mine pits. In the anti-seepage treatment of steep slopes, conventional methods require complex excavation and spraying treatment, which pose hidden dangers.
Using anti-seepage materials based on polymer polymer minerals, combined with drainage, drainage and anchoring mechanisms, the integrated anti-seepage design is formed through the combination of hidden grooves, prefabricated drainage concealed groove blocks, internal and external geogrid chambers, drainage pipes and T-shaped anchors. System, reduce excavation and backfill operations, and enhance the stability of the anti-seepage layer.
It reduces construction complexity and cost, enhances the stability of the anti-seepage layer, avoids slope slip or collapse, and improves the anti-seepage effect and system stability.
Smart Images

Figure CN118933031A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mine pit backfill repair and anti-seepage, and in particular to a mine pit steep slope anti-seepage system based on high molecular polymer mineral anti-seepage material. Background Art
[0002] Mine pits are formed during the mining process of mineral resources. At present, the main method of repairing mine pits is backfilling. At present, solid waste is used to fill the mine pits, but there is a problem of seepage pollution of pollutants, so anti-seepage treatment is required. At present, the conventional treatment of steep slopes in mine pits mainly adopts engineering measures such as excavation, backfilling, and mesh spraying on steep rock slopes to achieve the construction conditions for laying anti-seepage membranes.
[0003] There are many deficiencies in the existing technology, such as extremely high requirements for the anti-seepage foundation layer of the mine slope, great construction difficulty, large earthwork volume, high project investment, high requirements for slope geology, and easy occurrence of problems such as settlement and deformation of the anti-seepage layer of the slope or local instability of the surface layer of the slope. For example, the Chinese patent with publication number CN112523264A uses the hanging mesh spraying technology to level and passivate the slope base before paving, which has problems such as high construction cost, great difficulty and great hidden dangers of the spraying layer; the Chinese patent with publication number CN217782093U needs to process the slope to improve the anti-skid stability of the protective structure and the anti-seepage membrane, which has problems such as complex construction technology, great excavation difficulty, and slope disturbance instability. Summary of the invention
[0004] The present invention aims to solve the problems existing in the prior art and proposes a mine steep slope anti-seepage system based on high molecular polymer mineral anti-seepage materials.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions: A mine steep slope anti-seepage system based on high molecular polymer mineral anti-seepage material, comprising a drainage mechanism, a drainage guide mechanism, an anti-seepage mechanism and an anchoring mechanism arranged on the steep slope of the mine pit, characterized in that the drainage mechanism comprises a blind ditch arranged on the steep slope of the mine pit, a prefabricated drainage blind ditch block is arranged in the blind ditch, a pumping assembly is arranged in the prefabricated drainage blind ditch block, the drainage guide mechanism comprises an inner geocell and a drainage pipe arranged on the steep slope of the mine pit, the anti-seepage mechanism comprises an outer geocell arranged on the steep slope of the mine pit, and the anchoring mechanism comprises a T-shaped anchor rod installed on the steep slope of the mine pit.
[0006] Preferably, the outer geocell is filled with a high molecular weight polymer mineral anti-seepage material, and the inner geocell is filled with graded pebbles, and the particle size of the graded pebbles is 40 mm.
[0007] Preferably, one end of the drainage pipe extends into the steep slope of the mine pit, and the other end of the drainage pipe extends into the inner geocell.
[0008] Preferably, the drainage pipes are arranged at different heights on the steep slope of the mine pit at intervals, and the upward inclination angle of the drainage pipes relative to the horizontal plane is 5°.
[0009] Preferably, the T-shaped anchor rod is anchored on the steep slope of the mine pit by using drilling and grouting technology, the length of the T-shaped anchor rod is 1.2 m, and the T-shaped anchor rod is perpendicular to the direction of the steep slope of the mine pit.
[0010] Preferably, the laying of the outer geocell and the inner geocell starts from the bottom surface of the foot of the steep slope of the mine pit, and the outer geocell and the inner geocell are laid upward layer by layer with one layer for each step.
[0011] Beneficial effects of the present invention: 1. The present invention adopts the method of filling the external geocell with high molecular polymer mineral anti-seepage material, which eliminates the need for complicated excavation or backfilling operations on the mountain slope, reduces the amount of earthwork, reduces the complexity and difficulty of construction, and thus significantly reduces the construction cost.
[0012] 2. The present invention forms a whole by connecting the upper and lower internal and external geocells, thereby enhancing the stability of the high molecular polymer mineral anti-seepage layer, and can better cope with various stresses and changes during the mine backfilling process, avoiding the occurrence of local slippage or collapse. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 A schematic diagram of a mine steep slope anti-seepage system based on high molecular polymer mineral anti-seepage materials; Figure 2 for Figure 1 A schematic diagram of the enlarged structure.
