Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

890 results about "Building design" patented technology

Building design refers to the broadly based architectural, engineering and technical applications to the design of buildings. All building projects require the services of a building designer, typically a licensed architect. Smaller, less complicated projects often do not require a licensed professional, and the design of such projects is often undertaken by building designers, draftspersons, interior designers (for interior fit-outs or renovations), or contractors. Larger, more complex building projects require the services of many professionals trained in specialist disciplines, usually coordinated by an architect.

Building design scheme multi-objective optimization comparison and selection method, device, equipment and medium

The invention relates to a building design scheme multi-objective optimization comparison and selection method and device, equipment and a medium. The method comprises the steps of generating a multi-dimensional design parameter set by obtaining building information model data and parameterized design data; performing multi-dimensional target analysis and evaluation by using a multi-field joint simulation platform to generate a multi-dimensional evaluation index; a dynamic multi-objective optimization model is constructed through a dynamic weight adaptive algorithm in combination with project stage demands and user interaction data; carrying out iterative optimization by adopting an improved non-dominated sorting genetic algorithm to obtain an optimized design scheme gene sequence result, and introducing a spatial topology connectivity constraint to generate a Pareto optimal solution set; and according to the Pareto optimal solution set, generating an optimization scheme through user weight adjustment and scheme screening. According to the method, the optimal design scheme set meeting the project requirements can be quickly and efficiently generated and screened out, the project stage requirements and user preferences are met, and the design efficiency and the scheme quality are improved.
Owner:XIAMEN INFORMATION SCHOOL

Data optimization processing method and system for edge calculation in architectural design

The invention provides a data optimization processing method and system for edge calculation in architectural design. According to the method, geometric deviation and attribute change characteristics between building design models are obtained, and a version conflict identification graph for marking high-conflict areas is generated through topological relation comparison; deploying an incremental synchronous controller at an edge computing node of a physical layer, dynamically intercepting a high-conflict area association difference data fragment and compressing the high-conflict area association difference data fragment into an incremental data packet; analyzing a dependency topological relation between the models to predict a conflict propagation path; converting the path into a combined operation instruction conforming to a design rule through a collaborative modeling engine; and executing the instruction to integrate the difference, and outputting a conflict-free multi-building design integrated model after the models are fused. According to the method, second-level dynamic resolution and automatic fusion of building model conflicts are realized, the design iteration efficiency is improved, and the construction rework risk is eliminated.
Owner:中奥建工程管理有限公司

Architectural drawing multi-dimensional defect feature extraction and automatic prompting method and system

The invention relates to the technical field of architectural design drawing recognition, in particular to an architectural drawing multi-dimensional defect feature extraction and automatic prompting method and system. The method comprises the following steps: preprocessing collected architectural design drawing data; carrying out primitive recognition and semantic tag extraction on the preprocessed drawing based on deep learning; carrying out multi-dimensional defect feature modeling based on the semantic tags identified and extracted by the primitives; defect identification and intelligent prompting are carried out based on the modeled defect features; and generating a defect report. According to the method, full-dimensional automatic identification and accurate prompt of building design drawing defects are realized, the limitation of traditional manual examination on efficiency and coverage range is broken through, dominant problems such as geometry, layers and annotation can be quickly positioned, hidden defects such as standard conflicts and semantic contradictions can be deeply mined, and the comprehensiveness of drawing quality control is improved.
Owner:THE SECOND CONSTR OF CHINA CONSTR EIGHTH ENG DIV

Architectural design parameterized data driven scheme automatic evolution method and system

PendingCN121051979AGeometric CADDesign optimisation/simulationData setDesign evolution
The invention provides an automatic evolution method and system for a building design parameterization data driven scheme, and relates to the field of building design, and the method comprises the steps: firstly obtaining a building design parameterization basic data set containing building function requirements, structural safety, spatial layout, environment adaptation and other parameters; the method comprises the following steps: generating an architectural design parameter dynamic constraint model by using a parameter constraint dynamic iterator, generating an initial scheme through a parameterization scheme intelligent evolution model, starting a scheme iteration evolution closed-loop process to obtain an intermediate scheme, and finally screening out a target architectural design evolution scheme and outputting related parameterization process associated data. Automatic and intelligent generation and optimization of the building design scheme are realized.
Owner:NORTHEAST AGRICULTURAL UNIVERSITY

