779 results about "Operation scheduling" patented technology

Under the operations function (both manufacturing and services), scheduling relates to use of equipment and facilities, the scheduling of human activities, and receipt of materials. While issues relating to facility location and plant and equipment acquisition are considered long term and aggregate planning is considered intermediate term, operations scheduling is considered to be a short-term issue.

Track traffic synthetic monitoring system and method

The invention discloses a rail traffic comprehensive monitoring system and a method thereof, comprising a collecting platform, a comprehensive monitoring supporting platform and a monitoring control module which are sequentially connected through application interfaces. The invention also comprises a maintenance management module which is connected with the comprehensive monitoring supporting platform through the application interface. The method comprises online detection, filtration and malfunction grade judgement. The disposal is carried out according to different grades and different situations; a preparedness disposal is carried out if the disposal belongs to the first grade and, for the residual disposals, the maintenance strategy is determined and the expert database sub-module is updated according to the decision of experts; the equipment which is required to be maintained at once is maintained or waits to be maintained; a nominal disposal is firstly carried out during the maintenance and then malfunctions are isolated; the maintenance result is detected finally and the malfunction and maintenance condition are recorded. The invention can effectively reflects the healthy condition of equipment and gives out maintenance strategy in the comprehensive monitoring system, which leads the maintenance and operation scheduling to be integrated for management, implements high integration, transparence and informationization of maintenance operation, and effectively reduces construction cost.
Owner:SHANGHAI AUTOMATION INSTRAION CO LTD

Wind power plant parameter identification and dynamic equivalence method based on operation data

The invention discloses a wind power plant parameter identification and dynamic equivalence method based on operation data, comprising the following steps of a) performing recognition on wind generation set control model parameters based on testing data, b) combining with operation data and choosing characteristic variables reflecting the wind generation set and the wind power plant under influence and utilizing the improved fuzzy K average value dynamic clustering algorithm to perform cluster division, c) performing network simplification and parameter optimizing to obtain a wind power plant dynamic equivalence model based on global optimal position mutation particle swarm algorithm, and d) under disturbance input, comparing the wind power dynamic equivalence model with the detailed model dynamic respond to verify the validity of the equivalence model. The wind field dynamic equivalence model constructed by the invention can accurately reflect the dynamic characteristics of grid-connection points of the wind plant and have important construction application values, and can be used in the analysis of the stability of the double-fed wind power plant access power system and provide theory support for the programming and operation scheduling of the wind power plant power system.
Owner:SOUTH CHINA UNIV OF TECH

Method of scheduling jobs using database management system for real-time processing

A method of scheduling jobs in real time using a database management system is provided. An application task classifies jobs as any one transaction type of a hot type and a normal type. A processing area in a memory pool that is a common resource is allocated to the application task, and the job is transferred to a database job manager through a client application program interface (API). The job manager loads a request node of the job in a list of a transaction type corresponding to the job, of a mailbox of the DB task, which classifies job request nodes as the hot type and the normal type with respect to the type of transaction and manages the nodes, so that the job request node can be scheduled in units of transactions. The job manager transfers the job request nodes loaded in the mailbox for the DB task, one by one to the DB task so that the job request nodes can be processed in units of transactions in a manner in which a job corresponding to a hot-type transaction is processed with a priority over a job corresponding to a normal-type transaction, and between jobs of an identical truncation type, jobs are processed in order of job requesting time. The DB task loads through the job manager, the processing result of the job in a mailbox of the application task which requested the processing of the job, so that the corresponding application task can use the processing result in the future.
Owner:FUSIONSOFT

Job scheduling system suitable for grid environment and based on reliable expense

