Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

213 results about "Power planning" patented technology

Power planning is a step which typically is done with floorplanning in which power grid network is created to distribute power to each part of the design equally. •Power planning can be done manually as well as automatically through the tool. •Deal with Power Distribution Network.

Charging pile power regulation and control method and system

The invention discloses a charging pile power regulation and control method and system, and relates to the technical field of charging pile power regulation and control. Obtaining an estimated power interaction size time sequence of each charging pile in the current interaction period and an estimated power grid load power time sequence of the charging station in the current interaction period; presetting a time scale, dividing the current interaction period into a plurality of time slices, performing state division on the plurality of time slices, and performing power planning operation of the current interaction period of the charging station according to a state division result; a real-time power grid load power sequential sequence and a real-time power interaction magnitude sequential sequence in each time slice of a current interaction period are monitored in real time, model updating, quick response power regulation and control of a plurality of charging piles or monitoring of an energy storage battery pack of a charging station are performed based on a real-time monitoring result, and the accuracy and real-time performance of power regulation and control of the charging piles are ensured.
Owner:江西驴充充物联网科技有限公司

Regional power grid layout planning system, storage medium and computer equipment

The invention discloses a regional power grid layout planning system, a storage medium and computer equipment wherein the regional power grid layout planning system is realized based on a three-dimensional geographic information model and a territorial space information model. Comprising a transformer substation site selection planning plate used for selecting a site meeting given conditions, technical rules and policies and regulations in a given area, and a power transmission line path planning plate used for planning a reasonable path scheme according to a line rule on the basis of a given line starting point and a given line ending point in a planning area. And the regional power grid layout planning system platform plate is used for solving the problems that planning data models and attributes formed in each specialty and each technical process in the spatial layout service of the electric power facilities in the regional power grid are not uniform, data is distorted and results are difficult to share. Through regional power grid layout optimization technology research, effective landing of power planning can be guaranteed, uncertain factors of engineering construction are reduced, construction coordination difficulty is reduced, and source-grid-load-storage coordination development is promoted.
Owner:CHINA ENERGY CONSTR GRP SHAANXI ELECTRIC POWER DESIGN INST CO LTD +1

Novel power system control method with participation of new energy

The invention relates to the technical field of power system control, in particular to a novel power system control method with participation of new energy. The method comprises the following steps: acquiring historical and predicted environmental data, power consumption data and power supply quantity data; determining a stability coefficient according to the numerical fluctuation of the power supply quantity data and the correlation of the environmental data; determining a predicted power supply accuracy index in combination with the numerical fluctuation of the predicted power supply quantity data; determining a historical power consumption influence coefficient according to the numerical value change of the historical power consumption data; determining a power storage reliability index at the current moment by combining the numerical fluctuation of the predicted power consumption data in the prediction time period; and performing new energy access control at the current moment according to the power storage reliability index and the predicted power supply accuracy index. The stability of power consumption and power supply can be effectively combined, so that stable control of the whole power system is ensured, and the stability of power planning of the power system is improved.
Owner:MARKETING SERVICE CENT OF STATE GRID HEILONGJIANG ELECTRIC POWER CO LTD

New energy medium and long term stochastic programming method and system coupled with electro-hydrogen water regulation power supply

The invention discloses a new energy medium and long term stochastic programming method and system coupled with an electro-hydrogen water regulation power supply, and the method comprises the steps: building a power supply planning model with the minimum planning operation cost as an optimization target; bringing the new energy power supply and energy storage adjusting equipment operation model and the new energy consumption rate upper and lower limit constraint expression into a power supply planning model; in consideration of the randomness of fluctuation at two sides of a source and a load in power supply planning, based on the obtained power system operation scene set S and the power supply planning model, dividing into an investment decision-making layer and an operation simulation layer according to a time period influenced by a decision, and constructing a power supply planning two-stage stochastic optimization model based on a typical scene; and solving the power supply planning two-stage stochastic optimization model under a medium and long term planning framework, and determining the investment planning installed capacity of the adjusting power supply and the new energy in the planning level year. According to the invention, economy of medium and long term planning and power supply capacity configuration of new energy can be improved, and reasonable consumption and flexible adjustment of new energy electric power are promoted.
Owner:NORTH CHINA BRANCH OF STATE GRID CORPORATION OF CHINA +1