VR scene automatic generation method based on parallel projection design drawing

The invention discloses a VR scene automatic generation method based on a parallel projection design drawing, and the method comprises the following steps: S1, importing a two-dimensional CAD drawing containing building design information, and analyzing a primitive set in the drawing; s2, performing component type identification on the primitives, and establishing a mapping relation between a primitive set and spatial semantics; s3, performing geometric reconstruction based on a mapping relation between the primitive set and spatial semantics, and generating a three-dimensional component model with a unique name identifier; s4, establishing a multi-stage mapping model, and realizing size conversion from a drawing scale to a space coordinate system of the virtual reality system; s5, completing three-dimensional coordinate positioning and automatic assembly according to the multi-stage mapping model, and generating a three-dimensional structure layout of an overall building or park level; and S6, importing the assembled three-dimensional structure layout into a virtual reality rendering engine to generate a virtual reality scene. According to the invention, an automatic, precise and integrated conversion process from a two-dimensional design drawing to a three-dimensional virtual reality scene is realized.
Owner:SHAANXI RUIYI SICHUANG ELECTRONIC TECHNOLOGY CO LTD

Pedestrian behavior simulation operation control method based on unreal engine

PendingCN121457765AGeometric CADReservationsSimulationPedestrian behavior
The invention discloses a pedestrian behavior simulation operation control method based on an unreal engine. Efficient and vivid pedestrian behavior simulation is realized through five core modules: a three-dimensional scene construction module converts a BIM model based on an unreal engine Datasmith plug-in and constructs an interactive dynamic scene; the pedestrian model construction module defines multi-dimensional pedestrian attributes and supports data-driven initial distribution configuration; the hierarchical behavior control module realizes refined regulation and control of pedestrian behaviors through macroscopic path planning, microcosmic behavior decision and emotion driving; the dynamic resource optimization module adopts level-of-detail control and multi-thread task allocation to improve the operation efficiency of the system; and the real-time interaction and data analysis module provides scene regulation and control, data visualization and simulation data recording and playback functions. According to the method, the authenticity, the dynamic response capability and the controllability of pedestrian simulation are remarkably improved, and reliable technical support can be provided for traffic planning, emergency drilling and building design evaluation.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD

AI-based building design scene automatic intelligent generation method and system

The invention discloses an AI-based building design scene automatic intelligent generation method and system, and relates to the technical field of building design, accurate basic data is provided for subsequent design by constructing a building related data set H, then a three-dimensional space model of an ancient building is generated by using 3D modeling and image recognition technologies, and the three-dimensional space model of the ancient building is obtained. According to the method, the to-be-repaired model area is marked, the recognition accuracy of the to-be-repaired model area is improved, in material suitability analysis, the building repair material is selected according to the material suitability score CL, the material compatibility and the repair effect are ensured, a first ancient building repair design scheme is obtained according to the AI model, meanwhile, finite element analysis is conducted, and the recognition accuracy of the to-be-repaired model area is improved. According to the method, it is ensured that the repaired historic building can bear loads and keep stability, finally, through target function optimization and simulation, an optimal historic building repair design scheme is output, a repair plan is executed, high efficiency and accuracy of the historic building repair process are ensured, and the repair quality of the historic building is improved.
Owner:NANTONG VOCATIONAL COLLEGE

Systems and methods for generative building design and manufacturer integration

A computer-aided system and associated method for automated building design includes receiving input parameters and generating a three-dimensional parametric computer model of a building frame and populating the three-dimensional computer building model with generic and manufacturer-specific products by accessing internal and external data sources. The populated computer model undergoes real-time simulation to analyze regulatory compliance, verify engineering requirements including load calculations, and evaluate cost considerations. Based on simulation results, the method generates output documents including requests for proposals (RFP documents) for contractors, requests for quotations (RFQs) for vendors, and regulatory compliance documentation. These documents are transmitted to respective stakeholders through a secure data exchange protocol. The method further includes receiving responses to the generated RFP documents / RFQs.
Owner:GENERATE TECHNOLOGIES INC

