Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

246 results about "Project design" patented technology

Project design is an early phase of the project where a project’s key features, structure, criteria for success, and major deliverables are all planned out. The point is to develop one or more designs which can be used to achieve the desired project goals. Stakeholders can then choose the best design to use for the actual execution of the project.

Integrated business system for the design, execution, and management of projects

The system of method for building a database for the design and execution of projects is described. This system includes a host computer system in data communication with a central database and at least first and second databases. The central data base stores information relating to the design and execution of the project predetermined to be important to one or more project team members. The first and second databases are in communication with first and second computer systems which may be remotely located from each other and which execute standard industry software tools. The host computer system is configured to monitor a plurality of transactions to the first database. Each of the plurality of transactions stores data in the first database. The monitoring includes comparing the plurality of a transaction against a predetermined transaction. If the host computer detects a match between one of the plurality of transactions and the predetermined transaction, the host computer reads the first data stored in the first database by the matched transaction and stores the first data in either the second database or the central database, or both. Additionally, the host computer system generates a message indicating that the first database was updated with the first data. This message is then transmitted to the second computer system.
Owner:IBM CORP

System and method for power transmission and transformation project three-dimensional-aided preliminary design

InactiveCN103093008AEasy to rankNo path hazards leftSpecial data processing applicationsElectric power transmissionEngineering
A power transmission and transformation project three-dimensional-aided preliminary design system comprises a data storage unit, a power transmission and transformation project typical model base unit, a data exchange interface, a three-dimensional rendering engine unit and a spatial analysis unit. The data storage unit is used for storing and managing spatial data and non-spatial data needed to be referenced in designing power transmission and transformation projects of various types, the power transmission and transformation project typical model base unit is used for storing power transmission and transformation equipment three-dimensional models of various types and with representative significance by combining actual power transmission and transformation project design, the data exchange interface is used for inputting and outputting power transmission line design tower optimized arranging software data formats, the three-dimensional rendering engine unit is used for creating, loading and rendering three-dimensional scenes, and the spatial analysis unit is used for providing spatial measuring and spatial analysis functions. The power transmission and transformation project three-dimensional-aided preliminary design system created by applying the three-dimensional GIS (geographic information system) technology integrates data of various types needed at a preliminary design stage, comprehensively judges various factors influencing power transmission line route selection and transformer station address selection by stacking of the data of various types, and overcomes defects of poor up-to-date state, poor visuality and the like of topographic maps in conventional methods.
Owner:STATE GRID HENAN ELECTRIC POWER

Model driving based city track traffic running simulation method and system

The invention discloses a model driving based city track traffic running simulation method and system. According to the scheme, locomotive vehicle factors are input as external conditions and other influence factors are considered according to a disadvantage principle of a signal system, so that the effect of lowering the complexity of simulation is achieved; secondly, the effect of a vehicle control model of the signal system in train running simulation is highlighted, the combination of an ATP overspeed protection model and an ATO speed control model is considered, and the vehicle control effect of the signal system is highly fitted, so that a simulation result can meet an actual condition as far as possible and the goal of ensuring the precision of simulation can be achieved; and finally, a simulation platform generates related parameters of a tracking interval, a turn-back interval, blocking design, system parameter calculation and the like related to signal system project design in the same simulation platform by taking the train running simulation under the control of the signal system as a core, and has the functions of calculating and analyzing operation-related running time and travel speed index, thereby ensuring data consistency and realizing high functional integration.
Owner:SIGNAL & COMM RES INST OF CHINA ACAD OF RAILWAY SCI +3

Subway construction safety risk identification and evaluation system and working method thereof

