Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

7 results about "Project team" patented technology

A project team is a team whose members usually belong to different groups, have different functions and are assigned by the project manager to activities for the same project. A team can be divided into sub-teams according to need. Usually project teams are only used for a defined period of time. They are disbanded after the project is deemed complete. Due to the nature of the specific formation and disbandment, project teams are usually in organizations.

Software development management methods, devices, and software development systems

This application provides a software development management method, apparatus, and software development system. The method includes: a compilation step, compiling a development baseline to obtain the development baseline of the main project team and the development baseline of the collaborating project team; a merging step, merging the development baseline of the main project team and the development baseline of the collaborating project team to obtain a merged development baseline; a tracking step, tracking the development progress of the merged development baseline after a predetermined development period based on the merged development baseline, obtaining a progress tracking result; an updating step, updating the merged development baseline based on the progress tracking result, obtaining an updated merged development baseline; and a repetition step, repeating the tracking step and the updating step at least once until the software development is completed. This method solves the problem of low efficiency in software development in the prior art.
Owner:中国邮政储蓄银行股份有限公司

Construction method and system of building lifecycle database based on BIM

The application discloses a building full life cycle database construction method and system based on BIM, relates to the technical field of building cycle databases, and aims at solving the problem of poor effect of building data in the collection and management process. Through data support of the BIM model, the project team can make more wise decisions at different stages, improve the overall performance and sustainability of the project, and through the encryption transmission mechanism, the data is encrypted when being transmitted to the BIM collaborative platform and being transmitted in the platform, so that the leakage and tampering of the data in the transmission process are effectively prevented, and the security of the data is enhanced. Through the joint index and the covering index technology, quick query of multiple column conditions can be realized, diversified data retrieval requirements in business scenarios are met, invalid indexes can be found and optimized in time through regular monitoring of the use and performance of the indexes, and the storage pressure is reduced and the writing speed is improved.
Owner:JIANGSU JINGHANG ENGINEERING CONSULTING CO LTD

Automated test platform benchmark library architecture and method of use

This invention provides an automated testing platform benchmark library architecture and usage method, including an automated testing platform; the automated testing platform parses code and displays it on a webpage, enabling project team automated testing code sharing, with team members making real-time modifications and saving; the automated testing platform generates a layered automated testing framework and executes it via distributed nodes. This invention greatly simplifies user operations and reduces the cost for testers to build automated testing frameworks.
Owner:IND BANK CO +1

Methods and devices for automating batch processing in bank credit and accounting systems

This invention relates to the field of automated testing technology, and provides a method and apparatus for automated batch processing of bank credit and accounting systems. The main purpose is to facilitate project teams in using automated script execution during testing to replace manual batch processing and file handling operations in related systems. The main scheme includes: using a sampler interface to request simulated login to the accounting system and trigger the main batch processing flow of the accounting system, waiting for the batch processing to complete, and generating the end-of-day batch file corresponding to the batch processing date; remotely connecting to the credit server and deleting the old end-of-day files required for the previous batch processing stored on the credit server, then using the sampler again to remotely connect to the accounting server and remotely copy the end-of-day batch files generated by the accounting batch processing to the corresponding storage directory on the credit system server, ready for use by the credit system batch processing; using the sampler interface to request simulated login to the credit batch processing system, using the interface to trigger the end-of-day batch processing flow of the credit system, and waiting for the batch processing to succeed.
Owner:WUHAN ZBANK CO LTD

Human resource data evaluation system and method based on artificial intelligence

The invention relates to the technical field of talent data intelligent analysis and evaluation, and discloses a human resource data evaluation system and method based on artificial intelligence, and the method comprises the steps: obtaining a task description text of a target project and project resume data of candidate employees, and generating a project task semantic vector and a project experience semantic vector of each candidate employee; based on the member propagation role annotation data, counting the frequency proportion of each candidate employee serving as a blocking node and a reversing node; calculating the similarity between the project task semantic vector and the project experience semantic vector of each candidate employee, and generating a skill matching degree score of each candidate employee; and performing weighted combination on the skill matching degree score and the risk immunity index according to the risk weight coefficient of the target project to generate a candidate comprehensive sorting list and a project team configuration recommendation scheme. The technical problems of inaccurate skill matching and insufficient anti-risk capability in high-risk project team configuration are solved.
Owner:吉林省天地企业管理咨询有限公司

Communication evaluation system, communication evaluation method, and program

PCT designated stageWO2026176913A1Data packEngineering
A communication evaluation system according to the present disclosure comprises: an acquisition unit that, in bidirectional communication performed between a plurality of users belonging to a project team, acquires reaction data, which is data including content of a reaction performed by another user with respect to an action of a user; an evaluation unit that evaluates a degree of fulfillment of the communication between the plurality of users on the basis of at least the reaction data; and an output unit that outputs the evaluation of the degree of fulfillment by the evaluation unit.
Owner:NEC CORP

An engineering collaborative design management and control method and system based on digital twinning

The application discloses an engineering collaborative design management and control method and system based on digital twinning, relates to the technical field of digital twinning, and comprises the following steps: based on a collaborative management matrix, presenting project design in a digital twinning model through a virtual reality environment, and performing interactive design review and optimization to generate an optimized design scheme; based on the optimized design scheme, a project team arranges task execution according to design progress to generate task execution plans and resource scheduling data; monitoring actual execution of the task execution plans and the resource scheduling data, analyzing execution deviation, performing quality control, and generating a quality control report; and automatically generating the task execution plans and the resource scheduling data, which not only improves design quality and project management efficiency, but also enhances flexibility and real-time performance in a project execution process.
Owner:CHANGCHUN GOLD DESIGN INST