Building self-correction design method and system based on large language model

The invention provides a building self-correction design method and system based on a big language model, a design experience library and a design rule library are formed by using a BIM model of a historical design scheme and design specifications, and when a new project is designed, the big language model can be used for searching and understanding a historical experience knowledge library, and reasoning ability, so that the design efficiency is improved. Intelligent optimization suggestion is carried out on existing design parameters, the compliance of the suggestion is ensured through retrieval and understanding of a rule base, and finally semi-automatic or automatic correction of building design is achieved.
Owner:GUANGZHOU METRO DESIGN & RES INST CO LTD

Ai-assisted methods and apparatus for collaborative spatial annotation of building design plans

Methods and apparatus for spatial annotation of design plans in an AI-powered collaborative environment. It includes a controller to receive a static representation of a building's design plan and an AI engine to analyze raster images to identify design elements such as architectural aspects, walls, and rooms. An interactive user interface generates polygons and lines representing these elements, allowing users to select elements for annotation. The apparatus determines positional coordinates of selected elements, links annotations to these coordinates, and updates the interface in real-time for multiple users. Additional features include automated annotation suggestions, user interaction options like commenting and approval, and learning from user interactions to enhance future annotations. The apparatus can detect physical changes in design elements using cameras and update the interface accordingly. It supports dynamic collaboration and enhances the accuracy and efficiency of design plan annotations.
Owner:TOGAL AI INC

Tropical zone zero-carbon building integrated energy-saving energy production and consumption design and regulation and control system

The invention discloses a tropical zone zero-carbon building integrated energy-saving energy production and consumption design and regulation and control system. Comprising a parameterization modeling module used for establishing parameterization models of a building energy-saving subsystem, a capacity subsystem and an energy consumption subsystem; the simulation module is used for simulating energy consumption and carbon emission performance of the building under different parameter combinations; the optimization module is used for executing multi-objective optimization calculation based on the simulation result so as to determine optimal building design parameters and operation parameters meeting a preset carbon emission objective; the control module is used for carrying out coordination control on the energy-saving subsystem, the energy production subsystem and the energy consumption subsystem according to the optimal parameters output by the optimization module; and the monitoring feedback module is used for monitoring real-time energy consumption, capacity and environment data of the building and feeding back the data to the simulation module and the optimization module so as to iteratively update the model and the optimization strategy. The method has the remarkable advantages of energy conservation and emission reduction.
Owner:SANYA SCI & EDUCATION INNOVATION PARK WUHAN UNIV OF TECH

Green building passive design scheme intelligent generation method, system, equipment and medium

The invention relates to an intelligent generation method, system and device for a passive design scheme of a green building and a medium. The method comprises the following steps: firstly, collecting site limitation data and climate data, inputting the data into a thermal performance simulation model, and outputting building heat loss and solar heat gain distribution; based on the result, a genetic algorithm is used for optimizing parameters such as the building orientation and the window-wall ratio, and a building design parameter combination is formed through energy consumption calculation, standard judgment and iterative optimization. Then, thermal and economic parameters are extracted from the design parameters to construct a data set, the parameters are screened to generate a building layout optimization instruction, and the layout is adjusted in combination with a dynamic adaptation standard to obtain an optimization scheme. And finally, associating the optimized layout with site parameters, performing energy model optimization to form a low-carbon scheme, and coupling environment adaptability data to generate a sustainable development scheme. By means of the method, the problems that traditional design parameter optimization is low in efficiency and multiple targets are difficult to balance can be solved, layout reasonability and energy consumption control precision are improved, and low carbon of the whole life cycle of the building is assisted.
Owner:HENAN AGRICULTURAL UNIVERSITY

Building fire-fighting automatic verification and evacuation path verification system based on rule engine

The invention discloses a building fire-fighting automatic verification and evacuation path verification system based on a rule engine, and relates to the technical field of building fire-fighting intellectualization. Comprising the steps that a rule generation module analyzes a fire-fighting standard text and generates an executable rule set; the model analysis module is used for extracting component attributes and a spatial topological relation from the building information model; the real-time sensing module collects environment state data. The rule engine module matches the component attributes with the executable rule set to generate a first verification result; spatial topology and real-time sensing data are fused, the dynamic passing weight of each path segment is calculated, and an evacuation path network model is constructed. The path verification module verifies the safety of a path from a preset point to an exit based on the model, and generates a path verification result. And the result generation module outputs fire-fighting compliance data. According to the invention, through the dynamic optimal evacuation path planning from the static fire-fighting standard examination of the building design to the occurrence of the disaster, the guarantee capability and the emergency response efficiency of the building fire-fighting safety are improved.
Owner:SHANDONG HUASHENG DESIGN GRP CO LTD