Heterogeneous computing power unified scheduling method and system based on global planning

The invention provides a heterogeneous computing power unified scheduling method and system based on global planning. The method comprises the following steps: acquiring heterogeneous computing power equipment information; establishing a global computing power planning model; dynamically monitoring and identifying the equipment state; application state tracking and resource scheduling; optimizing node and equipment selection; mounting a device file and a drive directory; multi-dimensional computing power use monitoring is carried out; and calculating power uses rationality evaluation and exception handling. Through prospective systematic global computing power planning design, an agile and rigorous heterogeneous computing power unified scheduling process is constructed, intelligent sensing and accurate scheduling of various heterogeneous computing power are realized, multi-dimensional heterogeneous computing power resource monitoring capability is provided, accurate evaluation of computing power use rationality is powerfully supported, and the computing power utilization efficiency is improved. Complex and changeable computing power application scenes are better met, and the heterogeneous computing power utilization rate and productivity are effectively promoted.
Owner:WHALE CLOUD TECH CO LTD

Charging pile power distribution method and system based on dynamic load balancing

The invention provides a charging pile power distribution method and system based on dynamic load balancing, and the method comprises the following steps: obtaining the local state information of each charging pile, the state information at least comprises the charging queuing length, the current vehicle charge state, the current load power, the battery health state, the predicted residence time, the electricity price information and the power grid load state; based on the historical charging behavior, the electricity price fluctuation and the traffic flow data, the vehicle access frequency, the electricity price trend and the power demand of each charging pile in the future time period are predicted through a time sequence neural network; a prediction model is constructed; according to the method, forward-looking power planning is realized by entering a multi-dimensional prediction mechanism; the power distribution efficiency is improved by adopting a local collaborative game; the self-adaption and generalization ability is realized through reinforcement learning, and the robustness of a scheduling strategy in multiple scenes is enhanced; through a multi-target scheduling index, the electricity price, the battery life, the waiting time and the power grid load are optimized at the same time.
Owner:JIANGSU ZHUOYUE ENERGY STORAGE TECHNOLOGY CO LTD

Electric power planning method for wind power participating in electric energy market in consideration of uncertainty

The invention relates to an electric power planning method and device for wind power participating in an electric energy market in consideration of uncertainty, computer equipment, a computer readable storage medium and a computer program product. The method comprises the steps of obtaining a price difference contract price of a wind power plant, kilowatt-hour consumption resources of the wind power plant, wind power prediction power in a preset time period and a target wind power output scene, wherein the target wind power scene is used for representing uncertainty of wind power output in the preset time period; according to the price difference contract price, the kilowatt-hour electricity consumption resource, the wind power prediction power and the target wind power output scene, a wind power plant electric power planning model is determined, and the wind power plant electric power planning model is a double-layer planning model; determining the price difference contract coverage rate of the wind power plant according to the wind power plant power planning model; and determining a power planning strategy of the wind power plant based on the price difference contract coverage rate. By adopting the method, the reliability of the power planning strategy can be improved.
Owner:YUNNAN POWER GRID CO LTD +1

New energy capacity confidence evaluation method based on conditional denoising diffusion model

The invention discloses a new energy capacity confidence evaluation method based on a conditional denoising diffusion model, and belongs to the field of reliability analysis and power supply planning of a power system. According to the technical scheme, wind power data and photovoltaic power data serve as input samples, firstly, a noise prediction network is trained, a conditional denoising diffusion model is constructed based on the noise prediction network, then the samples are preprocessed and modeled, and effective information in the samples is reserved; then, according to a label vector of a given scene and pure noise data, a scene set of a new energy power curve with specific characteristics is generated through a condition denoising diffusion model which is trained through reasoning; and finally, based on the scene set of the power supply installed capacity, the fault rate parameter, the historical load curve and the new energy power curve of the power grid system, evaluating the capacity confidence after the new energy accesses the power grid system through a power generation side COPT convolution method. The power supply guarantee capability of the new energy system is accurately quantified, so that guarantee is provided for safe operation of a power system.
Owner:ZHEJIANG UNIV

