Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

183 results about "Time schedule" patented technology

Operation and maintenance management method and platform of photovoltaic power generation system

The invention provides an operation and maintenance management method and platform for a photovoltaic power generation system, and relates to the technical field of photovoltaic power station operation and maintenance, and the method comprises the steps: obtaining a to-be-processed operation and maintenance task set and an idle operation and maintenance personnel set; scheduling optimization is carried out on operation and maintenance tasks through an improved NSGA-II algorithm, a multi-objective optimization problem of total operation and maintenance cost minimization, total task completion time minimization and response time minimization is established, multi-objective optimization solution is carried out by adopting a clustering enhancement coding structure, a mixed population initialization strategy and a probability weighting genetic operator, and a Pareto optimal solution set is output; and selecting a final scheme from the Pareto optimal solution set, converting the final scheme into an executable format, and outputting a complete operation and maintenance scheduling scheme comprising a personnel scheduling list, a path planning instruction, a material and tool list and a total time schedule. According to the invention, multi-objective collaborative optimization of the operation and maintenance cost, the response time and the execution efficiency can be realized.
Owner:WUHAN YUNZHEN TECH CO LTD

Dynamic Sequencing and Scheduling of Warehouse Tasks

A system and method are disclosed for executing and monitoring changes in a warehouse plan. The method includes receiving an initial warehouse plan, receiving a changed warehouse plan, receiving user input defining a scope, capturing, via sensors, real-time data to determine execution changes, identifying warehouse execution changes based on the captured real-time data, outputting an execution changes report, using the received initial warehouse plan, the received changed warehouse plan, the identified warehouse execution changes and the defined scope of warehouse analysis to identify changes in the initial warehouse plan and generate required tasks, generating a task and changes report for tasks based on the identified changes, receiving warehouse information, determining a task priority and task schedule, outputting a dynamic task sequence and task schedule, beginning real-time electronic monitoring of user performance, and in response to the monitoring of user performance, changing the dynamic task sequence and task schedule.
Owner:BLUE YONDER GROUP INC

Power market participation-oriented virtual power plant two-stage joint optimization scheduling method, system and related device

The invention provides a virtual power plant two-stage joint optimization scheduling method and system for participation of a power market, and a related device, and the method comprises the following steps: 1, depicting the uncertainty characteristics of renewable energy sources, and obtaining a prediction error confidence interval; step 2, constructing a virtual power plant day-ahead scheduling model taking the maximum market income as a target; step 3, obtaining a day-ahead energy declaration curve and an energy storage operation strategy corresponding to the virtual power plant based on the obtained virtual power plant day-ahead scheduling model; 4, obtaining the actual output of the renewable energy in real time, and calculating the output deviation between the obtained actual output and the date energy declaration curve obtained in the step 3; 5, constructing a virtual power plant real-time scheduling model according to the obtained output deviation; 6, generating an interaction strategy between energy storage and a power grid according to the obtained real-time scheduling model of the virtual power plant; on the premise of guaranteeing the power supply stability of the system, the economic benefits of the virtual power plant participating in the power market transaction can be remarkably improved.
Owner:XIAN THERMAL POWER RES INST CO LTD

System and method for creating a virtual channel

A computer-implemented method and system for creating a virtual channel based on linear broadcast content, is disclosed. The method comprises obtaining scheduling information and content information associated with a plurality of content items in a content schedule for two or more existing channels, the content information comprising at least an identifier for each content item; determining, for each timeslot in a predetermined time period, a ranking for each content item scheduled in each timeslot; selecting, for each timeslot, a content item based on the ranking; and creating one or more virtual channel schedules comprising at least the identifier for the selected content items from the two or more existing channels.
Owner:THINKANALYTICS

Intelligent ERP system data management method based on business and financial integration