The invention belongs to the field of engineering risk identification and provides a subway construction safety risk identification and evaluation system and a working method thereof. The system comprises a user interface module, a project newly-building module, a risk identification information base module, a risk base module, a risk evaluation knowledge base module, a matching algorithm module and a risk evaluation module. The method comprises the following steps of: firstly receiving information of a user newly-built project, reminding a user of selecting and determining risk identification information according to a project design file, combining with a risk base and a matching algorithm to generate a risk identification list, and identifying all potential safety risks of the project to be evaluated; and then performing risk evaluation, generating a risk evaluation list, utilizing a risk evaluation calculation model to perform risk evaluation calculation, and finally acquiring a subway project construction safety risk identification and evaluation result. The invention relates to a pre-evaluation technical scheme for realizing subway construction safety risk identification and evaluation based on the design file before construction.
Owner:HUAZHONG UNIV OF SCI & TECH

BIM-based building information integrated management system and construction method thereof

The invention relates to a BIM-based building information integrated management system and a construction method thereof, and belongs to the technical field of information integrated management. The management system disclosed by the invention comprises a data layer, an information model layer and a function application layer, wherein the data layer realizes information collection, coding, classification and storage; the information model layer creates a building information model with model primitive basic data extracted from the data layer and updates and improves an information model with extended data to provide required model information for each project participant; the function application layer analyzes and applies various shared model information acquired by the information modellayer, and exchanges and shares information obtained by the respective analysis and application, which can dynamically process a large number of information about engineering project design, construction, completion acceptance, operation and maintenance with high quality, ensure efficient information circulation, realize project management informationization and make a best decision for all stagesof a whole life cycle.
Owner:PROMOTION CENT OF SCI & TECH DEV MINIST OF HOUSING & URBAN RURAL DEV OF THE PEOPLES REPUBLIC OF CHINA +3

Design review process management and control mode research method

A design review process management and control mode research method of the invention is implemented through the following steps: (a) submitting a review plan; (b) establishing a declaration directory and performing first review, wherein the economic research institute establishes the declaration directory and ensures the progress of design review work and the quality of review; (c) establishing a review process and implementing dynamic supervision, and establishing a review project library; (d) establishing an evaluation mechanism, wherein the economic research institute combines the existing evaluation indexes and the evaluation indexes put forward by the infrastructure department; (e) comprehensively analyzing and reviewing the plan; and (f) managing the plan scheme data and setting up sharing, wherein plan and review information query and project cost analysis are supported. According to the design review process management and control mode research method of the invention, a power transmission and transformation project design review platform which is in accordance with the requirements of the State Grid Corporation and is economical and practical, fully functional, and safe and reliable is established by closely combining the characteristics and needs of power transmission and transformation project design review and making full use of the existing resources, and therefore, the need of project design review is satisfied.
Owner:国网宁夏电力有限公司经济技术研究院

Ultra-large self-elevating wind turbine installation vessel with multi-type pile legs and design method thereof

The invention discloses a design scheme of a self-elevating vessel pile leg, in particular to a design scheme of an ultra-large self-elevating wind turbine installation vessel with multi-type pile legs. The wind turbine installation vessel projects designed and built at the present stage are all provided with single-type pile legs, and the wind turbine installation vessels with the single-type pile legs has various shortcomings that the wind turbine installation vessel with single casing type pile legs is not strong in loading capacity or operating depth, and the wind turbine installation vessel with single truss type pile legs is complex in building process and high in cost. According to the ultra-large self-elevating wind turbine installation vessel with the multi-type pile legs, load distribution of the ultra-large wind turbine installation vessel is optimized, load of the wind turbine installation vessel is reasonably distributed, the design scheme that the multi-type pile legs are adopted for the ultra-large wind turbine installation vessel is provided, and the advantages of the casing type pile legs and the truss type pile legs are sufficiently combined, so that loading capacity and operating depth of the ultra-large wind turbine installation vessel are improved, and simultaneously the ultra-large wind turbine installation vessel is superior in terms of building process and cost.
Owner:COSCO SHIPPING SHIPYARD (NANGTONG) CO LTD +3