High-voltage distribution network reactive power planning method and system based on improved particle swarm optimization

The invention particularly relates to a high-voltage distribution network reactive power planning method and system based on an improved particle swarm optimization algorithm, and the method comprises the steps: determining a target function of a high-voltage distribution network reactive power planning model; setting constraint conditions and related variables; a particle swarm algorithm is used as a reference algorithm, an improved particle swarm algorithm is adopted to optimize the reactive power planning model of the high-voltage distribution network, and the improved particle swarm algorithm comprises the step of introducing a self-adaptive adjustment strategy on an inertia weight and an acceleration factor; initializing related parameters in the particle swarm optimization; performing iterative calculation, updating the adaptive value, the individual optimal value and the global optimal value of each particle and the speed and the position of the particle to judge whether the maximum number of iterations is reached or not, and if the maximum number of iterations is reached, stopping iteration and outputting an optimal solution; and if the maximum number of iterations is not reached, continuing the iterative operation. According to the method, reactive power distribution can be optimized, network loss and operation cost are remarkably reduced, and reactive power optimization of the high-voltage power distribution network is more efficient and reliable.
Owner:STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER CO

Grid-connected detection method and device of AC / DC power distribution system, medium and product

The invention discloses a grid-connected detection method, device, medium and product for an AC / DC power distribution system, and the method comprises the steps: building a power flow model of the AC / DC power distribution system before grid connection of a distributed power supply, obtaining a time sequence power flow result according to the power flow model, carrying out the reliability calculation of the AC / DC power distribution system, and obtaining a reliability calculation index, and according to the time sequence power flow result and the reliability calculation index, constructing a comprehensive performance index of the AC / DC power distribution system, and according to the comprehensive performance index, generating operation state information of the AC / DC power distribution system for distributed power supply grid connection. According to the operation state information, weak links needing to be transformed of the AC / DC power distribution system can be determined, technical support and guidance can be provided for a distributed power supply grid connection strategy, and safe and reliable operation of the AC / DC power distribution system can be promoted. By optimizing scheduling and power supply planning, the operation efficiency of the AC / DC power distribution system can be improved, the operation cost can be reduced, and the accuracy of grid-connected detection of the AC / DC power distribution system can be improved.
Owner:GUANGDONG POWER GRID CO LTD +1

Sagomean new energy base source network direct current storage planning and parameter optimization method

The invention relates to the technical field of new energy power supply, and particularly discloses a Saggoga new energy base source network direct current storage planning and parameter optimization method, which comprises the following steps: analyzing wind and light output characteristics by adopting Gaussian kernel density estimation according to annual wind and light historical data of desert and gobi desert areas; generating a wind and light output scene according to the obtained probability distribution function, and performing k-medoids clustering to obtain a wind and light typical day scene; establishing a power supply planning and operation simulation model of the new energy base of Sagomean, simulating and generating a power supply capacity planning scheme and a daily simulation running diagram, and performing clustering analysis on core parameters of different schemes by k-means clustering; and formulating technical wind and light absorption and carbon emission indexes, analyzing whether the indexes under different planning operation schemes meet requirements or not, and repeatedly iterating the step 3 to obtain an optimal planning scheme and a parameter result. The method has the advantages that the targets of low-carbon environmental protection, wind and light absorption and the like are considered in parameter optimization, and the new energy utilization rate is improved and the pollution to the environment is reduced on the premise of ensuring that the investment cost of a new energy base is low.
Owner:SICHUAN ENERGY INTERNET RES INST TSINGHUA UNIV +2