The invention provides an intelligent ERP (Enterprise Resource Planning) system data management method based on business and financial fusion. The method comprises the following steps: analyzing order priority and resource demand through historical load and real-time failure rate, determining a key order, analyzing emergency degree and delivery deadline identification priority, generating a production schedule, and adjusting task time and equipment distribution; analyzing the scheduling scheme, determining a resource demand change, determining a financial budget allocation proportion according to the resource demand change, and determining a production and financial connection time point according to the financial budget allocation proportion; and determining a fund examination and approval priority order according to the production and finance connection time point, correcting a production schedule in combination with a connection time point offset error determined by analyzing a production time table and material demand change, and generating a resource allocation scheme.
Owner:SHENZHEN INSTITUTE OF INFORMATION TECHNOLOGY

Automatic definition of back office jobs based on device mobile originated push schedules

Techniques for obtaining a Mobile Originating (MO) push schedule from a device in a wireless network are described herein. For example, the system may request MO push schedules from device endpoints and compare the MO push schedule with existing job schedules stored by the system. If no existing job schedule matches the MO push schedule, the system may generate a new job schedule and add the endpoint as a member of the job schedule. In some cases, if an existing job schedule matches the MO push scheduled, the system may add the endpoint as a member of the existing job schedule. In some examples, the system may receive an indication that the MO push schedule of the endpoint has changed and may add and / or remove the endpoint from a job schedule based on an updated MO schedule received from the device endpoint.
Owner:ITRON INC

Driving circuit and driving method of display panel, and display panel

The invention relates to a driving circuit and a driving method of a display panel and the display panel, the driving circuit comprises a time schedule controller, a memory and a level translator, the time schedule controller is provided with a first communication port, a second communication port and a third communication port, the second communication port is connected with the memory, the third communication port is connected with the level translator, and the level translator is connected with the memory. Wherein the time schedule controller is used for acquiring a refresh rate adjustment instruction, acquiring an overcurrent protection parameter corresponding to the refresh rate adjustment instruction, and sending the overcurrent protection parameter to the level translator; the memory is used for storing at least two over-current protection parameters; and the level converter is used for setting an overcurrent protection function of the display panel according to the overcurrent protection parameter, so that the width of a detection window of the overcurrent protection function is adaptive to the pulse width of the vertical clock signal under the target refresh rate. Through the circuit, the technical problem that the design of a fixed overcurrent protection parameter is difficult to adapt to a display panel with a variable refresh rate is solved.
Owner:CHONGQING HKC OPTOELECTRONICS TECH CO LTD

A collaborative scheduling system and method for integrated operation of airport clusters

The present invention discloses a collaborative scheduling system and method for the integrated operation of airport clusters. The system includes: an initial planning subsystem that obtains initial scheduling data and calculates the ETA time of each incoming flight arriving at the destination airport and the ETD time of each departing flight based on the initial scheduling data; a single-airport integrated sequencing management subsystem that plans the corresponding runway scheduling plan and flight arrival and departure schedule based on the ETA time and ETD time of each airport's flights; and an airport cluster airspace integrated management subsystem that, with the goal of maximizing the throughput of the airport cluster, amends the runway scheduling plan and flight arrival and departure schedule corresponding to each airport and forms a conflict-free airspace scheduling plan. The present invention realizes the integrated collaborative scheduling of airport clusters by converting the airport cluster integrated scheduling problem into an airspace macro-scheduling model and a single-airport micro-scheduling model, comprehensively considering the flight timing constraints between airports, and realizing the integrated collaborative scheduling of airport clusters.
Owner:CHENGDU CIVIL AVIATION AIR TRAFFIC CONTROL SCI & TECH +2

Large model cross-domain computing power scheduling method

The invention provides a large-model cross-domain computing power scheduling method, which comprises the following steps of: according to a structured computing power demand expression, defining each attribute and parameter of a computing power demand by adopting a unified computing power demand description language, forming a standardized computing power demand description mode, and realizing consistent expression of computing power demands among different domains; in the scheduling system, a computing power demand comparison and priority determination mechanism is established, priority ranking is performed on computing power demands of different domains according to standardized computing power demand description, and the emergency degree and importance of each demand are determined; and generating a cross-domain computing power scheduling scheme according to the priority of the computing power demand in combination with the computing power resource condition of each domain, and determining a computing power distribution scheme and a scheduling time table of each domain to realize accurate matching of the computing power demand and the computing power resource.
Owner:SAIWUZHOU