Photovoltaic building design and control system based on multi-mode neural network

The invention specifically relates to a photovoltaic building design and control system based on a multi-modal neural network, and relates to the technical field of building energy saving, renewable energy utilization and artificial intelligence application. Comprising a multi-modal data acquisition and fusion module, a multi-modal neural network modeling and optimization design module, a real-time control strategy generation and execution module and a digital twin platform and continuous learning module. According to the method, global optimization is designed, powerful nonlinear fitting and feature fusion capabilities of the multi-modal neural network are utilized, multi-dimensional complex factors such as climate, buildings, users and a power grid are comprehensively considered, the optimal BIPV integration scheme which is high in power generation efficiency, small in influence on building performance and good in economical efficiency is rapidly generated, and the design efficiency and the scheme quality are remarkably improved.
Owner:ANHUI PROVINCIAL ARCHITECTURAL DESIGN & RSCH INST CO LTD

A field measurement device for architectural design

This invention belongs to the field of engineering measurement technology, specifically a field measurement device for architectural design. The device includes a tripod with a total station mounted on top. A sliding cylinder shields the device from strong light, preventing ambient light from affecting the laser beam and improving the accuracy of laser beam identification and calibration. A conical column, with its conical base, inserts into the soil, enhancing stability during operation and reducing detection errors caused by device sway. A first spring improves adaptability to ground surfaces of varying hardness, enhancing the device's versatility. When the two sliding plates abut against each other, they form a relatively enclosed environment, further reducing the influence of the external environment on the laser beam and improving the accuracy of laser beam identification and calibration.
Owner:BEIJING E-SUNNY ENVIRONMENTAL PROTECTION ENG CO LTD

Progress and resource management linkage application system based on BIM

The invention provides a progress and resource management linkage application system based on BIM, relates to the technical field of building management, and is suitable for full life cycle management of design, construction and operation of a building. The system comprises a demand modeling module, an intelligent equipment optimization module, a collision detection and progress optimization module, a multi-professional data integration and real-time simulation module, a building full-life-cycle intelligent management module and the like. By optimizing arrangement and streamline design of equipment, the space utilization rate and the medical service efficiency are improved; in the construction stage, a collision detection function and a digital twinning technology of the BIM are utilized to realize multi-specialty collaborative design and progress optimization; in the operation stage, the operation state of the equipment is monitored in real time in combination with an Internet of Things sensor, a preventive maintenance plan is generated, and energy consumption management is optimized through energy consumption data analysis. The system improves the design precision and construction efficiency of the building and the intelligent level of equipment management and operation maintenance, and has a wide application prospect.
Owner:WEST CHINA HOSPITAL SICHUAN UNIV

3D building digital monitoring method and system based on BIM

The invention provides a BIM-based 3D building digital monitoring method and system, and belongs to the technical field of building engineering monitoring, and the method comprises the steps: carrying out the digital conversion and processing of a building design drawing of a target building, extracting the geometric and attribute information of the target building, and generating a standard BIM model; verifying and calibrating the basic multi-dimensional data and the standard BIM model when the target building is completed, and generating a reference BIM model; performing spatial registration and association mapping on the acquired multi-dimensional monitoring data and the reference BIM model to generate an association data set; comparing based on the associated data set to generate a comparison result; obtaining a potential risk type and a risk evolution trend of the target building through a risk prediction model based on a comparison result, historical monitoring data and a component static attribute in the reference BIM model; and generating a target monitoring strategy based on the potential risk type and the risk evolution trend. The building operation and maintenance efficiency is improved, and the service life of the building is prolonged.
Owner:DHC SOFTWARE