Multi-scene coupled extreme weather adaptive power system planning method and system

The invention discloses a multi-scene coupled extreme weather adaptive power system planning method and system, belongs to the technical field of power system planning, and aims to solve the problem that traditional planning does not fully consider extreme weather influence and does not integrate multi-energy complementarity. Comprising the steps of collecting installed capacity, historical weather and power load data of a power grid unit; a conventional weather scene set is generated through clustering by adopting a kmeans algorithm, and an extreme weather scene set is generated in combination with types of extreme high temperature, cold waves and the like; constructing operation models and policy constraints of the thermal power unit, the new energy unit and the electrochemical energy storage unit; based on the planning-operation coupling framework, establishing a two-stage stochastic programming model with the goal of minimizing the total investment and operation cost; and integrating the multi-scene solving model, and outputting an adjustment power supply planning scheme. Through multi-scene coupling and two-stage optimization, planning and operation collaboration is realized, the economy, safety and adaptability of the power system in extreme weather are improved, and technical support is provided for low-carbon transformation.
Owner:NORTH CHINA BRANCH OF STATE GRID CORPORATION OF CHINA +1

Control method and system of car light storage and charging system and electronic equipment

The invention relates to a control method and system of a car home light storage and charging system and electronic equipment, and is applied to the technical field of vehicles, and the method comprises the steps that comprehensive energy data of the car home light storage and charging system are acquired, the car home light storage and charging system comprises multiple pieces of power equipment, and the power equipment comprises an inverter and a vehicle; according to the comprehensive energy data, determining an energy management strategy of the vehicle home light storage and charging system, wherein the energy management strategy is used for indicating the adjustment condition of the charging and discharging power of each device in the vehicle home light storage and charging system; obtaining an electric power planning strategy sent by the vehicle, wherein the electric power planning strategy is used for indicating the power utilization planning condition of each device in the vehicle home light storage and charging system; and based on the energy management strategy and the power planning strategy, controlling each power device in the car home light storage and charging system.
Owner:RADAR NEW ENERGY AUTOMOBILE (ZHEJIANG) CO LTD +1

New energy station transformation and multi-type power supply collaborative optimization method, system, equipment and medium

The invention relates to the technical field of new energy station transformation and multi-type power supply collaborative optimization, and discloses a new energy station transformation and multi-type power supply collaborative optimization method, system and device and a medium, and the method comprises the steps: obtaining a power system target parameter, and building and solving a first power supply planning model; preset disturbance is applied to the model, and frequency safety is checked. If not, adding system parameters and obtaining sensitivity cut constraints, and rebuilding and solving the model according to the system parameters and the sensitivity cut constraints. And after the conditions are met, outputting an optimization scheme. According to the method, the efficiency of a new energy station is improved, multi-power-supply collaborative optimization is realized, and the stability and reliability of a power system are enhanced. A power system is optimized in a targeted manner by accurately acquiring target parameters and establishing a first power supply planning model. And the model is solved and preset disturbance is configured, so that the frequency safety problem can be found and solved in time. In addition, by adding system parameters and obtaining sensitivity cut constraints, the scheme can be further refined and optimized, and accuracy and efficiency are improved.
Owner:GUIZHOU POWER GRID CO LTD

Energy storage system benefit evaluation method considering new energy output uncertainty

The invention discloses an energy storage system benefit evaluation method considering new energy output uncertainty, and the method comprises the steps: describing a low-carbon performance index through employing CO2 emission, SO2 emission and a system coal consumption index, and describing an economic performance index through employing system global operation cost; and the reliability index is described by adopting the expected insufficient power supply quantity, the expected power failure duration and the system power reserve rate. The method comprises the following steps: under the condition of constructing low-carbon-economic-reliability operation indexes of an energy storage system, determining an operation objective function of the energy storage system by adopting the minimum global operation cost of the system, formulating constraint conditions including operation of multiple types of units and systems, and determining an influence mechanism of the energy storage system; and on the basis of the established model, configuring an energy storage system on a power grid side by adopting a power planning decision and evaluation system, and establishing and solving a low-carbon-economy-reliability benefit evaluation model of the energy storage system by taking the capacity of the energy storage system as an analysis variable. And reference is provided for consumption of renewable energy sources and construction of a novel power system.
Owner:HUANENG POWER INTERNATIONAL INC ANHUI WIND POWER BRANCH