Methods and systems for streaming video

Systems and methods are disclosed configured to enable dynamic control of content streaming and / or to control content streaming so as to reduce peak system loads. A user electronic timetable is accessed from memory and is amazed to identify future unscheduled time periods. A first learning engine classifies timetable entries into subject types. A watchlist comprising a plurality of content items of respective time lengths is accessed. A second learning engine utilizes the classification and the time lengths to generate a scheduling recommendation of at least one item of content on the user watchlist. The scheduling recommendation is transmitted over a network to the user device. If the recommendation is accessed, a timetable entry is generated corresponding to the scheduling recommendation The at least one item of content on the user watchlist is streamed to the first device of the user in accordance with the accepted scheduling recommendation.
Owner:PLUTO INC

Pixel compensation method and device, time schedule controller and display device

The embodiment of the invention discloses a pixel compensation method and device, a time schedule controller and a display device. Through the pixel compensation method, the difference quantity of the two adjacent frames of display data can be judged according to the gray scale difference value of the two adjacent frames of display data, when the difference quantity is small or even the two adjacent frames of display data have no difference, the compensation algorithm can be adaptively closed, brightness compensation is not relatively carried out any more, then the granular sensation of the frames is reduced, and the image quality is improved. When the difference quantity is large, it can be determined that the video picture is in a dynamic change state, at the moment, a compensation algorithm is started, and naked eyes cannot easily perceive the granular sensation of the picture in the dynamic picture. Therefore, through the pixel compensation method provided by the embodiment of the invention, at least the technical problem that a multi-domain VA visual angle compensation algorithm causes a relatively strong grainy feeling of a picture can be solved.
Owner:TCL CHINA STAR OPTOELECTRONICS TECHNOLOGY CO LTD

Coordinated restricted target wake time schedule with jitter

PendingUS20260190024A1Time scheduleComputer network
Techniques and apparatus for scheduling coordinated restricted target wake times (Co-RTWTs) with jitter are described. An example technique includes determining a schedule of service periods allocated to at least one of (i) one or more access point (AP) devices or (ii) one or more aggregated flows associated with the one or more AP devices. A first service period allocated to a first AP device for exchanging first traffic is determined based on the schedule of service periods. Upon determining, in the first service period, that a second AP device has second traffic that satisfies a predetermined condition, a portion of the first service period is allocated to the second AP device for communicating the second traffic.
Owner:CISCO TECHNOLOGY INC

System and method for media distribution

A method for distributing an audio instruction from a manager site at a client site in a distributed audio system having a plurality of client sites, a generalized audio instruction for playback of audio at the client sites is received via user input at the manager site. The generalized audio instruction includes a plurality of labels which are global in the audio system and are indicative of a time schedule category, an audio zone category, and an audio source category. Pre-defined information which associates the plurality of labels indicative of the time schedule, audio zone, and audio source categories with client site specific identifiers of a time schedule, an audio zone, and an audio source, respectively, is accessed for each of client sites. The generalized audio instruction is adapted using the pre-defined information to generate a specialized audio instruction for each of the one or more client sites.
Owner:AXIS

Sequencer time jump execution

A method includes receiving a plurality of operations in a sequence recipe. The plurality of operations is associated with processing a plurality of substrates in a substrate processing system. The method further includes identifying a plurality of completion times corresponding to the plurality of operations. Each completion time of the plurality of completion times corresponds to completion of a respective operation of the plurality of operations. The method further includes simulating the plurality of operations by setting a virtual timeline for each of the plurality of completion times to generate a schedule for the sequence recipe. The method further includes causing the plurality of substrates to be processed or performing a corrective action based on the schedule.
Owner:APPLIED MATERIALS INC

System and method for look-ahead optimization of mine operation

A method and computing environment for mine productivity optimization is disclosed. Possible movements for mine vehicles over a predetermined timeframe are modeled, and a mine merit function is computed for each of the possible movements. A possible movement set is selected on the basis of the merit function, and a vehicle schedule is generated from the possible movement set and pushed out to the vehicles. Optimizations of future movement may be made continuously, on a rolling basis, and the schedules updated. Schedules may be revised on the basis of planned future events such as maintenance events.
Owner:MODULAR MINING SYSTEMS INC