The invention relates to an operation scheduling system which is applicable to the grid environment and based on the reliability cost; as indicated in graph 1, the whole system includes three layers: the first layer is an operation submission interface module 1; the second layer is an operation scheduling module 2 and the grid resource platform 7 as the substrate layer. From the perspective of the operational principle, the core of the invention is the operation scheduling module in the second layer, which includes a pre-scheduling module 3, a scheduling strategy module 4, an operation finish time prediction module 5 and a resource information module 6. The operation scheduling system in the invention proposes an operation running time prediction model and a resource usability prediction model; the operation running time prediction model based on the mathematical model and the resource usability prediction model based on the Markov model have high accuracy and high generality. The operation scheduling system adopts the copy fault-tolerance strategy, the primary copy asynchronous operation fault-tolerance strategy and the retry fault-tolerance respectively according to different operation service quality requirements and resource characteristics so that the operation scheduling system has high flexibility and high validity; meanwhile, the operation scheduling system supports the computation-intensive operation and the data-intensive operation to have good generality. Compared with the scheduling system in the prior art, the operation scheduling system has the advantages of supporting more concurrent users, improving the resource utilization rate, good generality, good extensibility and high system throughput.
Owner:HUAZHONG UNIV OF SCI & TECH

Reliability assessment method for secondary system of intelligent substation

The invention provides a reliability assessment method for a secondary system of an intelligent substation, and belongs to the field of power information automation. The assessment method divides the intelligent substation system into a communication subsystem, a control subsystem, a protection subsystem and a station control layer subsystem, obtains reliable parameters of each subsystem with the aid of the mean time to fail and the mean time to repair parameters of devices by an availability block diagram, finds out weak links of the secondary system, and improves the reliability of the secondary system of the intelligent substation, thereby achieving the purpose of increasing the quality of power supply at last, and providing an easily accepted and implemented reliability assessment method of the secondary system for the reliability assessment of the secondary system of the intelligent substation. By introducing a notion of reliability model, carrying out quantitative calculation and evaluation, and conducting sequence according to the reliability indexes and the degrees of risk, the reliability and availability of the whole intelligent substation system are improved. The assessment method of the invention can be widely applied in the system design, operation scheduling or device management fields of intelligent substation.
Owner:SHANGHAI MUNICIPAL ELECTRIC POWER CO +1

Flow processing operation scheduling method and system for dynamically adjusting task allocation

ActiveCN107580023ADynamically monitor and adjust task allocation strategiesMinimize impactTransmissionOperation schedulingData averaging
The invention discloses a flow processing operation scheduling method and system for dynamically adjusting task allocation. The method comprises the steps of receiving the flow processing operation bya main control node server, and generating an initial task allocation scheme according to a given reference concurrency degree, available resources in a cluster and the self structure of the flow processing operation; during the service operation process of the flow processing operation, automatically reporting the own running state information of each calculation node server to a main control node server by the calculation node server itself, uniformly summarizing the running state information of all calculation node servers by the main control node server, and conducting the corresponding aggregation operation; predicting the data average processing amount and the corresponding resource occupation value of the next time period according to the information after the aggregation operationby the main control node server; further dynamically adjusting the flow processing task instances of all the calculation node servers, finally generating a dynamic allocation scheme of the flow processing operation and distributing the dynamic allocation scheme to corresponding calculation node servers.
Owner:SHANDONG UNIV

Calculation method of power supply capability of power distribution system

The invention discloses a calculation method of power supply capability of a power distribution system. The calculation method is characterized in that the 'N-1' safety criterion is adopted as the premise, the interconnection relation of a main transformer is adopted as the basis, the upper-lower level coordination relation of the power distribution system is fully considered, the influence of load transfer limit of medium-voltage connection and short-time overload of the high-voltage main transformer are considered, and the power supply capability of the power distribution system can be accurately estimated, so that the deficiency of the load supply capability estimation on quantity when the single voltage level is only considered is avoided; the limit of the whole load supply capability of the power distribution system can be accurately mastered, so that the planning and the construction of the power distribution system is guided; and when the regional load increases in certain degree, the requirement for load increase is met by discovering the power supply capability of the existing power supply facilities. According to the method, the limit utilization ratio of the power distribution equipment can be determined on the premise of meeting the safety of the system and reference for a supply transferring scheme can be provided when the equipment fails, thus the operation scheduling of the power distribution system is guided and the method is beneficial to the effective use of the power distribution system facilities in power supply enterprises.
Owner:天津天电清源科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products