Energy management method and system for green electricity hydrogen production and hydrogenation all-in-one machine

The invention relates to an energy management method and system for a green electricity hydrogen production and hydrogenation all-in-one machine, and relates to the technical field of hydrogen energy application, the system comprises an upper layer control system and a communication interface module, collaborative optimization scheduling is executed in the day-ahead stage, the rolling stage and the real-time stage; the communication interface module supports IEC104, private UDP and other industrial protocols, and realizes real-time data interaction with a green electricity prediction system and a hydrogen production DCS system. The method comprises the following steps: making an electrolytic cell start-stop and power plan in a day-ahead stage; periodically correcting prediction and demand errors in a rolling stage; the power of the electrolytic cell is dynamically adjusted to fluctuate along with green electricity in the real-time stage. According to the invention, cross-section and multi-time scale coordination control is realized, and the green power consumption rate, the system operation economy and the hydrogen energy supply reliability are improved.
Owner:DALIAN INSTITUTE OF CHEMICAL PHYSICS CHINESE ACADEMY OF SCIENCES

Multi-region asynchronous interconnected power grid planning method and system considering frequency security constraint

The invention provides a multi-region asynchronous interconnected power grid planning method and system considering frequency security constraints. The method comprises the steps of obtaining frequency response characteristic related parameters and frequency deviations of alternating current power grids in all regions of a power system; according to the frequency response characteristic related parameters and the frequency deviation of the AC power grid in each region of the power system, determining the frequency safety constraint of the AC power grid in each region under the DC fault; and constructing a multi-region asynchronous interconnected power grid direct current and power supply planning model considering the frequency safety constraint by taking the frequency safety constraint of the alternating current power grid of each region under the direct current fault as a constraint condition, and carrying out optimization solution on the planning model by utilizing a GUROBI optimizer to obtain a direct current and power supply planning scheme of the asynchronous interconnected power grid of each region of the power system. According to the technical scheme, it can be effectively guaranteed that the direct current and power source planning scheme of the multi-region asynchronous power grid interconnected power grid meets the frequency safety requirement under high-proportion new energy access, and decision support is provided for power system planning.
Owner:TSINGHUA UNIVERSITY

Chip design method, device and medium

The invention discloses a chip design method, chip design equipment and a medium, and relates to the technical field of chips, during chip design, a target module in a chip is firstly determined, power supply planning of the target module is independently adjusted to avoid the influence of voltage drop on crosstalk when the wiring density is too large, crosstalk prevention is started in advance in the power supply planning stage, and the crosstalk is prevented from being damaged. After the layout and wiring design of the chip is carried out according to the power supply plan and the module layout, the crosstalk condition existing in the chip is directly analyzed, and if the crosstalk occurs in a target module, a mode of enlarging the layout space of the target module is adopted to cope with the crosstalk; if crosstalk occurs in other modules, a mode of adjusting electrical parameters of a signal line is adopted to cope with the crosstalk. Crosstalk prevention is carried out in the chip design stage, and different response modes are adopted according to different areas where crosstalk is located, so that the influence of crosstalk on normal working of the chip is avoided, and the accuracy and stability of the chip during working are improved.
Owner:SHANDONG BOSUAN ZHIXIN INFORMATION TECHNOLOGY CO LTD

Port distributed power supply planning method and system based on improved Pedal optimization algorithm