[0014] In the figure: 1 steep slope of the mine, 2 external geocell, 3 blind ditch, 4 prefabricated drainage blind ditch blocks, 5 pumping components, 6 internal geocell, 7 drainage pipe, 8 T-shaped anchor rod, 9 backfill material. DETAILED DESCRIPTION
[0015] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0016] Reference Figure 1-2 A mine steep slope anti-seepage system based on high molecular polymer mineral anti-seepage materials includes a drainage mechanism, a drainage guide mechanism, an anti-seepage mechanism and an anchoring mechanism arranged on the mine steep slope 1. Each mechanism cooperates with each other to achieve effective anti-seepage of the mine steep slope 1.
[0017] The drainage mechanism is the basic component of the whole system, which includes a blind ditch 3 set on the steep slope 1 of the mine. The blind ditch 3 can effectively gather and guide water flow. Inside the blind ditch 3, there is a prefabricated drainage blind ditch block 4 that fits tightly and tightly. This design minimizes the possibility of water leakage. The prefabricated drainage blind ditch block 4 is equipped with an efficient and reliable pumping component 5. The pumping component 5 consists of a high-performance pump and precision pipes, which can quickly and effectively pump out the accumulated water in the blind ditch 3 to ensure the timeliness and effectiveness of drainage.
[0018] The drainage mechanism plays a key role in water diversion in the system, including the inner geocell 6 and the drainage pipe 7 set on the steep slope 1 of the mine. The inner geocell 6 is reasonably positioned and arranged, and the graded pebbles filled inside it are strictly screened, with a uniform particle size of 40 mm. This specific particle size of graded pebbles can ensure that the inner geocell 6 has good porosity and permeability, allowing water to pass smoothly and achieve efficient water diversion. One end of the drainage pipe 7 is precisely extended into the steep slope 1 of the mine, and the other end is precisely extended into the inner geocell 6, forming a coherent water diversion channel. The drainage pipes 7 are arranged at different heights of the steep slope 1 of the mine. This careful arrangement can comprehensively collect seepage water from different parts. Moreover, the upward inclination angle of the drainage pipe 7 relative to the horizontal plane is precisely controlled to be 5°. This subtle angle design is conducive to the self-flow discharge of water under the action of gravity, greatly reducing the drainage resistance and significantly improving the drainage efficiency.
[0019] The anti-seepage mechanism is an important barrier to prevent water infiltration, including an outer geocell 2 set on the steep slope 1 of the mine. The outer geocell 2 is filled with a high-molecular polymer mineral anti-seepage material with excellent performance. It is a material used in anti-seepage engineering with good anti-seepage performance and chemical stability. This material has excellent anti-seepage performance, can effectively block the infiltration of external moisture, and provides reliable protection for the steep slope 1 of the mine. The laying of the outer geocell 2 and the inner geocell 6 starts from the bottom of the slope foot of the steep slope 1 of the mine. The laying process is rigorous and orderly, advancing upward layer by layer, and carefully laying each step to ensure that the entire slope is covered without omission, forming a continuous and solid anti-seepage layer.
[0020] The anchoring mechanism provides stable support and fixation for the entire system, including the T-shaped anchor rod 8 installed on the steep slope 1 of the mine pit. The T-shaped anchor rod 8 adopts advanced drilling and grouting technology to be firmly anchored on the steep slope 1 of the mine pit. The length of the T-shaped anchor rod 8 is 1.2m, which can ensure that the anchor rod has sufficient anchoring depth in the steep slope 1 of the mine pit, thereby providing a strong and stable anchoring force. At the same time, the T-shaped anchor rod 8 is perpendicular to the direction of the steep slope 1 of the mine pit. This vertical arrangement can maximize the anchoring effect, effectively prevent the displacement or deformation of each mechanism during use, and ensure the stability and reliability of the entire system.