Planning and deploying multiple assets for projects

A method may include receiving, via one or more processors, a first dataset associated with a plurality of projects that corresponds to performing hydrocarbon exploration or processing operations. The method may then involve receiving a second dataset associated with a plurality of assets, such that at least a portion of the plurality of assets is used to complete at least a portion of the plurality of projects. The method may also involve determining a plurality of schedules for deploying the at least a portion of the plurality of assets for use with the at least a portion of the plurality of projects, identifying a portion of the plurality of schedules based on an optimization algorithm with respect to revenue, and sending a notification indicative of the portion of the plurality of schedules to a computing device, wherein the computing device is configured to display the notification via an electronic display.
Owner:SCHLUMBERGER TECH CORP

Machine learning operations models for regulatory compliance and balanced scheduling

Technological improvements are described for automatically generating crew and equipment schedules that are optimized for regulatory compliance and balanced according to goals or policies referred to as balance settings. Example systems and methods include building and maintaining a compliance library of regulations. A machine-learning operations model generates a schedule that complies with regulations and receives input data including a proposed schedule and the priority-weighted balance settings. Then, the operations model, using a set of recursive processes, generates a candidate schedule that is optimized based on the regulations and the balance settings. An auditor confirms the candidate schedule complies with regulations. The auditor evaluates real-time data to flag potential violations and generate compliance notices and compliance reports. The system includes a generative AI model trained using an industry-specific small language model (ISLM) for receiving textual and image data for use by the operations model and for generating responsive messages.
Owner:BRAINTRUST IQ LLC

Real-time scheduling for heterogeneous multicore systems

A heterogeneous multi-core system to execute a real-time system of an automobile includes a plurality of system-on-chips in electronic communication with one another. Each system-on-chip includes a plurality of central processing units (CPUs) arranged into a plurality of logical domains. The heterogeneous multi-core system also includes a plurality of dispatched tasks that execute based on an execution pipeline and each perform a particular set of tasks for one of the logical domains. The plurality of dispatched tasks includes at least one offset dispatched task that executes at an offset time and a reference dispatched task that is located upstream of the execution stage of the offset dispatched task on the execution pipeline. The reference dispatched task communicates data to the offset dispatched task and the offset time represents a period of time measured relative to the reference dispatched task.
Owner:GM GLOBAL TECHNOLOGY OPERATIONS LLC

Information processing method, information processing device, and information processing program

In an information processing method for creating a server on the basis of a transport plan, a transport request including a start point at which transport starts, an end point at which transport ends, and a first arrival date and time indicating the date and time at which each of the one or more transport objects arrives at the start point for each of the one or more transport objects is acquired. A transport plan for transporting one or more transport objects is created on the basis of the total of one or more holding costs corresponding to the difference between the first arrival date and time and the second arrival date and time for each of the one or more transport objects, and one or more transport costs corresponding to the difference between the first arrival date and time and the second arrival date and time for each of the one or more transport objects. The second arrival date and time indicates the date and time at which one or more vehicles transporting the transport object arrive at the starting point, and the one or more transport costs are transport costs required for transporting from the starting point to the end point for each of the one or more transport objects, and the created transport plan is output.
Owner:PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD

Wireless digital audio system

A computer-implemented method for scheduling audio streams (120, 121, 122, 123, 124, 130, 131) within a wireless digital audio system (1) comprising a central unit (100), audio sinks (115-117, 125-129) and audio sources (125-129); wherein the central unit is configured to determine a broadcasting time schedule (101) for isochronous operation of the wireless digital audio system, wherein the broadcasting time schedule comprises consecutive time intervals (102, 103, 104); wherein a time interval comprises a set of time slots (110, 111, 112); the method comprising: broadcasting, by the central unit, one or more audio streams in one or more time slots of the set of time slots; and delegating, by the central unit, upon request of an audio source (125), the broadcasting in a subset (111) of the set of time slots to the audio source.
Owner:TELEVIC +2

A scheduling rule optimization method for a water, wind and light integrated system