The invention discloses a port distributed power supply planning method and system based on an improved Pedal optimization algorithm, and the method comprises the steps: constructing a photovoltaic power generation model and a wind power generation model, and converting the wind speed and illumination intensity of a typical wind and light time sequence scene in each season into the time sequence output power of a distributed power supply; constructing a distributed power supply planning model based on the annual comprehensive cost objective function, the annual total voltage deviation objective function and constraint conditions of the distributed power supply multi-objective planning model; performing performance improvement on the Pedal optimization algorithm to obtain an improved Pedal optimization algorithm; and solving the distributed power supply planning model based on an improved Pedal optimization algorithm to obtain an optimal planning result of the port distributed power supply. According to the method, the overall economic benefit of the power system is remarkably improved, the operation cost is reduced by optimizing resource allocation, effective utilization of green energy is promoted, and the active loss of the system is successfully reduced by optimizing the layout and operation strategy of the distributed power supply.
Owner:TIANJIN RES INST FOR WATER TRANSPORT ENG M O T

Electric power planning sandbox platform and information processing method thereof

The invention relates to the technical field of electric power planning, and particularly discloses an electric power planning sandbox platform which comprises a data acquisition and integration module, a model establishment and simulation module, an information processing and analysis module, a decision support and strategy evaluation module, a visualization and report module and a continuous optimization and update module. The invention discloses an electric power planning sandbox platform information processing method. The processing method comprises the following steps: acquiring and integrating relevant data of an electric power system; establishing a simulation model of the power system; the simulation of the power system model is operated, and a simulation result is analyzed; evaluating the influence of different policies on the power system, and optimizing the operation strategy of the power system according to the analysis result; user feedback and actual operation data are collected, and the performance and user experience of the power planning sandbox platform are optimized. Through the established optimization model, the electric field model can be optimized in real time, so that the data processing efficiency is higher, and the use effect of the platform is improved.
Owner:武汉华源电力设计院有限公司

Novel power system multi-dimensional support demand index evaluation method and system

The invention discloses a novel electric power system multi-dimensional support demand index evaluation method and system, and belongs to the field of electric power system demand estimation, and the method comprises the steps: analyzing the net load data condition of an electric power system based on system load data and new energy output data; screening extreme weather new energy continuous low output data according to the new energy output data based on the power system net load data condition, determining the time slice of the extreme weather, and obtaining the net load data of the extreme weather period; and determining a support demand index in the time sequence based on the extreme weather period net load data and the total time sequence net load data, and carrying out support planning on the novel power system power supply. According to the method, a multi-dimensional supporting index system of the supporting power supply is more comprehensively constructed, and a reference basis is provided for novel power system supporting power supply planning.
Owner:STATE GRID FUJIAN POWER ELECTRIC CO ECONOMIC RESEARCH INSTITUTE +2

Distribution network resource optimization configuration method and system based on artificial intelligence

The present invention provides a method and system for optimizing the configuration of distribution network resources based on artificial intelligence. It relates to data processing technology, and the method includes: establishing a virtual network corresponding to the distribution network based on digital twin technology, obtaining the power planning starting point and the power planning ending point selected by the resource configuration end; determining the initial planning route composed of the power planning starting point and the ending point, and performing corridor interception on the virtual corridor based on the relative position relationship between the initial planning route and the virtual corridor to obtain the corridor planning section; segmenting the corridor planning section, and updating the route of the initial planning route based on each divided sub-segment of the corresponding idle attribute to obtain the current planning route; configuring route temperature control, and sending circuit resource optimization data to the resource configuration end; in response to receiving the configuration completion signal sent by the resource configuration end, obtaining temperature monitoring data, and updating the operation status of the current planning route in the virtual network. The present invention at least improves the planning efficiency.
Owner:STATE GRID ZHEJIANG ELECTRIC POWER COMPANY TAIZHOU POWER SUPPLY

Virtual power plant energy supply and demand accurate matching method and system based on AI

