Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

125 results about "Development plan" patented technology

A development plan is an aspect of town and country planning in the United Kingdom comprising a set of documents that set out the local authority's policies and proposals for the development and use of land in their area. The development plan guides and shapes day-to-day decisions as to whether or not planning permission should be granted, under the system known as development control or development management in Scotland. In order to ensure that these decisions are rational and consistent, they must be considered against the development plan adopted by the authority, after public consultation and having proper regard for other material factors.

Integrated reservoir optimization

A method of managing a fluid or gas reservoir is disclosed which assimilates diverse data having different acquisition time scales and spatial scales of coverage for iteratively producing a reservoir development plan that is used for optimizing an overall performance of a reservoir. The method includes: (a) generating an initial reservoir characterization, (b) from the initial reservoir characterization, generating an initial reservoir development plan, (c) when the reservoir development plan is generated, incrementally advancing and generating a capital spending program, (d) when the capital spending program is generated, monitoring a performance of the reservoir by acquiring high rate monitor data from a first set of data measurements taken in the reservoir and using the high rate monitor data to perform well-regional and field-reservoir evaluations, (e) further monitoring the performance of the reservoir by acquiring low rate monitor data from a second set of data measurements taken in the reservoir, (f) assimilating together the high rate monitor data and the low rate monitor data, (g) from the high rate monitor data and the low rate monitor data, determining when it is necessary to update the initial reservoir development plan to produce a newly updated reservoir development plan, (h) when necessary, updating the initial reservoir development plan to produce the newly updated reservoir development plan, and (i) when the newly updated reservoir development plan is produced, repeating steps (c) through (h). A detailed disclosure is provided herein relating to the step (a) for generating the initial reservoir characterization and the step (b) for generating the initial reservoir development plan.
Owner:SCHLUMBERGER TECH CORP

Computer-implemented apparatus and method for capturing and monitoring employee development and performance in a call center

InactiveUS20070050238A1Easy accessEncourage employee developmentHardware monitoringOffice automationRelational databaseMilestone
An interactive computer-implemented apparatus and method for capturing and monitoring performance in a call center, and for promoting competition in productivity and quality metrics among employees comprising: a relational database, for use by all employees in the call center, comprising a competencies module defining competency requirements for each job in the call center, an individual employee development plan module linked to the competencies module a performance appraisal module for automatically calculating an overall performance rating for each employee, and a query and reporting facility, a database of employee demographic information, functional knowledge database comprising pre-defined employee functional knowledge elements required across all job codes of the call center organization; a competencies database comprising the organization's pre-defined employee competencies, the competencies linked to strategic goals of the call center organization, each competency assigned one or more proficiency levels, each proficiency level comprising one or pre-defined milestones, each job code assigned a targeted competency proficiency level; a development plan database for capture of employee-inputted development goals for one or more competencies, development goals selected from milestones per the competencies database, the selected development goals reviewed by a supervisor; a performance appraisal database for capture of the employee's supervisor-inputted performance ratings for a specified period, the performance ratings comprising distinct components of quality, productivity, and behavior, the behavior component further comprising a development rating, the development rating based on the employee's attainment of one or more employee's development goals per the development plan database, the rating for each component assigned a weight, the weight being a percentage of the maximum merit increase rate, the overall performance rating being the sum of the performance ratings for each component, the overall performance rating used to calculate the employee's merit increase, a periodic performance review database for capture of supervisor-inputted information from periodic performance reviews held with an employee, and a reports facility comprising instructions enabling administrators, employees, and supervisors to query one or more databases, the reports facility generating viewable and printable reports on-demand.
Owner:CARR MICHAEL +3

System and method for optimizing product development portfolios and integrating product strategy with brand strategy

A business and software method to cost-effectively optimize product and/or service development portfolios, to reduce time to market, and to better integrate and align product or service strategy with brand strategy. The business and software method includes defining in detail the product and service attributes that characterize the ideal customer experience, categorizing the attributes, assigning a numerical value of importance to the attributes, and applying those values to statistical analysis of each assessed product development initiative in terms of alignment with ideal experience and potential competitive impact relative to the resources and risks required to bring each initiative to market. A prioritization for product development resource allocation is developed based upon these analyses. The prioritization is presented in the form of decision intelligence tools for an organization to use and reach informed judgments concerning resource allocation to develop, maintain, or optimize a given product or service portfolio. The decision intelligence tools serve to improve business performance, increase market impact, and build brand equity for products and services of a given organization by improving alignment between what the organization promises customers and what it actually delivers.
Owner:CRISTOL STEVEN M

Method, system, base station and terminal for transmitting upstream detection pilot frequency

The invention discloses a method, system, base station and terminal for transmitting ascending detecting pilot frequency. The method is applied in long term development plan, which includes: transmitting ascending detecting pilot frequency scheduling signaling to terminals; the terminals transmitting the ascending detecting pilot frequency according to the indication in the ascending detecting pilot frequency scheduling signaling. The ascending detecting pilot frequency scheduling signaling includes assembly of one or a plurality of transmitting starting time, transmitting cycles, duration time, sub-carrier numbers, time slot number, long block number, frequency band and the like indication information of the ascending detecting pilot frequency. Use of the invention, can dynamically schedule the terminal for transmitting the ascending detecting pilot frequency, and gives out a scheme for carrying ascending detecting pilot frequency scheduling signaling, and also gives out a scheme for determining the position of the sub-frame the ascending detecting pilot frequency locates, so that the position of the sub-frame the ascending detecting pilot frequency locates can furthermore accurately reflect the channel situation of the ascending / descending process according to the ascending detecting pilot frequency.
Owner:DATANG MOBILE COMM EQUIP CO LTD