Arrangement method of storm combined deepwater laboratory comprehensive system

The invention discloses a wind wave combined deepwater laboratory comprehensive system arrangement method, and relates to the technical field of laboratory building design. Comprising the steps that a lifting floating bottom system, a wind generation system, a wave generation system, a trailer system and a crane system are arranged and installed to form a comprehensive system for a storm combined experiment; the lifting floating bottom system is arranged at the bottommost layer of the laboratory and comprises a deep water pool and a liftable floating bottom structure in the pool; the wave making system is arranged on the side surface of the deep pool; the trailer system is mounted above the deep pool and moves along the top surface of the deep pool; the crane system is arranged above the trailer system and installed below the second-layer truss. The wind tunnel power section is located on the second layer, and the wind tunnel experiment section is arranged on the first layer; according to the method, the problem of space interference between large-scale equipment is solved, experimental errors caused by equipment conflicts are avoided, complete implementation of basic functions of the system is ensured, and therefore the accuracy and reliability of experimental data are remarkably improved.
Owner:DALIAN UNIV OF TECH

Design method based on BIM model

The invention provides a design method based on a BIM model, and relates to the technical field of building design. The method comprises the following steps: constructing a component library of a BIM model, wherein the component library is used for determining that each component used in the BIM model meets a target construction standard; determining a drawing standard and a deepening direction of the building project based on the target construction standard; building a BIM model of the construction project based on the component library, and performing deepening processing on nodes in the BIM model based on the deepening direction, and obtaining a target BIM model under the condition that the deepening processing is completed; and receiving attribute information of a drawn drawing, and generating a construction drawing conforming to the drawing output standard based on the target BIM model. According to the method, the technical concept of forward drawing output can be achieved, the homology and consistency of design data are kept, and therefore the accuracy of produced design drawings can be improved.
Owner:THE SECOND ENG COMPANY OF CCCC FOURTH HARBOR ENG

Edge collaborative point cloud data modeling and building design collaborative management method and system, electronic equipment and storage medium

The invention provides an edge-collaborative point cloud data modeling and building design collaborative management method and system, electronic equipment and a storage medium, and relates to the technical field of edge computation.The method comprises the steps that city multi-source point cloud data is collected through a mobile scanning device, and time-space reference synchronization is conducted through an edge node dynamic transmission channel to generate a unified data set; detecting terrain contour features based on the environment sudden change index, triggering to re-collect updated data and generating scene constraint parameters; density self-adaptive compression is executed, a compression data set with adjustable partition precision is generated in combination with vegetation and temporary building distribution, and spatial topological features are extracted; inputting a building rule base to start distributed collaborative optimization to generate a design model; the model boundary is compared with the topographic change, the space conflict is solved through geometric structure adjustment, the closed-loop cooperative management adaptive to the environment contour is realized, the closed-loop cooperative control of the building design and the actual topographic data can be realized, and the space conflict is effectively avoided.
Owner:中奥建工程管理有限公司

Fabricated building structure stability monitoring method and system

The invention provides a fabricated building structure stability monitoring method and system, and relates to the technical field of building safety monitoring, and the method comprises the steps: obtaining node monitoring data at a plurality of moments of a monitoring period through a sensor combination disposed at a node; acquiring real-time environment data at a plurality of moments of the monitoring period; obtaining building design information; determining a node health coefficient according to the node monitoring data; determining a dynamic node weight according to the node health coefficient, the building design information and the node monitoring data; determining an overall building stability coefficient according to the real-time environment data, the dynamic node weight and the node health coefficient; and according to the node health coefficient and the overall building stability coefficient, carrying out structural stability monitoring on the to-be-detected building. According to the invention, the health conditions of the nodes and the whole building can be monitored respectively, and the accuracy of building structure stability monitoring is improved.
Owner:GANSU BUILDING RES INST CO LTD

Digital design system for civil engineering of transformer substation based on domestic BIM (Building Information Modeling) platform