Construction method with space gas film as formwork

The invention relates to a construction method with a space gas film as a formwork. A gas film formwork is machined and formed in a factory according to project design, the gas film formwork is transported to a construction site after being machined, before the gas film formwork is fixed and inflated, a hydraulic crane, building materials and building equipment are transported into the gas film formwork and cover correct positions, the gas film formwork is unfolded and fixed to a foundation, the gas film formwork is inflated, and the hydraulic crane, the building materials and the building equipment are located on the floor inside a building of the gas film formwork after the gas film formwork is formed; after the gas film formwork is installed and inflated, air pressure in a bin is kept stable, polyurethane foam is sprayed onto the inner surface of the gas film formwork to form a polyurethane layer, constructional steel bars and wall structure steel bars are bound to the surface of the polyurethane layer, concrete is sprayed layer by layer to form reinforced concrete layers, when the concrete reaches the designed strength, an inflating fan is shut down, holes are formed in walls, and subsequent construction processes are carried out. Compared with a traditional construction method, the construction method with the space gas film as the formwork has the advantages that the construction period is short, labor and material are saved, the energy consumption rate is low, the safety coefficient is high, the external shape is beautiful, and seamless connection of the overall structure can be achieved.
Owner:CHINA COAL BUILDING & INSTALLATION ENG GRP +1

Vehicle man-machine verification platform

The invention discloses a vehicle man-machine verification platform, which comprises a support skeleton assembly, a hood adjustment assembly, an instrument panel adjustment assembly, a shift adjustment assembly, a central armrest adjustment assembly, a pedal adjustment assembly, a brake adjustment assembly, a seat adjustment assembly, a third-row floor adjustment assembly, a door adjustment assembly, a threshold adjustment assembly and an A-pillar adjustment assembly. The hood adjustment assembly, the instrument panel adjustment assembly, the shift adjustment assembly, the central armrest adjustment assembly, the pedal adjustment assembly, and the brake adjustment assembly are arranged at one side of the Y direction of the support skeleton assembly; the seat adjustment assembly and the third-row floor adjustment assembly are arranged in the middle of the support skeleton assembly; the door adjustment assembly, the threshold adjustment assembly and the A-pillar adjustment assembly are arranged at the X-direction side of the support skeleton assembly; and the door adjustment assembly is arranged above the threshold adjustment assembly. Therefore, all-round manual adjustment is realized; the versatility is high, the project design cost can be lowered; the design quality is improved; and simultaneous use of multiple projects is guaranteed.
Owner:DFSK MOTOR LTD CHONGQING BRANCH CO

Debris flow material source dynamic reserve calculation method under rainfall condition

InactiveCN105868442AAvoid similarity problemsAvoid problems such as particle size effectsGeometric CADHydraulic engineering apparatusSource typeGeological exploration
The present invention relates to a calculation method for a dynamic reserve scale of a debris flow material source, and specifically to a debris flow material source dynamic reserve calculation method under a rainfall condition. The method comprises the steps of: according to plenty of field investigations and a debris flow material source type, establishing a geological model of material source destruction and conversion; and by using an on-site orthotopic artificial rainfall experiment, disclosing correlations about a conversion from slope destruction of a debris flow source region to a debris flow material source scale under different rainfall conditions, so as to establish a calculation model of a debris flow material source under a rainfall excitation condition. According to the method, proposed is the calculation method of carrying out calculation to determine a total dynamic reserve of the debris flow material source and, on this basis, calculating the dynamic reserve of the debris flow material source under the different rainfall excitation conditions, so as to provide solutions to key technical problems on geological exploration and project design such as a debris flow channel dam capacity and an exhaust conduit section.
Owner:INST OF MOUNTAIN HAZARDS & ENVIRONMENT CHINESE ACADEMY OF SCI