Seismic recognition method of low-order strike-slip faults in complex structural areas

The invention belongs to the petroleum exploration field and relates to a seismic recognition method of low-order strike-slip faults in complex structural areas. The seismic recognition method of the low-order strike-slip faults in the complex structural areas includes the following steps that: post-stack seismic data quality is analyzed; processing is carried out to obtain an advantageous frequency division phase band; processing is carried out to obtain Sobel operators in main directions; processing is carried out to Sobel operators in arbitrary directions; a multi-direction lower-order strike-slip fault system is extracted; and the reliability of the low-order strike-slip faults is verified. The method of the invention is suitable for seismic recognition and verification reliability of lower-order strike slip faults in any complex structural belts and can directly reflect the combination modes and spatial locations of lower-order strike-slip faults on a plane; and the method is an effective measure to determine low-order hidden faults in low signal-to-noise ratio and low-frequency seismic data areas and can provide an important basis for re-understanding of hidden fault oil control rules, reservation and production improvement, development plan deployment and adjustment in complex structural oil and gas fields or fault block oil and gas fields.
Owner:CHINA UNIV OF PETROLEUM (EAST CHINA)

Energy power planning method suitable for development of high-proportion renewable energy

InactiveCN107591830AAid in scientific decision-makingMeet the research needs of multi-regional interconnection development planningSingle network parallel feeding arrangementsEnergy storageEngineeringPower planning
The invention relates to the field of energy power planning and discloses an energy power planning method suitable for development of high-proportion renewable energy. The method comprises the following steps of obtaining related data of current situation and development of a power supply, related data of current situation and development of a power grid, related data of generation energy resourceendowment and related data of an energy power development policy, obtaining maximum load data in a planning period, and obtaining a wind speed, illumination intensity and annual hourly load data in the planning period; building a wind-light load joint scene set through clustering; building a multi-regional and multi-scene energy power development planning model; solving the planning model; and determining power supply construction, a power flow scheme and run statistics. According to the energy power planning method, on the basis of a multi-regional and multi-scene research idea, the multi-regional interconnection development planning research requirements can be met; moderate coupling of energy power planning and operation can also be met through a multi-scene mode; the development planning research practicality of high-proportion renewable energy power is improved; and scientific decision-making of the energy power development department is facilitated.
Owner:STATE GRID ENERGY RES INST

Systems, program products, and methods of human resource planning and development

InactiveUS20060184484A1Enhance supervisor and mentor and individual employee review and feedbackSimple methodResourcesSpecial data processing applicationsResource informationNetwork communication
Systems, program products, and methods of human resources planning and development are provided. An embodiment of a system includes a first computer defining a server adapted to be in communication with a communication network and having a human resource database associated therewith, a plurality of client computers each adapted to interface with a user and a communication network remote from the server, and a computer medium associated with the server and having program code responsive to preselected manning assumptions to process human resource information from the human resource database for predicting a future number of employees desired within the organization for a preselected period of time to thereby define a human resource manning plan, program code responsive to preselected employment development assumptions to process the human resource information for assigning a plurality of employment development activities to each of a plurality of participating employees in the organization to thereby define an employment development plan for each participating employee, and program code responsive to information generated by the employment development plan to revise the human resources manning plan and responsive to revisions in the human resources manning plan to revise the employment development plan.
Owner:SAUDI ARABIAN OIL CO

Method for improving oil reservoir exploitation effect by utilizing discrete fracture endpoint deformation numerical simulation

The invention discloses a method for improving an oil reservoir exploitation effect by utilizing discrete fracture endpoint deformation numerical simulation. The method comprises the following steps of dividing an oil reservoir storage body into a continuous medium and a discrete medium according to a characteristic scale; deforming the end part of a discrete fracture from a square shape into a pointed shape to eliminate tiny grids, establishing rock stratum surface grids, and establishing three-dimensional oil reservoir grids; inputting measured oil reservoir parameters such as porosity, permeability and water saturation into a simulator, wherein a real value rather than a grid display value is used for the width of the discrete fracture; correcting the oil reservoir parameters by using a history matching method; and measuring and calculating the well productivity, residual oil and gas reserves and the distribution positions of residual oil and gas, and making a subsequent oil reservoir exploitation plan. According to the method, a discrete fracture numerical simulator can be prevented from measurement and calculation interruption and failures, the whole links of oil reservoir exploitation can be actually measured and calculated to improve the measurement and calculation accuracy of the well productivity and the residual oil and gas distribution of an oil reservoir, and a more effective development plan can be made to improve the oil reservoir exploitation effect.
Owner:SOUTHWEST PETROLEUM UNIV +1

Atmospheric environment capacity calculation method

The invention provides an atmospheric environment capacity calculation method. The method comprises the following steps of: setting a staged environment protection target; setting different emission reduction situations by taking a fact that a pollutant environment concentration achieves the staged environment protection target as a constraint condition and combining a total pollutant amount emission reduction index requirement; carrying out environment effect simulation by utilizing an air quality model and a receptor model; and calculating a permissible total emission amount of atmospheric pollutants which satisfy an environment quality target and a total emission reduction amount index. The method has the beneficial effects of comprehensively considering dynamic changes of factors suchas meteorological resources of different seasons, production characteristics and pollution source emission manners of various industries and future development plans so as to realize optimal configuration of atmospheric environment capacity resources, determining that emission performance standards of various industries can represent the present advanced technological level so as to urge process reform and develop in the direction of energy-saving, low-emission and clean production, and considering source control and end treatment of pollutants so as to provide economic and technological feasibility and operability on the basis of satisfying environmental objectives.
Owner:NANKAI UNIV +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products