The invention provides a transformer substation civil engineering digital design system based on a domestic BIM platform, and the system comprises a building design module which is used for constructing a building professional model through employing a building component library; the general drawing design module is used for generating a general drawing professional model based on a parametric modeling technology; the water supply and drainage system digital design module is used for generating a water supply and drainage pipeline design scheme according to the water supply and drainage professional component library and determining a water supply and drainage professional model; the heating and ventilation system digital design module is used for determining the fan equipment model and the air pipe diameter according to the professional building model and determining a professional heating and ventilation model; and the multi-specialty cooperation module is used for carrying out online synchronous modification and real-time updating processing on the building specialty model, the general drawing specialty model, the water supply and drainage specialty model and the heating and ventilation specialty model. According to the method, building, general drawing, water supply and drainage and heating and ventilation multi-specialty collaborative design is achieved based on domestic BIM platform construction and through the parameterized modeling technology, and the design efficiency and the achievement standardization are improved.
Owner:STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER CO

Geological exploration drilling machine for architectural design

The invention relates to the field of geological exploration equipment, in particular to a geological exploration drilling machine for architectural design. Existing equipment is easy to fracture a soil core sample, and is easy to cause soil layer sequence disorder, so that the detection accuracy is influenced. A geological exploration drilling machine for building design comprises a movable chassis, a rotating frame installed on the movable chassis, a hydraulic push rod fixedly connected to the rotating frame and a lower moving plate fixedly connected to the hydraulic push rod. When the soil sampler is used, the five soil sampling cylinders are pushed to move by the five push rods when the push rod frame moves, the five soil sampling cylinders are pushed out of the soil sampler by the five push rods of the push rod frame, a worker pushes soil cores in the five soil sampling cylinders out of the soil sampling cylinders and sequentially puts the pushed-out soil cores into the storage box, and the soil cores can be taken out in sections, so that the taken-out soil cores are more complete; therefore, the soil core detection is more accurate.
Owner:RUGAO LAYOUT CONSTR DESIGN INST

Visual color matching method for ancient building

The invention relates to the technical field of building design, in particular to an ancient building visual color matching method, which comprises the following steps of: 1, acquiring multi-source data; step 2, color feature extraction; 3, constructing a historical color knowledge base; step 4, constructing a color matching model; and step 5, performing three-dimensional visual rendering. According to the historic building visual color matching method, qualitative analysis of'regional culture-natural environment 'is converted into quantitative collection of multispectral images and three-dimensional point clouds, and spatial accurate positioning of color features is achieved; a standardized knowledge base containing historical periods and technologies is constructed, and the fragmentation problem of traditional color matching experience is solved; through physical realistic rendering, the method is expanded to color simulation of the ancient building under different climate conditions, and the recovery credibility is improved.
Owner:SHENDU DESIGN GRP CO LTD

Building full-life-period carbon emission calculation method based on running carbon and implicit carbon

The invention relates to the technical field of building energy conservation and carbon emission, in particular to a building full-life-period carbon emission calculation method based on running carbon and implicit carbon, and the method specifically comprises the following steps: building carbon emission calculation models of a reference building and a design building; the whole life period of the building is divided into running carbon and implicit carbon; constructing a three-level index system, namely a total amount index, a strength index and a relative index; respectively calculating the emissions of operating carbon and implicit carbon of the two carbon emission calculation models; respectively carrying out carbon reduction calculation on the two carbon emission calculation models; calculating a total carbon emission amount index and an intensity index of the two carbon emission models, and further calculating a relative index; and judging whether the carbon emission of the designed building reaches the standard or not according to the third-level index result, and if not, readjusting. According to the method, a building full-life-period carbon emission calculation model containing running carbon and implicit carbon is constructed, the calculation precision is improved in combination with a three-level index system, and design optimization of zero-carbon buildings and green buildings can be assisted.
Owner:SHANDONG PROV CONSTR DESIGN & RES INST

Building emergency evacuation behavior prediction system based on emotion infection

PendingCN120633896AForecastingDesign optimisation/simulationContingency managementSimulation
The invention relates to the field of public safety, in particular to a building emergency evacuation behavior selection research method based on emotion infection. According to the method, emotional infection intensity data is obtained through a questionnaire, a hybrid selection model (HCM) considering emotional infection is constructed, and a P-SIR model combining an OCEAN model and an SIR infectious disease model is introduced to simulate the emotional infection process. Anylogic simulation software is used for carrying out a simulation experiment on path selection of evacuated people, and the influence of psychological latent variables such as emotional infection on emergency evacuation path selection is explored. According to the method, the problems that in existing research, an emotion infection model is not considered carefully, and psychological factors in a mixed selection model are not considered comprehensively are solved, the accuracy and practicability of an emergency evacuation model are improved, and theoretical support and basis are provided for an emergency management department to formulate an effective library emergency evacuation management strategy and building design specifications.
Owner:XINJIANG UNIVERSITY