[0021] Working principle of the present invention: First, the drainage mechanism starts to work. The dark ditch 3 on the steep slope 1 of the mine pit effectively gathers the water flow from the slope surface, and the prefabricated drainage dark ditch block 4 that fits tightly inside it minimizes the possibility of water leakage to the surrounding area. The pumping assembly 5 in the prefabricated drainage dark ditch block 4 is composed of a high-performance pump and precision pipes, which can quickly and effectively pump out the accumulated water in the dark ditch 3, ensuring the timeliness and effectiveness of drainage, avoiding the accumulation of accumulated water at the foot of the slope, and reducing the adverse effects of water pressure on the slope. Then, the drainage mechanism comes into play. The inner geocell 6 set on the steep slope 1 of the mine pit has good porosity and permeability due to the 40mm graded pebbles filled inside, so that the water flow on the slope surface can pass smoothly, realizing efficient water diversion. One end of the drainage pipe 7 extends into the steep slope 1 of the mine pit to collect seepage from different parts, and the other end extends into the inner geocell 6 to form a coherent water diversion channel. Moreover, the drainage pipes 7 arranged at different heights of the steep slope 1 of the mine pit are designed to be inclined upward at 5° relative to the horizontal plane, which uses gravity to allow water to flow out by itself, greatly reducing drainage resistance, significantly improving drainage efficiency, and avoiding the accumulation of water inside the slope. Then, the anti-seepage mechanism plays a key anti-seepage role. Then, the backfill material 9 composed of graded pebbles is filled to the bottom surface to make it flush, and then the outer geocell 2 is carefully laid upward layer by layer and on each step to form a continuous cover. The high-molecular polymer mineral anti-seepage material filled inside the outer geocell 2, with its excellent anti-seepage performance, effectively blocks the infiltration of external moisture, provides reliable protection for the steep slope 1 of the mine pit, and ensures the dryness and stability of the inside of the mine pit. Finally, the anchoring mechanism provides stable support and fixation for the entire system. The T-shaped anchor rod 8 installed on the steep slope 1 of the mine pit is firmly anchored in the steep slope 1 of the mine pit through advanced drilling and grouting technology. The length of 1.2m ensures that the anchor rod has sufficient anchoring depth in the steep slope 1 of the mine pit, providing a strong and stable anchoring force. The T-shaped anchor rod 8 is arranged perpendicular to the direction of the steep slope 1 of the mine pit, maximizing the anchoring effect, effectively preventing the displacement or deformation of the drainage mechanism, drainage guide mechanism and anti-seepage mechanism due to various forces during use, thereby ensuring the stability and reliability of the entire system, so that the entire system can function effectively for a long time.
[0022] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A mine steep slope anti-seepage system based on high molecular polymer mineral anti-seepage materials, comprising a drainage mechanism, a drainage guide mechanism, an anti-seepage mechanism and an anchoring mechanism arranged on the mine steep slope (1), characterized in that: The drainage mechanism comprises a culvert (3) arranged on a steep slope (1) of a mine pit, a prefabricated culvert block (4) being arranged in the culvert (3), a pumping assembly (5) being arranged in the prefabricated culvert block (4), the drainage mechanism comprises an inner geocell (6) and a drainage pipe (7) arranged on the steep slope (1) of the mine pit, the anti-seepage mechanism comprises an outer geocell (2) arranged on the steep slope (1) of the mine pit, and the anchoring mechanism comprises a T-shaped anchor rod (8) installed on the steep slope (1) of the mine pit.
2. The mine steep slope anti-seepage system based on high molecular polymer mineral anti-seepage material according to claim 1 is characterized in that: The outer geocell (2) is filled with a high molecular polymer mineral anti-seepage material, and the inner geocell (6) is filled with graded pebbles, wherein the particle size of the graded pebbles is 40 mm.
3. The mine steep slope anti-seepage system based on high molecular polymer mineral anti-seepage material according to claim 2 is characterized in that: One end of the drainage pipe (7) extends into the steep slope of the mine pit (1), and the other end of the drainage pipe (7) extends into the inner geocell (6).
4. The mine steep slope anti-seepage system based on high molecular polymer mineral anti-seepage material according to claim 3 is characterized in that: The drainage pipes (7) are arranged at intervals at different heights of the steep slope (1) of the mine, and the upward inclination angle of the drainage pipes (7) relative to the horizontal plane is 5°.
5. The mine steep slope anti-seepage system based on high molecular polymer mineral anti-seepage material according to claim 4 is characterized in that: The T-shaped anchor rod (8) is anchored on the steep slope (1) of the mine pit using a drilling and grouting technology; the T-shaped anchor rod (8) is 1.2 m long and is perpendicular to the direction of the steep slope (1) of the mine pit.
6. The mine steep slope anti-seepage system based on high molecular polymer mineral anti-seepage material according to claim 5, characterized in that: The laying of the outer geocell (2) and the inner geocell (6) starts from the bottom surface of the slope foot of the steep slope (1) of the mine pit, and the outer geocell (2) and the inner geocell (6) are laid upwards layer by layer, with one layer for each step.
Citation Information
Patent Citations
High and steep slope anti-seepage system and laying method thereof
CN112523264A
Geomembrane anti-seepage structure for high and steep slope
CN217782093U
Cited By
Fixing method for anti-seepage transition section of irregular rock slope of pit landfill
CN119981157A
A method for fixing the seepage prevention transition section on an irregular rock slope in a mine landfill.
CN119981157B
Reinforcing treatment structure for anti-seepage transition section of irregular rock slope of pit landfill
CN120159077A
A reinforcement and treatment structure for the seepage prevention transition section of an irregular rock slope in a mine landfill.
CN120159077B