Modeling method for inclined core wall earth-rockfill dam based on VB and CATIA

InactiveCN106874610AChange the problem of insufficient intuitionSolve duplication of workGeometric CADDesign optimisation/simulationTerrainInformatization
The invention discloses an informatization modeling method for an earth-rockfill dam based on VB and CATIA. Secondary development is carried out on the basis of the VB language and the CATIA, the VB calls the CATIA, and modeling is carried out. The modeling method comprises the following steps of establishing a three-dimensional terrain model on the basis of existing topographic and geological data; linking the VB with the CATIA; designing a VB interface comprising location control parameters and shape control parameters in the VB; writing codes in the VB and creating a dam axis according to endpoint coordinates of the ends of the dam axis; writing codes in the VB and completing design of a dam body; running a program, inputting the parameters, and generating a model. A traditional design mode is abstract in expression and poor in error-correcting capability, and greatly limits improvement of design efficiency. According to the informatization modeling method based on the VB and the CATIA, the characteristics of secondary development, parameterization and three-dimensional visualization of software are utilized, the disadvantage of the traditional water conservancy project design mode can be avoided, and the efficiency is improved.
Owner:HOHAI UNIV

Power distribution project intelligent design integrated service system and using method

The invention relates to a power distribution project intelligent design integrated service system and a using method. The system comprises a client, a platform service unit, a database unit, and a user unit. The client is connected with the platform service unit through a network. The database unit and the platform service unit are located at a cloud server side. By accurately calling various typical design modules on the cloud server, a design drawing is generated intelligently, and a material information table is output at the same time. By using the power distribution project intelligent design integrated service system of the structure and the using method, the work efficiency of electric power project design is improved, error on the design drawing is reduced, designers can perform design collaboratively, the work efficiency of designers is improved, timely and accurate information communication between users (including the design side and the construction side) and project-related parties is increased, the speed and efficiency of problem solving in all links of a project are improved, the time cost is saved, and the project quality and progress and high level of management are ensured.
Owner:GUANGZHOU ZHONGWANG ELECTRIC POWER ENG DESIGN

Full-life-cycle management and control system for metering designing

The invention discloses a full-life-cycle management and control system for metering designing. The system is composed of a management platform, distribution network design software, distribution network cost software and a mobile phone app. The management platform, the distribution network design software, and the distribution network cost software are based on a mobile internet. The operation and usage of the system are extended from a PC terminal to a hand-held terminal like a smart phone or an Ipad as well as to management and uploading of field surveying data. The management platform consists of an external system, a business platform, a development platform, middleware and a system platform. The external system includes planning software. According to the full-life-cycle management and control system, advanced applications of plan designing, engineering cost, project control, and teamwork of the whole process of the primary and secondary project designing of the distribution network for researching and development, designing and construction as well as development of a mobile phone app and a field surveying design terminal can be realized. With the information means, field data collection of the distribution network engineering project is simplified; the executive standards are standardized and unified; the material equipment model selection becomes simple; the reportingworkload is reduced; and the error rate is reduced.
Owner:广州建软科技股份有限公司

Big-data-based distributed power distribution network planning method

The invention discloses a big-data-based distributed power distribution network planning method. The method comprises: historical data are collected and arrangement to form a large database for convenient storage and searching; and a power distribution network is planned, data in the large database are invoked in real time, and then the power distribution network is planned and set reasonably. According to the invention, at a load analysis stage, an electricity consumption tendency of a user is dug, an electricity demand prediction model of the user is perfected, dynamic market information is obtained actively, and thus a foundation is laid for project design planning. At a project planning design stage, making of decisions of distributed power supply site selection and project scale construction in the distribution network is helped and the power generation efficiency is improved. At an equipment operation stage, an operation and maintenance way is effective changed to realize intelligent operation and maintenance. And at a data integration stage, data sharing at all links in the distribution network is realized, a scheduling and management department is assisted in making decisions, energy losses are reduced, and the working efficiency and the energy utilization rate are improved.
Owner:STATE GRID HENAN ELECTRIC POWER ELECTRIC POWER SCI RES INST +2
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products