Architectural design modeling method and system based on parameter entity and Boolean relationship thereof

The invention discloses a building design modeling method and system based on a parameter entity and a Boolean relationship thereof, and the method comprises the steps: converting a plurality of building components into geometric body data based on a structure shape, and abstracting a single geometric body into a whole model according to the Boolean relationship between the building components required by the design; the method specifically comprises the steps that firstly, building design related component data given by a user is preprocessed, a two-stage structure is adopted to redefine a geometry, the geometry is stored, and the Boolean relation between components is represented through a tree structure; the preprocessed data are transmitted into a grid generation solver, and a final three-dimensional model and affiliated topological information are obtained through background grid and contour surface construction, topological information integration and grid post-processing. The method can ensure that the building design modeling process has good robustness and calculation efficiency.
Owner:ZHEJIANG UNIV

BIM-based building design process dynamic management method

The invention discloses a BIM-based building design process dynamic management method, and relates to the technical field of BIM. Spatial state information of a construction task is extracted from a BIM model and is uniformly expressed as a six-dimensional space body vector TBox, standardized processing of a task geometric boundary is realized, and a task time and space three-dimensional data set Cx is generated; and the spatial evolution trend between tasks can be perceived in advance. On the basis, the system carries out space overlapping detection on any task pair in the three-dimensional data set Cx and calculates a task conflict vector CVec, whether conflicts exist or not is judged, directionality and space centralization of the conflicts are quantized by combining task path direction vectors and overlapping volume information, conflict severity index CIdx values of all the task pairs are summarized, and the conflict severity index CIdx values of all the task pairs are calculated. Dynamic judgment and optimization triggering of system-level construction risks are achieved, and building design and construction scheduling can have the capabilities of feedforward perception, self-adaptive adjustment and feedback optimization.
Owner:ANHUI HUIHE DESIGN CO LTD

Optimization method and system based on mix proportion of heavy slag water permeable brick

The invention belongs to the technical field of building design, and provides an optimization method and system based on the mix proportion of a heavy slag water permeable brick, and the method comprises the following steps: determining the mix proportion parameter of the heavy slag water permeable brick; establishing a performance data set of the heavy slag water permeable brick, and constructing a nonlinear mapping relation function between the mix proportion parameters of the heavy slag water permeable brick and the performance data set of the heavy slag water permeable brick; constructing a multi-objective function based on the nonlinear mapping relation function, establishing a multi-objective constraint condition, and constructing a multi-objective optimization data set according to the objective function and the multi-objective constraint condition; and performing weight analysis on each performance by adopting entropy weight TOPSIS, and substituting a weight value into the multi-objective optimization data set to determine an optimal mix proportion. According to the method, the RSM is combined with the NSGA-II and the entropy weight TOPSIS, so that the mix proportion is more accurate, and the adaptability is higher.
Owner:SHANDONG LIANNENG ENG CO LTD

Project working hour statistical analysis system for architectural design application behavior monitoring and algorithm analysis

The invention relates to the technical field of architectural design, in particular to an architectural design application behavior monitoring and algorithm analysis project man-hour statistical analysis system, which comprises a page behavior recording module, a task trajectory generation module, a project identifier collection module, a personnel time consumption verification module and an error offset tracking module. According to the method, a clear task execution structure is formed by extracting a task window and an operation path sequence in design software, reconstructing a task behavior chain and removing irrelevant operation content, continuous operation time periods are aggregated in combination with task affiliation information, and an accurate mapping relation between behavior data and project content is established; and matching the effective man-hour with the person in charge, collecting and comparing the effective man-hour with the person in charge, identifying a time offset section between a behavior record and declaration data, quantifying an offset rate, and judging the reasonability of man-hour declaration, thereby realizing dynamic verification and precision improvement of the corresponding relationship between man-hour distribution and tasks.
Owner:TIANHUA ARCHITECTURE DESIGN COMPANY