The invention relates to the technical field of power planning, provides an AI-based virtual power plant energy supply and demand accurate matching method and system, and solves the problems of low accuracy of virtual power plant energy supply and demand matching and low overall operation efficiency. The method comprises the following steps: acquiring an output data sequence of power supply equipment in a virtual power plant and an electricity price data sequence of an electricity market; dynamically adjusting the initial charging and discharging power of the energy storage equipment in the virtual power plant to obtain target charging and discharging power; carrying out fusion optimization on the load prediction model of each energy participation node in the virtual power plant by using a federated learning mode, and generating a global demand adjustment plan; generating a power dispatching plan based on the output data sequence and the electricity price data sequence; and the power dispatching plan and the global demand adjustment plan cooperatively act on energy supply and demand matching of the virtual power plant, and AI-based accurate energy supply and demand matching of the virtual power plant is realized. According to the invention, the accuracy of energy supply and demand matching of the virtual power plant and the overall operation efficiency are improved.
Owner:BEIJING LUOHE TECH CO LTD

Distribution network resource optimal configuration method and system based on artificial intelligence

ActiveCN119090248A
The invention provides a distribution network resource optimal configuration method and system based on artificial intelligence. The method comprises the following steps: establishing a virtual network corresponding to a power distribution network based on a digital twin technology, and obtaining a power planning starting point and a power planning ending point selected by a resource configuration end; determining an initial planning route composed of an electric power planning starting point and an electric power planning ending point, and performing corridor interception on the virtual corridor based on a relative position relation between the initial planning route and the virtual corridor to obtain a corridor planning section; segmenting the corridor planning section, and performing route updating on the initial planning route based on the obtained divided sub-sections corresponding to the idle attributes to obtain a current planning route; configuring route temperature control, and sending the circuit resource optimization data to a resource configuration end; and in response to receiving a configuration completion signal sent by the resource configuration end, acquiring temperature monitoring data, and updating the running state of the current planning route in the virtual network. The method at least improves the planning efficiency.
Owner:STATE GRID ZHEJIANG ELECTRIC POWER COMPANY TAIZHOU POWER SUPPLY

Power grid investment optimization method based on big data analysis

The invention relates to the technical field of power grid investment optimization, and particularly discloses a power grid investment optimization method based on big data analysis, and the method comprises the steps: carrying out the monitoring and processing of meteorological data of a power planning region, and obtaining a new energy station generating capacity time sequence function of the power planning region; the demand load is predicted according to the historical load data of the power planning area, and energy storage system demand construction scale data of the power planning area is obtained through comprehensive analysis; obtaining new energy vehicle use data of the power planning area, and performing comprehensive analysis to obtain a virtual energy storage compensation parameter of the power planning area; and optimizing the energy storage system demand construction scale data of the power planning area according to the virtual energy storage compensation parameter of the power planning area. According to the method, the charging demand and the discharging capacity of the electric vehicle are comprehensively considered, the optimal construction scale of the energy storage system is determined, and a more scientific basis is provided for power grid investment optimization.
Owner:TECH & ECONOMIC CONSULTING CENT FOR ELECTRIC POWER CONSTR OF CHINA ELECTRICITY COUNCIL

Industrial power consumption data classification method considering energy consumption characteristics

The invention relates to the technical field of data classification, and discloses an industrial power consumption data classification method considering energy consumption characteristics, which comprises the steps of data acquisition, preprocessing, feature extraction, data classification and data integration, data acquisition covers multiple parameters, the data source is wide, and the applicability is high. In the preprocessing link, through data marking, missing value filling and abnormal value replacement, the data accuracy and integrity are guaranteed, and a foundation is built for subsequent analysis; in feature extraction, multiple feature values are determined from the dimensions of power, electricity consumption, electricity consumption time and the like, and electricity consumption features are described in multiple directions; according to data classification, the characteristic value is compared with a preset threshold value, and multi-dimensional judgment is combined, so that classification is more accurate, and the actual power utilization condition of the industry is met; the data is integrated to form a comprehensive classification result, which is convenient for direct application in the aspects of power planning, industrial layout and the like. On the whole, the method is helpful to accurately grasp the industrial electricity utilization rule, and provides a scientific and effective basis for reasonable allocation of electric power resources, electricity utilization management and the like.
Owner:POWER ECONOMIC RESEARCH INSTITUTE OF JILIN ELECTRIC POWER CO LTD