The application discloses a kind of water wind light integration system scheduling rule optimization method, it is related to energy system scheduling technical field.Disclosed in the application includes: design water wind light multi-energy complementary long-term scheduling chart, initialize the up and down scheduling line on scheduling chart and decision output parameter, to calculate monthly total power generation;Design medium-term scheduling rule, monthly total power generation is distributed to each day, to obtain daily power generation;Design short-term scheduling rule, daily total power generation is distributed to each hour, to obtain day-ahead generation plan;Determine the load state of each hydropower station in cascade hydropower station, and the hydraulic connection and electric connection between different hydropower stations are constrained, to obtain real-time scheduling strategy;The optimization variable of multi-objective optimization scheduling model is updated and iterated to obtain pareto solution set, and water wind light integration scheduling rule is determined according to compromise solution.The application can minimize the risk of power rejection and load loss during operation.
Owner:XIAN UNIV OF TECH +2

Image forming apparatus

To provide an image forming apparatus which can be switched to a mode with less power consumption than a sleep mode by a method designated by a user in advance.SOLUTION: In a state in which the auto power-OFF period is stored in the memory 103, CPU101 indicates that the auto power-OFF period has elapsed since the power of predetermined hardware other than CPU101 and the memory 103 was turned OFF in a state in which the power of the fixing device 7 was OFF. In addition, it is possible to execute a process of turning off the power of the hardware including the CPU101 and the memory 103 when the predetermined condition is satisfied, and a process of turning off the power of the hardware including the CPU101 and the memory 103 when the time scheduled by the schedule has passed and the predetermined condition is satisfied in a state where the power of the fixing device 7 and the power of the predetermined hardware other than the CPU101 and the memory 103 are off in a state where the schedule is stored in the memory 103.SELECTED DRAWING: Figure 7
Owner:BROTHER KOGYO KK

Display control method, time schedule controller and display panel

The invention belongs to the technical field of display, and particularly relates to a display control method, a time schedule controller and a display panel. Comprising the following steps: acquiring a current starting voltage value and a current common voltage value output by a power management circuit in a startup or shutdown process of the display panel; when the current starting voltage value is the valid voltage and the current common voltage value is the invalid voltage, obtaining a target time difference of the current common voltage value from the invalid voltage to the valid voltage; a clock driving signal is adjusted according to the target time difference, so that the gate driving circuit delays opening of pixel rows in the display panel according to the clock driving signal; or / and adjusting the data output time sequence according to the target time difference, so that the data driving circuit delays the output of the data signal according to the data output time sequence. According to the invention, the splash screen phenomenon of the display panel during startup and shutdown is effectively improved.
Owner:CHONGQING HKC OPTOELECTRONICS TECH CO LTD +1

Time schedule controller with brightness compensation, display and pixel brightness compensation method

The invention discloses a time schedule controller with brightness compensation, a display and a pixel brightness compensation method. The pixel brightness compensation method comprises the following steps of: obtaining a current gray-scale value of a pixel in the display, accumulated operation time of the display, a current temperature and a current display brightness value; determining a first gain value and a third gain value according to the current gray-scale value, the current temperature and the accumulated operation time; generating a second gain value according to the current display brightness value; and converting the current gray-scale value of the pixel into a target gray-scale value through the first gain value, the second gain value and the third gain value. Therefore, the aging speed of the pixels can be slowed down, and the brightness of the pixels can still be maintained within the brightness range after the display time of the display panel reaches the target accumulated operation time.
Owner:HIMAX TECH LTD

A CAN network load balancing method, apparatus, device and medium

This application discloses a CAN network load balancing method, apparatus, device, and medium, relating to the field of communication technology and applied to a master ECU node. The method includes: after power-on, sending a local clock timestamp to each slave ECU node at preset time intervals, so that each slave ECU node synchronizes its local clock based on the timestamp; obtaining the transmission load reported by each slave ECU node after synchronizing its local clock, and planning the transmission time points of each slave ECU node based on the transmission load to obtain a time schedule table; and sending the time schedule table to each slave ECU node so that each slave ECU node sends CAN messages at the target time points specified in the time schedule table according to its local clock. In this application, the master ECU node can uniformly schedule the time for slave ECU nodes to send CAN messages based on their transmission load, reducing the peak load of the CAN bus and ensuring the stability and real-time performance of signal transmission.
Owner:IMOTION AUTOMOTIVE TECH (SUZHOU) CO LTD

Equipment schedule control method and apparatus

Disclosed is an equipment schedule control method and apparatus capable of operating equipment according to an optimal schedule in various environments by virtually simulating operation of the equipment, the method including (a) receiving parameter information related to operation of the equipment from an equipment terminal or an operator terminal, (b) generating primary simulation model information to which operation of current equipment is reflected, by using the parameter information, (c) reconstructing virtually operable secondary simulation model information by using the primary simulation model information, (d) calculating and comparing primary scheduling result information of the primary simulation model information and secondary scheduling result information of the secondary simulation model information, and (e) transmitting optimal equipment control information to the equipment terminal or the operator terminal to control the equipment to follow the secondary simulation model information, when the secondary scheduling result information is superior to the primary scheduling result information.
Owner:SYSTEM ENGINEERING MEGA SOLUTION CO LTD

Systems and methods for advanced scheduling and optimization of RAMP operations of a HUB based on an intelligent graphical user interface

Systems and techniques for optimizing ramp operations of a hub based on a dual-stream resource optimization (DSRO) through an intelligent graphical user interface (GUI). The GUI dynamically visualizes an optimized ramp operations schedule, enabling operators to interact with and adjust the schedule of inbound and outbound trains. Re-optimization features adapt to changes made by the operator, maintaining efficient hub operations. The GUI's intelligent decision-making capabilities consider complex resource interdependencies and the cascading effects of schedule adjustments. Enhanced operational efficiency is achieved by providing alerts and notifications for deviations from the optimized plan, facilitating swift action. User-driven optimization offers operators the flexibility to select from multiple optimization options or maintain the original schedule. This intelligent GUI integration with the ramp operations optimization system advances intermodal hub management, driving efficiency and responsiveness.
Owner:BNSF RAILWAY COMPANY

Job offer management system, method for managing job offer management method, and program

To enable smooth job recruitment.SOLUTION: A job offer management system includes: a determination unit configured to determine, after a work schedule of a staff member has been fixed in a work time slot assigned on the basis of desired work slots submitted by the staff member, whether there is any rejected desired work slot; and a proposal unit configured to propose short-term part-time work to the staff member whose desired work slot has been rejected when there is a rejected desired work slot.SELECTED DRAWING: Figure 1
Owner:INDEED INC

Dynamic effect processing method and electronic equipment

The embodiment of the invention provides a dynamic effect processing method and electronic equipment, and relates to the technical field of terminals. The method comprises the steps of recording a first time progress of a first dynamic effect when the first dynamic effect is interrupted in response to a first operation of interrupting the first dynamic effect in a process of playing the first dynamic effect based on a first interpolator curve; starting from the first time schedule, the first dynamic effect is reversely played based on a second interpolator curve, and at least part of the first interpolator curve indicates a first speed trend opposite to a second speed trend indicated by the second interpolator curve. Therefore, when the first dynamic effect is played in the forward direction and when the first dynamic effect is played in the reverse direction, the speed trends presented by the dynamic effects are consistent, and the consistency of the visual effect of the dynamic effects is effectively improved.
Owner:HONOR DEVICE CO LTD

Display module and display device

The invention provides a display module and a display device, the display module comprises a time schedule controller, the time schedule controller comprises at least one function module, the time schedule controller further comprises a micro-control unit connected with each function module, and the micro-control unit is used for monitoring whether each function module has an electrostatic abnormal event or not; when the static electricity abnormal event aiming at any target function module is monitored, resetting operation is carried out on the target function module, and the target function module is at least one of the at least one function module. According to the invention, the time schedule controller monitors the static electricity abnormity event of each functional module in real time and automatically resets the abnormal module, the problem that the static electricity abnormity cannot be positioned and processed in time in the prior art is solved, and the display module has the advantages of monitoring the static electricity abnormity in real time, automatically resetting the abnormal module and improving the reliability of the display module.
Owner:GUANGZHOU CHINA STAR OPTOELECTRONICS SEMICON DISPLAY TECH CO LTD