New energy extreme meteorological disturbance modeling-oriented scene generation method and system

The invention discloses a scene generation method and system for new energy extreme meteorological disturbance modeling, and relates to the technical field of power systems, and the method comprises the steps: recognizing a strong disturbance event under meteorological drive according to a constructed new energy effective output sample set, and constructing a generative adversarial neural network model embedded in a wind power photovoltaic physical boundary condition, acquiring a virtual disturbance section; and based on the virtual disturbance section, constructing a new energy annual extreme disturbance scene set by integrating a plurality of typical days embedded with disturbance, and applying the new energy annual extreme disturbance scene set to new energy extreme meteorological disturbance modeling and sample enhancement. The method has strong representation capability, good training stability and scene expansion capability, and can provide more representative and diversified input scenes for dispatching optimization and supporting power supply planning of the power system, so that the robustness and risk perception capability of the system for coping with extreme events are improved.
Owner:HUAZHONG UNIV OF SCI & TECH +1

Urban electricity utilization evaluation method based on electric power big data and related device

The invention belongs to the technical field of power planning, and particularly relates to an urban power utilization evaluation method based on power big data and a related device. The urban power utilization evaluation method comprises the following steps: collecting real-time power utilization behaviors of intelligent electric meter data, SCADA data and power grid GIS data to form multi-dimensional power utilization big data; constructing a knowledge graph based on the multi-dimensional power utilization big data and the topological structure association information; performing urban power consumption behavior analysis based on the knowledge graph to obtain power consumption behavior characteristic data; embedding the power consumption behavior characteristic data into a geographic space model by combining a geographic space technology, and mining regional power consumption distribution characteristics; based on regional power distribution characteristics, a spatial calculation algorithm is used, the power consumption population density is considered, and the urban power consumption layout is optimized. The problem that a traditional power system evaluation method cannot accurately evaluate the urban power demand is solved.
Owner:STATE GRID BEIJING ELECTRIC POWER CO +1

Intelligent power grid environment adaptive data processing method and system

The invention relates to the technical field of power grids, in particular to a smart power grid environment adaptive data processing method and system. According to the method, through cooperative work of an environment sensing sensor, a high-definition camera and an unmanned aerial vehicle inspection system, omnibearing environment information including meteorological data, landform data, vegetation coverage data and human activity data is obtained; a distributed storage architecture and a parallel processing technology are adopted to efficiently pre-process the environmental data; constructing a smart grid environment adaptive analysis model covering power planning decision support, power operation and maintenance decision support and power dispatching decision support; an analysis result is visually displayed through a multi-level visual interface based on the GIS technology, and environmental adaptability optimization of active defense, automatic recovery and optimal adaptation is achieved. The problems of uneven data quality, low processing efficiency, insufficient analysis capability and the like of a traditional power grid are solved.
Owner:GUANGXI POWER GRID CORP

Optimization planning method for Saggog large base source network direct current storage power supply in typical scene

The invention discloses an optimal planning method for a Saggoga large-base source network direct current storage power supply in a typical scene, and belongs to the technical field of power planning, and the method comprises the steps: scene generation and power supply planning: employing fuzzy C-means clustering to obtain the typical scene according to the current year-round data of wind speed and illumination intensity with hour as a time scale in a Saggoga region; and power supply planning is carried out after the typical scene is generated. According to the Sagomean new energy base source network direct current storage planning method with the optimal comprehensive benefit, a typical scene weather scene is extracted according to a wind and light scene clustering result, and the new energy base source network direct current storage is planned and configured by considering the optimal comprehensive benefit of the power supply configuration cost, the operation cost, the low-carbon benefit and the system elasticity.
Owner:ECONOMIC RES INST OF STATE GRID GANSU ELECTRIC POWER +2